November 05, 2014
Kenneth R Mitchell
1021 Nightingale Dr.
Fort Collins, CO 80525
Comment Summary:
Department: Planning Services
Contact: Ryan Mounce, 970-224-6186, rmounce@fcgov.com
Topic: General
07/28/2014: As landscaping details emerge for Final Plans and species are selected, consider the
minimum diversity requirements for trees in LUC 3.21(D)(3).
Comment Number: 3 Comment Originated: 07/28/2014
07/30/2014: From GIS: Addresses will be assigned by the GIS Department after the plans have met
final approval through Development Review and are recorded with the City.
Comment Number: 7 Comment Originated: 07/30/2014
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: Construction Drawings
09/10/2014: The response indicated that .5% will be maintained throughout which is acceptable. The
response also added however that curb and gutter is outflow, which I'm unsure why would be
intended. The paving plan notes the use of inflow curb and gutter, which would be required with the
inset curb and gutter for parking, unless outflow curb and gutter is utilized with concrete parking and a
pan between the parking and the through street. Please clarify.
07/30/2014: In measuring and the flowline grade around the inset parking appears to achieve only .4%
in areas. Please ensure .5% minimum is obtained.
Comment Number: 8 Comment Originated: 07/30/2014
Topic: General
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of
the above referenced project. If you have questions about any comments, you may contact the individual
commenter or direct your questions through the Project Planner, Ryan Mounce, at 970-224-6186 or
rmounce@fcgov.com.
RE: Prairie Village, MJA140002, Round Number 2
Page 1 of 6
09/10/2014: The response indicates further discussion on making this change. We've made this a
requirement on other projects, including Uptown Plaza and minor amendment for the Taco Bell next
door on West Elizabeth.
07/30/2014: The project will need to reconfigure the existing access ramp at the southeast corner of
the site to face east and direct pedestrians to cross parallel to Fromme Prairie Way, and provide
truncated domes in accordance with LCUASS drawing 1607. The new detached sidewalk should just
continue to this new access ramp with the existing attached sidewalk south of the new walk removed.
Comment Number: 2 Comment Originated: 07/30/2014
09/10/2014: The planning related documents (except the building elevations) are still labelled as
"Prairie Village Townhomes" while the plat, civil, and building elevations are labelled as "Prairie
Village". Please ensure all the documents share one of these titles. From my perspective either title is
fine.
07/30/2014: Please coordinate the name of the project across the various documents. The site and
landscape plan has "Townhomes" after "Prairie Village" while the other documents do not.
Comment Number: 3 Comment Originated: 07/30/2014
09/10/2014: With the emergency access easement defined on the plat connecting Harmony Road with
Fromme Prairie Way it appears that in order to maintain the full 24' width that an offsite emergency
access easement is needed from Lot 1 of the Overlook Fifth Filing P.U.D. Assuming PFA is requiring
this, we would need a letter of intent from that property owner indicating acceptability to the concept of
granting an easement, which would be required prior to approval of the plan. The dedication of an
emergency access easement by separate document requires a $250 transportation development
review fee along with fees assessed by Larimer County for recording the deed. The City has a
standard easement dedication form as well which requires signatures from the grantor along with an
attorney certification of the deed.
Comment Number: 10 Comment Originated: 09/10/2014
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: General
07/21/2014: No comments.
Comment Number: 1 Comment Originated: 07/21/2014
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
07/30/2014:
For the final landscape plan provide direct labeling of plant material and a plant schedule. Select street
trees from the City’s street tree list.
Comment Number: 2 Comment Originated: 07/30/2014
Page 2 of 6
09/09/2014:
Previous comment number 2 from 7/30/14 is continued. Thank you for the response that plant labeling
will occur at final.
07/30/2014:
For the final landscape plan provide direct labeling of plant material and a plant schedule. Select street
trees from the City’s street tree list.
Comment Number: 4 Comment Originated: 09/09/2014
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
07/18/2014:
1. Effective 8-1-14 all property line townhomes require fire-sprinklers systems installed per 2012 IRC.
2. Per state statue 9-5 any townhome project with 7 or more units must provide accessible units per
that standard.
