Loading...
HomeMy WebLinkAboutAVONDALE COTTAGES - FDP - FDP140018 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFINAL DRAINAGE REPORT FOR Avondale Cottages Ridgewood Hills PUD Prepared by: Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado 80550 Phone: 970.674.3300 Fax: 970.674.3303 Prepared for: Habitat For Humanity 4001 S. Taft Hill Road Fort Collins, Colorado 80525 Phone: 970.223.4522 Fax: 970.223.4524 August 6, 2014 Job Number 1192-117-00 August 6, 2014 Mr. Wes Lamarque Fort Collins Utilities – Stormwater 700 Wood Street Fort Collins, CO 80522 RE: Final Drainage Report for Avondale Cottages Dear Wes, I am pleased to submit for your review and approval, this Final Drainage Report for the Avondale Cottages affordable housing development. I certify that this report for the drainage design was prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual and is in compliance with the previously approved Final Drainage and Erosion Control Study for Ridgewood Hills PUD – First Filing, prepared by RBD Engineering Consultants, dated March 3, 1995. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Jason T. Claeys, P.E., LEED AP Interwest Consulting Group TABLE OF CONTENTS 1. INTRODUCTION ................................................................................................................................................. 1 2. EXISTING CONDITIONS .................................................................................................................................... 1 3. DEVELOPED CONDITIONS ............................................................................................................................... 1 4. LOW IMPACT DEVELOPMENT TECHNIQUES .............................................................................................. 3 5. CONCLUSION ...................................................................................................................................................... 3 6. REFERENCES ...................................................................................................................................................... 3 APPENDIX A — SITE DESCRIPTIONS, CHARACTERISTICS & REFERENCES ........................................ A APPENDIX B — DEVELOPED RATIONAL CALCULATIONS ........................................................................ B APPENDIX C — STORM DRAIN SIZING & RIPRAP CALCULATIONS ....................................................... C APPENDIX D — BIORETENTION POND ............................................................................................................ D 1 1. INTRODUCTION This site is legally known as Tract L of Ridgewood Hills PUD – First Filing. It contains 1.51 acres and is bounded by W. Trilby Road to the north, Avondale Road to the west, a daycare and condos to the south, and a regional detention pond to the east. The regional detention pond is labeled as Pond 28 with the drainage study mentioned above. The pond was designed for the complete build out of contributing drainage basins. The site was originally anticipated to be commercial use with a convenience store and office/retail buildings. The proposed use is residential with six single family homes and two shared single family units. 2. EXISTING CONDITIONS The site is currently vacant with what appears to be native vegetation. The property line to the south splits the existing private drive with the daycare. A portion of this drive is located on the Avondale Cottage site. The majority of the daycare site drains onto the Avondale Cottage site, and a limited area at the rear of the condos drains to this site. Currently runoff is conveyed via overland flow and a small drainage swale/depression, and as intended, ultimately drains to Pond 28. The site was originally intended to be commercial with a convenience store and office/retail buildings. 