Loading...
HomeMy WebLinkAboutMONTAVA PUD - ODP - ODP180002 - MONTAVA SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY (3)MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates Inc. | i MASTER STREET PLAN AMENDMENT Transportation Report August 2018 MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates Inc. | i Table of Contents Page 1 Introduction ......................................................................................................................1-1 2 Master Street Plan Recommendations Overview .............................................................2-1 3 Technical Analysis ...........................................................................................................3-1 Methodology .......................................................................................................................................... 3-1 #1 TIMBERLINE ROAD Vine Drive to Mountain Vista Drive .......................................................... 3-4 #2 GIDDINGS ROAD Suniga Drive to Richards Lake Road ......................................................... 3-5 #3 TURNBERRY ROAD Suniga Drive to Richards Lake Road ....................................................... 3-6 #4 MOUNTAIN VISTA DRIVE Turnberry Road to I-25 Interchange ............................................ 3-7 #5 SUNIGA DRIVE Turnberry Road to Giddings Road ............................................................... 3-8 #6 COUNTRY CLUB ROAD Turnberry Road to Giddings Road .................................................. 3-9 #7 CONIFER STREET Timberline Road to Suniga Drive ............................................................... 3-10 #8 RICHARDS LAKE ROAD Turnberry Road to Busch Drive ....................................................... 3-10 #9 BAR HARBOR Richards Lake Road to Country Club Road ................................................... 3-11 Figures Page Figure 2-1 Current & Proposed Master Street Plan Network ......................................................... 2-2 Figure 3-1 Year 2040 Adjusted Average Daily Traffic, Project Daily Trips, and Total Daily Traffic ...................................................................................................................................... 3-3 Tables Page Table 2-1 Master Street Plan Recommendations Summary ............................................................ 2-3 Table 3-1 Street Classifications and ADT Maximum Traffic Volume Threshold by Classification .......................................................................................................................... 3-2 MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 1-1 1 INTRODUCTION The Montava development project (“project”) is situated in a primarily undeveloped area of northeast Fort Collins and would comprise approximately 900 acres bounded by Richards Lake Road to the north, Mountain Vista Drive to the south, Busch Drive to the east and Turnberry Road to the west. The Project Applicant has requested an amendment to City of Fort Collins (City) Master Street Plan to reclassify and/or modify existing and future roadways that would provide direct, multimodal access and connectivity to the project and the Mountain Vista Subarea. The project would include an agri-urban community that blends urban farming and agricultural resources with an array of open space, parklands and trails, neighborhood-serving commercial businesses, and a variety of residential homes. To accommodate this planned community and create a network that supports active living and sustainable transportation choices for future residents, businesses, and visitors, the project would introduce a series of new streets that interweave the development into the fabric of the Mountain Vista area of Fort Collins. The proposed roadway network for the project largely originates from the multimodal framework and Master Street Plan documented in the City’s Mountain Vista Subarea Plan (2009). This document includes the following chapters:  Chapter 2: Master Street Plan Recommendations Overview – summary of recommended modifications and/or proposed new streets to be incorporated into the City’s Master Street Plan.  