Loading...
HomeMy WebLinkAboutZIEGLER-HARVEST PARK - FDP - FDP140022 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFINAL DRAINAGE REPORT Harvest Park - Ziegler Mixed Use Lot 2 Prepared for: Architecture West, LLC 4710 South College Ave Fort Collins, CO 80525 (970) 207-0424 Prepared by: Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado 80550 (970) 674-3300 September 10, 2014 Job Number 1054-095-00 iii TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................... iii 1. GENERAL LOCATION AND DESCRIPTION ...................................................................... 1 1.1 Location ............................................................................................................................ 1 1.2 Description of Property .................................................................................................... 1 2. DRAINAGE BASINS AND SUB-BASINS ............................................................................ 2 2.1 Major Basin Description .................................................................................................. 2 2.2 Sub-basin Description ...................................................................................................... 2 3. DRAINAGE DESIGN CRITERIA .......................................................................................... 3 3.1 Regulations ....................................................................................................................... 3 3.2 Directly Connected Impervious Area (DCIA) Discussion ............................................... 3 3.3 Development Criteria Reference and Constraints ............................................................ 4 3.4 Hydrologic Criteria ........................................................................................................... 4 3.5 Hydraulic Criteria ............................................................................................................. 5 3.6 Floodplain Regulations Compliance ................................................................................ 5 4. DRAINAGE FACILITY DESIGN ........................................................................................... 5 4.1 General Concept ............................................................................................................... 5 4.2 Specific Flow Routing ...................................................................................................... 6 5. CONCLUSIONS ...................................................................................................................... 9 5.1 Compliance with Standards .............................................................................................. 9 5.2 Drainage Concept ............................................................................................................. 9 6. REFERENCES ....................................................................................................................... 10 APPENDIX A-VICINITY MAP AND DRAINAGE PLAN ......................................................... A APPENDIX B-HYDROLOGIC COMPUTATIONS ..................................................................... B APPENDIX C-HYDRAULIC CALCULATIONS ......................................................................... C APPENDIX D-WATER QUALITY POND SIZING .................................................................... D APPENDIX E-FLOODPLAIN INFORMATION........................................................................... E 1 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location The Harvest Park / Ziegler Mixed Use development is located in southeast Fort Collins. It is located in the Southwest Quarter of Section 5, Township 6 North, Range 68 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. See the location map in Appendix A. The project is located west of Zeigler Road and the property will be split down the middle by the extension of County Fair Lane. The project is bounded on the north and west by Harvest Park Subdivision, on the south by McClelland’s Channel, and on the east by Ziegler Road. 1.2 Description of Property The property consists of approximately 4.03 acres of land which will be separated into two parcels by the County Fair Lane right-of-way. Both parcels are owned by the DP Investment Group. The south parcel is considered the proposed development and is part of the final compliance plans and the north parcel will be developed in the future. The proposed development consists of approximately 2.71 acres and the future parcel to the north consists of approximately 1.32 acres. The project will consist of four multifamily building units and associated parking and drives. The land currently slopes to the south at a range of approximately 1.5% to 2%. The land is currently occupied by one single family home and several outbuildings. The majority of the ground cover is dryland vegetation or gravel. There is offsite flow from the parcel to the north that presently drains through the property. The offsite parcel consists of two single family homes, several outbuildings and large gravel areas. The McClelland’s Channel is located on the southerly portion of the site. McClelland’s Channel was mapped by the City in November 2000 (revised in 2003) and there is a 100- yr floodplain/floodway associated with the channel. The channel is not mapped by FEMA. There are no proposed improvements within the City Floodplain/Floodway boundary. 