HomeMy WebLinkAboutRIGDEN FARM FILING SIX, TRACT Z, MULTI-FAMILY - PDP - PDP140009 - REPORTS - DRAINAGE REPORTProject: Tract Z Multi-Family
Project Number: 13-2449
Basin Area (SF) AREA (AC) Landscape Paved Roof
Percent
Impervious
A1 42,151 0.97 9,583 19,166 14,810 77%
A2 20,828 0.48 1,861 11,160 7,807 87%
A3 32,705 0.75 22,938 1,763 8,004 27%
A4 17,156 0.39 10,122 464 6,570 37%
A5 15,831 0.36 9,979 1,116 4,736 34%
Total 128,671 2.95 54,483 33,669 41,927 55.5%
Proposed Design
6/12/2014 Olsson Associates Copyright 2014
A1
A4
A3
A2
A5
Project Title:
Catchment ID:
Illustration
Instructions: For each catchment subarea, enter values for A and C.
Subarea Area Runoff Product
ID acres Coeff.
A C* CA
input input input output
Pavement 0.43 100.00 43.00
Roof 0.36 90.00 32.40
Landscape 0.18 0.00 0.00
Porous 40.00 0.00
Sum: 0.97 Sum: 75.40
Area-Weighted Runoff Coefficient (sum CA/sum A) = 77.73
*See sheet "Design Info" for inperviousness-based runoff coefficient values.
Area-Weighting for Runoff Coefficient Calculation
132449_Runoff Calcs, Weighted C 6/12/2014, 3:24 PM
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = A1
Area = 0.97 Acres
Percent Imperviousness = 75.40 %
NRCS Soil Type = B A, B, C, or D
II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3
Design Storm Return Period, Tr = 2 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 0.85 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C = 0.51
Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Coefficient, C-5 = 0.54
Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
NRCS Land Heavy Tillage/ Short Nearly Grassed
Type Meadow Field Pasture/ Bare Swales/
Lawns Ground Waterways
Conveyance 2.5 5 7 10 15
Calculations: Reach Slope Length 5-yr NRCS Flow Flow
ID S L Runoff Convey- Velocity Time
Coeff ance V Tf
ft/ft ft C-5 fps minutes
input input output input output output
Overland 0.0100 25 0.54 N/A 0.08 5.02
1 0.0100 359 20.00 2.00 2.99
2
3
4
5
384 Computed Tc = 8.01
Regional Tc = 12.13
User-Entered Tc = 8.01
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I = 2.51 inch/hr Peak Flowrate, Qp = 1.24 cfs
Rainfall Intensity at Regional Tc, I = 2.13 inch/hr Peak Flowrate, Qp = 1.06 cfs
Rainfall Intensity at User-Defined Tc, I = 2.51 inch/hr Peak Flowrate, Qp = 1.24 cfs
(Sheet Flow)
20
Shallow Paved Swales
Sum
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Rigden Farm Filing Six, Tract Z MF
A1
Paved Areas &
132449_Runoff Calcs, Tc and PeakQ 6/12/2014, 3:25 PM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia = 78.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.780
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.25 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 42,051 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.43 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 886.6 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum) DWQCV = 6 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin = 591 sq ft
D) Actual Flat Surface Area AActual = 1710 sq ft
E) Area at Design Depth (Top Surface Area) ATop = 2165 sq ft
F) Rain Garden Total Volume VT= 969 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y = 2.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 = 887 cu ft
iii) Orifice Diameter, 3/8" Minimum DO = 0.69 in
Design Procedure Form: Rain Garden (RG)
SSZ
OLSSON ASSOCIATES
October 1, 2014
RIGDEN FARM TRACT Z
FORT COLLINS, CO
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
Rain Garden.xlsm, RG 10/1/2014, 12:07 PM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
NO SPRINKLER HEADS ON FLAT SURFACE
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
SSZ
OLSSON ASSOCIATES
October 1, 2014
RIGDEN FARM TRACT Z
FORT COLLINS, CO
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
Rain Garden.xlsm, RG 10/1/2014, 12:07 PM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Type of Permeable Pavement Section
A) What type of section of permeable pavement is used?
(Based on the land use and activities, proximity to adjacent
structures and soil characteristics.)
B) What type of wearing course?
2. Required Storage Volume
A) Effective Imperviousness of Area Tributary to Permeable Pavement, Ia Ia = 87.0 %
B) Tributary Area's Imperviousness Ratio (I = Ia / 100) i = 0.870
C) Tributary Watershed Area ATotal = 20,828 sq ft
(including area of permeable pavement system)
D) Area of Permeable Pavement System APPS = 6,967 sq ft
(Minimum recommended permeable pavement area = 6314 sq ft)
E) Impervious Tributary Ratio RT = 1.7
(Contributing Imperviuos Area / Permeable Pavement Ratio)
F) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 524 cu ft
(WQCV = (0.8 * (0.91 * i3 - 1.19 * i2 + 0.78 * i) / 12) * Area)
G) Is flood control volume being added?