3. DEVELOPED CONDITIONS The proposed development will consists of 8 single family units and 2 duplex units, averaging a 1,100 sqft footprint, including the single car garages. Private drives are proposed for access to the units with additional parking off of the drives to meet land use code requirements. The remaining site is either utilized as water quality enhancement/low impact development, landscape areas, and pedestrian access. The percent impervious associated with the proposed improvements is 55.8%. The site is located within Basin 300 of the original drainage report. A detailed breakdown of the basin percent impervious determination was not available, though the report anticipated a 56.27% basin imperviousness upon site build-out. Basin 300 consists of majority of the daycare site, a small portion of the condominiums, Tract L (proposed 2 Avondale Cottages) and regional detention Pond 28. Pond 28 is designed to detain the 100-yr runoff rate to the 2-yr historic runoff rate. There are a total of 10 basins (totaling 17.73 acres) within Ridgewood that drain to Pond 28 including Basin 300. Basin 300 is a total of 3.91 acres with the Avondale project being responsible for 1.51 acres of this basin. Rather than only looking at the area responsible for the Avondale Cottages project, we looked at all of Basin 300 (which consists of the regional detention pond, existing multifamily, and the daycare outside of our site) to determine the runoff volumes in reference to the rainfall criteria current at the time Ridgewood was designed and the current rainfall criteria and proposed impervious area. In reference to the previous rainfall criteria and the Fort Collins Storm Drainage Criteria and Construction Standards (FCSDCCS) and the percent impervious associated with different land uses, we worked backwards to determine the originally assumed percent imperviousness of Tract L. In reference to the original drainage report, Basin 300 is 56.27% impervious and has a runoff coefficient of 0.64. The detailed calculations supporting these values are not included in the report. Therefore we needed to back calculate, based on the proposed uses and the City’s criteria manual, to determine the % impervious and runoff coefficients originally assumed. The outcomes match the proposed uses at the time, with the Avondale Cottages site proposed to be a convenience store/gas station and commercial building. From this information, the runoff volume was calculated from the entire Basin 300, with the pre-1997 rainfall data, that would have contributed to Pond 28. During a 100-yr storm, under the old rainfall data, Basin 300 would have contributed 51,414 cu-ft of runoff volume to Pond 28. The runoff volume was then calculated from the entire Basin 300 under the proposed developed conditions, with the current rainfall data and the proposed percent impervious. During a 100-yr storm, Basin 300 would contribute 45,775 cu-ft of runoff to Pond 28. This is an ultimate reduction of 5,639 cu-ft of runoff draining from Basin 300 to Pond 28 comparing to the original runoff volume. If there would have been an increase in runoff volume from the proposed improvements associated with Avondale Cottages, the project would be responsible to account for the difference in runoff volumes. Since a reduction in runoff volume is proposed, this project ultimately allows more storage from basins outside of the responsibility of the Avondale site. 3 Please reference the attached calculations and exhibits. 