2 2. DRAINAGE BASINS AND SUB-BASINS 2.1 Major Basin Description The proposed development lies within the McClelland’s Creek Master Drainage Basin. 2.2 Sub-basin Description The existing site drains to the south where it is intercepted by McClelland’s Channel. The proposed development will increase the amount of flows that currently exists on site due to an increase in impervious area. Because the time-to-peak of the onsite basins will be much smaller than the time-to-peak of the overall McClelland Channel drainage basin (see Section 3.3) and due to the sites’ close proximity to the river itself, the City of Fort Collins Stormwater Department has determined that water quantity detention will not be required. However, water quality treatment measures will be required for the developed site. Three off-site areas have been considered for this report. The first has been designated as sub-basin OS-1 which includes the eastern half of the Ruff property which drains into Ziegler Road. The Ruff property is located directly north of the proposed development. Sub-basin OS-2 includes the Harvest Park Subdivision frontage along Ziegler Road up to the existing high point in the road which is approximately 850’ north of the Lot 1 property line. OS-1 and OS-2 will sheet flow into the existing curb and gutter along the west half of Ziegler Road and flow south until it is intercepted by the new street intersection of County Fair Lane where the runoff will be collected in a Type R inlet and routed through the site via storm pipe to the water quality pond. Sub-basin OS-3 includes the Zeigler frontage just south of the proposed development that drains to the north via curb and gutter where it is collected in a low point with a Type R inlet. This runoff is conveyed via existing storm pipe directly to McClelland’s Channel 3 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations This report was prepared to meet or exceed the “City of Fort Collins Storm Drainage Design Criteria Manual” specifications. Where applicable, the criteria established in the “Urban Storm Drainage Criteria Manual” (UDFCD), developed by the Denver Regional Council of Governments, has been used. 3.2 Directly Connected Impervious Area (DCIA) Discussion Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainageways and implementing long-term source controls. The Four Step Process applies to the management of smaller, frequently occurring events. Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). See the LID Area Exhibit in Appendix D. Where space allows, runoff from this site will be routed through vegetated areas and into a grass swale in order to slow runoff and promote infiltration during minor storm events. Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release Once runoff has been minimized, the remaining runoff shall be treated through capture and slow release of the WQCV. The water quality pond located south of the site just upstream from McClelland’s Channel will accomplish this requirement. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate and volume of runoff during and following development. The only proposed improvement within a natural drainageway (McClelland’s Channel) is the water quality pond spillway. This spillway will be stabilized with buried riprap. The outlet of 4 the water quality pond will be connected to an existing 24” pipe outfall that discharges into the channel which is currently stabilized with riprap and vegetation. Step 4: Implement Site Specific and Other Source Control BMPs Proactively controlling pollutants at their source by preventing pollution rather than removing contaminants once they have entered the stormwater system or receiving waters is important when protecting storm systems and receiving waters. This can be accomplished through site specific needs such as construction site runoff control, post- construction runoff control and pollution prevention / good housekeeping. It will be the responsibility of the contractor to develop a procedural best management practice for the site. 3.3 Development Criteria Reference and Constraints The runoff from this site has been routed to conform to the requirements of the City Stormwater Department. Water quality facilities are required for the new construction proposed on the site. Water quality will be met