August 22, 2014
Michelle Zimmerman
Clean Energy Collective, LLC
3005 Center Green Drive, Suite 205
Boulder, CO 80301
Comment Summary:
Department: Planning Services
Contact: Ryan Mounce, 970-224-6186, rmounce@fcgov.com
Topic: General
08/19/2014: Landscaping is needed along all the fences that face or are viewable from Riverside
Avenue, with additional plantings necessary along the edges of the Phase 2-fencing that do not
directly face the river. It would also be beneficial to incorporate several different types of species
interspersed with one another or as clusters to avoid creating a monoculture.
Comment Number: 1 Comment Originated: 08/19/2014
08/19/2014: Given the unique conditions of the site and the solar garden use, and requirements for
non-traditional landscaping (e.g. no trees), lets discuss submitting an alternative compliance request to
document these aspects and the alternatives proposed.
Comment Number: 2 Comment Originated: 08/19/2014
08/19/2014: The site plan note that the location of the transformer and inverter equipment may change
leaves a lot of ambiguity. I'd like to pin down a definite location for this equipment as soon as
possible so this note can be removed, or add additional documentation that landscaping or screening
is required if this equipment is moved and will be visible from the public right-of-way.
Comment Number: 3 Comment Originated: 08/19/2014
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of
the above referenced project. If you have questions about any comments, you may contact the individual
commenter or direct your questions through the Project Planner, Ryan Mounce, at 970-224-6186 or
rmounce@fcgov.com.
RE: Riverside Community Solar Garden, PDP140013, Round Number 1
Page 1 of 6
08/19/2014: Additional labels and clarifications are needed for the site plan:
Please add a lot coverage table showing the total area (SF) of Phase 1, Phase 2 and the remainder of
the parcel.
Please show the location of the remnant asphalt along the top of the river slope and add a note
whether this will be removed or remain.
Please add a note that the building is to be demolished.
Please add a label that the eastern fence is existing chain-link fencing with barbed wire for the
Wastewater Treatment Plant.
The cover sheet will need signature blocks for Owner's Authorization and Direction of Planning
approval. Please let me know if you need examples or sample language.
Comment Number: 4 Comment Originated: 08/19/2014
08/20/2014: At a future time, further notes or details may need to be added to the site and landscape
plan as we learn more about a potential Art in Public Places component to the project.
Comment Number: 5 Comment Originated: 08/20/2014
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221-6501, tsiegmund@fcgov.com
Topic: General
08/19/2014: Please add the standard note to the site plan:
Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks,
curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be
replaced or restored to City of Fort Collins standards at the Developer's expense prior to the
acceptance of completed improvements and/or prior to the issuance of the first Certificate of
Occupancy
Comment Number: 1 Comment Originated: 08/19/2014
08/19/2014: Per the approved CDOT access control plan, a 10ft bike/pedestrian sidewalk is to be
installed along the Riverside frontage of the property. Current submittal is showing a future 6ft sidewalk
to be installed by others. Typically, development projects are required to build all public infrastructure
as part of the current project.
Comment Number: 2 Comment Originated: 08/19/2014
08/19/2014: The new sidewalk along Riverside will need to extend to the southeast and connect to the
existing sidewalk along E Mulberry St. The sidewalk alignment will also need to extend to Mulberry St
ROW line. See redlines.
Comment Number: 3 Comment Originated: 08/19/2014
08/19/2014: The existing handicap ramp along E Mulberry St, adjacent to the site, does not comply
with current ADA standards. Replacement of the deficient ramp to current standards will need to be
completed with this project
Comment Number: 4 Comment Originated: 08/19/2014
Page 2 of 6
08/19/2014: A grading plan may be necessary to determine the layout of the sidewalk along the
Riverside frontage of the property. Maximum cross slope on sidewalk is 2%. Are you planning on
sloping the sidewalk NE, away from the railroad tracks?
Comment Number: 5 Comment Originated: 08/19/2014
08/19/2014: Please add a type III barricade where the sidewalk ends at the NW property line.
Comment Number: 6 Comment Originated: 08/19/2014
08/19/2014: COFC Engineering and CDOT have concerns regarding the proposed access point off of
the COFC Waste Water Treatment Plant (WWTP) driveway. The access needs to move north, out of
CDOT right-of-way. This will involve coordination with COFC WWTP. An access easement or letter
from the COFC WWTP will be needed to obtain access from a separate parcel.
Comment Number: 7 Comment Originated: 08/19/2014
Department: Environmental Planning
Contact: Kate Rentschlar, 970-224-6086, krentschlar@fcgov.com
Topic: General
08/19/2014:
Instead of the current drawing on the site/landscape plan, a top of bank line needs to be added for the
Poudre River and some style of hatching can be used to show existing vegetation. Both the line and
the hatching need to be labeled on the landscape/site plan.
Comment Number: 1 Comment Originated: 08/19/2014
08/19/2014:
The natural habitat buffer zone needs to be delineated and labeled on the site/landscaping plan.