4. LOW IMPACT DEVELOPMENT TECHNIQUES In reference to the code requirements for implementation of Low Impact Development (LID) techniques, we have looked at many options, along with the site constraints, to satisfy these requirements. In reference to the geotechnical engineering’s soils study, the soils on this site have a high potential of swell, with a potential change in soil volume of 11%. This expansive clay is sitting on impervious sandstone bed rock, approximately 6’ below the surface. With the introduction of ground moisture, there is the potential swell of 8”. With this soil information, we needed to determine means to enhance the water quality by implementing LID techniques that would minimize ground water infiltration. We met with City Stormwater Staff to review the scenario and determined that it would satisfy the code intent for LID by utilizing a lined bioretention pond/rain garden, and would waive the permeable paving requirement if we were able treat majority of the site with the bioretention pond. With the proposed grading, the bioretention pond/rain garden will treat approximately 80% of the site’s improved runoff. The bioretention pond depth is limited to 12” for water quality enhancement and is design to have an additional 6” depth to convey the 100-yr storm runoff. 5. CONCLUSION All computations that have been completed within this report are in compliance with the CoFC Stormwater Criteria Manual, and Urban Drainage and Flood Control District requirements and standards. The proposed drainage concepts presented in this report and on the construction plans adequately provide for stormwater quantity and quality treatment of proposed impervious areas. Conveyance elements have been designed to pass required flows and to minimize future maintenance. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit will be required. 6. REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage 4 and Flood Control District, June 2001, Revised April 2008. 2. Storm Drainage Criteria Manual and Construction Standards, City of Fort Collins Storm Water Utility, City of Fort Collins, Colorado, Updated January, 1997 with 2012 amendments. 3. “Hydrologic Group Rating for Larimer County Area, Colorado”, USDA-Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov. [03/28/2014] 4. “Final Drainage and Erosion Control Study for Ridgewood Hills P.U.D. First Filing”, prepared by RBD Inc., Dated March 3, 1995 APPENDIX A — SITE DESCRIPTIONS, CHARACTERISTICS & REFERENCES vicinity map Scale: 1" = 1000' Hydrologic Soil Group—Larimer County Area, Colorado (Avondale Cottages) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/28/2014 Page 1 of 4 4482580 4482590 4482600 4482610 4482620 4482630 4482640 4482650 4482660 4482580 4482590 4482600 4482610 4482620 4482630 4482640 4482650 4482660 492860 492870 492880 492890 492900 492910 492920 492930 492940 492950 492960 492970 492980 492860 492870 492880 492890 492900 492910 492920 492930 492940 492950 492960 492970 492980 40° 29' 40'' N 105° 5' 3'' W 40° 29' 40'' N 105° 4' 58'' W 40° 29' 37'' N 105° 5' 3'' W 40° 29' 37'' N 105° 4' 58'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 25 50 100 150 Feet 0 5 10 20 30 Meters Map Scale: 1:592 if printed on A landscape (11" x 8.5") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 26 Cushman fine sandy loam, 0 to 3 percent slopes C 0.6 37.2% 108 Thedalund loam, 3 to 9 percent slopes C 0.9 62.8% Totals for Area of Interest 1.5 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—Larimer County Area, Colorado Avondale Cottages Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/28/2014 Page 3 of 4 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Avondale