through the use of a grass swale and a water quality pond. The City of Fort Collins has agreed that detention is not required for this development because the peak flow coming off of the proposed site occurs well before the peak flow in McClelland’s Channel. Specifically, the peak flow during the 100-yr storm event from the proposed site occurs at 35 minutes. According to the Master Plan the peak flow just upstream of the proposed site in McClelland’s Channel occurs at 1 hour 11 minutes. Please refer to the proposed hydrograph in Appendix B. 3.4 Hydrologic Criteria Runoff computations were prepared for the 2-year and 10-year minor and 100-year major storm frequency utilizing the rational method. Colorado Urban Hydrograph Procedure was used to generate the 100-year hydrograph for the site. All hydrologic calculations associated with the basins are included in Appendix B of this report. Standard Form 8 (SF-8) provides time of concentration calculations for all sub- basins. Standard Form 9 (SF-9) provides a summary of the design flows for all Sub- basins and Design Points associated with this site. 5 Water quality volume was calculated using the method recommended in the “Urban Storm Drainage Criteria Manual”. All calculations are located in Appendix D. 3.5 Hydraulic Criteria All final hydraulic calculations were prepared in accordance with the City of Fort Collins Drainage Criteria and are included in Appendix C of this report. The storm system has been designed to convey the 10-yr flow wherever there is overland relief for the 100-year storm event. The 100-year flows will be conveyed overland though the street, drive aisle and grass swale in such a way as to prevent flooding of structures. 3.6 Floodplain Regulations Compliance A completed “City of Fort Collins Floodplain Review Checklist for 100% Submittals” has been included in Appendix E. All floodway/floodplain information is in compliance with Chapter 10 of the City of Fort Collins Municipal Code. Although the McClelland’s Channel floodplain & floodway are within the limits of the proposed development, no improvements are proposed within floodplain & floodway. 4. DRAINAGE FACILITY DESIGN 4.1 General Concept The majority of the proposed development will be collected and conveyed to the proposed water quality pond on the southern most portion of the site where it will be treated before being released into McClelland’s Channel. The pond outfall will be connected to an existing 24-inch storm pipe that discharges into McClelland’s Channel. 6 4.2 Specific Flow Routing A summary of the drainage patterns within each basin is provided in the following paragraphs. Basin OS1 includes the area north of the proposed site that drains through the northern parcel that will be part of a future development. This runoff will be cut off by the extension of County Fair Lane and will be collected in the proposed catch basins and conveyed to the proposed water quality pond. This basin also includes the frontage of the existing portion of Ziegler Road. Runoff will follow existing flow patterns south along Ziegler road where it will be intercepted by the proposed inlets in County Fair Lane. Basin OS2 is a sub-basin from the Harvest Park Subdivision north of the site that drains to the east where it is intercepted by the Ziegler Road curb and gutter and conveyed south along Ziegler. This runoff will be intercepted by the proposed inlets at the low point in County Fair Lane. Basin 1 includes the northern half of the site, Lot 1, which is not part of this development. Future development will consist of either additional multifamily homes with associated drives or several commercial buildings with associated drives and parking lot. While this basin remains undeveloped during the proposed development of the southern parcel, runoff will follow existing flow patterns to the south where it will be intercepted by County Fair Lane and captured in the proposed catch basins. Flow will then be conveyed to the proposed water quality pond. Basin 1 also includes the northern half of the County Fair Lane roadway improvements. Runoff from the northern half of the roadway will be conveyed to the low point near the Zeigler intersection where it will be collected by an inlet and piped to the water quality pond. Basin 2 includes the existing Ziegler road frontage along the undeveloped northern portion of the site. Ultimate improvements (to be completed with the future development of the northern half) will include a detached sidewalk along Ziegler. All runoff follows existing flow patterns south along the Ziegler curb and gutter until it is intercepted by the proposed inlets in the low point of County Fair Lane. This runoff will be conveyed south to the proposed water quality pond. 7 Basin 3 includes the northern half of the County Fair Lane improvements. Runoff will be conveyed along the curb and gutter to a new low point where it will be