Chapter 3: Transportation Analysis – detailed profiles of each recommendations, including operations analysis based on long-range (Year 2040) traffic forecasts provided by North Front Range Metropolitan Planning Organization (NFRMPO) and estimated traffic volumes with implementation of the project under a full buildout scenario. MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 2-1 2 MASTER STREET PLAN RECOMMENDATIONS OVERVIEW The Master Street Plan compliments the Transportation Master Plan, Amended December 17, 2013 in supporting the vision, principles, and policies established by the City, and provides a map of the City’s long-range vision for its major street network. The Master Street Plan includes the existing and proposed street classification and location of transportation connections throughout Fort Collins. It is important to note that the Master Street Plan is intended to be living document and through the City’s planning process, the street classification network is meant to be amended to address new infrastructure and development. This chapter provides an overview of the current Master Street Plan per the City’s Transportation Master Plan and proposed modifications to the Master Street Plan network with overall growth in the Mountain Vista Subarea plus implementation of the Montava project. For purposes of this document, the geographic context (or affected area) is generally defined by the boundaries of the project, specifically Richards Lake Road to the north, Mountain Vista Drive to the south, Busch Drive to the east, and Turnberry Road to the west. However, given the expanse of the project, the street network under evaluation and included in the City’s Master Street Plan extend beyond these boundaries and therefore, other existing/planned streets within the City of Fort Collins and Larimer County are also included in the discussion. Figure 2-1 present the City’s current and proposed Master Street Plan within the vicinity of the project and the recommended street classifications in and around the project area. MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 2-2 Figure 2-1 Current & Proposed Master Street Plan Network City of Fort Collins Master Street Plan Network Proposed Master Street Plan Amendment Network Source: Transportation Master Plan, City of Fort Collins, CO. Source: HF2M Colorado; DPZ, 2018. Table 2-1 on the following page presents a summary table of current and proposed changes to street classifications and recommended modifications and/or additions to the street network associated with the Montava project. MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 2-3 Table 2-1 Master Street Plan Recommendations Summary Location Current MSP Designation Recommended Designation Additional Recommendations Timberline Road (Vine Drive to Mountain Vista Drive) (Mountain Vista Drive to Country Club Road) (Country Club Road to Giddings Road) Four-Lane Arterial Four-Lane Arterial Two-Lane Arterial Two-Lane Collector  Timberline will extend north of Mountain Vista and create an intersection with four approaches  The extension of Timberline will result in a NE-SW orientation from Mountain Vista to Giddings Road and allow for connection with Country Club Road extension  Classify as two-lane arterial between Mountain Vista Drive and Country Club Road and classify as two-lane collector between Country Club Road and Giddings Road within project site Giddings Road (Suniga Drive to Richards Lake Road) Two-Lane Arterial Two-Lane Arterial  Maintain two-lane arterial between Mountain Vista Drive and Richards Lake Road  Create new connections within project site to Giddings Road  Extend Giddings Road further south of Mountain Vista Drive as two-lane arterial and connect to Suniga Drive extension Turnberry Road (Richards Lake Road to Suniga Drive) Two-Lane Arterial Two-Lane Arterial  Extend Turnberry Road south of Mountain Vista Drive to Suniga Drive Mountain Vista Drive (Timberline Road to I-25 Interchange) (Turnberry Road to Timberline Road) Four-Lane Arterial Two-Lane Arterial Four-Lane Arterial Two-Lane Arterial  Consider a phased approach to widening of Mountain Vista Drive from two to four-lane roadway between Timberline Road and I-25 interchange and align widening with adjacent development to the north/south of the roadway  Maintain two-lane arterial classification between Turnberry Road and Timberline Road Suniga Drive (Turnberry Road to Timberline Road) Four-Lane Arterial Four-Lane Arterial  Extend Suniga Drive farther east of Turnberry Road to connect to Giddings Road (extension) Conifer Street (Turnberry Road to Suniga Drive) Two-Lane Arterial Two-Lane Arterial  Extend Conifer from Timberline Road east to Giddings Road Busch Drive (Richards Lake Road to Mountain Vista Drive) Two-Lane Collector Two-Lane Collector None Richards Lake Road (Turnberry Road to Busch Drive) Two-Lane Arterial Two-Lane Arterial None Country Club Road (Turnberry Road to Giddings Road) Two-Lane Collector Two-Lane Collector  Extend Country Club Road to connect into Montava Town Center, and connect with Timberline Road Maple Hill Road MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 3-1 3 TECHNICAL ANALYSIS This chapter provides a detailed assessment of the recommended changes to the current street classification system per the Master Street Plan and analysis details for specific locations. METHODOLOGY The technical analysis provided herein