3. Call Russ at 970-416-2341 to schedule a pre-submittal code review meeting.
Comment Number: 1 Comment Originated: 07/18/2014
Department: Outside Agencies
Contact: Ryan Mounce, 970-224-6186, rmounce@fcgov.com
Topic: General
07/25/2014: The following comments are from Bob Rulli, Field Engineer with CenturyLink, who may be
reached at 970-490-7503 or robert.rulli@centurylink.com:
MST&T easement runs along the south border of the property. This easement contains the west end of
the major W Harmony duct run. Multiple ducts as well as manholes (actual location of manhole not
noted on plat). This will not be relocated and access to this manhole must be provided. The manhole
will likely sit in one of the units' driveway. Grade changes (frame and cover adjustments) will be
developers expense. Ducts must be protected in place during construction. Depth coverage must be
maintained for final.
Service to these 7 units would most likely originate from existing facilities SW corner of the property.
Cable may be extended north in the 5' utility easement to provide an access pedestal. Service drops
to one central location (West side of structure for demarcation). Inside wiring to each unit from this
network interfaces required.
Applicant must work with area engineer to determine existing facility tap in and extension for service to
units. Due to tariff requirements, a conduit run for cable extensions and service drop conduits will be
needed. Actual route and access pedestal locations (if existing cannot be utilized) will need to be
worked out with CTL engineering.
Please contact us well in advance as our engineering and construction cycle time is about 8 weeks
now due to so much volume all over Front Range North.
Comment Number: 1 Comment Originated: 07/25/2014
Department: PFA
Page 3 of 6
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
FIRE LANES
9/10/14: Restatement of information detailed in email to City Planner, Ryan Mounce, dated 9/10/14: Fire
access is needed on the NE side of the property because minimum fire access requirements cannot
be met from Fromme Prairie Way alone. Units 2, 3, 5 & 7 are out of access. Providing an EAE through
the commercial area, as currently detailed on the plat, will cover the remainder of Units 5 & 7 but not
Units 2 & 3. As a minimum, the EAE needs to extended to the property limits on the north side of the
property. From that location, firefighters can cover the majority of Units 2 & 3 within the 150 foot access
limitation. Only the courtyard of Unit 3 remains out of access, but as the buildings are to be
sprinklered, the 150 foot maximum fire access requirement may be extended in this circumstance.
An option proposed by Ken Miller was to include the driveway in the EAE dedication. That would
provide total access to the building's exterior but as it exceeds the minimum code requirement it is not
compulsory. If that choice is made however, the turning radius of the driveway would have to conform
with fire code standards. If it's possible to include the adjoining commercial property in the access
easement, that solution would clean up the EAE boundaries. For documentation purposes, I'll note
required turning radii are not being achieved in all areas of the proposed EAE but those
circumstances are acceptable as a pre-existing condition of the site.
08/04/2014: Fire Lanes shall be provided to within 150' of ALL portions of all buildings, as measured
by an approved route around the exterior of the building. Supporting documentation does not provide
details of an existing Emergency Access Easement serving the commercial property bordering to the
north. Without it, some portions of the east & west buildings (especially units 2,3,6,&7) would be out of
fire access. Lacking further site details, it is unclear if access needs are being met with this site
design. When fire lanes cannot be provided, the fire code official is authorized to increase the
dimension of 150 feet if the building is equipped throughout with an approved, automatic fire-sprinkler
system. Further information is required.
Comment Number: 1 Comment Originated: 08/04/2014
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
07/17/2014: The site disturbs more than 10,000 sq-ft, therefore Erosion and Sediment Control Materials
need to be submitted for FDP. The erosion control requirements are in the Stormwater Design Criteria
under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted dose not meet requirements. Please submit; Revised Erosion Control Plans based off
redlines from 7-17-2014, Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning this section, or if there are any questions please contact Jesse Schlam
970-218-2932 or email @ jschlam@fcgov.com
Comment Number: 1 Comment Originated: 07/17/2014
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
07/29/2014: A suggestion for the cobble swale along the southern edge of the property is to
reference the Grove development and to propose a similar design.