collected in a Type 5 inlet and conveyed via storm system #1 to the water quality pond. Basin 4 includes the existing Ziegler road frontage that is adjacent to the southern half of the site. Improvements will include a 6 foot detached sidewalk. Runoff will follow existing flow patterns along the Ziegler curb and gutter to a low point just north of the bridge that crosses McClelland’s Channel. Runoff is collected by an existing set of inlets and then conveyed directly to an existing discharge location in McClelland’s Channel. Runoff from Basin 4 is not conveyed to the proposed water quality pond. The proposed pond is treating approximately 510 LF of existing Ziegler Road frontage that is included in Basin OS1. Basin 4 consists of approximately 498 LF of existing Ziegler Road frontage that will not be treated in the proposed pond. The City has agreed that it is acceptable to not treat Basin 4 and trade that water with the runoff from the Ziegler frontage in Basin OS1. Basin 6 includes the County Fair Lane improvements that are east of the proposed high point (approximately 40 LF). Runoff will be conveyed along the curb and gutter to an existing low point in County Fair Lane approximately 120 feet west of the property line. This runoff is conveyed to the Harvest Park Pond. This area was accounted for in the original Harvest Park Drainage Report. Basin 7 includes the western half of the roof of Building A. Roof runoff will be collected and hard piped to a private storm system which will convey the runoff to storm system #1 which drains into the water quality pond. Basin 8 includes the eastern half of the roof of Building A. Roof runoff will be collected and hard piped to storm system #1 which drains into the water quality pond. Basin 9 includes the western half of the roof of Building D. Roof runoff will be collected and hard piped to storm system #1 which drains into the water quality pond. Basin 10 includes the open space between buildings A and B. Runoff will sheet flow to a proposed lowpoint where it will be collected with an area drain and conveyed to storm system #1 which drains into the water quality pond. 8 Basin 11 includes the western half of the roof of Building B. Roof runoff will be collected and hard piped to a private storm system which will convey the runoff to storm system #1 which drains into the water quality pond. Basin 12 includes the eastern half of the roof of Building B. Roof runoff will be collected and hard piped to storm system #1 which drains into the water quality pond. Basin 13 includes the parking lot between Building C and D. Runoff will sheet flow over the pavement until it is intercepted by the curb and gutter and conveyed to a lowpoint in the southeast corner of the lot. A Type R inlet will collect the runoff and a private storm system will convey the runoff to storm system #1 which drains into the water quality pond. Basin 14 includes the western half of the roof of Building C. Roof runoff will be collected and hard piped to storm system #1 which drains into the water quality pond. Basin 15 includes the concrete drive that provides access to all buildings on site. The drive is an inverted crown and all runoff will be conveyed to south where it will discharge directly into the water quality pond. Basin 16 includes the eastern half of the roof of Building C and D as well as the landscape area between the Ziegler right-of-way and the Building C and D. Runoff will be conveyed to a grass swale which will encourage infiltration. Due to the poor on site soils, the swale will have an underdrain system to eliminate standing water. Access runoff in the swale will be collected with an area inlet and connected to an existing 24” storm sewer pipe that discharges directly to McClelland’s Channel. Basin 17 includes the walk and landscape area west of Building A that cannot be collected and conveyed to storm system #1 due to site constraints. Runoff from this basin sheet flows into the Harvest Park detention pond directly west of the site. Basin 18 includes the walk and landscape area west of Building B that cannot be collected and conveyed to storm system #1 due to site constraints. Runoff from this basin sheet flows into the Harvest Park detention pond directly west of the site. 9 4.3 Drainage Summary Drainage facilities located outside of the right of way (including the grass swale, water quality pond, proposed storm drain system and the pond outlet) will be maintained by the owners of the property. 5. CONCLUSIONS 5.1 Compliance with Standards All computations that have been completed within this report are in compliance with the City of Fort Collins Erosion Control Reference Manual for Construction Sites and the Storm Drainage Design Criteria Manual. All floodway information is in compliance with Chapter 10 of the City of Fort Collins Municipal Code. 5.