adheres to the evaluation standards and methodology established by the City. Each affected roadway within the Master Street Plan was evaluated based on current classification, future Year 2040 traffic volumes from on the North Front Range Metropolitan Planning Organization (NFRMPO) regional travel demand model, and the additional daily vehicle trips generated by the project. A technical project travel demand methodology and scenario development memorandum prepared by Nelson\Nygaard was approved by City staff as of May 18, 2018. It should be noted that the current NFRMPO model estimated approximately 38,000 trips in the zones that would encompass the entire project site. The daily trips estimated in the above referenced memoranda with the proposed Montava development plan would result in approximately 42,000 trips. This assessment includes a two-step process: 1. Determine projected Year 2040 traffic volumes along affected roadways in the Master Street Plan that are in the project area (as defined in previous chapters) and identify if these future volumes are in compliance with the current street designations in the Master Street Plan; and 2. Determine projected Year 2040 traffic volumes with the additional traffic generated by the project and identify if these future volumes are in compliance with the recommended street designations in the Master Street Plan. As stated in Subsection 4.4.5 in Chapter 4 – Transportation Impact Study Guidelines of Larimer County Urban Area Streets Standards (April 1, 2007), the Applicant shall provide roadway functional classification recommendations based on “total traffic projections”, which includes “existing traffic, plus the future background traffic, plus the project-generated traffic.” For purposes of this analysis and per the City-approved scope of work, this assessment used Year 2040 traffic volumes and these future baseline volumes with the additional traffic generated by the project, as defined above. It is assumed that background traffic volumes and/or vehicle trips generated by approved but unbuilt projects in Fort Collins are accounted for in the Year 2040 projections. Because the NFRMPO included land-use and roadway volumes in Traffic Analysis Zones (TAZs) within the project boundaries and thus, assumed development in the project area and associated vehicle trips were subtracted from 2040 volumes to avoid overestimation of total vehicle traffic with implementation of the project. It is noted that under Year 2040 conditions, no additional planned transportation improvements proposed by the City of Fort Collins or Larimer County were incorporated into the future network and travel demand modeling. Figure 3-1 MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 3-2 presents the Year 2040 baseline (no project) volumes, the projected-generated average daily trips, and the total average daily traffic volumes along study roadways. As a general guideline, roadway classifications are determined by their functionality with respect to the daily carrying capacity (i.e., number of vehicles relative to number of travel lanes), access and connectivity to surrounding land uses and local context, mode priority, street design standards and streetscape elements. The table below summarizes the general description of roadway classifications, mode priority, and general average daily traffic (ADT) ranges.1 Table 3-1 Street Classifications and ADT Maximum Traffic Volume Threshold by Classification Classification Mode Priority Description1 Average Daily Traffic (ADT) Range2 Arterial Bicycle:  Pedestrian:  Transit:  Vehicle:  Provide access and safe crossings for all travel modes along regional corridors. Accommodates distribution of trips to collector streets and connections to mixed commercial areas. Six-Lane: 35,000+ ADT Four-Lane: 15,001 – 35,000 ADT Two-Lane: 5,000 – 15,000 ADT Collector Bicycle:  Pedestrian:  Transit:  Vehicle:  Distributes trips to residential and commercial areas. Balanced level of service for vehicle, transit, bicycles and pedestrians where possible. 1,000 – 7,000 ADT Local Bicycle:  Pedestrian:  Transit:  Vehicle:  Prioritizes walking and biking, low-traffic streets in neighborhood and mixed-use areas, and distributes local traffic to collector streets. Less than 1,000 ADT  = High Priority  = Medium Priority  = Low Priority Notes: 1. Descriptions are general in terms of functionality and purpose. 