Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MAINSTREET HEALTH & WELLNESS SUITES - PDP - PDP140018 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONS
FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" 3 3 3 3 3 4 4 4 5 5 5 5 6 6 22 9 9 6 9 1 12 1 1 12 13 13 8 13 18 8 8 14 8 14 7 2 6 2 TYP TYP TYP TYP FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" 3 3 3 3 3 4 4 5 5 5 5 5 6 22 6 6 9 6 9 9 21 12 1 7 1 12 1 8 13 13 8 TYP. TYP. TYP. FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" 3 3 3 3 3 3 3 3 6 3 3 4 4 5 5 FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" PART A PART B 2 A303 3 3 3 3 3 5 5 6 6 9 9 1 1 18 1 10 14 8 14 8 5 7 22 21 FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" PART A PART B 3 A301 3 3 3 3 6 3 3 4 4 22 6 5 9 1 1 18 12 18 1 12 8 8 14 16 19 8 10 14 10 2 7 22 2 TYP. TYP. TYP. TYP. TYP. Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 10/3/2014 10:51:04 AM A2 OF 6 SOUTH ELEVATION HEALTH & WELLNESS SUITES OF FT. COLLINS 2014.00421 ZIEGLER ROAD FT. COLLINS, CO 80528 FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" PART A PART B 3 3 4 5 3 6 6 9 1 12 1 13 13 8 13 18 8 7 TYP 1 A304 FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" 2 A302 PART A PART B 3 4 4 3 5 5 5 22 9 6 9 1 12 8 14 8 14 7 2 6 2 TYP TYP TYP Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 10/3/2014 10:51:06 AM A3 OF 6 WEST ELEVATION HEALTH & WELLNESS SUITES OF FT. COLLINS 2014.00421 ZIEGLER ROAD FT. COLLINS, CO 80528 10/01/14 SCHEMATIC DESIGN NOT FOR CONSTRUCTION 1/8" = 1'-0" A3 OF 6 FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" 4 A311 3 A301 5 A311 3 3 3 3 3 13 4 9 5 6 5 6 9 19 12 1 18 1 18 12 18 1 18 18 14 13 8 13 16 8 18 20 22 17 FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" PART A PART B 1 A303 3 3 3 3 3 3 4 4 5 5 6 22 9 9 18 18 18 12 18 12 18 1 1 1 20 13 8 13 14 2 2 2 TYP. TYP. TYP. TYP. TYP. TYP. Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 10/3/2014 10:51:09 AM A4 OF 6 NORTH ELEVATION HEALTH & WELLNESS FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" 2 A301 1 A301 2 A302 PART A PART B 3 3 5 3 5 5 6 22 6 9 9 21 12 1 7 8 FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" 1 A302 UPPER TRUSS BRG 122' - 0" PART A PART B 3 4 3 4 5 5 6 6 9 1 12 1 8 13 13 8 TYP. TYP. TYP. 1 A304 Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 10/3/2014 10:51:11 AM A5 OF 6 EAST ELEVATION HEALTH & WELLNESS SUITES OF