HomeMy WebLinkAboutRIVER DISTRICT BLOCK 8 MIXED-USE DEVELOPMENT (OLD ELK DISTILLERY) - PDP - PDP140016 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESland planning landscape architecture urban design entitlement
Thinking outside of the box for over two decades.
401 W. Mountain Ave., Suite 100 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
September 24, 2014
River District Block 8 Mixed-Use
Development
Project Development Plan - Planning Objectives
Introduction
The River District Block 8 Mixed-Use Development Project Development Plan is a
mixed use project located on a 1.2-acre site at the southwest corner of Linden Street
and Willow Street in Old Town. The site falls within River Downtown Redevelopment
District. The 70,841 square foot building includes a distillery, retail space, a
restaurant/pub, banquet room and office space. The main building is 52.5 feet tall with
a tower element that reaches to 80 feet tall. The proposed development takes a
comprehensive approach to the use of the site, with a special focus on enhancing the
street, providing for efficient functional site requirements and utilizing high quality and
enduring materials.
The new building reflects traditional development patterns and aligns with historic
buildings at the street edge. A south facing alley-like area between the old Depot
(currently Mawson Lumber) and the new building is celebrated as a link to the
restaurant and pub component of the distillery.
The buildings architecture grows from the pedestrian nature of Linden and the
celebration of existing historic buildings including the Depot next door. The proposed
multi-use building respects the one-story nature of the Depot ,following the transitional
height requested by the district guidelines, with a similar one story building as a plinth
for a crescendo of heights as we get farther from the Depot. The façade along Linden
incorporates a porous retail front with human scale elements, similar in proportions to
Old Town facades.
Thinking outside of the box for over two decades.
401 W. Mountain Ave., Suite 100 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
As the building turns the corner along Willow there is an entry to subterranean
catacombs, planned to house a music/event venue. The spirits barrel vault is placed at
the base of an iconic tower that houses the tall stills of the distillery. Along Willow, the
factory side is expressed by a traditional two-story factory made of brick and large
widows.
The facility, as a whole evokes, a sense of history influenced by Old Town as well as
the industrial nature of the grain silos, the railroad tracks and other buildings/sites being
redeveloped. The interior of the building follows a chronological discovery that
articulates a reference to the commerce of spirits. Beginning with a small distillery
building that grows over time, inviting the entrepreneurial spirit to connect with
community and bring other uses to the neighborhood that include a pub, a fine dining
restaurant, retail, a banquet room, and office space for the distillery and the other
building amenities.
The exterior materials include brick, with stone trim, metal panels, soft awnings,
storefront, and industrial looking windows. The building façade will include a water
tower, a smokestack, and grain silos to help define the nature of the building use.
(i) Statement of appropriate City Plan Principles and Policies achieved by the proposed
plan.
The River District Block 8 Mixed-Use Development project is supported by many City
Plan Principles and Policies including:
Economic Health Policies having to do with job creation, diversifying the local
economy, leveraging the Fort Collins brand, and supporting local, unique and
creative businesses.
Environmental Health Policies that promote energy efficiency, waste
management, recycling, hazardous materials management, water quality and
storm water management.
Community and Neighborhood Livability Policies having to do with compact
urban development, redevelopment in infill areas, community appearance and
design, streetscapes and public spaces, ecologically sound landscape
practices, commercial developments that contribute to Fort Collins visual quality
and uniqueness, enhancement of historic resources, bicycle and pedestrian
access, Downtown activity center goals and the Poudre River District design
objectives.
Culture, Parks, and Recreation Policies that encourage art and culture as
economic drivers for the Downtown, cultural education, and diverse cultural and
artistic experiences.
Transportation Policies that encourage pedestrian mobility, bicycle facilities, and
alternative modes of travel
Thinking outside of the box for over two decades.
401 W. Mountain Ave., Suite 100 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
(ii) Description of proposed open space, wetlands, natural habitats and features,
landscaping, circulation, transition areas, and associated buffering on site and in the
general vicinity of the project.
