HomeMy WebLinkAboutLANDMARK RESIDENCES ON MOUNTAIN AVENUE - PDP - PDP140011 - SUBMITTAL DOCUMENTS - ROUND 2 - UTILITY PLANSN. SHIELDS ST.
W. MULBERRY ST.
MOUNTAIN AVE.
VARIES CONCRETE
DRIVE
PUBLIC ALLEY
(20' ROW)
LOT LINE
LOT LINE
SLOPE VARIES
(0.5-3.0%)
No. Revisions:
By: Date:
REVIEWED BY:
R. Curtiss
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
December 17, 2014
PROJECT:
1022-001
Sheet
Of 10 Sheets
LANDMARK RESIDENCES ON MOUNTAIN AVENUE
DRAWING FILENAME: D:rojects\1022-001\Dwg\1022-001_Cover.dwg LAYOUT NAME: CS1 DATE: Dec 17, 2014 - 11:23am CAD OPERATOR: ben
LIST OF XREFS: [NES-xborder]
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 010
Fort Collins, Colorado 80521
E N G I N E E R I N G
N O R T H E RN
PHONE: 970.221.4158 FAX: 970.221.4159
www.northernengineering.com
12/17/14
C0.00
COVER SHEET
C. Snowdon
A. Boese
NA
DECEMBER 2014 CONTACT INFORMATION
PROJECT TEAM:
ROF Properties, LLC
C/O Firsthand Management LLC
5271 S. Yampa St.
Centennial, CO 80015
UTILITY CONTACT LIST: *
UTILITY COMPANY
* This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for
No. Revisions:
By: Date:
REVIEWED BY:
R. Curtiss
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
December 17, 2014
PROJECT:
1022-001
Sheet
Of 10 Sheets
LANDMARK RESIDENCES ON MOUNTAIN AVENUE
DRAWING FILENAME: D:rojects\1022-001\Dwg\1022-001_Cover.dwg LAYOUT NAME: CS2 DATE: Dec 17, 2014 - 11:23am CAD OPERATOR: ben
LIST OF XREFS: [NES-xborder]
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 010
Fort Collins, Colorado 80521
E N G I N E E R I N G
N O R T H E RN
PHONE: 970.221.4158 FAX: 970.221.4159
www.northernengineering.com
12/17/14
C0.01
GENERAL & CONSTRUCTION NOTES
C. Snowdon
A. Boese
nts
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what's below.
Call before you dig.
R
A. GENERAL NOTES
1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer
County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the
specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort
Collins.
2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise.
3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer.
Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of
any work shown in these plans.
4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as
beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins
Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer
hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and
demands which may arise from any errors and omissions contained in these plans.
DENEK JASON T/
CHISTINE D
9852 CLAIRTON PL
LITTLETON, CO 80126
W. MOUNTAIN AVE.
(140' ROW)
N. SHIELDS ST.
(60' ROW)
FRARE BARBARA L
1016 W. MOUNTAIN AVE.
FORT COLLINS, CO 80521
CALLAWAY
JEFFERY RYAN
EDWARDS-CALAWAY
LILY NOWELL
112 N. SSHIELDS ST.
FORT COLLINS, CO
80521
BEAVERS MARKET INC NO.3
1100 W. MOUNTAIN AVE.
FORT COLLINS, CO 80521
CHILDRENS HOUSE
MONTESSORI SCHOOL LLC
113 N. SHIELDS ST.
FORT COLLINS, CO 80521
MH
TELE
WV
WV
WV
H
Y
D
WV
VAULT
ELEC
MW
CONTROL
IRR
WV
H2O
IRR
VAULT
ELEC
MH
MH
MH
LID
LID
LID
LID
LID
LID
LID
LID
LID
LID
MW
MW
MW
X X X
X X X X X X
X X
X X X X X
X
X X
X
MH
TELE
WV
H
Y
D
WV
VAULT
ELEC
CONTROL
IRR
W
GAS
W W W W W W W W W W W W W W W W W W W W W W W
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
X X X X X X
X X
X
X X X X X X X X
X X
X X X X X X
X X
X X X
X X X
X X
X X X X X X
E
E E E
T S
TRAFFIC
VAULT
TRAFFIC
VAULT
TRAFFIC
VAULT
W
E
X
UD UD
UD UD UD UD UD UD UD UD UD UD
W
W
W W
W
W
S
S S
S
S
S
S
F
W W
X X X
X X X X X X
X X
X X X X X
X
X X
X
MH
TELE
CONTROL
IRR
W
VAULT
GAS
W W W W W W W W W W W W W W W W W W W W W W
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
X X X X X X
X X
X
X X X X X X X X
X X
X X X X X X
X X
X X X
X X X
X X
X X X X X X
X X X
X X X
E
E E E
T S
TRAFFIC
VAULT
TRAFFIC
VAULT
TRAFFIC
VAULT
E
VAULT
CABLE
VAULT
ELEC
X X
UD UD
UD UD UD UD UD UD UD UD UD UD
X X X X X
E E E
EV
E
E E E
FFE=24.90
FFE=25.40 FFE=25.40
FFE=25.40
FFE=25.40 FFE=25.40
FFE=25.40
DENEK JASON T/
CHISTINE D
9852 CLAIRTON PL
LITTLETON, CO 80126
X X X
X X X X X X
X X
X X X X X
X
X X
X
CONTROL
IRR
VAULT
ELEC
X X X X X X
X X
X
X X X X X X X X
X X
X X X X X X
X X
X X X
X X X
X X
X X X X X X
X X X
X X X
E E E
T S
TRAFFIC
VAULT
TRAFFIC
VAULT
TRAFFIC
VAULT
E
VAULT
CABLE
VAULT
ELEC
X X
UD UD
UD UD UD UD UD UD UD UD UD UD
X X X X X
E E E
EV
E
E E E
DENEK JASON T/
CHISTINE D
9852 CLAIRTON PL
LITTLETON, CO 80126
N. SHIELDS ST.
(60' ROW)
FRARE BARBARA L
1016 W. MOUNTAIN AVE.
FORT COLLINS, CO 80521
PERFORATED
MONITORING
WELL W/ OPEN
GRATE
PERFORATED
MONITORING
W
X X
X X
X
X
X
X X
X
X
VAULT
CABLE
X
UD UD UD
E
GARAGE
2 CAR
GARAGE
GARAGE
GARAGE
PRIVATE DRIVE
DENEK JASON T/
CHISTINE D
9852 CLAIRTON PL
LITTLETON, CO 80126
N. SHIELDS ST.
(60' ROW)