FT. COLLINS Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 10/3/2014 10:52:20 AM A6 OF 6 EXTERIOR COLOR PALETTE HEALTH & WELLNESS SUITES OF FT. COLLINS 2014.00421 ZIEGLER ROAD FT. COLLINS, CO 80528 10/01/14 SCHEMATIC DESIGN NOT FOR CONSTRUCTION REVISION SCHEDULE NO. DESCRIPTION DATE 2014.00421 ZIEGLER ROAD FT. COLLINS, CO 80528 10/01/14 SCHEMATIC DESIGN NOT FOR CONSTRUCTION 1/8" = 1'-0" A5 OF 6 1 EAST ELEVATION-PART A 1/8" = 1'-0" A5 OF 6 2 EAST ELEVATION-PART B KEYED ELEVATION NOTES (NOTED WITH 1 ) 1 KANSAS STONE, FLINT HILLS GRAY - SEE SPECIFICATIONS 2 CAST STONE CAP - SEE DETAIL XXX 3 ALLURA FIBER CEMENT BOARD SIDING, PAINTED 4 VINYL DOUBLE HUNG WINDOW - SEE A600 SHEETS 5 FIBER CEMENT BOARD TRIM, PAINTED 6 PREFINISHED 6" METAL GUTTER AND 3"x4" DOWNSPOUT 7 INSULATED HOLLOW METAL DOOR AND FRAME 8 FASCIA BOARD TRIM, PAINTED, TYPICAL 9 ASPHALT SHINGLE ROOFING 10 CONTINUOUS RIDGE VENT, TYPICAL 11 PREFINISHED METAL FLASHING 12 PTAC UNIT - SEE MECHANICAL DRAWINGS 13 NICHIHA VINTAGE WOOD FIBER CEMENT PANEL, CEDAR 14 PREFINISHED METAL PARAPET COPING 15 BRICK CONTROL JOINT - SEE DETAIL XXX 16 ROOF EXPANSION JOINT - SEE DETAIL XXX 17 PORT COCHERE DROP OFF CANOPY 18 ALUMINUM STOREFRONT - SEE A600 SHEETS 19 WALL EXPANSION JOINT - SEE DETAIL XXX 20 INSULATED METAL CANOPY - SEE A300 SHEETS 21 PREFINISHED METAL LOUVER GATE 22 PREFINISHED METAL 18"X12" SCUPPER CONDUCTOR W/3"X4" D.S. 23 ROOF MEMBRANE GRAVEL STOP - SEE A300 SHEETS 24 BREAK METAL WRAP - SEE A300 SHEETS 25 STRUCTURAL STEEL COLUMNS - SEE STRUCTURAL SHEETS N KEYPLAN 1B 2B 1A 2A 1C 2C 1 2 REVISION SCHEDULE NO. DESCRIPTION DATE SUITES OF FT. COLLINS 2014.00421 ZIEGLER ROAD FT. COLLINS, CO 80528 10/01/14 SCHEMATIC DESIGN NOT FOR CONSTRUCTION 1/8" = 1'-0" A4 OF 6 1 NORTH ELEVATION-PART A 1/8" = 1'-0" A4 OF 6 2 NORTH ELEVATION-PART B KEYED ELEVATION NOTES (NOTED WITH 1 ) 1 KANSAS STONE, FLINT HILLS GRAY - SEE SPECIFICATIONS 2 CAST STONE CAP - SEE DETAIL XXX 3 ALLURA FIBER CEMENT BOARD SIDING, PAINTED 4 VINYL DOUBLE HUNG WINDOW - SEE A600 SHEETS 5 FIBER CEMENT BOARD TRIM, PAINTED 6 PREFINISHED 6" METAL GUTTER AND 3"x4" DOWNSPOUT 7 INSULATED HOLLOW METAL DOOR AND FRAME 8 FASCIA BOARD TRIM, PAINTED, TYPICAL 9 ASPHALT SHINGLE ROOFING 10 CONTINUOUS RIDGE VENT, TYPICAL 11 PREFINISHED METAL FLASHING 12 PTAC UNIT - SEE MECHANICAL DRAWINGS 13 NICHIHA VINTAGE WOOD FIBER CEMENT PANEL, CEDAR 14 PREFINISHED METAL PARAPET COPING 15 BRICK CONTROL JOINT - SEE DETAIL