The site is highly urban and does not contain any natural habitats or features. The site
design includes streetscapes along Linden and Willow with an alley-like pocket park on
the south side adjacent to the Depot building. The outdoor spaces are designed to be
consistent with the Fort Collins River District Design Guidelines. Some of the key site
design features that are used to enhance the street edge are pedestrian-oriented
entries, windows facing the street, small public spaces linked to the sidewalk, urban
streetscape design and landscaping, and street furniture. The ultimate design for these
outdoor spaces will also include special paving, water features, enhanced pedestrian
scale lighting and other unique decorative features.
(iii) Statement of proposed ownership and maintenance of public and private open
space areas; applicant's intentions with regard to future ownership of all or portions of
the project development plan.
360 Linden LLC will own and maintain the private outdoor spaces inside the property
line.
(iv) Estimate of number of employees for business, commercial, and industrial uses.
Old Elk Distillery will have around 35 employees, the restaurant could have 50 or more
depending upon the shifts. The project as a whole will likely push to 100 total
employees at some point in the future with the management groups for the other
venues, etc.
(v) Description of rationale behind the assumptions and choices made by the applicant.
See introduction.
(vi) The applicant shall submit as evidence of successful completion of the applicable
criteria, the completed documents pursuant to these regulations for each proposed use.
The Planning Director may require, or the applicant may choose to submit, evidence
that is beyond what is required in that section. Any variance from the criteria shall be
described.
All land uses proposed in the project are permitted uses in the zone district and no
modifications or engineering variances are being requested.
(vii) Narrative description of how conflicts between land uses or disturbances to
wetlands, natural habitats and features and or wildlife are being avoided to the
maximum extent feasible or are mitigated.
Thinking outside of the box for over two decades.
401 W. Mountain Ave., Suite 100 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
The project does not affect any wetlands or natural habitats or features.
(viii) Written narrative addressing each concern/issue raised at the neighborhood
meeting(s), if a meeting has been held.
The uses proposed in the building are all Type I uses and a neighborhood meeting is
not required. However, the applicant has voluntarily scheduled a neighborhood meeting
for October 1
st
to provide an opportunity for neighboring property owners to see the
proposal, ask questions and provide comments.
(ix) Name of the project as well as any previous name the project may have had during
Conceptual Review.
River District Block 8 Mixed-Use Development (Old Elk Distillery at PDR)
(e) Response Letter (27 copies) addressing each of the applicable issues raised in the
conceptual review letter.
The project was presented at a Preliminary Design Review (PDR) meeting on August
27
th
. See comment responses attached.
(f) A complete list of the new street names requested in the proposed development. (2
copies) The Larimer County Street Inventory System can be accessed to determine the
availability of street names. The Web site is: www.co.larimer.co.us/streets.
No new streets are being proposed.
(g) Legal description of the site.
See attached
(h) The name and address of each owner of property within the boundaries of the
development plan area.
360 Linden, LLC
Manager: Kurt Hoeven
Contact: Brandon Grebe
401 W. Mountain Ave, Suite 200
Fort Collins, CO 80521
P: 970.498.2261
(i) A list of names of all general and limited partners (if a partnership), all managers and
directors (if a limited liability company) and/or officers and directors (if a corporation)
involved as either applicants or owners of the project development plan.
360 Linden, LLC
Thinking outside of the box for over two decades.
401 W. Mountain Ave., Suite 100 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
Manager: Kurtis A. Hoeven
Officer: None
Member/Owner: Blue Ocean Holdings I Real Estate, LLC (Kurt is also the Manager of this entity)
(j) A development schedule indicating the approximate date when construction of the
project, or stages of the same, can be expected to begin and be completed, including
the proposed phasing of construction of public improvements and recreational and
common space areas.
Construction is expected to begin in early Spring of 2015 and be completed late Fall of
2015.