Comment Number: 3 Comment Originated: 07/29/2014
Page 4 of 6
07/29/2014: At final, landscaping will be reviewed for the rain garden.
Comment Number: 4 Comment Originated: 07/29/2014
09/09/2014: Stosrmwater is ready for a hearing.
Comment Number: 5 Comment Originated: 09/09/2014
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
09/04/2014: The text masking has been addressed, but the elevations are still in color. The colors will
cause scanning and reproduction problems.
07/28/2014: All text will need to be masked. The color/shading will cause problems with scanning &
reproduction.
Comment Number: 1 Comment Originated: 07/28/2014
Topic: Construction Drawings
09/04/2014: Please correct the poject datum statements. Sheet C000 shows NAVD88 as the project
datum, and sheet C001 shows NAVD29 Unadjusted. An equation to get from NAVD88 to NGVD29
unadjusted, i.e. NAVD88 = NGVD29 Unadjusted + _______, has not been provided.
07/28/2014: Please state the project datum on sheets C000 & C001, and provide an equation to get
from NAVD88 to NGVD29 unadjusted, i.e. NAVD88 = NGVD29 Unadjusted + _______.
Comment Number: 2 Comment Originated: 07/28/2014
09/04/2014: There are still issues. See redlines.
07/28/2014: There are line over text issues. See redlines.
Comment Number: 4 Comment Originated: 07/28/2014
09/04/2014: Please mask text(marked) within hatching on sheet C200. See redlines.
Comment Number: 21 Comment Originated: 09/04/2014
Topic: Landscape Plans
09/04/2014: There is one issue on sheet C200. See redlines.
07/28/2014: Please mask all text(marked) within hatching. See redlines.
Comment Number: 5 Comment Originated: 07/28/2014
Topic: Plat
09/08/2014: There is some linework that needs to be corrected. See redlines.
07/28/2014: Please make changes as marked. See redlines. If changes are not made or you
disagree with comments, please provide written response of why corrections were not made.
Comment Number: 8 Comment Originated: 07/28/2014
09/08/2014: There are a few distances that need to be added. See redlines.
07/29/2014: Please add the bearings, distances & curve data as marked. See redlines.
Comment Number: 12 Comment Originated: 07/29/2014
09/08/2014: Please label the Utility Easement at the northeast corner of Tract A. See redlines.
07/29/2014: All easements must be locatable and labeled. See redlines.
Comment Number: 14 Comment Originated: 07/29/2014
09/08/2014: Please add(as marked) to the "set" description in the legend. See redlines.
Comment Number: 22 Comment Originated: 09/08/2014
Page 5 of 6
Topic: Site Plan
09/04/2014: There are still issues. See redlines.
07/29/2014: There are line over text issues. See redlines.
Comment Number: 18 Comment Originated: 07/29/2014
09/04/2014: Please add a legal description for the project property.
Comment Number: 20 Comment Originated: 09/04/2014
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
09/10/2014: no new comments.
Comment Number: 4 Comment Originated: 09/10/2014
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: Construction Drawings
07/30/2014: Show existing and proposed gas and electric on the utility plans.
Comment Number: 5 Comment Originated: 07/30/2014
09/09/2014: Show/label existing curb stops.
Comment Number: 6 Comment Originated: 09/09/2014
09/09/2014: Add this note to Sht C300 Utility Plan: Water service lines beyond City curb stops aqnd
the sewer services extending from the City manhole are to be maintained by the homeowners
association.
Comment Number: 7 Comment Originated: 09/09/2014
09/09/2014: See redlined utility plans for other comments.
Comment Number: 8 Comment Originated: 09/09/2014
Topic: Landscape Plans
09/09/2014: Update landscape plan to coincide with current utility plan. Water meters will be inside
the units. Remove the meters shown on the common, private service lines outsidee the buildings.
Comment Number: 9 Comment Originated: 09/09/2014