XXX 16 ROOF EXPANSION JOINT - SEE DETAIL XXX 17 PORT COCHERE DROP OFF CANOPY 18 ALUMINUM STOREFRONT - SEE A600 SHEETS 19 WALL EXPANSION JOINT - SEE DETAIL XXX 20 INSULATED METAL CANOPY - SEE A300 SHEETS 21 PREFINISHED METAL LOUVER GATE 22 PREFINISHED METAL 18"X12" SCUPPER CONDUCTOR W/3"X4" D.S. 23 ROOF MEMBRANE GRAVEL STOP - SEE A300 SHEETS 24 BREAK METAL WRAP - SEE A300 SHEETS 25 STRUCTURAL STEEL COLUMNS - SEE STRUCTURAL SHEETS N KEYPLAN 1B 2B 1A 2A 1C 2C 1 2 REVISION SCHEDULE NO. DESCRIPTION DATE 1 WEST ELEVATION-PART A 1/8" = 1'-0" A3 OF 6 2 WEST ELEVATION-PART B KEYED ELEVATION NOTES (NOTED WITH 1 ) 1 KANSAS STONE, FLINT HILLS GRAY - SEE SPECIFICATIONS 2 CAST STONE CAP - SEE DETAIL XXX 3 ALLURA FIBER CEMENT BOARD SIDING, PAINTED 4 VINYL DOUBLE HUNG WINDOW - SEE A600 SHEETS 5 FIBER CEMENT BOARD TRIM, PAINTED 6 PREFINISHED 6" METAL GUTTER AND 3"x4" DOWNSPOUT 7 INSULATED HOLLOW METAL DOOR AND FRAME 8 FASCIA BOARD TRIM, PAINTED, TYPICAL 9 ASPHALT SHINGLE ROOFING 10 CONTINUOUS RIDGE VENT, TYPICAL 11 PREFINISHED METAL FLASHING 12 PTAC UNIT - SEE MECHANICAL DRAWINGS 13 NICHIHA VINTAGE WOOD FIBER CEMENT PANEL, CEDAR 14 PREFINISHED METAL PARAPET COPING 15 BRICK CONTROL JOINT - SEE DETAIL XXX 16 ROOF EXPANSION JOINT - SEE DETAIL XXX 17 PORT COCHERE DROP OFF CANOPY 18 ALUMINUM STOREFRONT - SEE A600 SHEETS 19 WALL EXPANSION JOINT - SEE DETAIL XXX 20 INSULATED METAL CANOPY - SEE A300 SHEETS 21 PREFINISHED METAL LOUVER GATE 22 PREFINISHED METAL 18"X12" SCUPPER CONDUCTOR W/3"X4" D.S. 23 ROOF MEMBRANE GRAVEL STOP - SEE A300 SHEETS 24 BREAK METAL WRAP - SEE A300 SHEETS 25 STRUCTURAL STEEL COLUMNS - SEE STRUCTURAL SHEETS N KEYPLAN 1B 2B 1A 2A 1C 2C 2 1 REVISION SCHEDULE NO. DESCRIPTION DATE 10/01/14 SCHEMATIC DESIGN NOT FOR CONSTRUCTION KEYED ELEVATION NOTES (NOTED WITH 1 ) 1 KANSAS STONE, FLINT HILLS GRAY - SEE SPECIFICATIONS 2 CAST STONE CAP - SEE DETAIL XXX 3 ALLURA FIBER CEMENT BOARD SIDING, PAINTED 4 VINYL DOUBLE HUNG WINDOW - SEE A600 SHEETS 5 FIBER CEMENT BOARD TRIM, PAINTED 6 PREFINISHED 6" METAL GUTTER AND 3"x4" DOWNSPOUT 7 INSULATED HOLLOW METAL DOOR AND FRAME 8 FASCIA BOARD TRIM, PAINTED, TYPICAL 9 ASPHALT SHINGLE ROOFING 10 CONTINUOUS RIDGE VENT, TYPICAL 11 PREFINISHED METAL FLASHING 12 PTAC UNIT - SEE MECHANICAL DRAWINGS 13 NICHIHA VINTAGE WOOD FIBER CEMENT PANEL, CEDAR 14 PREFINISHED METAL PARAPET COPING 15 BRICK CONTROL JOINT - SEE DETAIL XXX 16 ROOF EXPANSION JOINT - SEE DETAIL XXX 17 PORT