FRARE BARBARA L
1016 W. MOUNTAIN AVE.
FORT COLLINS, CO 80521
CALLAWAY JEFFERY RYAN
EDWARDS-CALAWAY LILY NOWELL
112 N. SSHIELDS ST.
FORT COLLINS, CO 80521
BEAVERS MARKET INC NO.3
1100 W. MOUNTAIN AVE.
FORT COLLINS, CO 80521
CHILDRENS HOUSE
MONTESSORI SCHOOL LLC
113 N. SHIELDS ST.
FORT COLLINS, CO 80521
PUBLIC ALLEY
19' EOC-FL
31" ROLLOVER
CURB & GUTTER
1' THICKENED
EDGE
13' EOC-FL
5015
5020
5025
5030
5035
5040
5015
5020
5025
5030
5035
5040
9+50 10+00 11+00 12+00 12+50
Horizontal Scale 1" = 10'
Vertical Scale 1" = 2'
10+00
5020
5024
5020
5024
-20 00
2.00%
Horizontal Scale 1" = 10'
Vertical Scale 1" = 2'
10+25
5020
5024
5020
5024
-20 00
2.12%
Horizontal Scale 1" = 10'
Vertical Scale 1" = 2'
10+50
5020
5024
5020
5024
-20 00
2.30%
Horizontal Scale 1" = 10'
Vertical Scale 1" = 2'
10+75
5020
5024
5020
5024
-20 00
1.11%
Horizontal Scale 1" = 10'
Vertical Scale 1" = 2'
11+00
5020
5024
5020
5024
-20 00
0.80%
Horizontal Scale 1" = 10'
Vertical Scale 1" = 2'
11+25
5020
5024
5020
5024
-20 00
0.40%
Horizontal Scale 1" = 10'
Vertical Scale 1" = 2'
11+50
5020
5024
5020
WV
WV
WV
H
Y
D
WV
VAULT
ELEC
CONTROL
IRR
WV
H2O
IRR
VAULT
ELEC
W
VAULT
ELEC
W
ELEC
VAULT
ELEC T
GAS
GAS
X
X X X
X
X X X X
X
X X X
X
X
X
X
X X X
X
X
E
T S
TRAFFIC
VAULT
TRAFFIC
VAULT
TRAFFIC
VAULT
X
EXISTING HIGH
POINT
EXISTING CURB
INLET
H2
0.97 0.217
H1
0.58 0.014
H3
1.00 0.239
H4
1.00 0.227
h1 h2
CONTROL
IRR
GAS
X X X
X
X X X X
X
X X X
X
X
X
X
X X X
X
X
E
VAULT
CABLE
X
X X
X
X
X
X
UD
UD UD UD UD UD
X X
E
EV
E E
X
X X X
X
X X
X
DENEK JASON T/
CHISTINE D
9852 CLAIRTON PL
LITTLETON, CO 80126
W. MOUNTAIN AVE.
(140' ROW)
N. SHIELDS ST.
(60' ROW)
FRARE BARBARA L
1016 W. MOUNTAIN AVE.
FORT COLLINS, CO 80521
CALLAWAY
JEFFERY RYAN
EDWARDS-CALAWAY
LILY NOWELL
112 N. SSHIELDS ST.
FORT COLLINS, CO
80521
BEAVERS MARKET INC NO.3
1100 W. MOUNTAIN AVE.
FORT COLLINS, CO 80521
CHILDRENS HOUSE
MONTESSORI SCHOOL LLC
113 N. SHIELDS ST.
FORT COLLINS, CO 80521
FFE=24.90
FFE=25.40 FFE=25.40 FFE=25.40 FFE=25.40 FFE=25.40 FFE=25.40
GARAGE
FFE=23.57
PROPERTY BOUNDARY
6485 - 5021.47 NAVD 88
6703 - 5023.17 NAVD 88
PUBLIC ALLEY
GARAGE
FFE=23.57
GARAGE
FFE=23.51
GARAGE
FFE=23.18
GARAGE
FFE=23.91
GARAGE
FFE=23.91
GARAGE
FFE=23.91
GARAGE
FFE=23.91
GARAGE
FFE=23.91
No. Revisions:
By: Date:
REVIEWED BY:
R. Curtiss
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
December 17, 2014
PROJECT:
1022-001
Sheet
Of 10 Sheets
LANDMARK RESIDENCES ON MOUNTAIN AVENUE
DRAWING FILENAME: D:rojects\1022-001\Dwg\Drng\1022-001_Flood Exhibit.dwg LAYOUT NAME: F1 DATE: Dec 17, 2014 - 11:25am CAD OPERATOR: ben
LIST OF XREFS: [1022-001_xTopo] [1022-001_xExst] [1022-001_xPgrad] [1022-001_xPutil] [1022-001_xSite] [NES-xborder] [1022-001_xFloodplain]
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 010
Fort Collins, Colorado 80521
E N G I N E E R I N G
N O R T H E RN
PHONE: 970.221.4158 FAX: 970.221.4159
www.northernengineering.com
12/17/14
C5.01
FLOODPLAIN EXHIBIT
C. Snowdon
A. Boese
1"=20'
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
NORTH
EXISTING CITY FLOODWAY
NOTES:
1.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT
DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY
INFORMATION.
2.ALL ELEVATIONS DEPICTED IN PLAN VIEW AND BENCHMARKS LISTED HEREON
ARE PER THE CITY OF FORT COLLINS VERTICAL CONTROL DATUM (NAVD88)
3.A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH STRUCTURE AND
EACH SITE CONSTRUCTION ELEMENT (DETENTION PONDS, BIKE PATHS, PARKING
LOT, UTILITIES, ETC.) IN THE HIGH RISK FLOOD FRINGE AND FLOODWAY.
4.NO STORAGE OF MATERIALS OR EQUIPMENT SHALL BE ALLOWED IN THE
FLOODWAY, WHETHER TEMPORARY (DURING CONSTRUCTION) OR PERMANENT.
LANDSCAPING SHALL ALSO MEET THE REQUIREMENTS FOR NO RISE IN THE
FLOODWAY.
{5.REFER TO THE PRELIMINARY DRAINAGE REPORT FOR LANDMARK RESIDENCES
ON MOUNTAIN AVENUE BY NORTHERN ENGINEERING, DATED DECEMBER 17, 2014
FOR ADDITIONAL INFORMATION.
6.A NO RISE CERTIFICATION IS REQUIRED FOR ANY WORK WITHIN THE FLOODWAY
SUCH AS UTILITIES, LANDSCAPING, CURB & GUTTER, ETC.
7.ALL HVAC EQUIPMENT IS TO BE LOCATED ON THE ROOFTOP OF THE
STRUCTURE.
8.ALL STRUCTURES WITHIN THE FLOODWAY (PICNIC TABLES, BIKE RACKS, ETC.)
SHALL BE ANCHORED.
9.DUMPSTER SHALL BE SECURED TO PREVENT OFFSITE FLOATATION DURING A
100-YEAR STORM.
10.NO CRITICAL FACILITIES OR USES MAY BE CREATED IN ANY FLOOD ZONE.
11.A FEMA ELEVATION CERTIFICATION SHALL BE PROVIDED AND APPROVED FOR
EACH BUILDING PRIOR TO THE ISSUANCE OF A CERTIFICATION OF OCCUPANCY.}
FIELD SURVEY BY:
BENCHMARKS:
Northern Engineering Service, Inc.
Project No. 1022-001
Date: April 23, 2014
CROSS-SECTION (CSL)
BASE FLOOD ELEVATION (BFE)
ELEVATION NGVD 29 (UNADJUSTED) 5000
20554
LEGEND:
5013
PROPOSED CONTOUR 93
EXISTING CONTOUR
EXISTING STORM SEWER LINE W/ MH ST
D
EXISTING ROW LINE
EXISTING INLET GRATE
LIMITS OF 100-YR FLOOD FRINGE / / / / / / / / / / / / / / / / / / / / / / / / / / / /
PROPOSED UNDERDRAIN UD
PROPOSED STORM DRAIN
PROPOSED CURB & GUTTER
EXISTING CURB & GUTTER
FOR STORMWATER REVIEW ONLY
NOT FOR CONSTRUCTION
EXISTING HIGH RISK FLOODPLAIN
{PROJECT DATUM: NAVD88
BENCHMARK #1:
City of Fort Collins Benchmark 3-08
Southwest corner of Mulberry St. and Shields St. on a concrete traffic signal base
Elevation = 5030.29
BENCHMARK #2:
City of Fort Collins Benchmark 31-97
Southwest corner of Laporte Ave. and Sheilds St., on a concrete traffic signal base.
Elevation = 5023.65}
LOWEST FLOOR
ELEVATION = C
BASE FLOOD ELEVATION
(BFE) = A
MINIMUM HVAC EQUIPMENT
ELEVATION BASE = FLOOD B
ELEVATION
(BFE) = A
18"
MIN.
18"
MIN.