2. ADT ranges are general guidelines and actual volume thresholds may vary depending on function. Source: Nelson\Nygaard, 2018; City of Fort Collins, Master Street Plan. 1 Detailed descriptions regarding street design standards per roadway classification are provided in Chapter 7 – Street Design and Technical Criteria, Larimer County Urban Area Street Standards (April, 2007). MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 3-3 Figure 3-1 Year 2040 Adjusted Average Daily Traffic, Project Daily Trips, and Total Daily Traffic MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 3-4 #1 TIMBERLINE ROAD Vine Drive to Mountain Vista Drive Description: Maintain a key, multimodal “gateway” arterial street connection between the Mountain Vista Subarea and central Fort Collins, and provide connections to major east-west corridors. Existing Classification: Four-Lane Arterial Recommendation: Four-Lane Arterial with the following:  Continue to align Timberline Road as a true north-south roadway between Vine Drive and Mountain Vista Drive.  Create standard, four-way intersection at Mountain Vista Drive.  Future traffic volumes would allow for a two-lane arterial designation. However, the future traffic volumes with project-generated vehicle would exceed ADT capacity thresholds for a two-lane arterial designation. A four-lane arterial designation would support the overall functionality of the roadway, including accommodating multimodal traffic (including transit, bicyclists, and pedestrians). Existing Volumes (2018): 5,700 average daily trips 2040 Projected Volumes: Scenario Roadway ADT Year 2040 Baseline 9,500 Year 2040 with Project 14,600 - 20,100 Source: NFRMPO Model; Nelson\Nygaard, 2018. Additional Considerations:  The proposed roadway classification supports the City’s vision of Timberline Road per the Transportation Master Plan. The proposed capacity of a four-lane arterial can accommodate multiple modes of travel and adequate capacity to allow for a mix of both general traffic, transit vehicles, and bicycle travel. Timberline Road would be designated as an Enhanced Travel Corridor (ETC), a uniquely designed corridor that is planned for high-frequency transit, bicycling and walking as part of the corridor. The intention of Timberline Road ETC is to enhance travel time through the corridor to connect primary destinations.  Within the Montava development, the roadway will narrow to a two-lane arterial north of Mountain Vista Drive to Country Club Road (extension). From the intersection Country Club Road, the alignment will shift from a north-south orientation to a northeast- southwest orientation that connects to Giddings Road to the east and the County Club Road extension to the west.  It is recommended that the roadway transition to a two-lane collector from Country Club Road to Giddings Road. The estimated auto traffic along this segment will diffuse as the presence of several residential streets will distribute and lessen traffic demand.  Although traffic demand would exceed ADT capacity thresholds for two-lane arterial and two-lane collector along the planned extension north of Mountain Vista Drive into the MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 3-5 project site, the roadway would provide multiple connections to residential streets and driveways, distribute traffic within the site, allow for slower-moving vehicles, and comfort to multimodal users such as bicyclists and pedestrians. Potential widening to a four-lane arterial along any portion of the roadway north of Mountain Vista Drive is not recommended and will not support the residential characteristic along the corridor.  Create a focal route for the planned Montava Town Center and accommodate for appropriate land-use development, densities, and provide a high degree of multimodal access to surrounding uses. #2 GIDDINGS ROAD Suniga Drive to Richards Lake Road Description: Enhance north-south arterial street connection to accommodate multimodal traffic between Mountain Vista Subarea and major east-west corridors. Existing Classification: Two-Lane Arterial Recommendation: Two-Lane Arterial with the following:  Serve as a north-south arterial between Mountain Vista Road and Richards Lake Road.  Recommended to maintain two-lane roadway although estimated traffic demand in the future with project volumes would marginally exceed ADT capacity thresholds. A two- lane arterial roadway would coincide with residential character of the corridor, the planned access points to adjacent neighborhoods, local-serving commercial, and farmland areas. Existing Volumes (2018): 3,100 average daily trips 2040 Projected Volumes: Scenario Roadway ADT Year 2040 Baseline 7,500 Year 2040 with Project 17,300 – 19,400 Source: NFRMPO Model; Nelson\Nygaard, 2018. Additional Considerations:  The proposed roadway classification supports the City’s vision per the Transportation Master Plan to continue a two-lane arterial linkage between Mountain Vista Drive and Richards Lake Road.  Giddings will serve as a primary north-south route for the planned residential uses and the proposed farm.  The character of this roadway will provide buffered bike lanes and sidewalks for pedestrian access to adjacent uses; no on-street parking is planned.  