Comment Number: 2 Comment Originated: 08/19/2014
08/19/2014:
Please add the following statement to the notes on the site and landscape plans, and on any sheets
that show the habitat buffer: Please see Section 3.4.1 of the Land Use Code for allowable uses within
the buffer zone.
Comment Number: 3 Comment Originated: 08/19/2014
08/19/2014:
Was an assessment ever performed to look at the possibility of removing the asphalt along the upper
bank?
Comment Number: 9 Comment Originated: 08/19/2014
08/19/2014:
If the building is going to be demolished - please ensure the interior is surveyed prior to demolition to
make sure bats or owls are not utilizing the building.
Comment Number: 10 Comment Originated: 08/19/2014
Topic: Landscape Plans
08/19/2014:
Please add a note to the landscape plan stating: The objective of the buffer zone is to protect the
ecological character of the natural habitat from the impacts of the activities associated with
development and should be maintained as a native landscape.
Comment Number: 4 Comment Originated: 08/19/2014
Page 3 of 6
08/19/2014:
Section 4.17(D)(1)(a) of the Land Use Code calls for a "continuous landscape buffer along the River".
To help meet this, additional native shrubs should be planted in a natural manner between the
development and the River.
Comment Number: 5 Comment Originated: 08/19/2014
08/19/2014: Areas within the habitat buffer that are bare or disturbed will need to be re-seeded.
Comment Number: 7 Comment Originated: 08/19/2014
08/19/2014: Species in the seed mixes need to be provided.
Comment Number: 8 Comment Originated: 08/19/2014
Topic: Site Plan
08/19/2014:
Please show the distance between the fence and the top of bank where it is nearest.
Comment Number: 6 Comment Originated: 08/19/2014
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
08/20/2014:
The second site meeting with the applicant indicated that the entry drive would be revised and not
cross CDOT right of way. The neww route presented appears to have very small tree impact, but will
need to be reviewed at next round of review.
Comment Number: 1 Comment Originated: 08/20/2014
08/20/2014:
Along Riverside wide grouping of Autumn Brilliance Serviceberry are shown. Consider using the
native chokecherry or another native drought tolerant shrub in place of the A.B. Serviceberry as the
native choke cherry has much better xeric adaptation. A substantial water berm/basin around these
plants would help for establishment. Please provide landscape note that describes how these plants
will be irrigated to establishment.
Comment Number: 2 Comment Originated: 08/20/2014
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com
Topic: General
08/08/2014: No comments.
Comment Number: 1 Comment Originated: 08/08/2014
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
08/19/2014: FIRE ACCESS
Poudre Fire Authority is working with the project team to resolve fire access needs to the site. Further
comments are withheld pending site plan redesign.
Comment Number: 1 Comment Originated: 08/19/2014
Page 4 of 6
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
08/19/2014: No comments.
Comment Number: 1 Comment Originated: 08/19/2014
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Landscape Plans
08/14/2014: There are line over text issues. See redlines.
Comment Number: 1 Comment Originated: 08/14/2014
08/14/2014: There are text over text issues. See redlines.
Comment Number: 2 Comment Originated: 08/14/2014
Topic: Site Plan
08/14/2014: Please add "City Of Fort Collins" to the sub-title on sheet 1. See redlines.
Comment Number: 3 Comment Originated: 08/14/2014
08/14/2014: Please remove the "0" (zeros) from the numbering in the index on sheet 1. See redlines.
Comment Number: 4 Comment Originated: 08/14/2014
08/14/2014: The legal description on sheet 1 is not acceptable. We require an accurate verified
description of the property.
Comment Number: 5 Comment Originated: 08/14/2014
08/14/2014: There are line over text issues. See redlines.
Comment Number: 6 Comment Originated: 08/14/2014
08/14/2014: Please improve the quality of the PV Array Racking System & Typical Mesh Fence
details. See redlines.
Comment Number: 7 Comment Originated: 08/14/2014
08/14/2014: Please sharpen up the text in the Inverter Pad details. It is very pixelated and hard to
read. See redlines.
Comment Number: 8 Comment Originated: 08/14/2014
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
08/19/2014: Please coordinate with the engineering department and CDOT on the appropriate location
for the access drive to connect to the access drive for the treatment plant. It will likely need to be
outside CDOT ROW.
Comment Number: 1 Comment Originated: 08/19/2014
08/19/2014: Transportation Planning staff notes that the trail shown along the SW border of the property
needs to be 10 feet wide, a hard surface, and the eastern end needs to connect to the existing
sidewalk along Mulberry.
Comment Number: 2 Comment Originated: 08/19/2014
Page 5 of 6
08/19/2014: Based on very limited additional traffic to be generated by the use, any requirement for a
traffic impact study is waived.
Comment Number: 3 Comment Originated: 08/19/2014
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: Landscape Plans
08/19/2014: A note on the landscape plan indicates that "Irrigation to be provided by existing
abandoned on-site irrigation system". Is an irrigation tap needed? What is the water source for this
system?
Comment Number: 1 Comment Originated: 08/19/2014
Page 6 of 6