HomeMy WebLinkAboutTHE LEARNING EXPERIENCE AT MIRAMONT OFFICE PARK - FDP - FDP140012 - SUBMITTAL DOCUMENTS - ROUND 1 - REVISIONSApril 25, 2014
Attn: Noah Beals
City of Fort Collins
Community Development
281 N. College Avenue
Fort Collins, CO 80522
RE: The Learning Experience at Miramont Office Park
4775 Boardwalk Drive
Lot 3, Miramont Office Park
Dear Mr. Beals:
Below are responses to the comments as stated in your letter dated February 28, 2014:
Current Planning:
1) Comment Number 7 – Mechanical/utility equipment (Vents, flues, ac/rtu, meters,
boxes, conduit...) locations need to be identified on the plans with notes on how
such equipment is screened and painted.
Response: The equipment will be located inside of the building.
2) Comment Number 15 - The cover sheet index drawing will need to also include
the landscape plan, lighting plan, and elevations sheets.
Response: The Landscape, Lighting and Building Elevation Plans have
been added to the PDP Cover Sheet.
Engineering Development Review:
1) Comment Number 5 - $400 TDRF fee to vacate easement has been paid
(2/26/2014). Approval of easement vacation by utility owners is still outstanding. I
will update once known.
Response: No response is required.
2) Comment Number 13 - Please add the following construction details to the details
sheet in the utility plan set:
Sidewalk- LCUASS detail 1601 and 1602
Vertical curb and gutter- LCUASS detail 701
Truncated dome detail- LCUASS detail 1607
Response: The details have been added to the Utility Plans.
3) Comment Number 14 - Please show the existing chase plate in the sidewalk along
Boardwalk Dr that is to be removed and replaced. See redlines.
The Learning Experience at Miramont Office Park
April 25, 2014
Page 2 of 2
Response: The chase plate to be removed has been shown. The chase and
plate will be removed and replaced with sidewalk.
Environmental Planning:
1. Comment Number 1 - The native grass mix you have proposed contains species
the City is currently working towards eliminating, such as crested wheatgrass. I
will provide you with a list of seed mixes we recommend at the meeting.
Response: The native grass mix has been revised per your
recommendations.
Stormwater Engineering:
1. Comment Number 5 - Repeat. Waiting for FDP for full submittal.
Response: It is unclear if any additional information is required.
2. Comment Number 4 - Stormwater is ready for a hearing.
Response: No response is required.
Technical Services:
1. Comment Number 15 – Building Elevations: No comments.
Response: No response is required.
2. Comment Number 5 – Construction Plans: There are still issues on sheet U4.0.
See redlines.
Response: The line over text issues as shown on the markups have been
corrected.
3. Comment Number 10 - Lighting Plan: There are line over text issues.
Response: The line over text issues as shown on the markups have been
corrected.
If you have any questions regarding the above response to comments, please contact
me at 720-283-6783 ext. 136 or at mcevaal@redland.com.
Sincerely,
Mark D. Cevaal, P.E.
Sr. Project Manager