Maintaining a two-lane arterial south of Mountain Vista Drive to a future connection to Suniga Drive would provide adequate carrying capacity with buildout of the area. This includes the project, planned combined high school and middle school along the corridor and other development in the area. Expanding roadway to a four-lane arterial is not recommended and could result in adverse environmental effects, including induced MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 3-6 traffic demand, noise, air quality, and unnecessary land takings that could preclude development potential.  Giddings Road, south of connection to Mountain Vista Drive, to provide main access to planned middle and high schools, therefore allowing for distribution of vehicle trips and alleviated potential traffic congestion along other adjacent routes, including Timberline Road and Mountain Vista Drive. This section will also provide a roadway connection to future adjacent development. #3 TURNBERRY ROAD Suniga Drive to Richards Lake Road Description: Establish a north-south arterial street connection that extends south of Mountain Vista Drive. This extension will allow for a greater connected roadway network to serve the Mountain Vista Subarea and the adjacent areas of Larimer County. Existing Classification: Two-Lane Arterial Recommendation: Two-Lane Arterial with the following:  Maintain two-lane roadway between Richards Lake Road (and points further north) and Mountain Vista Drive.  Extend two-lane roadway south of Mountain Vista Drive to provide connection to planned Conifer Street and Suniga Drive.  Design to accommodate low vehicle speeds, striped and buffered bicycle lanes, no on- street parking and multiple access points to adjacent residences.  A two-lane arterial designation would maintain the existing character and overall functionality of the roadway. Any widening would result in potentially adverse environment effects, including induced traffic levels, noise, air quality; none of which would not be conducive to the adjacent residential neighborhoods the roadway serves currently and in the future. Existing Volumes (2018): 3,800 average daily trips 2040 Projected Volumes: Scenario Roadway ADT Year 2040 Baseline 6,000 Year 2040 with Project 10,200 Source: NFRMPO Model; Nelson\Nygaard, 2018. Additional Considerations:  The potential extension of Turnberry Road is still under consideration by City staff and the alignment and its planned connections are still under review.  The roadway would serve as a north-south arterial route for the existing neighborhoods (e.g., Water’s Edge, Hearthfire, Maple Hill, Storybrook, Adriel Hills, and residents along Country Club Road in Larimer County)..  The extension of Turnberry Road farther south of Mountain Vista Drive would also alleviate potential traffic congestion levels along other north-south roadways, including MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 3-7 Timberline Road, Giddings Road, while also reducing cut-through traffic demand along County Club Road.  The Turnberry Road connection is anticipated to reduce future 2040 traffic on Country Club Road in the range of 4,000 to 7,000 vehicles. Please note the volumes shown earlier on Figure 3-1 reflect Country Club with these reductions. The projected volumes would indicate that Turnberry Road is necessary to provide desired traffic flows, pedestrian experience, and bicycle connections within the entire Mountain Vista Subarea. Therefore, it is recommended that the extension of Turnberry Road south of Mountain Vista Drive be included in the Master Street Plan.  Extending Turnberry Road farther south of Suniga Drive to Vine Drive is not recommended, as the future design/alignment and functionality of Vine Drive is uncertain and under review by City staff. In addition, current residents along Vine Drive would have continued north-south access via Timberline Road.  The design of the extension of Turnberry Road, south of Mountain Vista Drive, should be sensitive to the existing land uses. #4 MOUNTAIN VISTA DRIVE Turnberry Road to I-25 Interchange Description: Mountain Vista Drive is expected to be an active “gateway” to the Mountain Vista Subarea Area and a major east-west connection between the I-25 interstate and area-wide multimodal corridors. Existing Classification: Two-Lane Arterial (west of Timberline Road) Four-Lane Arterial (east of Timberline Road) Recommendation: Two-Lane Arterial and Four-Lane Arterial with the following:  During Phase 1 of area-wide development, including Montava and potential adjacent properties, recommend the following:  Four-lane arterial between Timberline Road to I-25 interchange  Two-lane arterial between Turnberry Road and Timberline Road  Establish a ‘boulevard’ design