HomeMy WebLinkAboutMAINSTREET HEALTH & WELLNESS SUITES - PDP - PDP140018 - SUBMITTAL DOCUMENTS - ROUND 1 - LANDSCAPE PLAN (3)(12) Gym-d
(1) Gym-d
(4) Gle-t
(4) Gle-t
(1) Gle-t
(4) Gle-t
(11) Cat-s
(5) Cat-s
(1) Que-m
(1) Que-m
(1) Que-m
(1) Que-m (1) Que-m (1) Que-m
(4) Til-c
(4) Til-c
(6) Til-c
(3) Pic-p (5) Pic-f
(2) Pin-f
(3) Pic-g
(3) Pic-p
(3) Pic-g
(3) Ame-x
(3) Ame-x
(4) Bet-x
(3) Bet-f
(xx) Gai-x
(18) Spo-h
(8) Jam-a
(18) Spo-h
(8) Jam-a
(12) Pan-v
(20) Jun-b
(20) Tax-x
(20) Tax-x
(20) Jun-b
(28) Tax-x
(20) Jun-b
(20) Jun-b
(27) Pan-v
(12) Fal-p
(10) Fal-p
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
9/10/2014 11:57:25 AM
HEALTH & WELLNESS
SUITES OF FT.
COLLINS
2014.00421
ZIEGLER ROAD
FT. COLLINS, CO 80528
10/01/14
SCHEMATIC DESIGN
REVISION SCHEDULE
NO. DESCRIPTION DATE
NOT FOR CONSTRUCTION
0
Scale 1" = 30'-0"
15 30 60
(2) Ace-x
(1) Gym-d
(2) Ace-x
(2) Bet-f
(2) Bet-f
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
9/10/2014 11:57:25 AM
HEALTH & WELLNESS
SUITES OF FT.
COLLINS
2014.00421
ZIEGLER ROAD
FT. COLLINS, CO 80528
10/01/14
SCHEMATIC DESIGN
REVISION SCHEDULE
NO. DESCRIPTION DATE
NOT FOR CONSTRUCTION
0
Scale 1" = 10'-0"
5 10 60
North
ENLARGED
COURTYARD
PLANTING PLAN
L2 of 4
Planting Beds, typ.
Planting Beds, typ.
Planting Beds, typ.
Planting Beds, typ.
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
9/10/2014 11:57:25 AM
HEALTH & WELLNESS
SUITES OF FT.
COLLINS
2014.00421
ZIEGLER ROAD
FT. COLLINS, CO 80528
10/01/14
SCHEMATIC DESIGN
REVISION SCHEDULE
NO. DESCRIPTION DATE
NOT FOR CONSTRUCTION
PLANTING DETAILS
1 L3 of 4
Area to receive sod lawn (turf-type Tall Fescue)
PLANT SCHEDULE
Symbol Qty Botanical Name Common Name Size Container Water Needs Notes
SHADE TREES
Ace-x Acer x freemanii 'Celebration' Celebration Freeman Maple 2" cal. B&B M strong central leader, matched
Cat-s Catalpa speciosa Northern Catalpa 2" cal. B&B L-M strong central leader, matched
Gle-t Gleditsia triacanthos inermis
'Shademaster'
Shademaster Honeylocust 2" cal. B&B L-M full, strong central leader, matched
Gym-d Gymnocladus dioicus 'Espresso' Espresso Kentucky Coffeetree 2" cal. B&B L-M full, strong central leader
Que-m Quercus macrocarpa Bur Oak 2" cal. B&B L-M dug in spring, symmetrical
Til-c Tilia cordata 'Greenspire' Greenspire Littleleaf Linden 2" cal. B&B M full, strong central leader, matched
ORNAMENTAL TREES
Ame-a Amelanchier alnifolia Saskatoon Serviceberry 1.5" cal. B&B L-M multi-stemmed, 3-5 stems
Bet-f Betula fontinalis Rocky Mountain Birch 1.5" cal. B&B H single trunk, symmetrical, matched
EVERGREEN TREES
Pic-p Picea pungens Colorado Spruce min. 6' ht. B&B M-H symmetrical, full
Pic-f Picea pungens glauca 'Fat Albert' Fat Albert Colorado Blue Spruce min. 6' ht. B&B M-H symmetrical, full
Pic-g Picea pungens glauca Colorado Blue Spruce min. 6' ht. B&B M-H symmetrical, full
Pin-f Pinus flexilis Limber Pine min. 6' ht. B&B L-M symmetrical, full
DECIDUOUS SHRUBS
Cha-m Chamaebatiara millefolium Fernbush 24" ht., #5 container VL-L Space @ 4'-0" o.c., allow to mass
Chr-n Chrysothamnus nauseosus var.
