HomeMy WebLinkAboutUNION PLACE/REVIVE - COMBINED MJA/FDP - FDP140032 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT1501 ACADEMY CT. STE 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com
December 17, 2014
Mr. Wes Lamarque
Stormwater Engineering
City of Fort Collins Utilities Department
700 Wood Street
Fort Collins, CO 80521
RE: Union Place Subdivision, First Replat
Final Drainage & Erosion Control Letter
Dear Wes,
We have prepared this letter to document the drainage design and analysis for Union
Place Subdivision, First Replat. The original report for this subdivision entitled “Union
Place Final Drainage & Erosion Control Study” was prepared by Nolte Associates, Inc. on
October 8, 2009. Addendum #1 was prepared by United Civil Design Group on
12/31/2013 and documented the changes associated with the Minor Amendment that
was finalized on 3/12/2014.
The revisions to the site for Union Place Subdivision, First Replat include the following:
• The previously planned condominiums on Lot 1 of Block 5, Lots 1 & 2 of Block 4,
and Lots 1 & 2 of Block 2 are being changed to single family attached units.
Individual lot lines were added for each of the single family attached units which
requires a Replat and Major Amendment process.
• Revisions to utility services for the change from condominiums to single family
attached units.
• Revisions to the landscaping.
• Revisions to the lot grading for the defined single family attached units that were
previously undefined.
• Signing and Striping additions to meet fire department requirements.
The net effect of these changes will only have a minimal effect on the drainage on the
site and will not adversely affect the drainage on or offsite. No new calculations have
been included.
Sincerely,
Samuel M. Eliason, P.E.
Principal
United Civil Design Group
1501 ACADEMY CT. STE 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com
December 17, 2014
Mr. Wes Lamarque
Stormwater Engineering
City of Fort Collins Utilities Department
700 Wood Street
Fort Collins, CO 80521
RE: Union Place Subdivision, First Replat
Final Drainage & Erosion Control Letter
Dear Wes,
We have prepared this letter to document the drainage design and analysis for Union
Place Subdivision, First Replat. The original report for this subdivision entitled “Union
Place Final Drainage & Erosion Control Study” was prepared by Nolte Associates, Inc. on
October 8, 2009. Addendum #1 was prepared by United Civil Design Group on
12/31/2013 and documented the changes associated with the Minor Amendment that
was finalized on 3/12/2014.
The revisions to the site for Union Place Subdivision, First Replat include the following:
• The previously planned condominiums on Lot 1 of Block 5, Lots 1 & 2 of Block 4,
and Lots 1 & 2 of Block 2 are being changed to single family attached units.
Individual lot lines were added for each of the single family attached units which
requires a Replat and Major Amendment process.
• Revisions to utility services for the change from condominiums to single family
attached units.
• Revisions to the landscaping.
• Revisions to the lot grading for the defined single family attached units that were
previously undefined.
• Signing and Striping additions to meet fire department requirements.
The net effect of these changes will only have a minimal effect on the drainage on the
site and will not adversely affect the drainage on or offsite. No new calculations have
been included.
Sincerely,
Samuel M. Eliason, P.E.
Principal
United Civil Design Group
1501 ACADEMY CT. STE 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com
December 17, 2014
Mr. Wes Lamarque
Stormwater Engineering
City of Fort Collins Utilities Department
700 Wood Street
Fort Collins, CO 80521
RE: Union Place Subdivision, First Replat
Final Drainage & Erosion Control Letter
Dear Wes,
We have prepared this letter to document the drainage design and analysis for Union
Place Subdivision, First Replat. The original report for this subdivision entitled “Union
Place Final Drainage & Erosion Control Study” was prepared by Nolte Associates, Inc. on
October 8, 2009. Addendum #1 was prepared by United Civil Design Group on
12/31/2013 and documented the changes associated with the Minor Amendment that
was finalized on 3/12/2014.
The revisions to the site for Union Place Subdivision, First Replat include the following:
• The previously planned condominiums on Lot 1 of Block 5, Lots 1 & 2 of Block 4,
and Lots 1 & 2 of Block 2 are being changed to single family attached units.
Individual lot lines were added for each of the single family attached units which
requires a Replat and Major Amendment process.
• Revisions to utility services for the change from condominiums to single family
attached units.
• Revisions to the landscaping.
• Revisions to the lot grading for the defined single family attached units that were
previously undefined.
• Signing and Striping additions to meet fire department requirements.
The net effect of these changes will only have a minimal effect on the drainage on the
site and will not adversely affect the drainage on or offsite. No new calculations have
been included.
Sincerely,
Samuel M. Eliason, P.E.
Principal
United Civil Design Group