DETAIL
NTS
SLAB-ON-GRADE
COMMERCIAL
EL. DESIGNATION NAVD 88
A 5022.99 FT
B 5037.00 FT (ROOF)
C 5024.90 FT
REGULATORY FLOOD PROTECTION ELEVATION 5024.48 FT
RESIDENTIAL
EL. DESIGNATION NAVD 88
A 5022.87 FT
B 5043.54 FT (ATTIC)
C 5024.40 FT
REGULATORY FLOOD PROTECTION ELEVATION 5024.37 FT
h3
h4
N. SHIELDS STREET
W. MOUNTAIN AVE.
ALLEY
X
X X X
X
X X
X
UD
UD UD UD UD UD
X X
E
EV
E E
WV
WV
WV
H
Y
D
WV
VAULT
ELEC
CONTROL
IRR
W
VAULT
ELEC
GAS
E
T S
TRAFFIC
VAULT
TRAFFIC
VAULT
TRAFFIC
VAULT
PROPOSED
BUILDING
MONITORING WELL
W/ OPEN GRATE
FOR MINOR STORM
6" PERFORATED
UNDERDRAIN
6" PERFORATED
UNDERDRAIN
EXISTING HIGH
POINT
EXISTING CURB
INLET
MAJOR STORM
TO OVERTOP
DRIVE CUT
N. SHIELDS STREET
W. MOUNTAIN AVE.
ALLEY
acres
OS2
0.15 0.012
0.19
acres
OS1
0.92 0.018
1.00
acres
A1
0.80 0.077
1.00
acres
B1
0.87 0.056
1.00
acres
C1
0.77 0.335
0.96
acres
D1
0.68 0.149
0.85
acres
OS3
0.35 0.035
0.44
acres
OS4
0.95 0.014
1.00
os1
b1
a1
c1
d1
os3
os2
os4
MONITORING WELL
W/ OPEN GRATE
FOR MINOR STORM
MAJOR STORM
TO OVERTOP
PIPE END
w/ CONCRETE
COLLAR FOR
MINOR
STORM
MAJOR STORM
TO OVERTOP
No. Revisions:
By: Date:
REVIEWED BY:
R. Curtiss
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
December 17, 2014
PROJECT:
1022-001
Sheet
Of 10 Sheets
LANDMARK RESIDENCES ON MOUNTAIN AVENUE
DRAWING FILENAME: D:rojects\1022-001\Dwg\Drng\1022-001_DRNG.dwg LAYOUT NAME: DR1 DATE: Dec 17, 2014 - 11:25am CAD OPERATOR: ben
LIST OF XREFS: [1022-001_xPgrad] [1022-001_xPutil] [1022-001_xSite] [1022-001_xTopo] [1022-001_xExst] [NES-xborder]
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 010
Fort Collins, Colorado 80521
E N G I N E E R I N G
N O R T H E RN
PHONE: 970.221.4158 FAX: 970.221.4159
www.northernengineering.com
12/17/14
C5.00
DRAINAGE EXHIBIT
C. Snowdon
A. Boese
1"=20'
FOR DRAINAGE REVIEW ONLY
NOT FOR CONSTRUCTION
LEGEND:
NOTES:
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
NORTH
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
5013
PROPOSED CONTOUR 93
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED VERTICAL
PROPOSED OVERLAND FLOW DIRECTION
CURB & GUTTER
EXISTING STORM SEWER LINE
PROPERTY BOUNDARY
EXISTING INLET GRATE
PROPOSED UNDERDRAIN UD
PROPOSED STORM DRAIN
PROPOSED RIBBON CURB
PROPOSED PERMEABLE PAVERS
acres
B
1.79
0.86
a
BASIN ACREAGE
DESIGN POINT
BASIN DELINEATION
MAJOR RUNOFF COEFFICIENT
PROPOSED BASIN LINES
HISTORIC DRAINAGE EXHIBIT PROPOSED DRAINAGE EXHIBIT
5024
-20 00
-0.39%
5022.4
5022.41
5023.1
5022.68
5023.2
5022.73
5022.9
5022.55
5022.8
5022.25
5022.4
5022.01
5022.2
5021.84
EXISTING
GROUND
EXISTING
GROUND
EXISTING
GROUND
EXISTING
GROUND
EXISTING
GROUND
EXISTING
GROUND
EXISTING
GROUND
PROPOSED
GRADE
PROPOSED
GRADE
PROPOSED
GRADE
31" ROLLOVER
CURB & GUTTER
W
VAULT
ELEC
GAS
X X
X X
X X X X X X
X X
X X
X X X
X X X
X X X
PUBLIC ALLEY
10+00
10+25
10+50
10+75
11+00
11+25
11+50
No. Revisions:
By: Date:
REVIEWED BY:
R. Curtiss
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
December 17, 2014
PROJECT:
1022-001
Sheet
Of 10 Sheets
LANDMARK RESIDENCES ON MOUNTAIN AVENUE
DRAWING FILENAME: D:rojects\1022-001\Dwg\Strt\1022-001_PUBLIC ALLEY_XSCES.dwg LAYOUT NAME: C4.01 DATE: Dec 17, 2014 - 11:25am CAD OPERATOR: ben
LIST OF XREFS: [1022-001 Streets] [1022-001_xPutil] [1022-001_xSite] [1022-001_xExst] [NES-xborder]
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 010
Fort Collins, Colorado 80521
E N G I N E E R I N G
N O R T H E RN
PHONE: 970.221.4158 FAX: 970.221.4159
www.northernengineering.com
12/17/14
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
NORTH
EXISTING RIGHT-OF-WAY
LEGEND:
PROPOSED STORM SEWER
EXISTING STORM SEWER
EXISTING EDGE OF ASPHALT
ST
PROPOSED STORM MANHOLE
PROPOSED CURB & GUTTER
PROPOSED CENTERLINE
PEDESTRIAN ACCESS RAMPS
PROPOSED CONCRETE
CROSSPAN (TYP.)
PROPOSED RIGHT-OF-WAY
NOTES:
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF
THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE
FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2.SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND
RECOMMENDATIONS.
3.MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF
NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN
VEHICLE OR BICYCLE WHEEL PATHS.
4.EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50
FEET.
PROPOSED STORM INLET
PROPERTY BOUNDARY
PROPOSED LOT LINE
EASEMENT SAWCUT LINE LINE
EXISTING LOT LINE
( IN FEET )
10 0 10 20 30
1 INCH = 10 FEET
C4.01
CROSS SECTIONS
PUBLIC ALLEY C. Snowdon
A. Boese
1"=10'
EXISTING
GROUND
PROPOSED
GRADE
5022.41
5022.68
5022.73
5022.55
5022.25
5022.01
5021.84
1.50%
-0.50%
-1.20%
-0.80%
PVI STA = 10+00.00
PVI ELEV = 5022.41
PVI STA = 11+08.42
PVI ELEV = 5022.15
PVI STA = 11+39.80
PVI ELEV = 5021.90
PVI STA = 11+71.91
PVI ELEV = 5021.74
75.0' VC
HP ELEV = 5022.74
HP STA = 10+42.56
PVI STA = 10+38.36
PVI ELEV = 5022.99
BVCS: 10+00.86
BVCE: 5022.42
EVCS: 10+75.86
EVCE: 5022.54
A.D. = 2.70
K = 27.80
PROPOSED
GRADE
EXISTING
GROUND
No. Revisions:
By: Date:
REVIEWED BY:
R. Curtiss
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
December 17, 2014
PROJECT:
1022-001
Sheet
Of 10 Sheets
LANDMARK RESIDENCES ON MOUNTAIN AVENUE
DRAWING FILENAME: D:rojects\1022-001\Dwg\Strt\1022-001_PUBLIC ALLEY.dwg LAYOUT NAME: R1 DATE: Dec 17, 2014 - 11:24am CAD OPERATOR: ben
LIST OF XREFS: [1022-001_xExst] [1022-001_xPutil] [1022-001_xSite] [NES-xborder]
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 010
Fort Collins, Colorado 80521
E N G I N E E R I N G
N O R T H E RN
PHONE: 970.221.4158 FAX: 970.221.4159
www.northernengineering.com
12/17/14
C4.00
ROADWAY PLAN & PROFILE
PUBLIC ALLEY C. Snowdon
A. Boese
1"=30'
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
NORTH
EXISTING RIGHT-OF-WAY
LEGEND:
PROPOSED STORM SEWER
EXISTING STORM SEWER
EXISTING EDGE OF ASPHALT
ST
PROPOSED STORM MANHOLE
PROPOSED CURB & GUTTER
PROPOSED CENTERLINE
PEDESTRIAN ACCESS RAMPS
PROPOSED CONCRETE
CROSSPAN (TYP.)
PROPOSED RIGHT-OF-WAY
NOTES:
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF
THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE
FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2.SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND
RECOMMENDATIONS.
3.MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF
NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN
VEHICLE OR BICYCLE WHEEL PATHS.
4.EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50
FEET.