to accommodate multimodal traffic, including potential Transfort transit routes (per Phase 3 of the Transit Master Plan), buffered bike lanes, landscaped parkways, and wide pedestrian sidewalks/pathways. Existing Volumes (2018): 6,200 average daily trips 2040 Projected Volumes: Scenario Roadway ADT Year 2040 Baseline 10,700 – 15,000 Year 2040 with Project 14,900 – 29,800 Source: NFRMPO Model; Nelson\Nygaard, 2018. MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 3-8 Additional Considerations:  The proposed roadway classification supports the City’s vision per the Transportation Master Plan to create a two- and four-lane arterial linkage between Turnberry Road and I-25 interchange. Roadway will serve as the primary east-west travel route for those destined to/from I-25 highway.  Character of roadway is to serve regional and local multimodal traffic in northeast portion of Fort Collins, including future Transfort transit route service, and accommodate dedicated on-road and fully-separated bicycle and pedestrian facilities and access to adjacent properties. #5 SUNIGA DRIVE Turnberry Road to Giddings Road Description: Suniga Drive is a planned east-west, multimodal Enhanced Travel Corridor (ETC) that will provide connections to the Mountain Vista Subarea to downtown Fort Collins and provide key connections to north-south roadways, including College Avenue, Turnberry Road, Timberline Road, and Giddings Road. Currently Suniga is planned to extend east of Timberline and connect back to Vine Drive. Existing Classification: Four-Lane Arterial Recommendation: Four-Lane Arterial with the following:  Continue to extend Suniga Drive east to connect to Turnberry Road (future extension), Timberline Road, and to Giddings Road (future extension).  Design would support City’s vision of a four-lane with center median boulevard design and would be a designated ETC, providing greater east-west connectivity to downtown Fort Collins and neighborhoods to the north and east of downtown.  Future traffic volumes per NFRMPO model (without project-generated traffic) would not exceed the ADT capacity thresholds for a four-lane arterial designation. However, with the proposed project traffic, the potential increase in vehicle traffic would marginally exceed these ADT capacity thresholds. Regardless, the potential widening to a six-lane roadway is not recommended. To maintain the character of the ETC-designated roadway and planned adjacent uses along the corridor, a six-lane roadway would create an east- west suburban highway as opposed to a local-serving, east-west arterial to accommodate multimodal traffic (including public transit and school buses), and provide a safer, convenience experience for non-auto users (bicyclists and pedestrians). Existing Volumes (2018): NA – Future Roadway 2040 Projected Volumes: Scenario Roadway ADT Year 2040 Baseline 26,400 Year 2040 with Project 40,200 Source: NFRMPO Model; Nelson\Nygaard, 2018. MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 3-9 Additional Considerations:  The proposed roadway classification supports the City’s vision to provide a four-lane arterial linkage between College Avenue and the Mountain Vista Subarea.  Roadway will serve as the primary east-west travel route for those destined to/from the Mountain Vista Subarea, planned schools, and I-25 highway.  Design Suniga Drive to support a dedicated, buffered bicycle lane and serve as a main Transfort bus route, creating economic opportunity along the corridor as an ETC route. #6 COUNTRY CLUB ROAD Turnberry Road to Giddings Road Description: Maintain two-lane roadway to provide east-west connectivity between Larimer County and Fort Collins, providing connections between Highway 1 and Turnberry Road. Existing Classification: Two-Lane Collector Recommendation: Two-Lane Collector with the following:  Maintain Country Club Road west and east of Turnberry Road as “Two-Lane Collector”  Although future traffic volumes per NFRMPO model (with and without project-generated traffic) would exceed the ADT capacity thresholds, a “two-lane collector” designation would maintain the existing character and overall functionality of the roadway.  Modify the current alignment shown in the Master Street Plan that indicates a connection to Giddings Road. Extend Country Club Road east of Thoreau Drive and realign to connect with the planned Timberline Road extension within Montava development. Existing Volumes (2018): 7,000 average daily trips 2040 Projected Volumes: Scenario Roadway ADT Year 2040 Baseline 8,500 Year 2040 with Project 10,500 Source: NFRMPO Model; Nelson\Nygaard, 2018. Additional Considerations:  The extension of Country Club Road to the east into the Montava development will provide greater connectivity while limiting additional traffic to/from Giddings Road.  