Cottages Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/28/2014 Page 4 of 4 Ridgewood Hills - First Filing References Ridgewood Hills PUD - First Filing - Utility Plans Dated March 1995 Drainage & Erosion Control Plan, Sheet 7 of 54 Final Drainage & Erosion Control Study for Ridgewood Hills PUD - First Filing Dated March 3, 1995 Appendix - Composite "C" Values (page 16 of pdf version) Avondale Cottages RUNOFF VOLUME COMPARISON Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: Old Rainfall w/ Original Runoff Coefficient versus New Rainfall w/ Proposed Runoff Coefficient Area (acres) % Impervious* Runoff Coefficient (C2 )** Runoff Coefficient (C100) Area (acres) % Impervious* Runoff Coefficient (C2 )** Runoff Coefficient (C100) 0.11 60.00% 0.70 0.88 0.11 60.00% 0.70 0.88 0.67 90.00% 0.85 1.00 0.67 90.00% 0.85 1.00 1.62 10.00% 0.25 0.31 1.62 10.00% 0.25 0.31 1.51 90.84% 0.95 1.00 1.51 55.81% 0.66 0.82 3.91 56.27% 0.64 0.79 3.91 42.76% 0.52 0.65 Time (min) Intensity (in/hr) Incremental Runoff Volume (cu-ft) Cumulative Runoff Volume (cu-ft) Time (min) Intensity (in/hr) Incremental Runoff Volume (cu-ft) Cumulative Runoff Volume (cu-ft) 5 9.00 8,383 8,383 5 9.95 7,630 7,630 10 7.30 6,799 15,182 10 7.72 5,920 13,551 15 6.00 5,588 20,770 15 6.52 5,000 18,551 20 5.20 4,843 25,614 20 5.60 4,295 22,845 25 4.60 4,284 29,898 25 4.98 3,819 26,665 30 4.15 3,865 33,764 30 4.52 3,466 30,131 35 3.80 3,539 37,303 35 4.08 3,129 33,260 40 3.50 3,260 40,563 40 3.74 2,868 36,128 45 3.25 3,027 43,590 45 3.46 2,653 38,781 50 3.00 2,794 46,384 50 3.23 2,477 41,258 55 2.80 2,608 48,992 55 3.03 2,324 43,582 5 10 15 20 25 35 40 45 50 55 6.0 5.2 4.6 4.15 3.8 3.5 3.25 3.0 2.6 2.8 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 Intensity (in/hr) City of Fort Collins Rainfall Intensity-Duration-Frequency Curve 2-yr (FTC) 10-yr (FTC) 100-yr (FTC) 2-yr (UD) 10-yr (UD) 100-yr (UD) 100-yr 10-yr 0.0 1.0 2.0 3.0 4.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 65.0 Duration (min) 2-yr 10-yr Duration (minutes) 2-yr Intensity (in/hr) 10-yr Intensity (in/hr) 100-yr Intensity (in/hr) Duration (minutes) 2-yr Intensity (in/hr) 10-yr Intensity (in/hr) 100-yr Intensity (in/hr) 5 2.85 4.87 9.95 33 1.22 2.08 4.24 6 2.67 4.56 9.31 34 1.19 2.04 4.16 7 2.52 4.31 8.80 35 1.17 2.00 4.08 8 2.40 4.10 8.38 36 1.15 1.96 4.01 9 2.30 3.93 8.03 37 1.13 1.93 3.93 10 2.21 3.78 7.72 38 1.11 1.89 3.87 11 2.13 3.63 7.42 39 1.09 1.86 3.80 12 2.05 3.50 7.16 40 1.07 1.83 3.74 13 1.98 3.39 6.92 41 1.05 1.80 3.68 14 1.92 3.29 6.71 42 1.04 1.77 3.62 15 1.87 3.19 6.52 43 1.02 1.74 3.56 16 1.81 3.08 6.30 44 1.01 1.72 3.51 17 1.75 2.99 6.10 45 0.99 1.69 3.46 18 1.70 2.90 5.92 46 0.98 1.67 3.41 19 1.65 2.82 5.75 47 0.96 1.64 3.36 20 1.61 2.74 5.60 48 0.95 1.62 3.31 21 1.56 2.67 5.46 49 0.94 1.60 3.27 22 1.53 2.61 5.32 50 0.92 1.58 3.23 23 1.49 2.55 5.20 51 0.91 1.56 3.18 24 1.46 2.49 5.09 52 0.90 1.54 3.14 25 1.43 2.44 4.98 53 0.89 1.52 3.10 26 1.40 2.39 4.87 54 0.88 1.50 3.07 27 1.37 2.34 4.78 55 0.87 1.48 3.03 28 1.34 2.29 4.69 56 0.86 1.47 2.99 29 1.32 2.25 4.60 57 0.85 1.45 2.96 30 1.30 2.21 4.52 58 0.84 1.43 2.92 31 1.27 2.16 4.42 59 0.83 1.42 2.89 32 1.24 2.12 4.33 60 0.82 1.40 2.86 Figure 3-1a City of Fort Collins Rainfall Intensity-Duration-Frequency Table for using the Rational Method Duration 2-yr 10-yr 100-yr 2-yr ∆∆∆∆ 10-yr ∆∆∆∆ 100-yr ∆∆∆∆ 5 2.85 4.87 9.95 2.78 -0.07 4.74 -0.13 9.68 -0.27 6 2.67 4.56 9.31 2.64 -0.03 4.51 -0.05 9.20 -0.11 7 2.52 4.31 8.80 2.52 0.00 4.30 -0.01 8.78 -0.02 8 2.40 4.10 8.38 2.41 0.01 4.11 0.01 8.39 0.01 9 2.30 3.93 8.03 2.31 0.01 3.94 0.01 8.04 0.01 10 2.21 3.78 7.72 2.21 0.00 3.78 0.00 7.72 0.00 11 2.13 3.63 7.42 2.13 0.00 3.64 0.01 7.43 0.01 2-yr 0.82 12 2.05 3.50 7.16 2.05 0.00 3.51 0.01 