PROPOSED STORM INLET
PROPERTY BOUNDARY
PROPOSED LOT LINE
EASEMENT SAWCUT LINE LINE
EXISTING LOT LINE
RIGHT FLOWLINE
PUBLIC ALLEY
SCALE : 1" = 30' (H) 1" = 5' (V)
( IN FEET )
0
1 INCH = 30 FEET
30 30 60 90
WELL
6" PERFORATED
UNDERDRAIN
6" PERFORATED
UNDERDRAIN
6" SOLID
OUTLET PIPE
RAMP
RAMP
RAMP
14" LANDSCAPE WALL
PERMEABLE
PAVERS
PERMEABLE
PAVERS
RIBBON
CURB
18" INFLOW
CURB & GUTTER
LANDSCAPE WALL
(HEIGHT VARIES)
IP
RS
RS
VTC
CWA
SF
SF SF SF
SF
SF
SF SF
SF
SF
SF SF SF SF SF SF SF SF
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
SF SF
SF SF SF SF SF SF SF
SF SF SF SF SF SF SF SF SF SF SF
SF SF SF SF SF SF SF SF
SF SF SF SF SF
SF SF
SF SF
SF
SF
SF SF SF
SF SF SF SF
SF SF
SF
SF SF
RS
PERFORATED
MONITORING
WELL W/ OPEN
GRATE
IP
IP
PERFORATED
MONITORING
WELL
No. Revisions:
By: Date:
REVIEWED BY:
R. Curtiss
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
December 17, 2014
PROJECT:
1022-001
Sheet
Of 10 Sheets
LANDMARK RESIDENCES ON MOUNTAIN AVENUE
DRAWING FILENAME: D:rojects\1022-001\Dwg\Drng\1022-001_EROS.dwg LAYOUT NAME: ER1 DATE: Dec 17, 2014 - 11:24am CAD OPERATOR: ben
LIST OF XREFS: [1022-001_xTopo] [1022-001_xExst] [1022-001_xPgrad] [1022-001_xPutil] [1022-001_xSite] [NES-xborder] [1022-001 Propsoed]
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 010
Fort Collins, Colorado 80521
E N G I N E E R I N G
N O R T H E RN
PHONE: 970.221.4158 FAX: 970.221.4159
www.northernengineering.com
12/17/14
C3.01
EROSION CONTROL PLAN
C. Snowdon
B. Ruch
1"=20'
NORTH
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what's below.
Call before you dig.
R
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
( IN FEET )
1 inch = ft.
10 0 10 Feet
10
20 30
1.IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES
ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR
PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED.
ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY
DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO
CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL
AUTHORITIES.
2.THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH,
GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY
NECESSARILY SHOWN IN THEIR EXACT LOCATION.
3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING
(CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH
GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL
MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED.
4.CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION
CONTROL MEASURES ACCORDING THE THE CONSTRUCTION
SEQUENCING AND LEVEL OF SITE STABILIZATION.
5.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION
FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL
SITE IS FULLY STABILIZED.
6.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION
FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM,
UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT.
7.INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE
SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN
WATTLES FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR
PAVEMENT, ETC.)
8.CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES,
PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO
MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL
WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH
VEGETATIVE COVER AND STABILIZE THE SLOPE.
9.ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE
NECESSARY TO INSURE THAT EACH BUILDING PAD IS STABILIZED
THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE
ALLOWED TO CROSS THE PUBLIC SIDEWALKS.
10.CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER
PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER
PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE
SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN
SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, SAND BAGS
OR GRAVEL SOCKS FOR PAVEMENT, ETC.)
11.FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED
(100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL
DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND
FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT
ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE
WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY.
12.CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE
SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT
LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR
DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT
AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP,
RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR
DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE
GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN.
13.THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE
WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING
OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE
BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS
TO THE PUBLIC HEALTH AND WELFARE.
{14.WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND
WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS,
DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH
TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL
STAFF TO PREVENT EROSION.
15.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON
EROSION CONTROL NOTES:
TABLE OF CONSTRUCTION
SEQUENCE AND BMP APPLICATION
Project: River District Block Eight MIxed-Use
CONSTRUCTION PHASE PHASE I PHASE II PHASE III PHASE IV
Grading (Include Offsite)
Overlot
Pipeline Installation
Stormwater
Concrete Installation
Site Walls
Building Structure
Miscellaneous
Hardscape Amenities
BEST MANAGEMENT PRACTICES
Temporary
Inlet Protection (IP)
Vehicle Tracking Control (VTC)
Flow Barriers (Bales, Wattles, etc.) (WD)
Concrete Washout Area (CWA)
Preventative Maintenance Activities/Meetings/etc.
Silt Fence (SF)
Permanent
Mulching/Sealant
Sewer Service
Water Service
Curb and Gutter
FIELD SURVEY BY:
BENCHMARKS:
SILT FENCE SF
INLET PROTECTION IP
WATTLE PROTECTION W
ROCK SOCK RS
VEHICLE TRACKING PAD VTC
SF
{1.CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP
MULCHING OR SIMILAR METHODS (AS APPLICABLE).
2.TOTAL DISTURBED AREA = 0.62 ACRES
3.SWMP ADMINISTRATOR:
Contact________________________________
Company________________________________
Address________________________________
Phone________________________________
4.CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT
AREA IF ACCESS IS OFF PAVEMENT.
5.SEE "GRADING & EROSION CONTROL NOTES" ON SHEET C0.01 OF THE UTILITY PLAN
SET FOR }LANDMARK RESIDENCES ON MOUNTAIN AVENUE,{ PREPARED BY NORTHERN
ENGINEERING DATED DECEMBER 17, 2014 FOR ADDITIONAL INFORMATION.
}6.REFER TO THE PRELIMINARY DRAINAGE REPORT FOR LANDMARK RESIDENCES ON
MOUNTAIN AVENUE, DATED DECEMBER 17, 2014 BY NORTHERN ENGINEERING FOR
ADDITIONAL INFORMATION.
GENERAL NOTES:
CWA
CONCRETE WASHOUT AREA
NOTE:
ALL BMP'S SHOWN ON THIS PLAN ARE GRAPHIC
REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE
AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR
AND DOCUMENTED ON THE DYNAMIC SITE PLAN.
LEGEND:
4953
PROPOSED CONTOUR
PROPOSED STORM SEWER
EXISTING CONTOUR
PROPOSED CURB & GUTTER
PROPERTY BOUNDARY
PROPOSED INLET
{PROJECT DATUM: NAVD88
BENCHMARK #1:
CITY OF FORT COLLINS BENCHMARK 3-08
SOUTHWEST CORNER OF MULBERRY ST. AND SHIELDS ST. ON A CONCRETE TRAFFIC SIGNAL BASE
ELEVATION = 5030.29
BENCHMARK #2:
CITY OF FORT COLLINS BENCHMARK 31-97
SOUTHWEST CORNER OF LAPORTE AVE. AND SHEILDS ST., ON A CONCRETE TRAFFIC SIGNAL BASE.