nauseosus Dwarf Rabbitbrush 18" ht., #5
container VL-L space @ 3'-0" o.c., allow to mass
Fal-p Fallugia paradoxa Apache Plume 24" ht., #5 container VL-L space @ 5'-0" o.c., allow to mass
Hyd-a Hydrangea arborescens 'Abetwo' Incrediball Hydrangea 24" ht., #5 container M-H space @ 4'-0" o.c.
Jam-a Jamesia americana Waxflower 24" ht., #5 container L-M Space @ 4'-0" o.c., allow to mass
Phy-o Physocarpus opulifolius 'Nanus' Dwarf Ninebark 18" ht., #5 container L-M space @ 3'-0" o.c., allow to mass
Rhu-t Rhus trilobata 'Autumn Amber' Autumn Amber Sumac 24" ht., #5 container VL-L space @ 3'-0" o.c., allow to mass
Rib-c Ribes cereum Squaw Currant 24" ht., #5 container L-M Space @ 4'-0" o.c., allow to mass
Sym-x Symphoricarpos x chenault 'Hancock' Hancock Coralberry 24" ht., #5 container L-M space @ 3'-0" o.c., allow to mass
EVERGREEN SHRUBS
Bux-x Buxus x koreana 'Winter Gem' Winter Gem Boxwood 24" ht., #5 container M-H space @ 3'-0" o.c., allow to mass
Bux-g Buxus 'Green Mountain' Green Mountain Boxwood 24" ht., #5 container M-H space @ 3'-0" o.c., allow to mass
Jun-s Juniperus sabina 'Tamariscifolia' Tammy Juniper 24" ht., #5 container L space @ 3'-0" o.c., allow to mass
Jun-b Juniperus squamata 'Blue Star' Blue Star Singleseed Juniper 24" ht., #5 container L space @ 3'-0" o.c., allow to mass
Pic-c Picea glauca 'Conica' Dwarf Alberta Spruce 36" ht., #5 container M space @ 4'-0" o.c.
Pic-b Picea pungens 'Globe' Globe Spruce 24" ht., #5 container M Space @ 4'-0" o.c., allow to mass
Tax-c Taxus cuspidata 'Monloo' Emerald Spreader Yew 18" spd., #5 container H space @ 3'-0" o.c., allow to mass
Tax-x Taxus x media 'Tautonii' Dense Tauton Yew 30" spd., #5 container H space @ 4'-0" o.c., allow to mass
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
9/10/2014 11:57:25 AM
HEALTH & WELLNESS
SUITES OF FT.
COLLINS
2014.00421
ZIEGLER ROAD
FT. COLLINS, CO 80528
10/01/14
SCHEMATIC DESIGN
REVISION SCHEDULE
NO. DESCRIPTION DATE
NOT FOR CONSTRUCTION
0
Scale 1" = 30'-0"
15 30 60
North
HYDROZONE PLAN
L4 of 4
Low Water Needs Area
Moderate Water Needs Area
High Water Needs Area
ANNUAL WATER BUDGET
High Water Zones: SF x (18 Gal/SF) = Gallons / Season
Moderate Water Zones: SF x (10 Gal/SF) = Gallons / Season
Low Water Zones: SF x (3 Gal/SF) = Gallons / Season
Very Low Water Zones: SF x (0 Gal/SF) = Gallons / Season
Total Gallons Needed by All Zones: = Gallons / Season
Total Square Feet (SF) of All Zones: = SF
Average Gal/SF/Season, All Zones: Total Gallons / Total SF = Gallons / SF / Season
ORNAMENTAL GRASSES AND PERENNIALS
Ach-m Achillea 'Moonshine' Moonshine Yarrow #1 pot VL-M space @ 18" o.c., triangular spacing
Aqu-r Aquilegia 'Redstar' Red Star Columbine #1 pot M space @ 15" o.c., triangular spacing
Ast-s Astilbe simplicifolia Dwarf Pink Astilbe #1 pot H space @ 18" o.c.