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans adequately provide for stormwater quality treatment of proposed impervious areas. Conveyance elements have been designed to pass required flows and to minimize future maintenance. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit will be required. 10 6. REFERENCES 1. City of Fort Collins, “Storm Drainage Criteria Manual”, (SDCM), dated March, 1986. 2. Urban Drainage and Flood Control District, “Urban Storm Drainage Criteria Manual”, Volumes 1 and 2, dated June 2001, and Volume 3 dated September 1999. 3. ICON Engineering, Inc., “McClelland’s Creek Master Drainage Plan Update”, dated November 20, 2000 (Revised March 2003). A APPENDIX A VICINITY MAP AND DRAINAGE PLAN B APPENDIX B HYDROLOGIC COMPUTATIONS SUMMARY DRAINAGE SUMMARY TABLE Design Tributary Area C (2) C (10) C (100) tc (2) tc (10) tc (100) Q(2)tot Q(10)tot Q(100)tot DRAINAGE Sub-basin STRUCTURE Point (ac) (min) (min) (min) (cfs) (cfs) (cfs) /REMARKS OS-1 2.05 0.50 0.50 0.62 13.9 13.9 12.7 2.0 3.4 9.0 OS-2 0.41 0.65 0.65 0.81 7.1 7.1 5.3 0.7 1.2 3.2 OS-3 0.19 0.79 0.79 0.99 5.0 5.0 5.0 0.4 0.7 1.9 1 0.98 0.74 0.74 0.93 5.9 5.9 5.0 2.0 3.3 9.1 2 0.20 0.81 0.81 1.00 5.0 5.0 5.0 0.5 0.8 2.0 3 0.12 0.84 0.84 1.00 5.0 5.0 5.0 0.3 0.5 1.1 4 0.47 0.80 0.80 1.00 5.0 5.0 5.0 1.1 1.9 4.7 5 0.19 0.65 0.65 0.81 5.0 5.0 5.0 0.3 0.6 1.5 6 0.06 0.79 0.79 0.98 5.0 5.0 5.0 0.1 0.2 0.6 7 0.07 0.95 0.95 1.00 5.0 5.0 5.0 0.2 0.3 0.7 8 0.08 0.95 0.95 1.00 5.0 5.0 5.0 0.2 0.4 0.8 9 0.07 0.95 0.95 1.00 5.0 5.0 5.0 0.2 0.3 0.7 10 0.10 0.46 0.46 0.57 5.0 5.0 5.0 0.1 0.2 0.6 11 0.07 0.95 0.95 1.00 5.0 5.0 5.0 0.2 0.3 0.7 12 0.08 0.95 0.95 1.00 5.0 5.0 5.0 0.2 0.4 0.8 13 0.12 0.84 0.84 1.00 5.0 5.0 5.0 0.3 0.5 1.2 14 0.07 0.95 0.95 1.00 5.0 5.0 5.0 0.2 0.3 0.7 15 0.59 0.56 0.56 0.70 6.6 6.6 5.8 0.8 1.4 3.9 16 0.31 0.53 0.53 0.66 6.0 6.0 5.6 0.4 0.7 1.9 17 0.05 0.40 0.40 0.50 5.0 5.0 5.0 0.1 0.1 0.3 18 0.04 0.38 0.38 0.48 5.1 5.1 5.0 0.0 0.1 0.2 19 0.37 0.20 0.20 0.25 7.5 7.5 7.4 0.2 0.3 0.8 OVERALL SITE 4.03 0.67 0.67 0.84 14.3 14.3 10.8 5.2 8.8 25.4 Page 7 Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado LOCATION: ZIEGLER MIXED USE PROJECT NO: 1154-095-00 COMPUTATIONS BY: SB DATE: 9/4/2014 Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Runoff % coefficient Impervious C Streets, parking lots (asphalt): 0.95 100 Concrete: 0.95 96 Roofs: 0.95 90 Gravel: 0.50 40 Lawns (flat <2%, heavy soil): 0.20 0 SUBBASIN TOTAL TOTAL PAVED CONCRETE ROOF GRAVEL LANDSCAPE RUNOFF % DESIGNATION AREA AREA AREA AREA AREA AREA AREA COEFF. Impervious REMARKS (ac.) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (C) OS-1 2.05 89,485 13,234 0 6,612 39,400 30,239 0.50 39 OFF SITE NORTH OS-2 0.41 18,000 8,736 2,015 0 0 7,249 0.65 59 OFF SITE NORTH, ZIEGLER FRONTAGE OS-3 0.19 8,420 5,630 1,040 0 0 1,750 0.79 79 OFF SITE SOUTH, ZIEGLER FRONTAGE 1 0.98 42,666 0 18,000 13,000 0 11,666 0.74 68 NORTH PARCEL 2 0.20 8,649 5,822 1,182 0 0 1,645 0.81 80 NORTH PARCEL, ZIEGLER FRONTAGE 3 0.12 5,010 0 4,303 0 0 707 0.84 82 4 0.47 20,654 13,285 3,372 0 0 3,997 0.80 80 5 0.19 8,234 0 4,923 0 0 3,311 0.65 57 6 0.06 2,664 0 2,085 0 0 579 0.79 75 7 0.07 2,949 0 0 2,949 0 0 0.95 90 8 0.08 3,493 0 0 3,493 0 0 0.95 90 9 0.07 2,927 0 0 2,927 0 0 0.95 90 10 0.10 4,560 0 1,551 0 0 3,009 0.46 33 11 0.07 2,949 0 0 2,949 0 0 0.95 90 12 0.08 3,492 0 0 3,492 0 0 0.95 90 13 0.12 5,153 0 4,400 0 0 753 0.84 82 14 0.07 2,927 0 0 2,927 0 0 0.95 90 15 0.59 25,530 0 12,330 0 0 13,200 0.56 46 16 0.31 13,449 0 1,244 4,604 0 7,601 0.53 40 17 0.05 2,323 0 617 0 0 1,706 0.40 25 18 0.04 1,684 0 411 0 0 1,273 0.38 23 19 0.37 16,232 0 0 0 0 16,232 0.20 0 OVERALL SITE 4.03 175,545 19,107 54,418 36,341 0 65,679 0.67 59 OVERALL SITE Equations - Calculated C coefficients & % Impervious are area weighted C = Σ (Ci Ai) / At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai's RUNOFF COEFFICIENTS & % IMPERVIOUS Flow-FINAL.xls Cval Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado LOCATION: ZIEGLER MIXED USE PROJECT NO: 1154-095-00 COMPUTATIONS BY: SB DATE: 9/4/2014 10-yr storm Cf = 1.00 SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASIN) tc DESIGN SUBBASIN(s) Area C Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10 POINT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min) (1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14) OS-1 2.05 0.50 215 2.0 12.6 495 2.30 0.016 3.0 2.7 15.3 710 13.9 13.9 OS-2 0.41 0.65 55 2.0 4.8 335 1.50 0.016 2.5 2.3 7.1 390 12.2 7.1 OS-3 0.19 0.79 24 2.0 2.1 195 1.50 0.016 2.5 1.3 3.5 219 11.2 5.0 1 0.98 0.74 45 2.0 3.4 295 1.00 0.016 2.0 2.4 5.9 340 11.9 5.9 2 0.20 0.81 16 2.0 1.7 205 2.30 0.016 3.0 1.1 2.8 221 11.2 5.0 3 0.12 0.84 16 2.0 1.5 120 0.80 0.016 1.8 1.1 2.6 136 10.8 5.0 4 0.47 0.80 16 2.0 1.7 270 2.30 0.016 3.0 1.5 3.2 286 11.6 5.0 5 0.19 0.65 26 2.0 3.3 125 0.80 0.016 1.8 1.2 4.4 151 10.8 5.0 6 0.06 0.79 10 2.0 1.4 50 0.50 0.016 1.4 0.6 2.0 60 10.3 5.0 7 0.07 0.95 35 100.0 0.3 30 1.00 0.012 2.7 0.2 0.5 65 10.4 5.0 