ELEVATION = 5023.65
BASIS OF BEARINGS
BASIS OF BEARINGS IS THE EAST RIGHT-OF-WAY LINE OF NORTH SHIELDS STREET AS BEARING NORTH 00 35'27" EAST
(ASSUMED BEARING).}
ORIGINAL FIELD SURVEY BY:
NORTHERN ENGINEERING SERVICES
PROJECT #1022.001
DATE: APRIL, 23 2014
IP
N. SHIELDS ST.
(60' ROW)
FRARE BARBARA L
1016 W. MOUNTAIN AVE.
ERS MARKET INC NO.3 FORT COLLINS, CO 80521
T COLLINS, CO 80521
GARAGE
FFE=23.17
GARAGE
FFE=23.52
GARAGE
FFE=23.57
GARAGE
FFE=23.57
GARAGE
FFE=23.91
GARAGE
FFE=23.91
GARAGE
FFE=23.91
GARAGE
FFE=23.91
GARAGE
FFE=23.91
PERFORATED
MONITORING
WELL
PERFORATED
MONITORING
WELL W/ OPEN
GRATE
PERFORATED
MONITORING
WELL
6" PERFORATED
UNDERDRAIN
6" PERFORATED
UNDERDRAIN
6" SOLID
OUTLET PIPE
RAMP
RAMP
RAMP
PERMEABLE
PAVERS
PERMEABLE
PAVERS
18" INFLOW
CURB & GUTTER
INSTALL TRUNCATED
DOME
2-RISERS
2-RISERS
4-RISERS
4-RISERS
LANDSCAPE WALL
(HEIGHT VARIES)
2-RISERS 2-RISERS 2-RISERS 2-RISERS 2-RISERS
PERFORATED
MONITORING
WELL W/ OPEN
GRATE
MONITORING
WELL
CLEANOUT
CLEANOUT
PIPE END w/
CONCRETE COLLAR
No. Revisions:
By: Date:
REVIEWED BY:
R. Curtiss
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
December 17, 2014
PROJECT:
1022-001
Sheet
Of 10 Sheets
LANDMARK RESIDENCES ON MOUNTAIN AVENUE
DRAWING FILENAME: D:rojects\1022-001\Dwg\Grad\1022-001_GRAD.dwg LAYOUT NAME: G1 DATE: Dec 17, 2014 - 11:24am CAD OPERATOR: ben
LIST OF XREFS: [1022-001_xTopo] [1022-001_xExst] [1022-001_xPgrad] [1022-001_xPutil] [1022-001_xSite] [NES-xborder] [1022-001 Propsoed]
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 010
Fort Collins, Colorado 80521
E N G I N E E R I N G
N O R T H E RN
PHONE: 970.221.4158 FAX: 970.221.4159
www.northernengineering.com
12/17/14
C3.00
GRADING PLAN
C. Snowdon
A. Boese
1"=20'
LEGEND:
5013
PROPOSED CONTOUR 93
EXISTING CONTOUR
PROPOSED BARRIER CURB
PROPERTY BOUNDARY
PROPOSED SPOT ELEVATION 33.43
PROPOSED SLOPES
NOTES:
2.0%%%
PEDESTRIAN ACCESS RAMPS
EXISTING SPOT ELEVATION (47.45)
PROPOSED VERTICAL CURB & GUTTER
PROPOSED ELECTRIC TRANSFORMER TF
EXISTING RIGHT OF WAY
PROPOSED RIGHT OF WAY
NORTH
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what's below.
Call before you dig.
R
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
( IN FEET )
1 inch = ft.
10 0 10 Feet
10
20 30
X X X X X
E E E
EV
E
E E E
DENEK JASON T/
CHISTINE D
9852 CLAIRTON PL
LITTLETON, CO 80126
W. MOUNTAIN AVE. (140' ROW)
N. SHIELDS ST.
(60' ROW)
FRARE BARBARA L
1016 W. MOUNTAIN AVE.
FORT COLLINS, CO 80521
BEAVERS MARKET INC NO.3
1100 W. MOUNTAIN AVE.
FORT COLLINS, CO 80521
CHILDRENS HOUSE
MONTESSORI SCHOOL LLC
113 N. SHIELDS ST.
FORT COLLINS, CO 80521
PUBLIC ALLEY
6' SIDEWALK
PROPOSED 3
4" RESIDENTIAL
WATER SERVICE (TYP.)
PROPOSED
CLEANOUTS
(TYPICAL)
EXISTING
FIRE HYDRANT
20± LF 1-1/2"
HDPE W.S.
COMMON PRIVATE
DOMESTIC WATER SERVICE
INSTALL CITY CURB STOP
W W W W W W W W W W W W W W W W W W W W W W W
21' ADDITIONAL
RIGHT-OF-WAY
PROPOSED 4" RESIDENTIAL
SANITARY SERVICE (TYP.)
PROPOSED 4" COMMERCIAL
SANITARY SERVICE (TYP.)
PROPOSED 1" COMMERCIAL
WATER SERVICE (TYP.)
PROPOSED 4" COMMERCIAL
FIRE SERVICE (TYP.)
59± LF 1-1/2"
HDPE W.S.
23± LF 1-1/2"
HDPE W.S.
18± LF 1-1/2"
HDPE W.S.
12± LF 1-1/2"
HDPE W.S.
18± LF 1-1/2"
HDPE W.S.
23± LF 3/4" W.S.
19± LF 3/4" W.S.
27± LF 3/4" W.S.
26± LF 3/4" W.S.
19± LF 3/4" W.S.
44± LF 3/4" W.S.
EXISTING 8" WATER MAIN
INSTALL 1" WATER SERVICE
INSTALL 1-1/2" WATER SERVICE
INSTALL 8"X4" WET TAP
WITH 4"-G.V. & T.B
APPROXIMATE LIMITS
OF ASPHALT PATCHING
(SEE NOTE 7)
PRIVATE
CURB STOP
(TYPICAL)
INSTALL 1" METER
W/ CURB STOP
EXISTING 8"
SEWER MAIN
47± LF 4" PVC @ 2.0% S.S.
51± LF 4" PVC @ 2.0% S.S.
44± LF 4" PVC @ 2.0% S.S.
44± LF 4" PVC @ 2.0% S.S.
51± LF 4" PVC @ 2.0% S.S.
26± LF 4" PVC @ 2.0% S.S.
SS SERVICE 7
INV. IN=5016.98 (S)
INV. OUT=5016.98 (W)
FG=5023.45
SS SERVICE 6
INV. IN=5016.86 (E)
INV. OUT=5016.70 (W)
FG=5023.76
SS SERVICE 5
INV. IN=5016.34 (E)
INV. OUT=5016.34 (W)
FG=5023.63
SS SERVICE 4
INV. IN=5015.74 (E)
INV. OUT=5015.74 (W)
FG=5023.64
SS SERVICE 3
INV. IN=5015.62 (E)
INV. OUT=5015.62 (W)
FG=5023.63
SS SERVICE 2
INV. IN=5015.02 (E)
INV. OUT=5015.02 (W)
FG=5023.67
INSTALL RESIDENTIAL SERVICE CONNECTION
INV. IN=5013.17 (N)
INV. IN=5013.34 (E)
INV. OUT=5013.17 (S)
FG=5022.80
83.99 LF
6" PVC
@ 2.00%
30.00 LF
6" PVC
@ 2.00%
6.00 LF
6" PVC
@ 2.00%
30.00 LF
6" PVC
@ 2.00%
18.00 LF
6" PVC
@ 2.00%
6.00 LF
4" PVC
@ 2.00%
EXISTING STORM INLET
GRATE EL=5021.45
BTM SILTED IN
FL=5020.05 (W) 8"
PROPOSED
CLEANOUTS
(TYPICAL)
PROPOSED
CLEANOUTS
(TYPICAL)
PRIVATE
CURB STOP
(TYPICAL)
PRIVATE
CURB STOP
(TYPICAL)
PRIVATE
CURB STOP
(TYPICAL)
EXISTING GAS
VALVE
EXISTING WATER
METER
1-1/2" x 3
4" TEE
W/ STIFFENER
(TYPICAL)
1-1/2" x 3
4" TEE
W/ STIFFENER
(TYPICAL)
1-1/2" x 3
4" TEE
W/ 3
4" REDUCER &
STIFFENER
61.94 LF
4" PVC
@ 2.00%
INSTALL 45° BEND
INV. IN=5019.12 (SE)
INV. OUT=5019.12 (W)
FG=5023.70
22.70 LF
4" PVC
@ 2.00%
INSTALL 45° BEND
INV. IN=5019.58 (S)
INV. OUT=5019.58 (NW)
FG=5024.11
20.58 LF
4" PVC
@ 2.00%
INSTALL COMMERCIAL SERVICE CONNECTION
INV. IN=5013.16 (N)
INV. IN=5017.88 (E)
INV. OUT=5013.16 (S)
FG=5022.80
PROPOSED TRANSFORMER
PRIVATE STORM LINE
TO BE OWNED AND MAINTAINED
BY THE HOA
CLEANOUT A3-1
INV. IN=5021.04 (N)
INV. OUT=5021.04 (W)
FG=5023.89
MONITORING WELL A3
w/ SOLID LID
INV. IN=5020.58 (N)
INV. IN=5020.58 (E)
INV. OUT=5020.58 (S)
FG=5023.74
MONITORING WELL A6
w/ SOLID LID
INV. IN=5021.05 (N)
INV. OUT=5021.05 (W)
FG=5023.54
MONITORING WELL A4
w/ SOLID LID
INV. IN=5020.67 (E)
INV. OUT=5020.67 (S)
FG=5023.43
MONITORING WELL A5
w/ GRATED LID
INV. IN=5020.83 (E)
INV. OUT=5020.83 (W)
FG=5023.04
MONITORING WELL A7
w/ SOLID LID
INV. OUT=5021.13 (S)