Ber-l Berlandiera lyrata Chocolate Flower #1 pot VL-L space @ 18" o.c., triangular spacing
Bou-g Bouteloua gracilis Blue Grama Grass #1 pot L space @ 18" o.c., triangular spacing
Gai-a Gaillardia aristata 'Oranges and Lemons' Oranges and Lemons Gaillardia #1 pot L-M space @ 18" o.c., triangular spacing
Heu-m Heuchera micrantha 'Purple Palace' Purple Palace Coral Bells #1 pot M space @ 12" o.c., triangular spacing
Mah-r Mahonia repens Creeping Oregon Grape Holly #1 pot L-M space @ 18" o.c., triangular spacing
Pan-v Panicum virgatum 'Heavy Metal' Heavy Metal Switchgrass #1 pot L space @ 3'-0" o.c.
Pen-s Penstemon strictus Rocky Mountain Penstemon #1 pot L-M space @ 15" o.c., triangular spacing
Sal-v Salvia verticillata 'Purple Rain' Purple Rain Salvia #1 pot M space @ 18" o.c., triangular spacing
Sch-s Schizachyrium scoparium 'The Blues' The Blues Little Bluestem #1 pot L space @ 2'-0" o.c.
Sol-c Solidago canadensis 'Golden Baby' Golden Baby Goldenrod #1 pot L space @ 18" o.c.
Spo-h Sporobolus heterolepis Prairie Dropseed #1 pot M space @ 2'-0" o.c.
2"
Slope & scarify sides of pit.
Excavated soil or topsoil backfill.
Set root ball on undisturbed
soil cone at bottom of pit.
times ball diameter.
Width of pit to be two
Finish grade
4" shredded hardwood bark mulch
1
2 dia. of
root ball
Do NOT cut main leader
TREE PLANTING
Not to Scale
Remove all burlap & wire
from top 1/3 of root ball.
4" saucer rim sloped
gradually to finished grade
Fertilized topsoil mix.
Water thoroughly
when pit is half full.
Thoroughly loosen subsoil
at bottom of plant pit.
Lightly compacted topsoil mix
3'-0" min.
Finished grade
4" mulch
Set plant 2" to 4" above
finished grade.
#4 rebar painted flat black, tie to
trunk with 1/2" flexible vinyl strip.
1
2" Flexible vinyl strip -
black or green
NOTES: Do not cut leader.
1. This detail used for evergreens 6'
or less in size; other evergreens
staked in standard fashion.
2. Do not prune evergreens except
under direction of Landscape
Architect.
EVERGREEN TREE PLANTING
Not to Scale
Face of Wall
#6 - #10 washed river gravel, compacted
Spade Edge - See Detail this sheet
4"
3'-0"
MOW STRIP
Not to Scale
Compacted Subgrade
Non woven geotextile fabric
Topsoil. See Specs
2"
Slope & scarify sides of pit.
Excavated soil or topsoil backfill.
Set root ball on undisturbed
soil cone at bottom of pit.
times ball diameter.
Width of pit to be two
Finish grade
4" shredded hardwood bark mulch
1
2 dia. of
root ball
MULTI-STEM TREE PLANTING
Not to Scale
4" shredded hardwood bark mulch
Refer to Planting Schedule for On-Center
Note: All perennial beds shall be planted
12" prepared soil; see specifications
Remove container
using triangular planting scheme.
Compacted subgrade
planting dimension.
Existing grade.
PERENNIAL PLANTING
Not to Scale
NOTE: Remove burlap from top 1/3 of
Slope & scarify sides of pit.
3" high topsoil saucer for
Width of pit to be two
Excavated soil or topsoil backfill.
soil cone at bottom of pit.
4" shredded hardwood
Set root ball on undisturbed
Equal to
1/2 ball dia.
times ball diameter.
root ball or carefully remove container.
individual plants.