H) Total Volume Needed VTotal = cu ft
3. Depth of Reservoir
A) Minimum Depth of Reservoir Dmin = 6.0 inches
(Minimum recommended depth is 6 inches)
B) Is the slope of the reservoir/subgrade interface equal to 0%?
C) Porosity (Porous Gravel Pavement < 0.3, Others < 0.40) P = 0.40
D) Slope of the Base Course/Subgrade Interface S = 0.020 ft / ft
E) Length Between Lateral Flow Barriers (max = 18.79 ft.) L = 18.8 ft
F) Volume Provided Based on Depth of Base Course V = 639 cu ft
Flat or Stepped: V = P * ((Dmin-1)/12) * Area
Sloped: V = P * [(Dmin - (Dmin - 6*SL-1)) / 12] * Area Volume assumes uniform slope & lateral flow barrier spacing.
Calculate the volume of each cell individually when this varies.
4. Lateral Flow Barriers
A) Type of Lateral Flow Barriers
B) Number of Permeable Pavement Cells Cells = 10
5. Perimeter Barrier
A) Is a perimeter barrier provided on all sides of the
pavement system?
(Recommeded for PICP, concrete grid pavement, or for any
no-infiltration section.)
Rigden Farm Filing Six, Tract Z MF
Fort Collins, Colorado
Design Procedure Form: Permeable Pavement Systems (PPS)
SSZ
Olsson Associates
June 12, 2014
Choose One
No Infiltration
Partial Infiltration Section
Full Infiltration Section
Choose One
YES
NO
Choose One
YES- Flat or Stepped Installation
NO- Sloped Installation
Choose One
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
6. Filter Material and Underdrain System
A) Is the underdrain placed below a 6-inch thick layer of
CDOT Class C filter material?
B) Diameter of Slotted Pipe (slot dimensions per Table PPs-2)
C) Distance from the Lowest Elevation of the Storage Volume y = 0.7 ft
(i.e. the bottom of the base course to the center of the orifice)
7. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is there a minimum 30 mil thick impermeable PVC geomembrane
liner on the bottom and sides of the basin, extending up to the top
of the base course?
B) CDOT Class B Separator Fabric
8. Outlet
(Assumes each cell has similar area, subgrade slope, and length
between lateral barriers (unless subgrade is flat). Calculate cells
individually where this varies.)
A) Depth of WQCV in the Reservoir DWQCV = 4.50 inches
(Elevation of the Flood Control Outlet)
B) Diameter of Orifice for 12-hour Drain Time DOrifice = 0.66 inches
(Use a minimum orifice diameter of 3/8-inches)
Notes:
Rigden Farm Filing Six, Tract Z MF
Design Procedure Form: Permeable Pavement Systems (PPS)
SSZ
Olsson Associates
June 12, 2014
Fort Collins, Colorado
Choose One
YES
NO
Choose One
4-inch
6-inch
Choose One
Choose One
YES
NO
Placed above the liner
Placed above and below the liner
N/A
Permeable Pavement Calc2.0, PPS 6/12/2014, 3:27 PM
RAIN GARDEN NOTES
FIGURE
1
PERMEABLE PAVEMENT
UNDERDRAIN PLAN
FORT COLLINS 2014
R
EXHIBIT
TEL 970.461.7733
Loveland, CO 80538
Suite 160
RAIN GARDEN 5285 McWhinney Boulevard
OUTLET STRUCTURE DETAIL R 2
EXHIBIT
1
BIORETENTION- RAIN GARDEN DETAILS
FORT COLLINS 2014
URBAN DRAINAGE AND FLOOD CONTROL DISTRICT R
BUILDING #3
5-PLEX
BUILDING #4
3-PLEX
BUILDING #7
8-PLEX
CELL 1
CELL 2
CELL 3
CELL 4
CELL 5
CELL 6
CELL 7
CELL 8
CELL 9
CELL 10
C
C
PERMEABLE PAVEMENT NOTES
FIGURE
1
PERMEABLE PAVEMENT
UNDERDRAIN PLAN
FORT COLLINS 2014
R
EXHIBIT
TEL 970.461.7733
Loveland, CO 80538
Suite 160
PERMEABLE PAVEMENT 5285 McWhinney Boulevard
UNDERDRAIN DETAIL R 1
PERMEABLE PAVEMENT SECTION D-D
PERMEABLE PAVEMENT SECTION C-C
EXHIBIT
TEL 970.461.7733
Loveland, CO 80538
Suite 160
PERMEABLE PAVEMENT 5285 McWhinney Boulevard
CROSS SECTIONS R 2
Concrete Walls
PVC geomembrane installed normal to flow
N/A- Flat installation
Other (Describe):
Choose One
YES
NO
Choose One
PICP
Concrete Grid Pavement
Pervious Concrete
Porous Gravel
Permeable Pavement Calc2.0, PPS 6/12/2014, 3:27 PM