FG=5022.96
45° BEND A3-2
INV. IN=5021.33 (NE)
INV. OUT=5021.33 (S)
FG=5022.85
PIPE END A3-3
w/ CONCRETE COLLAR
INV. OUT=5021.34 (SW)
FG=5021.34
CLEANOUT A2
INV. IN=5020.17 (N)
INV. OUT=5020.17 (W)
FG=5022.75
30.44 LF 8" PVC @ 0.40%
103.95 LF 8" PVC @ 0.39%
41.40 LF 6" PERF. PVC @ 0.40%
21.17 LF 6" PERF. PVC @ 0.40%
53.99 LF 6" PERF. PVC @ 0.40%
20.11 LF 8" PVC @ 0.45%
113.36 LF 8" PVC @ 0.40%
69.94 LF 8" PVC @ 0.41%
5.26 LF 8" PVC @ 0.31%
PROPOSED
CLEANOUT
(TYPICAL)
RELOCATED
ELECTRIC
VAULT
No. Revisions:
By: Date:
REVIEWED BY:
R. Curtiss
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
December 17, 2014
PROJECT:
1022-001
Sheet
Of 10 Sheets
LANDMARK RESIDENCES ON MOUNTAIN AVENUE
DRAWING FILENAME: D:rojects\1022-001\Dwg\Util\1022-001_UTIL.dwg LAYOUT NAME: C2.00 DATE: Dec 17, 2014 - 11:24am CAD OPERATOR: ben
LIST OF XREFS: [1022-001_xExst] [1022-001_xPutil] [1022-001_xSite] [NES-xborder]
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 010
Fort Collins, Colorado 80521
E N G I N E E R I N G
N O R T H E RN
PHONE: 970.221.4158 FAX: 970.221.4159
www.northernengineering.com
12/17/14
C2.00
UTILITY PLAN
C. Snowdon
A. Boese
1"=20'
NORTH
NOTES:
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES
ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE
COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE
RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2.ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF
FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS LATEST
EDITION.
3.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY
REPRESENTED AND ARE NOT TO SCALE.
4.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT
LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY
PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD.
5.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION
BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES.
6.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT
DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY
INFORMATION.
{7.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE
DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL
REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS.
}
8.CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD
LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY
SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS.
9.ALL INDIVIDUAL WATER SERVICES LINES ARE TO BE INSTALLED WITH A
CURB STOP OUTSIDE OF THE BUILDING AND A METER WITHIN THE
INDIVIDUAL UNITS.{
10.REFER TO MECHANICAL PLANS FOR ALL WATER SERVICE AND SANITARY
SEWER SERVICE LOCATIONS. IF CONFLICT OCCURS BOTH THE MECHANICAL
ENGINEER AND CIVIL ENGINEER SHALL BE CONTACTED PRIOR TO
INSTALLATION OR ORDERING OF MATERIALS.
11.WATER SERVICE LINES BEYOND CITY CURB STOPS ADJACENT TO
SHIELDS STREET AND SANITARY SEWER SERVICE LINES EXTENDING FROM
PUBLIC MAIN IN THE ALLEY ARE TO BE MAINTAINED BY THE HOMEOWNERS
ASSOCIATION.
}12.A FLOODPLAIN USE PERMIT IS REQUIRED PRIOR TO ANY WORK WITHIN
THE HIGH-RISK FLOOD FRINGE AND FLOODWAY. SEE SHEET C5.01 FOR
FLOODPLAIN INFORMATION.
13.A NO-RISE CERTIFICATION IS REQUIRED PRIOR TO ANY CONSTRUCTION
WITHIN THE FLOODWAY. SEE SHEET C5.01 FOR FLOODPLAIN INFORMATION.
{
}
14.SEE FLOODPLAIN EXHIBIT ON SHEET C5.01 FOR FLOODPLAIN
EXISTING LOT LINES
EXISTING WATER MAIN
PROPOSED STORM SEWER
LEGEND:
W
G
CTV
E
EXISTING STORM SEWER
EXISTING ELECTRIC
EXISTING TELEPHONE
EXISTING GAS
PROPOSED ELECTRIC TRANSFORMER
S
W
PROPOSED WATER SERVICE
EXISTING SANITARY SEWER SS
PROPOSED CURB & GUTTER
PROPOSED CURB STOP & METER PIT
EXISTING FIRE HYDRANT H Y
D
PROPOSED EASEMENT LINE
PROPERTY BOUNDARY
PROPOSED ASPHALT PATCH
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what's below.
Call before you dig.
R
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
TF
W
( IN FEET )
1 inch = ft.
10 0 10 Feet
10
20 30
MW
W
VAULT
ELEC
MW
MW
MW
W
S
S
ELEC
VAULT
ELEC T
GAS
GAS
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
W W W W W W W W W W W W W W W
W W W W W W W W W W W
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
X
X X X
X
X X X X
X
X X X
X
X
X
X
X X X
X
X
G
G G G
OHE OHE OHE OHE OHE OHE
OHE OHE OHE
W
E
E
E
E E E E
E E E
E
E
E
E E
E E
T S
TRAFFIC
VAULT
TRAFFIC
VAULT
TRAFFIC
VAULT
W W
VAULT
CABLE
VAULT
ELEC
X
X X
X
X
X
X
EXISTING OVERHEAD ELECTRIC
TO BE REMOVED
/
/
/
/ / /
/
/ /
/
/ /
/
/ /
/
/
/
/
/ / / / / /
/
/ /
/
/ /
/
/
/
/
/
/
/
/ / / / / /
/
/ /
/
/ /
/
/
/
/
/
/
/
/ / / / / /
/
/ /
/
/ /
/
/
/
/
/
/
/
/ / /
/ / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
EXISTING GAS LINE
TO BE REMOVED
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / /
/ / /
/ / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / /
/ / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / /
/ / / / / / / /
/ / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
EXISTING 8" CONCRETE WALL
TO BE REMOVED
EXISTING 6" CONCRETE WALL
TO BE REMOVED
EXISTING MONITORING WELL
TO BE REMOVED (TYP.)
EXISTING MONITORING WELL
TO BE REMOVED (TYP.)
EXISTING ELECTRIC LINES
TO BE REMOVED
EXISTING CONCRETE CURB
EXISTING ELECTRIC LINE TO BE REMOVED
TO BE REMOVED
EXISTING ELECTRIC LINE
TO BE REMOVED
EXISTING SIGN
TO BE REMOVED
EXISTING
BUILDING
(1260)
EXISTING SHED
TO BE REMOVED
EXISTING ELECTRIC LINE
TO BE REMOVED
EXISTING IRRIGATION ARV
TO BE REMOVED
EXISTING WATER MANHOLE
TO BE REMOVED
EXISTING WATER METER
TO BE REMOVED
EXISTING WATER VALVE
TO BE REMOVED
EXISTING ELECTRIC VAULT
TO BE RELOCATED
EXISTING FENCE
EXISTING CONCRETE CURB
TO BE REMOVED
EXISTING FENCE
EXISTING FENCE
EXISTING MONITORING WELL
TO BE REMOVED (TYP.)