7.16 0.00 10-yr 1.40 13 1.98 3.39 6.92 1.98 0.00 3.39 0.00 6.92 0.00 100-yr 2.86 14 1.92 3.29 6.71 1.92 0.00 3.28 -0.01 6.69 -0.02 15 1.87 3.19 6.52 1.86 -0.01 3.17 -0.02 6.48 -0.04 16 1.81 3.08 6.30 1.80 -0.01 3.08 0.00 6.28 -0.02 C 1 28.5 17 1.75 2.99 6.10 1.75 0.00 2.99 0.00 6.10 0.00 C 2 10 18 1.70 2.90 5.92 1.70 0.00 2.90 0.00 5.93 0.01 C 3 0.786651 19 1.65 2.82 5.75 1.65 0.00 2.82 0.00 5.77 0.02 20 1.61 2.74 5.60 1.61 0.00 2.75 0.01 5.61 0.01 21 1.56 2.67 5.46 1.57 0.01 2.68 0.01 5.47 0.01 22 1.53 2.61 5.32 1.53 0.00 2.61 0.00 5.34 0.02 23 1.49 2.55 5.20 1.49 0.00 2.55 0.00 5.21 0.01 24 1.46 2.49 5.09 1.46 0.00 2.49 0.00 5.09 0.00 25 1.43 2.44 4.98 1.43 0.00 2.43 -0.01 4.97 -0.01 26 1.40 2.39 4.87 1.39 -0.01 2.38 -0.01 4.86 -0.01 27 1.37 2.34 4.78 1.36 -0.01 2.33 -0.01 4.76 -0.02 28 1.34 2.29 4.69 1.34 0.00 2.28 -0.01 4.66 -0.03 29 1.32 2.25 4.60 1.31 -0.01 2.24 -0.01 4.57 -0.03 30 1.30 2.21 4.52 1.28 -0.02 2.19 -0.02 4.48 -0.04 31 1.27 2.16 4.42 1.26 -0.01 2.15 -0.01 4.39 -0.03 32 1.24 2.12 4.33 1.24 0.00 2.11 -0.01 4.31 -0.02 33 1.22 2.08 4.24 1.21 -0.01 2.07 -0.01 4.23 -0.01 34 1.19 2.04 4.16 1.19 0.00 2.03 -0.01 4.15 -0.01 Coefficients Intensity (in/hr) Urban Drainage Intensity (in/hr) City of Fort Collins Urban Drainage Inputs Urban Drainage Intensity Equation 1-hr Rainfall Depths (P 1 ) City of Fort Collins Rainfall Intensity-Duration-Frequency Table Use of Urban Drainage Intensity Equation for CoFC IDF Values This cell was determined using Solver to best match intensities given from the Fort Collins IDF values. C 3 2 1 1 ( c ) C t C P I + = 34 1.19 2.04 4.16 1.19 0.00 2.03 -0.01 4.15 -0.01 35 1.17 2.00 4.08 1.17 0.00 2.00 0.00 4.08 0.00 36 1.15 1.96 4.01 1.15 0.00 1.96 0.00 4.01 0.00 37 1.13 1.93 3.93 1.13 0.00 1.93 0.00 3.94 0.01 2-year 5-yr 10-yr 25-yr 50-yr 100-yr 5 0.29 0.40 0.49 0.63 0.79 1.00 10 0.33 0.45 0.56 0.72 0.90 1.14 15 0.38 0.53 0.65 0.84 1.05 1.33 20 0.64 0.89 1.09 1.41 1.77 2.23 25 0.81 1.13 1.39 1.80 2.25 2.84 30 1.57 2.19 2.69 3.48 4.36 5.49 35 2.85 3.97 4.87 6.30 7.90 9.95 40 1.18 1.64 2.02 2.61 3.27 4.12 45 0.71 0.99 1.21 1.57 1.97 2.48 50 0.42 0.58 0.71 0.92 1.16 1.46 55 0.35 0.49 0.60 0.77 0.97 1.22 60 0.30 0.42 0.52 0.67 0.84 1.06 65 0.20 0.28 0.39 0.62 0.79 1.00 70 0.19 0.27 0.37 0.59 0.75 0.95 75 0.18 0.25 0.35 0.56 0.72 0.91 80 0.17 0.24 0.34 0.54 0.69 0.87 85 0.17 0.23 0.32 0.52 0.66 0.84 90 0.16 0.22 0.31 0.50 0.64 0.81 95 0.15 0.21 0.30 0.48 0.62 0.78 100 0.15 0.20 0.29 0.47 0.60 0.75 105 0.14 0.19 0.28 0.45 0.58 0.73 110 0.14 0.19 0.27 0.44 0.56 0.71 115 0.13 0.18 0.26 0.42 0.54 0.69 120 0.13 0.18 0.25 0.41 0.53 0.67 City of Fort Collins Design Storms for using SWMM Figure 3-1c Time (min) Intensity (in/hr) These are the 1-hour storm 2-year 5-yr 10-yr 25-yr 50-yr 100-yr 1-hr 0.82 1.14 1.40 1.81 2.27 2.86 2-hr 0.98 1.36 1.71 2.31 2.91 3.67 Storm Duration Rainfall Depth (in) Note: The City of Fort Collins SWWM input hyetopgrah is used to calculate the 1-hr and 2-hr storm rainfall depths for the different storm events. These are the 1-hour storm depths that are used in the Urban Drainage intensity equation, derived from the CoFC Hyetograph. B APPENDIX B — DEVELOPED RATIONAL CALCULATIONS TRACT K WEST TRILBY ROAD AVONDALE ROAD LOT 2 LOT 1 LOT 5 LOT 4 LOT 3 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME Avondale Cottages Drainage Exhibit 08/06/2014 1"=X' N/A JTC RA 1192-117-00 X of XX LEGEND SILT FENCE INLET PROTECTION DRAINAGE ARROW BASIN DESIGNATION BASIN AREA BASIN COEFFICIENT (5-YR) DESIGN POINT 0 40' 40 20 40 80 SCALE: 1" = Avondale Cottages DEVELOPED IMPERVIOUS AREA CALCULATION Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised August 2006) BASINS: C2 C5 C10 C100 C2 C5 C10 C100 0.89 