COCHERE DROP OFF CANOPY 18 ALUMINUM STOREFRONT - SEE A600 SHEETS 19 WALL EXPANSION JOINT - SEE DETAIL XXX 20 INSULATED METAL CANOPY - SEE A300 SHEETS 21 PREFINISHED METAL LOUVER GATE 22 PREFINISHED METAL 18"X12" SCUPPER CONDUCTOR W/3"X4" D.S. 23 ROOF MEMBRANE GRAVEL STOP - SEE A300 SHEETS 24 BREAK METAL WRAP - SEE A300 SHEETS 25 STRUCTURAL STEEL COLUMNS - SEE STRUCTURAL SHEETS 1/8" = 1'-0" A2 OF 6 1 SOUTH ELEVATION-PART A 1/8" = 1'-0" A2 OF 6 2 SOUTH ELEVATION-PART B N KEYPLAN 1B 2B 1A 2A 1C 2C 2 1 REVISION SCHEDULE NO. DESCRIPTION DATE 5 22 6 6 6 9 9 9 1 1 18 1 1 1 18 12 18 1 12 10 14 8 14 8 8 14 16 19 8 10 14 10 5 7 22 21 2 7 22 2 TYP. TYP. TYP. TYP. TYP. FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" 3 3 3 3 3 3 3 3 3 3 13 3 4 4 9 4 5 5 5 6 5 6 6 22 9 19 9 9 12 18 18 12 18 18 18 18 18 18 12 18 12 18 1 1 1 1 1 1 14 13 8 13 16 8 18 20 13 8 13 14 22 17 2 2 2 TYP. TYP. TYP. TYP. TYP. TYP. Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 10/3/2014 10:51:01 AM A1 OF 6 EXTERIOR ELEVATIONS HEALTH & WELLNESS SUITES OF FT. COLLINS 2014.00421 ZIEGLER ROAD FT. COLLINS, CO 80528 10/01/14 SCHEMATIC DESIGN NOT FOR CONSTRUCTION 1/16" = 1'-0" A1 OF 6 3 WEST ELEVATION-OVERALL 1/16" = 1'-0" A1 OF 6 4 EAST ELEVATION-OVERALL 1/16" = 1'-0" A1 OF 6 1 SOUTH ELEVATION-OVERALL 1/16" = 1'-0" A1 OF 6 2 NORTH ELEVATION-OVERALL KEYED ELEVATION NOTES (NOTED WITH 1 ) 1 KANSAS STONE, FLINT HILLS GRAY - SEE SPECIFICATIONS 2 CAST STONE CAP - SEE DETAIL XXX 3 ALLURA FIBER CEMENT BOARD SIDING, PAINTED 4 VINYL DOUBLE HUNG WINDOW - SEE A600 SHEETS 5 FIBER CEMENT BOARD TRIM, PAINTED 6 PREFINISHED 6" METAL GUTTER AND 3"x4" DOWNSPOUT 7 INSULATED HOLLOW METAL DOOR AND FRAME 8 FASCIA BOARD TRIM, PAINTED, TYPICAL 9 ASPHALT SHINGLE ROOFING 10 CONTINUOUS RIDGE VENT, TYPICAL 11 PREFINISHED METAL FLASHING 12 PTAC UNIT - SEE MECHANICAL DRAWINGS 13 NICHIHA VINTAGE WOOD FIBER CEMENT PANEL, CEDAR 14 PREFINISHED METAL PARAPET COPING 15 BRICK CONTROL JOINT - SEE DETAIL XXX 16 ROOF EXPANSION JOINT - SEE DETAIL XXX 17 PORT COCHERE DROP OFF CANOPY 18 ALUMINUM STOREFRONT - SEE A600 SHEETS 19 WALL EXPANSION JOINT - SEE DETAIL XXX 20 INSULATED METAL CANOPY - SEE A300 SHEETS 21 PREFINISHED METAL LOUVER GATE 22 PREFINISHED METAL 18"X12" SCUPPER CONDUCTOR W/3"X4" D.S. 23 ROOF MEMBRANE GRAVEL STOP - SEE A300 SHEETS 24 BREAK METAL WRAP - SEE A300 SHEETS 25 STRUCTURAL STEEL COLUMNS - SEE STRUCTURAL SHEETS N KEYPLAN 1B 2B 1A 2A 1C 2C 1 3 2 4