EXISTING OVERHEAD ELECTRIC
TO BE REMOVED
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
EXISTING ELECTRIC VAULT
TO BE REMOVED
EXISTING TELEPHONE PEDESTAL
EXISTING LIGHT POLE TO BE REMOVED
EXISTING WATER METER
EXISTING UNDERGROUND STORAGE
TANKS TO BE REMOVED
EXISTING LIGHT POLE
TO BE REMOVED
EXISTING FENCE
EXISTING BUILDING
TO BE REMOVED
EXISTING FENCE
TO BE RELOCATED
(BY OTHERS)
/
/ / / / / / / / / / / / / / / /
/ / / / /
EXISTING WATER SERVICE
TO BE ABANDONED AT MAIN
/ / / / / / / / / / / / / / /
/ / / / /
/ / /
10' APPROXIMATE
ASPHALT PATCHING
(SEE NOTE 7)
ENTRANCE
TO BE REMOVED
SAWCUT LINE
EXISTING COLORED
CONCRETE HANDICAP
RAMP TO BE REMOVED
AND REPLACED
SAWCUT LINE
SIDEWALK
TO BE REMOVED
BEAVERS MARKET
EXISTING PARKING LOT
EXISTING DRIVE CUT
TO BEAVERS MARKET
EXISTING
BUILDING
EXISTING SANITARY
SEWER LOCATION UNKNOWN
CONTRACTOR TO LOCATE AND
ABANDON AT MAIN
No. Revisions:
By: Date:
REVIEWED BY:
R. Curtiss
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
December 17, 2014
PROJECT:
1022-001
Sheet
Of 10 Sheets
LANDMARK RESIDENCES ON MOUNTAIN AVENUE
DRAWING FILENAME: D:rojects\1022-001\Dwg\Exist\1022-001_ECON.dwg LAYOUT NAME: EX1 DATE: Dec 17, 2014 - 11:24am CAD OPERATOR: ben
LIST OF XREFS: [NES-xborder] [1022-001_xTopo] [1022-001_xExst]
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 010
Fort Collins, Colorado 80521
E N G I N E E R I N G
N O R T H E RN
PHONE: 970.221.4158 FAX: 970.221.4159
www.northernengineering.com
12/17/14
C1.00
DEMOLITION PLAN
EXISTING CONDITIONS & C. Snowdon
A. Boese
1"=20'
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
EXISTING ELECTRIC E
LEGEND:
G
T
EXISTING STORM SEWER
EXISTING TELEPHONE
EXISTING GAS
EXISTING IRRIGATION BOX
EXISTING GAS METER
EXISTING TELEPHONE PEDESTAL
FIELD SURVEY BY:
NOTES:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE
AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR
SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE
RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL,
REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL.
3.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE.
4.CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING
SITE SURVEY.
5.CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT
MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES
APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE,
ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. {THE CITY OF FORT
COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION THAT WILL ACCEPT
CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED
AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD AND CAN BE
REACHED AT (970) 482-1249.}
6.REFER TO LANDSCAPE PLANS BY RIPLEY DESIGN FOR TREE PROTECTION NOTES,
PROCEDURES, AND MITIGATION REQUIREMENTS
7.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN
THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE
WITH CITY STREET REPAIR STANDARDS.
{8.CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND
POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY
POTENTIAL CONFLICTS.
9.CONTRACTOR SHALL LOCATE ALL EXISTING UTILITY SERVICES AND ABANDON AT THE
EXISTING MAIN PER CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS, LATEST
ADDITION.}
EXISTING SANITARY SEWER SS
EXISTING WATER W
EXISTING FENCE X
EXISTING WATER METER
EXISTING FIRE HYDRANT
EXISTING ELECTRIC VAULT
PROPERTY BOUNDARY
EXISTING RIGHT-OF-WAY
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
5015
5013
EXISTING MONITORING WELL MW
VAULT
ELEC
H Y
D
CONTROL
IRR
G
EXISTING LOT LINE
APPROXIMATE LIMITS OF CONCRETE/
ASPHALT & GRAVEL REMOVAL
EXISTING TREES (TO REMAIN)
EXISTING TREES (TO BE REMOVED)
ORIGINAL FIELD SURVEY:
NORTHERN ENGINEERING SERVICES
DATE: April 23, 2014
EXISTING ELEC/TV E/TV
W
{1.EXISTING TREES MARKED FOR PROTECTION AND PRESERVATION SHALL NOT BE REMOVED.
2.HEAVY EQUIPMENT SHOULD NOT BE ALLOWED TO COMPACT OVER THE ROOT ZONE OF EXISTING TREES.
3.AVOID CUTTING SURFACE ROOTS WHENEVER POSSIBLE, SIDEWALKS AND PAVING LEVELS SHOULD BE CONTOURED SUFFICIENTLY TO AVOID DAMAGE.
4.ROOT CUTS FROM EXCAVATION SHOULD BE DONE RAPIDLY, SMOOTH FLUSH CUTS SHOULD BE MADE, BACKFILL BEFORE THE ROOTS HAVE A CHANCE TO DRY OUT AND WATER THE TREE IMMEDIATELY.
5.PRIOR TO CONSTRUCTION, ALL PROTECTED TREES SHALL HAVE A ORANGE PROTECTIONS BARRIER FENCING ERECTED, WHICH AS A MINIMUM ARE SUPPORTED BY 1" X 1" OR SIMILAR STURDY STOCK, FOR SHIELDING
OF
PROTECTED TREES, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR ON HALF () OF THE DRIP LINE, WHICH EVER IS GREATER, WITHIN THIS PROTECTION ZONE THERE SHALL BE NO MOVEMENT OF EQUIPMENT
OR STORAGE OF
EQUIPMENT, MATERIALS, DEBRIS, FILL OR CUT UNLESS APPROVED BY THE CITY FORESTER.
6.ALL EXISTING TREES SHALL BE PRUNED TO THE CITY FORESTER'S "MEDIUM PRUNED STANDARDS."
7.WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THE DISTURBANCE.
}{
8.DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE OR DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS,
ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE, WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES.
9.NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE.
10.LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATION FROM CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAYS AND UTILITY EASEMENTS MAY BE "RIBBONED OFF," RATHER THAN
ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN NOT (5) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POSTS STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TYING A RIBBON
OR ROPE FROM
STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF SUCH AREAS BEING CLEARED.
11.ALL TREE PRUNING AND REMOVAL WORK SHALL BE PERFORMED BY A CITY OF FORT COLLINS LICENSED ARBORIST WHERE REQUIRED BY CODE.
12.THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOT SYSTEM OF
PROTECTED
EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED FROM TREE DIAMETER AT BREAST HEIGHT
AS DESCRIBED
IN THE CHART BELOW.}
TREE PROTECTION NOTES:
TREE DIAMETER AT BREAST HEIGHT (INCHES) AUGER DISTANCE FROM FACE OF TREE (FEET)
0-2 1
3-4 2
5-9 5
10-14 10
15-19 12
OVER 19 15
NORTH
APPROXIMATE SAWCUT LINE
5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and
specifications current at the date of approval of the plans by the City of Fort Collins Engineer.
6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of
the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The
Developer shall be responsible for unknown underground utilities.
7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning
excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be
located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be
the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans.
8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any
utility crossings required.
9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer
to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction.
10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is
accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all
parties affected by any disruption of any utility service as well as the utility companies.
11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider.
Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a
pre-construction meeting may be required prior to commencement of any work.
12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary
sewer should be constructed prior to installation of the water lines and dry utilities.
13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water
Utility.
14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is
discharged into a storm sewer, channel, irrigation ditch or any waters of the United States.
15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of
Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan.
16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite
drainage facilities shall be the responsibility of the property owner(s).
17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be
submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two
weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the
Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the
Development Agreement.
18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage,
whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the
City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development.
19. All recommendations of the Preliminary Drainage Report for Landmark Residences on Mountain Avenue, dated December 17, 2014 by Northern
Engineering shall be followed and implemented.
20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be
maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping.
21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must
be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by
the the City of Fort Collins street inspector.
22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit
is obtained, if applicable.
23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The
Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort
Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If
the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work
in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an
improper installation.
24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is
complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the
results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may
use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be
prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement
of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final
report.
25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at
all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to
the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then
resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets.
26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the
purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the
property lines and marked so as to reduce the excavation necessary for building connections.
27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for
roads within these districts.
28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the
Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval.
29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree
removal requiring a permit.
30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security.
Refer to OSHA Publication 2226, Excavating and Trenching.
31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The the
City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer
shall be responsible for providing any and all traffic control devices as may be required by thE construction activities.