8 0.08 0.95 35 100.0 0.3 30 1.00 0.012 2.7 0.2 0.5 65 10.4 5.0 9 0.07 0.95 35 100.0 0.3 30 1.00 0.012 2.7 0.2 0.5 65 10.4 5.0 10 0.10 0.46 40 5.0 4.3 40 0.50 0.012 1.9 0.4 4.6 80 10.4 5.0 11 0.07 0.95 35 100.0 0.3 30 1.00 0.012 2.7 0.2 0.5 65 10.4 5.0 12 0.08 0.95 35 100.0 0.3 30 1.00 0.012 2.7 0.2 0.5 65 10.4 5.0 13 0.12 0.84 70 4.0 2.5 6 3.00 0.016 3.5 0.0 2.5 76 10.4 5.0 14 0.07 0.95 35 100.0 0.3 30 1.00 0.012 2.7 0.2 0.5 65 10.4 5.0 15 0.59 0.56 12 1.0 3.4 281 0.50 0.016 1.4 3.3 6.6 293 11.6 6.6 16 0.31 0.53 24 25.0 1.7 240 1.00 0.034 0.9 4.2 6.0 264 11.5 6.0 17 0.05 0.40 25 2.0 5.0 0 0.00 0.000 0.0 0.0 5.0 25 10.1 5.0 18 0.04 0.38 25 2.0 5.1 0 0.00 0.000 0.0 0.0 5.1 25 10.1 5.1 19 0.37 0.20 18 50.0 1.9 218 0.50 0.035 0.6 5.6 7.5 236 11.3 7.5 OVERALL SITE 4.03 0.67 240 2.0 9.5 525 0.50 0.013 1.7 5.0 14.5 765 14.3 14.3 EQUATIONS: tc = ti + tt ti = [1.87 (1.1 - CCf ) L0.5 ] / S 1/3 tt = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of IDF curves STANDARD FORM SF-2 TIME OF CONCENTRATION - 10 YEAR Flow-FINAL.xls TOC-10 Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado LOCATION: ZIEGLER MIXED USE PROJECT NO: 1154-095-00 COMPUTATIONS BY: SB DATE: 9/4/2014 100-yr storm Cf = 1.25 SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASIN) tc DESIGN SUBBASIN(s) Area C C*Cf Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10 POINT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min) (1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14) OS-1 2.05 0.50 0.62 215 2.0 10.0 495 2.30 0.016 3.0 2.7 12.7 710 13.9 12.7 OS-2 0.41 0.65 0.81 55 2.0 3.1 335 1.50 0.016 2.5 2.3 5.3 390 12.2 5.3 OS-3 0.19 0.79 0.99 24 2.0 0.8 195 1.50 0.016 2.5 1.3 2.1 219 11.2 5.0 1 0.98 0.74 0.93 45 2.0 1.6 295 1.00 0.016 2.0 2.4 4.1 340 11.9 5.0 2 0.20 0.81 1.00 16 2.0 0.6 205 2.30 0.016 3.0 1.1 1.7 221 11.2 5.0 3 0.12 0.84 1.00 16 2.0 0.6 120 0.80 0.016 1.8 1.1 1.7 136 10.8 5.0 4 0.47 0.80 1.00 16 2.0 0.6 270 2.30 0.016 3.0 1.5 2.0 286 11.6 5.0 5 0.19 0.65 0.81 26 2.0 2.1 125 0.80 0.016 1.8 1.2 3.3 151 10.8 5.0 6 0.06 0.79 0.98 10 2.0 0.5 50 0.50 0.016 1.4 0.6 1.1 60 10.3 5.0 7 0.07 0.95 1.00 35 100.0 0.2 30 1.00 0.012 2.7 0.2 0.4 65 10.4 5.0 8 0.08 0.95 1.00 35 100.0 0.2 30 1.00 0.012 2.7 0.2 0.4 65 10.4 5.0 9 0.07 0.95 1.00 35 100.0 0.2 30 1.00 0.012 2.7 0.2 0.4 65 10.4 5.0 10 0.10 0.46 0.57 40 5.0 3.5 40 0.50 0.012 1.9 0.4 3.9 80 10.4 5.0 11 0.07 0.95 1.00 35 100.0 0.2 30 1.00 0.012 2.7 0.2 0.4 65 10.4 5.0 12 0.08 0.95 1.00 35 100.0 0.2 30 1.00 0.012 2.7 0.2 0.4 65 10.4 5.0 13 0.12 0.84 1.00 70 4.0 0.9 6 3.00 0.016 3.5 0.0 1.0 76 10.4 5.0 14 0.07 0.95 1.00 35 100.0 0.2 30 1.00 0.012 2.7 0.2 0.4 65 10.4 5.0 15 0.59 0.56 0.70 12 1.0 2.5 281 0.50 0.016 1.4 3.3 5.8 293 11.6 5.8 16 0.31 0.53 0.66 24 25.0 1.3 240 1.00 0.034 0.9 4.2 5.6 264 11.5 5.6 17 0.05 0.40 0.50 25 2.0 4.3 0 0.00 0.000 0.0 0.0 4.3 25 10.1 5.0 18 0.04 0.38 0.48 25 2.0 4.4 0 0.00 0.000 0.0 0.0 4.4 25 10.1 5.0 19 0.37 0.20 0.25 18 50.0 1.8 218 0.50 0.035 0.6 5.6 7.4 236 11.3 7.4 OVERALL SITE 4.03 0.67 0.84 240 2.0 5.8 525 0.50 0.013 1.7 5.0 10.8 765 14.3 10.8 EQUATIONS: tc = ti + tt ti = [1.87 (1.1 - CCf ) L0.5 ] / S 1/3 tt = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of IDF curves TIME OF CONCENTRATION - 100 YR STANDARD FORM SF-2 Flow-FINAL.xls TOC-100 Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado RATIONAL METHOD PEAK RUNOFF (2-YEAR) LOCATION: ZIEGLER MIXED USE PROJECT NO: 1154-095-00 COMPUTATIONS BY: SB DATE: 9/4/2014 2-yr storm, Cf = 1.00 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Tributary A C Cf tc i Q (2) from Q (2) Q(2)tot Sub-basin (new) Design Point (ac) (min) (in/hr) (cfs) Point (cfs) (cfs) OS-1 2.05 0.50 13.9 1.93 2.0 OS-2 0.41 0.65 7.1 2.53 0.7 OS-3 0.19 0.79 5.0 2.85 0.4 1 0.98 0.74 5.9 2.68 2.0 2 0.20 0.81 5.0 2.85 0.5 3 0.12 0.84 5.0 2.85 0.3 4 0.47 0.80 5.0 2.85 1.1 5 0.19 0.65 5.0 2.85 0.3 6 0.06 0.79 5.0 2.85 0.1 7 0.07 0.95 5.0 2.85 0.2 8 0.08 0.95 5.0 2.85 0.2 9 0.07 0.95 5.0 2.85 0.2 10 0.10 0.46 5.0 2.85 0.1 11 0.07 0.95 5.0 2.85 0.2 12 0.08 0.95 5.0 2.85 0.2 13 0.12 0.84 5.0 2.85 0.3 14 0.07 0.95 5.0 2.85 0.2 15 0.59 0.56 6.6 2.58 0.8 16 0.31 0.53 6.0 2.66 0.4 17 0.05 0.40 5.0 2.80 0.1 18 0.04 0.38 5.1 2.78 0.0 19 0.37 0.20 7.5 2.48 0.2 OVERALL SITE 4.03 0.67 14.3 1.91 5.2 Q = Cf C iA Q = peak discharge (cfs) C = runoff coefficient Cf = frequency adjustment factor I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis) Flow-FINAL.xls Q2 Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado RATIONAL METHOD PEAK RUNOFF (10-YEAR) LOCATION: ZIEGLER MIXED USE PROJECT NO: 1154-095-00 COMPUTATIONS BY: SB DATE: 9/4/2014 10-yr storm, Cf = 1.00 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Tributary A C Cf tc i Q (10) from Q (10) Q(10)tot Sub-basin (new) Design Point (ac) (min) (in/hr) (cfs) Point (cfs) (cfs) OS-1 2.05 0.50 13.9 3.29 3.4 3.4 OS-2 0.41 0.65 7.1 4.32 1.2 1.2 OS-3 0.19 0.79 5.0 4.87 0.7 0.7 1 0.98 0.74 5.9 4.58 3.3 3.3 2 