0.90 0.92 0.96 0.89 0.90 0.92 0.96 0.71 0.73 0.75 0.81 0.73 0.75 0.77 0.83 0.71 0.73 0.75 0.81 0.73 0.75 0.77 0.83 0.23 0.30 0.36 0.50 0.28 0.35 0.42 0.58 0.02 0.08 0.15 0.35 0.04 0.15 0.25 0.50 C2 C5 C10 C100 D1 C 41,801 0.960 13,749 9,529 1,202 0 17,322 56.0% 0.38 0.43 0.49 0.62 D2 C 6,392 0.147 0 1,856 1,134 0 3,402 42.1% 0.29 0.36 0.42 0.59 D3 C 4,809 0.110 3,104 0 422 0 1,220 72.4% 0.51 0.55 0.59 0.69 OF1 C 20,502 0.471 10,605 3,225 1,222 0 5,450 71.3% 0.50 0.54 0.58 0.68 OF2 C 17,063 0.392 0 5,789 2,278 0 8,997 30.5% 0.23 0.31 0.38 0.57 OF1 + D1 C 62,303 1.430 24,354 12,755 2,423 0 22,771 57.5% 0.39 0.44 0.49 0.62 Total C 90,567 2.079 27,458 20,399 6,257 0 36,453 50.6% 0.34 0.40 0.46 0.60 Roof 90% COMPOSITE Weighted % Impervious Alawn (sq feet) Apavers (sq feet) Lawns, clayey soil Awalk (sq feet) Aroof (sq feet) 0% Pavers 40% Walk 90% Land Use % Impervious Hydrologic Soil Classification B Runoff Coefficient Hydrologic Soil Classification C Runoff Coefficient Paved 100% Sub-basin Designation Apaved (sq feet) Atotal (acres) Atotal (sq feet) Soil Type J.Claeys Interwest Consulting Group 1192-117-00 Avondale Cottages DEVELOPED TIME OF CONCENTRATION Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised August 2006) EQUATIONS: -Equation RO-3 -Equation RO-4 -Urbanized Check Equation RO-5 -Equation RO-3 CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins BASINS: Type of Travel Surface Cv D1 D1 0.43 0.960 79 0.0677 5.77 241 0.0162 Paved Areas 20 2.54 1.58 7.35 11.78 7.35 D2 D2 0.36 0.147 70 0.0392 7.20 40 0.0714 Paved Areas 20 5.34 0.13 7.33 10.61 7.33 D3 D3 0.55 0.110 16 0.0463 2.42 109 0.0112 Paved Areas 20 2.12 0.85 5.00 10.69 5.00 OF1 OF1 0.54 0.471 134 0.0198 9.45 161 0.0197 Paved Areas 20 2.81 0.96 10.40 11.64 10.40 OF2 OF2 0.31 0.392 57 0.0526 6.31 142 0.0250 Grassed Waterway 15 2.37 1.00 7.31 11.10 7.31 REMARKS tc Urban Check Final tc (min) tc =ti +tt SLOPE (min) (ft/ft) VEL. (ft/s) tt ti (min) (min) LENGTH Table RO-2 (ft) SUB-BASIN DATA INITIAL/OVERLAND TIME (ti) DESIGN POINT Sub-basin C5 AREA (acres) LENGTH (ft) TRAVEL TIME (tt) J.Claeys Interwest Consulting Group 1192-117-00 August 6, 2014 SLOPE (ft/ft) Avondale Cottages DEVELOPED PEAK RUNOFF Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: City of Fort Lupton - Standards and Specifications, June 1994 (Rainfall Depths) Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised August 2006) EQUATIONS: I = rainfall intensity (in/hr) Q n = n-yr peak discharge (cfs) P 1 = one-hour point rainfall depth (in) C n = n -yr runoff coefficient t c = time of concentration (min) I n = n -yr rainfall intensity (in/hr) P 1-2yr = 0.82 in A n = Basin drainage area (ac) P 1-5yr = 1.42 in P 1-10yr = 1.68 in P 1-100yr = 2.71 in BASINS: Runoff Coeff. (C5 ) C(A) (acres) Intensity (in/hr) Q (ft 3 /s) Runoff Coeff. (C5 ) C(A) (acres) Intensity (in/hr) Q (ft 3 /s) Runoff Coeff. (C10 ) C(A) (acres) Intensity (in/hr) Q (ft 3 /s) Runoff Coeff. (C100 ) C(A) (acres) Intensity (in/hr) Q (ft 3 /s) D1 D1 0.960 7.35 0.38 0.36 4.29 1.55 0.43 0.41 4.29 1.78 0.49 0.47 5.07 2.37 0.62 0.59 8.18 4.86 D2 D2 0.147 7.33 0.29 0.04 4.29 0.18 0.36 0.05 4.29 0.23 0.42 0.06 5.08 0.32 0.59 0.09 8.19 0.70 D3 D3 0.110 5.00 0.51 0.06 4.81 0.27 0.55 0.06 4.81 0.29 0.59 0.07 5.69 0.37 0.69 0.08 9.18 0.70 Maple Hill - Fourth Replat Attenuated Flows for Pipe Sizing Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 EQUATIONS: -Equation RO-3 -Equation RO-4 -CoFC Tov Equation CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs) I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac) P1-2yr = 0.82 in. P1-10yr = 1.40 P1-5yr = 1.14 in. P1-100yr = 2.86 BASINS: UD-Sewer - DP/Manhole D1 Contributing Basins D1+OF1 Contributing Area (acres) 1.43 C2 C5 C10 C100 Runoff Coefficients 0.39 0.44 0.49 0.62 Overland Flow Time Length (ft) 137 Slope (%) 0.02 2-yr 5-yr 10-yr 100-yr ti (min) 11.30 11.30 11.30 11.30 Travel Time Length (ft) Slope (%) Type of Travel Surface Cv Velocity (ft/s) tt (min) 246 1.29% Paved Areas 20 2.27 1.81 Total Time 1.81 Final Time of Concentration - tc (min) 2-yr 5-yr 10-yr 100-yr 13.11 13.11 13.11 13.11 Intensities (in/hr) 2-yr 5-yr 10-yr 100-yr 1.98 2.75 3.37 6.89 Discharge (cfs) 2-yr 5-yr 10-yr 100-yr 1.10 1.73 2.39 6.15 J. Claeys, PE Interwest Consulting Group 1192-117-00 C APPENDIX C — STORM DRAIN SIZING & RIPRAP CALCULATIONS You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Gilcrest Bus Facility Riprap Protection Downstream of Culverts-Circular Conduits Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, Revised April 2008 PIPE/FLOW PROPERTIES: 7.98 1.25 2.98 *Pipe Flow and Tailwater Depth from HY-8 PROTECTION DESIGN: Step 1: Is Method Applicable, Q/D c 2.5 O6 Q/D c 2.5 = 4.57 Step 2: Apply Diameter Adjustments if Pipe Flow is Supercritical (Values from HY-8) Flow Velocity (ft/s) 6.50 Flow Depth (ft) 1.25 Froude No. 1.02 Pipe Flow is: Supercritical D c or D a = 1.25 Step 3: Determine Q/D c 1.5 or Q/D a 1.5 = 5.71 Step 4: Determine Y t /D c or Y t /D a = 1.00 Step 5: Determine Required Riprap Size, d 50 (Figure MD-21) Riprap Type d 50 - Median Rock Size (inches) L 9 M 12 H 18 VH 24 Step 5: Determine Extent of Riprap Protection, L p (Equation MD-23) Expansion Factor, from Fig MD-23 5.95 1.45 *using V=5.5ft/s for erosive soils L p not to be less than 3D = 3.75 ft -0.53 ft L p not to be greater than 10D = 12.50 ft Use L p of 3.75 ft Step 6: Determine Width of Riprap Protection W p = 3D = 3.75 ft Step 7: Determine Riprap Proection Thickness T p = 2*d 50 = 18 inches Step 8: Determine Cutoff Wall Depth (B) B = D c /2+T p = 2.13 ft PROTECTION SUMMARY: L 3.75 ft 3.75 ft Project Description Flow Element: Generic Weir Solve For: Crest Length Input Data Discharge: 6.06 ft³/s Headwater Elevation: 100.50 ft Crest Elevation: 100.00 ft Weir Coefficient: 2.60 US Results Crest Length: 6.59 ft Headwater Height Above Crest: 0.50 ft Flow Area: 3.30 ft² Velocity: 1.84 ft/s Wetted Perimeter: 7.59 ft Top Width: 6.59 ft Worksheet for Outlet Structure Weir Capacity D APPENDIX D — BIORETENTION POND Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 56.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.560 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.18 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 41,801 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.43 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 622.6 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 415 sq ft D) Actual Flat Surface Area AActual = 423 sq ft E) Area at Design Depth (Top Surface Area) ATop = 788 sq ft F) Rain Garden Total Volume VT= 606 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 3.3 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 623 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 0.52 in Design Procedure Form: Rain Garden (RG) J.Claeys Interwest Consulting Group August 6, 2014 Avondale Cottages Avondale Road & Trilby Road, Fort Collins Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO Avondale UD-BMP_v3.03.xlsm, RG 8/6/2014, 8:13 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? PROVIDE A 30 MIL (MIN) PVC LINER WITH CDOT CLASS B GEOTEXTILE ABOVE IT. USE THE SAME GEOTEXTILE BELOW THE LINER IF THE SUBGRADE IS ANGULAR 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) J.Claeys Interwest Consulting Group August 6, 2014 Avondale Cottages Avondale Road & Trilby Road, Fort Collins Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO Avondale UD-BMP_v3.03.xlsm, RG 8/6/2014, 8:13 AM 18 inches 2.13 ft East Access Culvert East Access Culvert J.Claeys Interwest Consulting Group 1192-117-00 August 6, 2014 Design Flow, Q (cfs) Pipe Dia., Dc (ft) Tailwater depth, Yt (ft) - if known Concrete Cutoff Wall Depth (ft) Use Type L Riprap Length of Basin (ft) Method Applicable Width of Basin (ft) Riprap Type Riprap Layer Thickness (in) = = V Q At = 2 tan θ 1  =        −      = c t t p D Y A L 2 tan θ 1 August 6, 2014 City of Fort Collins - Storm Water Criteria Manual (1997) ( ) 0 .786 1 10 28 . 5 t c P I + Q n = C n I n A = t c = t i + t t 0 . 5 V = C v S w V L tt 60 ( ) = 0 .33 5 0 . 395 1 . 1 S C L ti − = OF1 OF1 0.471 10.40 0.50 0.24 3.77 0.89 0.54 0.25 3.77 0.96 0.58 0.28 4.47 1.23 0.68 0.32 7.20 2.32 OF2 OF2 0.392 7.31 0.23 0.09 4.30 0.38 0.31 0.12 4.30 0.52 0.38 0.15 5.08 0.76 0.57 0.22 8.20 1.83 Total 2.079 1.55 1.78 2.37 4.86 Design Point Sub-basin Area (acres) tc (min) 2-yr Peak Runoff 5-yr Peak Runoff 100-yr Peak Runoff J.Claeys Interwest Consulting Group 1192-117-00 August 6, 2014 10-yr Peak Runoff Q n = C n I n A n 0.786 1 (10 ) 28 . 5 t c P I + 0.786 = 1 (10 ) 28 . 5 t c P I + = ( ) 0 .33 5 0 . 395 1 . 1 S C L t i − = c i t t = t + t 0 . 5 v w V = C S 10 180 = L + t c V L t t 60 = August 6, 2014 % Impervious values from Table RO-3 in the Urban Storm Drainage Criteria Manual for Hydrologic Soil Classifications 38 1.11 1.89 3.87 1.11 0.00 1.90 0.01 3.88 0.01 39 1.09 1.86 3.80 1.09 0.00 1.87 0.01 3.82 0.02 40 1.07 1.83 3.74 1.08 0.01 1.84 0.01 3.76 0.02 41 1.05 1.80 3.68 1.06 0.01 1.81 0.01 3.70 0.02 42 1.04 1.77 3.62 1.04 0.00 1.78 0.01 3.64 0.02 43 1.02 1.74 3.56 1.03 0.01 1.76 0.02 3.59 0.03 44 1.01 1.72 3.51 1.01 0.00 1.73 0.01 3.54 0.03 45 0.99 1.69 3.46 1.00 0.01 1.71 0.02 3.48 0.02 46 0.98 1.67 3.41 0.99 0.01 1.68 0.01 3.44 0.03 47 0.96 1.64 3.36 0.97 0.01 1.66 0.02 3.39 0.03 48 0.95 1.62 3.31 0.96 0.01 1.64 0.02 3.34 0.03 49 0.94 1.60 3.27 0.95 0.01 1.61 0.01 3.30 0.03 50 0.92 1.58 3.23 0.93 0.01 1.59 0.01 3.25 0.02 51 0.91 1.56 3.18 0.92 0.01 1.57 0.01 3.21 0.03 52 0.90 1.54 3.14 0.91 0.01 1.55 0.01 3.17 0.03 53 0.89 1.52 3.10 0.90 0.01 1.53 0.01 3.13 0.03 54 0.88 1.50 3.07 0.89 0.01 1.51 0.01 3.09 0.02 55 0.87 1.48 3.03 0.88 0.01 1.50 0.02 3.06 0.03 56 0.86 1.47 2.99 0.87 0.01 1.48 0.01 3.02 0.03 57 0.85 1.45 2.96 0.86 0.01 1.46 0.01 2.98 0.02 58 0.84 1.43 2.92 0.85 0.01 1.44 0.01 2.95 0.03 59 0.83 1.42 2.89 0.84 0.01 1.43 0.01 2.92 0.03 60 0.82 1.40 2.86 0.83 0.01 1.41 0.01 2.88 0.02 0.00 -0.02 0.00 C 3 2 1 1 ( c ) C t C P I + = 60 2.60 2,422 51,414 60 2.86 2,193 45,775 cu-ft 100-yr Runoff Volumes 100-yr Runoff Volumes 5,639 Under the proposed conditions with the Avondale Cottages project, and comparing the old rainfall data to the new rain fall data, there is a reduction in runoff volume of: Basin 300 Basin 300 Current Rainfall and Proposed Surface Characteristics Site Condos Daycare Pond 28 J.Claeys Interwest Consulting Group 1192-117-00 August 6, 2014 Tract L (Avondale) Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised April 2008) Storm Drainage Design Criteria and Construction Standards, City of Fort Collins, May 1984 *Table 3-7 Referenced for % Impervious **Table 3-2 Referenced for Runoff Coefficients "Final Drainage and Erosion Control Study for Ridgewood Hills P.U.D. First Filing", prepared by RBD, Dated March 3, 1995 Tract L (Avondale) Original Rainfall and Surface Characteristics Site Condos Daycare Pond 28 Survey Area Data: Version 8, Dec 23, 2013 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Nov 18, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (Avondale Cottages) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/28/2014 Page 2 of 4