32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic
Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic
sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed.
33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's
local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and
from the Development.
34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site
construction activities on Sundays or holidays, unless there is prior written approval by the City of Fort Collins.
35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these
drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise.
36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for
clarification, and annotate the dimension on the as-built record drawings.
37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and
specifications, and a copy of any permits and extension agreements needed for the job.
38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications,
the Developer shall contact the Designer and the City of Fort Collins Engineer immediately.
39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the
Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins
Engineer.
40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as
the basis of bearings. The information shall be as follows:
Project Datum: NAVD88
Benchmark #1:
City of Fort Collins Benchmark 3-08
Southwest corner of Mulberry St. and Shields St. on a concrete traffic signal base
Elevation = 5030.29
Benchmark #2:
City of Fort Collins Benchmark 31-97
Southwest corner of Laporte Ave. and Sheilds St., on a concrete traffic signal base.
Elevation = 5023.65
Basis of Bearings
Basis of Bearings is the East right-of-way line of North Shields Street as bearing North 00° 35' 27" East (assumed bearing).
41. All stationing is based on centerline of roadways unless otherwise noted.
42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters,
landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like
kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the
issuance of the first Certificate of Occupancy.
43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing
street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in
accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large
patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width,
including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer
and/or the City of Fort Collins Inspector at the time the cuts are made.
44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before
construction, or to the grades and condition as required by these plans.
45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections.
46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and
workmanship defects for a minimum period of two years from the date of acceptance.
47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage
structures and pipes, for the following private streets: N.A.
48. Approved Variances are listed as follows:
CONSTRUCTION NOTES
A. Grading and Erosion Control Notes
1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site.
2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans.
3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All
other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project
schedule, construction plans, and erosion control report.
4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property
sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion
control facilities shown herein.
5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the
area(s) required for immediate construction operations, and for the shortest practical period of time.
6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition
by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside
project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent
erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County.
7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall:
a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in
order to ensure the continued performance of their intended function.
b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector.
c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector.
8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and
debris from all drainage infrastructure and other public facilities.
9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of
way, and make sure streets and walkways are cleaned at the end of each working day.
10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to
cause their release into any waters of the United States.
11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering,
and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched.
12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and
before turning the maintenance over to the City/County or Homeowners Association (HOA).
13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant
or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout,
chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the
proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations.
14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and
located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout
material will be removed and properly disposed of prior to the area being restored.
15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever
measures are determined necessary, as directed by the City.
16. For additional information see separate Preliminary Drainage Report for Landmark Residences on Mountain Avenue.
B. Street Improvement Notes
1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here.
2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval,
prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall
be submitted for approval prior to placement of any asphalt.
3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to
create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can
be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins.
4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the
subgrade has been inspected and approved by the City of Fort Collins Engineer.
5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings
are not allowed.
6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing
street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter
25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay
shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not
cut the new asphalt overlay work.
7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as
per the Right-of-Way Work Permit traffic control plan.
8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt.
Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly.
9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full
depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required.
The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single
axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than
3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins
Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be
notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector.
C. Traffic Signing and Pavement Marking Construction Notes
1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction
Notes listed here.
2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic.
3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD.
4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads.
5. All lane lines for concrete pavement should be epoxy paint.
6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement
of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols.
7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards.
8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction.
9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings.
10. All sign posts shall utilize break-away assemblies and fasteners per the Standards.
11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified
during the field inspection must be corrected before the 2-year warranty period will begin.
12. The Developer installing signs shall be responsible for locating and protecting all underground utilities.
13. Special care shall be taken in sign location to ensure an unobstructed view of each sign.
14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort
Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an
unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the
requirements of the 2-year warranty period for new construction (except fair wear on traffic markings).
15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail.
D. Storm Drainage Notes
1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite
drainage facilities shall be the responsibility of the property owner(s).
2. All recommendations of the Preliminary Drainage Report for Landmark Residences on Mountain Avenue, dated December 17, 2014 by Northern
Engineering shall be followed and implemented.
3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted
to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior
to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility
Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development
Agreement.
E. Utility Notes
1. All waterline and sanitary sewer construction shall conform to the City of Fort Collins Utility standards and specifications current to date of
construction.
2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water
utility.
3. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire.
4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The
HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be
installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal box and tracer wire test lid per City
Water Detail 25.
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for
locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of
Colorado (UNCC) at 811 for additional information.
PHONE NUMBER
Northern Engineering Services, Inc.
Nick Haws, PE, LEED AP
301 N. Howes Street, Suite 100
Fort Collins, Colorado 80521
(970) 221-4158
E N G I N E E R I N G
N O R T H E RN
PLANNER/
LANDSCAPE ARCHITECT
These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility
by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness
of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities
required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort
Collins for additional quantities of items shown that may be required during the construction phase.
DISCLAIMER STATEMENT:
PROJECT
LOCATION
VICINITY MAP
NORTH 1"=1500'
DEVELOPER/APPLICANT
SITE ENGINEER
SURVEYOR
PROJECT DATUM: NAVD88
BENCHMARK #1:
City of Fort Collins Benchmark 3-08
Southwest corner of Mulberry St. and Shields St. on a concrete traffic signal base
Elevation = 5030.29
BENCHMARK #2:
City of Fort Collins Benchmark 31-97
Southwest corner of Laporte Ave. and Sheilds St., on a concrete traffic signal base.
Elevation = 5023.65
Basis of Bearings
Basis of Bearings is the East right-of-way line of North Shields Street as bearing
North 00° 35' 27" East (assumed bearing).
Original Field Survey by:
Northern Engineering Services
Project #1022-001
Date: April, 23 2014
ORIGINAL FIELD SURVEY BY:
PROJECT BENCHMARKS:
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
GAS----------------- Xcel Energy----------------------------- Stephanie Rich (970) 225-7857
ELECTRIC-------- City of Fort Collins Light & Power-- Doug Martine (970) 224-6152
CABLE------------- Xfinity-------------------------------------- Don Kapperman (970) 567-0425
TELECOM.--------Centurylink------------------------------- William Johnson (970) 377-6401
WATER------------ City of Fort Collins Utilities----------- Roger Buffington (970) 221-6854
WASTEWATER--City of Fort Collins Utilities----------- Roger Buffington (970) 221-6854
STORMWATER- City of Fort Collins Utilities----------- Glen Schlueter (970) 224-6065
SHEET INDEX
COVER SHEET
EXISTING CONDITIONS
UTILITY SHEETS
GENERAL & CONSTRUCTION NOTES
C0.00
C0.01
C1.00 EXISTING CONDITIONS & DEMOLITION PLAN
C2.00 UTILITY PLAN
DRAINAGE & DRAINAGE
C5.00 DRAINAGE EXHIBIT
I hereby affirm that these final
construction plans were prepared
under my direct supervision, in
accordance with all applicable City
of Fort Collins and State of
Colorado standards and statutes,
respectively; and that I am fully
responsible for the accuracy of all
design. revisions, and record
conditions that I have noted on
these plans.
CERTIFICATION STATEMENT:
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
GRADING AND EROSION CONTROL SHEETS
C3.01 EROSION CONTROL PLAN
UTILITY PLANS FOR
LOCATED IN THE SOUTHWEST QUARTER OF SECTION 11, TOWNSHIP 7 NORTH,
RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
(1032 W. MOUNTAIN AVENUE)
LANDMARK RESIDENCES ON MOUNTAIN AVENUE
Ripley Design, Inc.
Brent Cooper
401 West Mountain Avenue
Fort Collins, Colorado 80521
■ land planning ■ landscape architecture ■ (970) 224-5828
■ urban design ■ entitlement ■
Northern Engineering Services, Inc.
Gary Gilliland, PLS
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
(970) 221-4158
E N G I N E E R I N G
N O R T H E RN
C5.01 FLOODPLAIN EXHIBIT
STREET SHEETS
PUBLIC ALLEY
ROADWAY PLAN & PROFILE
C4.00
PUBLIC ALLEY
CROSS SECTIONS
C4.01
C3.00 GRADING PLAN