HomeMy WebLinkAboutASCENT STUDIO CLIMBING & FITNESS - MAJOR AMENDMENT - MJA140003 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY1
Kate Penning
From: toddb@tjbconsulting.com
Sent: Monday, July 21, 2014 3:05 PM
To: Kate Penning
Subject: FW: Timberline center climbing gym Lots 12/13, traffic study waiver
From: toddb@tjbconsulting.com
Sent: Friday, April 11, 2014 2:59 PM
To: Noah Beals (nbeals@fcgov.com); Tyler Siegmund (tsiegmund@fcgov.com)
Cc: 'Joe Hosek'; 'Tiffany Carlson'
Subject: FW: Timberline center climbing gym Lots 12/13, traffic study waiver
Hi All,
See below from Martina‐‐traffic study is waived for Ascent Studios proposal.
Have a good weekend,
Todd Borger, PE
TJB Consulting Group
Colorado Survey
Civil Engineering, Land Surveying
105 South Sunset Street, Suite H
P.O. Box 1348
Longmont, CO 80502
303.532.2268 office
303.517.7116 mobile
toddb@tjbconsulting.com
Think Green before printing this e-mail
From: Martina Wilkinson [mailto:mwilkinson@fcgov.com]
Sent: Friday, April 11, 2014 2:47 PM
To: toddb@tjbconsulting.com
Subject: RE: Timberline center climbing gym Lots 12/13
Hi Todd –
I’ve taken a look at the materials you sent, including the notes from the conceptual review last fall. I’ve compared the
likely trip generation for your revised use (climbing gym) with the approved use for those lots in Timberline Center
(retail/office/restaurant).
The trip generation is either similar or lower than what was approved – so in this case I believe we can waive the
requirement for the TIS. Sounds like this is the same general conclusion reached last fall. I agree with that conclusion.
Let me know if you need anything further.
Martina
Martina Wilkinson, P.E. PTOE
City of Fort Collins Traffic Operations
P.O. Box 580
2
Fort Collins, CO 80522‐0580
mwilkinson@fcgov.com
970‐221‐6887
From: toddb@tjbconsulting.com [mailto:toddb@tjbconsulting.com]
Sent: Wednesday, April 09, 2014 2:19 PM
To: Martina Wilkinson
Subject: Timberline center climbing gym Lots 12/13
Martina,
Thanks for your help,
Attached is what I understand to be the original submittal materials for concept plan review, as well as the staff
comments on the submittal.
Let me know if you have other questions,
Todd Borger, PE
TJB Consulting Group
Colorado Survey
Civil Engineering, Land Surveying
105 South Sunset Street, Suite H
P.O. Box 1348
Longmont, CO 80502
303.532.2268 office
303.517.7116 mobile
toddb@tjbconsulting.com
Think Green before printing this e-mail