Loading...
HomeMy WebLinkAboutNORTHERN COLORADO FEEDERS SUPPLY - PDP - PDP140010 - SUBMITTAL DOCUMENTS - ROUND 1 - SITE PLAN3" water vent 4" water vent "fort collins water" "fort collins water" "gas riser" "RR x-ing" "RR x-ing" open air structure on 4' stem wall wood frame building on concrete concrete canopy over concrete canopy over asphalt center line union pacific railroad 4978 4976 4977 4978 4979 4979 4978 4978 53.51' Utility easement per Exception Item No. 11 50.0' Waterline Easement per Exception No. 20 20.0' Waterline Easement per Exception No. 17 30.0' Approx.Track Easement per Exception No. 14 concrete asphalt asphalt asphalt asphalt asphalt edge of asphalt edge of gravel edge of asphalt 25' dedicated UPRR ROW from centerline track found 3/8" iron rod found rod with orange cap illegible 1ƒ ( 1ƒ : 6ƒ ( 1ƒ : GHHG POINT OF BEGINNING 4978 4978 35' dedicated ROW per Schedule A Exception and Exception Item No. 19 from section line REVISIONS SHEET CONTENTS DRAWN CHECKED DATE SHEET NO. REUSE OF DOCUMENTS: THE IDEAS AND DESIGN INCORPORATED HEREON, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF ARCHITECTURE PLUS AND IS NOT TO BE USED FOR ANY OTHER PROJECT WITHOUT PRIOR WRITTEN AUTHORIZATION OF ARCHITECTURE PLUS 318 East Oak Street + Fort Collins 80524 1531 West 29th Street + Loveland 80538 970.493.1220 + 888.698.7897 + www.aplusarch.com NORTHERN COLORADO FEEDERS SUPPLY JULY.2014 KRB BJC ISSUE FOR PERMIT 300 HICKORY STREET FORT COLLINS, COLORADO 80524 NO. BY DESCRIPTION DATE 1 SITE PLAN