HomeMy WebLinkAboutNORTHERN COLORADO FEEDERS SUPPLY - PDP - PDP140010 - SUBMITTAL DOCUMENTS - ROUND 1 - SITE PLAN3"
water vent
4" water vent
"fort collins water"
"fort collins water"
"gas riser"
"RR x-ing"
"RR x-ing"
open air structure on 4' stem wall
wood frame building on concrete
concrete
canopy over concrete
canopy over asphalt
center line union pacific railroad
4978
4976
4977
4978
4979
4979
4978
4978
53.51' Utility easement
per Exception Item No. 11
50.0' Waterline Easement
per Exception No. 20
20.0' Waterline Easement
per Exception No. 17
30.0' Approx.Track Easement
per Exception No. 14
concrete
asphalt
asphalt
asphalt
asphalt
asphalt
edge of asphalt
edge of gravel
edge of asphalt
25' dedicated
UPRR ROW
from centerline
track
found 3/8"
iron rod
found rod with orange cap illegible
1
(
1
:
6
(
1
:
GHHG
POINT OF BEGINNING
4978
4978
35' dedicated ROW per
Schedule A Exception and
Exception Item No. 19
from section line
REVISIONS
SHEET
CONTENTS
DRAWN
CHECKED
DATE
SHEET NO.
REUSE OF DOCUMENTS: THE IDEAS AND DESIGN INCORPORATED HEREON, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF ARCHITECTURE
PLUS AND IS NOT TO BE USED FOR ANY OTHER PROJECT WITHOUT PRIOR WRITTEN AUTHORIZATION OF ARCHITECTURE PLUS
318 East Oak Street + Fort Collins 80524
1531 West 29th Street + Loveland 80538
970.493.1220 + 888.698.7897 + www.aplusarch.com
NORTHERN COLORADO
FEEDERS SUPPLY
JULY.2014
KRB
BJC
ISSUE FOR PERMIT
300 HICKORY STREET
FORT COLLINS, COLORADO 80524
NO. BY DESCRIPTION DATE
1
SITE PLAN