0.20 0.81 5.0 4.87 0.8 0.8 3 0.12 0.84 5.0 4.87 0.5 0.5 4 0.47 0.80 5.0 4.87 1.9 1.9 5 0.19 0.65 5.0 4.87 0.6 0.6 6 0.06 0.79 5.0 4.87 0.2 0.2 7 0.07 0.95 5.0 4.87 0.3 0.3 8 0.08 0.95 5.0 4.87 0.4 0.4 9 0.07 0.95 5.0 4.87 0.3 0.3 10 0.10 0.46 5.0 4.87 0.2 0.2 11 0.07 0.95 5.0 4.87 0.3 0.3 12 0.08 0.95 5.0 4.87 0.4 0.4 13 0.12 0.84 5.0 4.87 0.5 0.5 14 0.07 0.95 5.0 4.87 0.3 0.3 15 0.59 0.56 6.6 4.40 1.4 1.4 16 0.31 0.53 6.0 4.55 0.7 0.7 17 0.05 0.40 5.0 4.78 0.1 0.1 18 0.04 0.38 5.1 4.75 0.1 0.1 19 0.37 0.20 7.5 4.24 0.3 0.3 OVERALL SITE 4.03 0.67 14.3 3.26 8.8 8.8 Q = Cf C iA Q = peak discharge (cfs) C = runoff coefficient Cf = frequency adjustment factor I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis) Flow-FINAL.xls Q10 Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado RATIONAL METHOD PEAK RUNOFF (100-YEAR) LOCATION: ZIEGLER MIXED USE PROJECT NO: 1154-095-00 COMPUTATIONS BY: SB DATE: 9/4/2014 100-yr storm, Cf = 1.25 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Des. Area A C Cf tc i Q (100) from Q (100) Q(100)tot (new) Design Point Design. (ac) (min) (in/hr) (cfs) Point (cfs) (cfs) OS-1 2.05 0.62 12.7 7.02 9.0 9.0 OS-2 0.41 0.81 5.3 9.59 3.2 3.2 OS-3 0.19 0.99 5.0 9.95 1.9 1.9 1 0.98 0.93 5.0 9.95 9.1 9.1 2 0.20 1.00 5.0 9.95 2.0 2.0 3 0.12 1.00 5.0 9.95 1.1 1.1 4 0.47 1.00 5.0 9.95 4.7 4.7 5 0.19 0.81 5.0 9.95 1.5 1.5 6 0.06 0.98 5.0 9.95 0.6 0.6 7 0.07 1.00 5.0 9.95 0.7 0.7 8 0.08 1.00 5.0 9.95 0.8 0.8 9 0.07 1.00 5.0 9.95 0.7 0.7 10 0.10 0.57 5.0 9.95 0.6 0.6 11 0.07 1.00 5.0 9.95 0.7 0.7 12 0.08 1.00 5.0 9.95 0.8 0.8 13 0.12 1.00 5.0 9.95 1.2 1.2 14 0.07 1.00 5.0 9.95 0.7 0.7 15 0.59 0.70 5.8 9.39 3.9 3.9 16 0.31 0.66 5.6 9.49 1.9 1.9 17 0.05 0.50 5.0 9.95 0.3 0.3 18 0.04 0.48 5.0 9.95 0.2 0.2 19 0.37 0.25 7.4 8.70 0.8 0.8 OVERALL SITE 4.03 0.84 10.8 7.52 25.4 25.4 Q = C iA Q = peak discharge (cfs) C = runoff coefficient I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis) Flow-FINAL.xls Q100 C APPENDIX C HYDRAULIC CALCULATIONS Worksheet Protected Project: Inlet ID: Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm (local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 5.9 15.3 cfs * If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet. Geographic Information: (Enter data in the blue cells): Subcatchment Area = Acres Percent Imperviousness = % NRCS Soil Type = A, B, C, or D Slope (ft/ft) Length (ft) Overland Flow = Channel Flow = Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm Design Storm Return Period, Tr = years Return Period One-Hour Precipitation, P1 = inches C1 = C2 = C3 = User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C = User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 = Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.00 0.00 cfs Total Design Peak Flow, Q = 5.9 15.3 cfs <--- FILL IN THIS SECTION OR… FILL IN THE SECTIONS BELOW. <--- DESIGN PEAK FLOW FOR ONE-HALF OF STREET OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD Harvest Park - Ziegler Mixed Use A1 Site is Urban Site is Non-Urban Show Details Site Type: Street Inlets Area Inlets in a Median Flows Developed For: Inlet A-1 (5 FT TYPE R).xlsm, Q-Peak 9/10/2014, 8:01 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 10.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb nBACK = 0.016 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section nSTREET = 0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 12.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Harvest Park - Ziegler Mixed Use A1 (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Inlet A-1 (5 FT TYPE R).xlsm, Q-Allow 9/10/2014, 8:01 AM Project = Inlet ID = Design Information (Input) MINOR MAJOR Type of Inlet Inlet Type = Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 8.8 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.6) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Q a = 5.4 10.4 cfs WARNING: Inlet Capacity less than Q Peak for Minor and Major Storms Q PEAK REQUIRED = 5.9 15.3 cfs INLET IN A SUMP OR SAG LOCATION Harvest Park - Ziegler Mixed Use A1 CDOT Type R Curb Opening H-Vert H-Curb W Lo (C) Lo (G) Wo WP Inlet A-1 (5 FT TYPE R).xlsm, Inlet In Sump 9/10/2014, 8:01 AM Worksheet Protected Project: Inlet ID: Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm (local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 0.6 1.5 cfs * If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet. Geographic Information: (Enter data in the blue cells): Subcatchment Area = Acres Percent Imperviousness = % NRCS Soil Type = A, B, C, or D Slope (ft/ft) Length (ft) Overland Flow = Channel Flow = Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm Design Storm Return Period, Tr = years Return Period One-Hour Precipitation, P1 = inches C1 = C2 = C3 = User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C = User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 = Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.50 4.90 cfs Total Design Peak Flow, Q = 1.1 6.4 cfs <--- FILL IN THIS SECTION OR… FILL IN THE SECTIONS BELOW. <--- DESIGN PEAK FLOW FOR ONE-HALF OF STREET OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD Harvest Park - Ziegler Mixed Use A2 Site is Urban Site is Non-Urban Show Details Site Type: Street Inlets Area Inlets in a Median Flows Developed For: Inlet A-2 (5 FT TYPE R).xlsm, Q-Peak 9/10/2014, 8:05 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 10.