Finish grade.
bark mulch
SHRUB PLANTING
Not to Scale
Area to receive hardwood bark mulch
Topsoil (as specified)
Existing grade
5"
3"
3"
SPADE EDGE
Not to Scale
2
3
4
5
6
7
North
OVERALL
PLANTING PLAN
L1 of 4
REFER TO SHEET L2
1. Plant material to be installed and maintained by a qualified and experienced landscape installer.
2. All materials are subject to the approval of the Landscape Architect and Owner at any time.
Landscape Architect to inspect all plant locations and plant bed conditions prior to installation.
Stake all plant locations for review and approval by the Landscape Architect before planting.
On-site adjustments may be required. Plants are to be freshly dug. Transporting of plants shall be
done in a manner as to not destroy the natural shape, compromise the health, or alter the
characteristics of plant materials.
3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery
Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. Remove from the site any
plant material that turns brown or defoliates within five (5) days after planting. Replace
immediately with approved, specified material.
4. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make
own plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i.e.,
spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed
measurements and install appropriate quantities as governed by plant spacing per schedule.
5. All plant beds shall receive 3" minimum of genuine shredded hardwood bark mulch (unless
otherwise noted). Apply pre-emergent herbicide as directed by the manufacturer prior to installing
mulch. Seed all areas disturbed by construction activities that are not otherwise noted to receive
pavement, planting bed, or other treatment.
6. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet ASTM D5268
standards. Landscaper shall verify depth and quality of topsoil prior to plant installation. A
minimum of 4" of topsoil is required for lawn areas; 12" for plant beds. Topsoil sources shall
include the reuse of surface soil stockpiled on site, clean of roots, plants, sod, stones, clay lumps,
and other extraneous or foreign materials larger than 1". Supplement with imported topsoil from
off-site sources when quantities are insufficient. Do not obtain supplemental topsoil from
agricultural land, bogs, or marshes. Inorganic amendments, organic amendments, and fertilizers
shall be used to amend topsoil as needed for long-term plant health.
7. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to
satisfaction of the Owner and Operating Authority at no additional cost.
8. Install all plant material in accordance with all local codes and ordinances. Coordinate with the
Owner to obtain any required permits necessary to complete work. All workmanship and materials
shall be guaranteed by the Contractor for a period of one (1) calendar year after Final Acceptance.
9. Maintain all plant material for a three (3) month period from date of Substantial Completion.
Maintenance shall include pruning, cultivating, watering, weeding, fertilizing, restoring plant
saucers, spraying for disease and insects, and replacing tree wrappings. Recommended long-term
maintenance procedures shall be provided to the Owner before expiration of this period.
10. Satisfactory Seeded Lawn: At end of maintenance period, a healthy, uniform, close stand of grass
has been established, free of weeds and surface irregularities, with coverage exceeding 90
percent over any 10 sq. ft. (0.92 sq. m) and bare spots not exceeding 3 by 3 inches.Reestablish
lawns that do not comply with requirements and continue maintenance until lawns are fully
satisfactory to the Owner.
GENERAL LANDSCAPE AND
PLANTING NOTES
LANDSCAPE ORDINANCE REQUIREMENTS
STREET TREES
1 Canopy Shade Tree per 30 to 40 LF of road
Ziegler Road: 425 LF / 30-40 LF = 11-14 Trees required, 13 Trees provided
Precision Drive: 520 LF / 30-40 LF = 13-18 Trees required, 16 Trees provided
PARKING LOT PERIMETER LANDSCAPING:
1 Tree / 40 LF along a side lot line
North: 209 LF / 40 LF = 6 Trees required and provided
East: 272 LF / 40 LF = 7 Trees required and provided
6FUHHQLQJIURPQRQUHVLGHQWLDOXVHVVKDOOKDYHDPLQLPXPKHLJKWRI´DORQJDPLQLPXPRIRIWKH
parking lot
PARKING LOT INTERIOR LANDSCAPING
1 Canopy Shade Tree per Landscape Island required and provided
1 Canopy Shade Tree per 40 LF required along each side of driveways and provided
MINIMUM SPECIES DIVERSITY
60 or more trees on site: 15% maximum percentage of any one species
SCREENING
All trash collection, service areas, and loading docks shall be screened from off-site view
Planting Beds, typ. Planting Beds, typ.
Planting Beds, typ.
Planting Beds, typ.
Planting Beds, typ.
Planting Beds, typ.