Design of easterly extension of Country Club Road (i.e., east of Turnberry Road) to include two-way auto traffic with intermittent on-street parking and separate bicycle and pedestrian facilities.  Within the Montava development a future two-lane collector street designation to function as a low-traffic route and provide a high level of access and connections to adjacent land uses, including planned residences and open space areas (including recreational trails and parkland). MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 3-10 #7 CONIFER STREET Timberline Road to Suniga Drive Description: Conifer Street is a planned two-lane roadway to provide east-west connectivity to Mountain Vista Subarea and downtown Fort Collins. Existing Classification: Two-Lane Arterial Recommendation: Two-Lane Arterial with the following:  Extend two-lane roadway east of Timberline Road to Giddings Road  Provide new connection to key north-south corridors, including Turnberry Road (extended), Timberline Road, and Giddings Road (extended)  Roadway is expected to experience volumes that would not exceed capacity thresholds for two-lane roadway per NFRMPO model and with estimated increase in project-generated traffic. Existing Volumes (2018): Not Available (Future Roadway) 2040 Projected Volumes: Scenario Roadway ADT Year 2040 Baseline 8,200 Year 2040 with Project 14,600 Source: NFRMPO Model; Nelson\Nygaard, 2018. Additional Considerations: The extension of Conifer Street further east to connect to Turnberry Road, Timberline Road, and Giddings Road will serve as an additional east-west connection between existing neighborhoods north of downtown Fort Collins and the Mountain Vista Subarea, while creating better east-west distribution of traffic between Suniga Drive and Conifer Street. #8 RICHARDS LAKE ROAD Turnberry Road to Busch Drive Description: Maintain two-lane roadway to provide east-west connectivity to key corridors in northern portion of Fort Collins, including Turnberry Road and Giddings Road. Existing Classification: Two-Lane Arterial Recommendation: Two-Lane Arterial with no proposed changes. The additional vehicle trips associated with Montava in combination with existing and future estimated traffic demand will continue to allow for a two-lane arterial designation. Existing Volumes (2018): 1,400 average daily trips MONTAVA |MASTER STREET PLAN AMENDMENT TRANSPORTATION REPORT City of Fort Collins Nelson\Nygaard Consulting Associates, Inc. | 3-11 2040 Projected Volumes: Scenario Roadway ADT Year 2040 Baseline 4,300 – 5,200 Year 2040 with Project 4,700 – 5,600 Source: NFRMPO Model; Nelson\Nygaard, 2018. Additional Considerations:  No proposed changes to Richards Lake Road. The proposed Montava network that connects to Richards Lake Road will provide access points into Montava and maintain the same connections as under existing conditions. #9 BAR HARBOR Richards Lake Road to Country Club Road Description: Maintain two-lane residential street to provide north-south connectivity for Maple Hill residents to Mountain Vista Subarea. Existing Classification: Two-Lane Collector Recommendation: Two-Lane Collector with the following:  Discontinue two-lane roadway at Country Club Road due to needs of the City’s vision for a proposed park/recreational area.  Connection between Richards Lake Road and Country Club Road would maintain access as exists today and terminating at Country Club Road to the south would avoid cut- through traffic within the Maple Hill neighborhood.  Roadway is expected to experience volumes that would not exceed capacity thresholds for two-lane collector per NFRMPO model and with estimated increase in project-generated traffic. Existing Volumes (2018): 5,200 average daily trips 2040 Projected Volumes: Scenario Roadway ADT Year 2040 Baseline 5,200 Year 2040 with Project 5,300 Note 1. The regional model did not provide 2040 ADT volume data for Bar Harbor. It is assumed that the future baseline volumes would represent existing volumes as the roadway and adjacent neighborhood is fully built out. Source: NFRMPO Model; Nelson\Nygaard, 2018. Additional Considerations:  The proposed Montava network would not connect directly to Bar Harbor Road but would connect to Country Club Road, providing Maple Hill residents with direct access to Montava and other planned roadways. (Turnberry Road to Timberline Road) Two-Lane Collector Two-Lane Collector  Extend Maple Hill Road east of Bar Harbor Drive to Timberline Road extension within project site. Bar Harbor Drive (Richards Lake Road to Country Club Road) Two-Lane Collector Two-Lane Collector  Due to needs of the City’s proposed park, Bar Harbor as it exists today would remain. The extension of Bar Harbor from Country Club to Mountain Vista would be eliminated. Source: DPZ; Nelson\Nygaard, June 2018.