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb nBACK = 0.016 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section nSTREET = 0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 12.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Harvest Park - Ziegler Mixed Use A2 (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Inlet A-2 (5 FT TYPE R).xlsm, Q-Allow 9/10/2014, 8:05 AM Project = Inlet ID = Design Information (Input) MINOR MAJOR Type of Inlet Inlet Type = Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 8.8 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.6) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Q a = 5.4 10.4 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 1.1 6.4 cfs INLET IN A SUMP OR SAG LOCATION Harvest Park - Ziegler Mixed Use A2 CDOT Type R Curb Opening H-Vert H-Curb W Lo (C) Lo (G) Wo WP Inlet A-2 (5 FT TYPE R).xlsm, Inlet In Sump 9/10/2014, 8:05 AM Worksheet Protected Project: Inlet ID: Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm (local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 0.5 1.2 cfs * If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet. Geographic Information: (Enter data in the blue cells): Subcatchment Area = Acres Percent Imperviousness = % NRCS Soil Type = A, B, C, or D Slope (ft/ft) Length (ft) Overland Flow = Channel Flow = Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm Design Storm Return Period, Tr = years Return Period One-Hour Precipitation, P1 = inches C1 = C2 = C3 = User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C = User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 = Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.00 0.00 cfs Total Design Peak Flow, Q = 0.5 1.2 cfs <--- FILL IN THIS SECTION OR… FILL IN THE SECTIONS BELOW. <--- DESIGN PEAK FLOW FOR ONE-HALF OF STREET OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD Harvest Park - Ziegler Mixed Use A3 Site is Urban Site is Non-Urban Show Details Site Type: Street Inlets Area Inlets in a Median Flows Developed For: Inlet A-3 (5 FT TYPE R) - Copy.xlsm, Q-Peak 9/10/2014, 8:03 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 10.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb nBACK = 0.016 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section nSTREET = 0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 12.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Harvest Park - Ziegler Mixed Use A3 (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Inlet A-3 (5 FT TYPE R) - Copy.xlsm, Q-Allow 9/10/2014, 8:03 AM Project = Inlet ID = Design Information (Input) MINOR MAJOR Type of Inlet Inlet Type = Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 8.8 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.6) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Q a = 5.4 10.4 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 0.5 1.2 cfs INLET IN A SUMP OR SAG LOCATION Harvest Park - Ziegler Mixed Use A3 CDOT Type R Curb Opening H-Vert H-Curb W Lo (C) Lo (G) Wo WP Inlet A-3 (5 FT TYPE R) - Copy.xlsm, Inlet In Sump 9/10/2014, 8:03 AM D APPENDIX D WATER QUALITY POND SIZING Lot 2, Harvest Park / Ziegler Mixed Use Proposed WQ Pond - Stage/Storage LOCATION: Water Quality Pond PROJECT NO: 1154-095-00 COMPUTATIONS BY: SMB DATE: 9/9/2014 V = 1/3 d ( A + B + sqrt(A*B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour WATER QUALITY REQD: 0.09 (Ac-Ft) DETENTION REGD: 0.0 (Ac-Ft) TOTAL REQD: 0.09 (Ac-Ft) Surface Incremental Total Stage Area Storage Storage (Elev) (Ft^2) (Ac-ft) (Ac-ft) 2.5 0 3.0 235 0.00 0.00 4.0 1250 0.02 0.02 5.0 2440 0.04 0.06 WQ WSEL- 5.6 3515 0.04 0.10 6.0 4232 0.04 0.13 SPILL- 6.3 4783 0.03 0.16 TOP OF BERM - 7.0 6435 detention-FINAL.xls Water Qualtiy Pond Emergency Overflow Spillway Sizing LOCATION: Water Quality Pond PROJECT NO: 1154-095-00 COMPUTATIONS BY: SMB DATE: 9/9/2014 Equation for flow over a broad crested weir Q = CLH3/2 where C = weir coefficient = 2.6 H = overflow height L = length of the weir The pond has a spill elevation equal to the maximum water surface elevation in the pond Design spillway with 1.0 ft flow depth, thus H = 0.7 ft Size the spillway assuming that the pond outlet is completely clogged. Pond Q (100) = 22.2 cfs (peak flow into pond) Spill elev = 4906.30 ft = 100-year WSEL Min top of berm elev.= 4907.00 Weir length required: L = 15 ft Use L = 15 ft v = 1.82 ft/s spillway, detention-FINAL.xls E APPENDIX E FLOODPLAIN INFORMATION