June 27, 2014
Angie Milewski
BHA Design
1603 Oakridge Dr
Fort Collins, CO 80525
RE: Pedersen Toyota Expansion, PDP140007, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Noah Beals, at 970-416-2313 or
nbeals@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/16/2014
06/16/2014: Land Use Code (LUC) Section 4.21(E)(2)(a) Pedestrian-oriented outdoor spaces
shall be placed next to activity areas that generate users (such as shops and street corners).
These spaces shall be visible from street and sidewalks and should contain amenities such as
art and shelters.
Because of the size of this project and its connections to three different streets there should be
at least two pedestrian-oriented outdoor spaces.
There should be a pedestrian oriented space along college ave located currently where the
permeable pavers are located this should include pedestrian access to the public sidewalk
and to the entrance of the building.
The other pedestrian-oriented space on the west side should be located closer to the
pedestrian entrance and not the vehicle entrance of the building.
Both areas should include greater detail on the pedestrian use such as seating, tables, art, or
shelters.
BHA – 2 Pedestrian-oriented outdoor spaces have been moved to the entrances of the retail additions, as
well as one larger plaza area at the main entrance of the dealership. Each space will provide bench
seating, differentiated paving from the sidewalks, tree canopy shading, and landscape features.
Landscape features may include enhanced planting, planter pots, boulders, and/or sculptural element.
Comment Number: 2 Comment Originated: 06/17/2014
06/17/2014: In the landscape plan on the tree mitigation sheet the tree quantities still need to
be completed.
BHA – Tree mitigation quantities have been compiled and are listed in the tree mitigation table.
Comment Number: 3 Comment Originated: 06/17/2014
06/17/2014: LUC 3.2.2(J) Along S College Ave the 15 ft. average minimum landscape setback
from the right of way is not being met.
This is an average of how much of parking frontage is meeting the required landscaped area
15' setback.
Please provide details of the calculations of the average landscape setback area.
BHA – The average width of the landscape buffer along College equals 16.8’. At its minimum, it is 6.9’
wide, at its maximum it is 28’ wide. The landscaped buffer area exceeds the 15’ buffer area by 118 SF.
Detailed exhibit of calculations has been provided.
Comment Number: 4 Comment Originated: 06/17/2014
06/17/2014: LUC 3.2.2(C)(4) On the site plan or in an additional detail the bicycle parking needs
to be shown and labeled with the number of spaces. Are all the spaces on the 1st level?
BHA – Bike parking is now shown and labeled with quantities on the site plan.
Comment Number: 5 Comment Originated: 06/17/2014
06/17/2014: LUC 3.2.4 The lighting plan also needs to include the average foot-candle for only
the vehicle use areas.
APS/GREGORY: The additional lighting statistics have been added to the photometric plan as requested.
Is there no lighting on the fourth story of the parking structure?
APS/GREGORY: It is our understanding that the upper 2-levels of the parking garage will be a future
phase and not included as part of this project. When the upper 2-levels of the parking structure are
constructed the fourth level will be open to the sky and will be illuminated in some fashion. A photometric
study on that phase will be submitted in compliance with Fort Collins standards when that phase is to be
constructed. At this point in time it is not clear to us how the 2nd level will be utilized under the phase 1
portion of this project, or how it will be prepared for the future additions of levels 3 & 4. Therefore, we do
not know if the 2nd level will be open to the sky and illuminated as part of phase 1 or not. If it is to be open
to the sky and illuminated we will utilize Pole lights to illuminate the area in question similar to the rest of
the parking lot area. We have added a worst case 2nd level, open to sky, parking structure lighting
scenario to the photometric plan on sheet E1.1.
Is there any existing lighting that is remaining that was not included on the lighting plan?
APS/GREGORY: Not that we are aware of. It is our understanding that all exterior lighting will be provided
as new.
Comment Number: 6 Comment Originated: 06/17/2014
06/17/2014: LUC 3.2.5 Trash and recycling enclosure shall be provided with walk-in access
and at least 20ft from a public sidewalk on a concrete pad.
Where is the trash and recycling enclosure?
BHA – Trash enclosure is now shown on the plan. It will be located on a concrete pad in the rear parking
lot near the building.
Comment Number: 7 Comment Originated: 06/18/2014
06/18/2014: LUC 3.5.1 Mechanical/Utility equipment (vents, flues, meters, boxes, transformers,
conduit, RTU...) shall be screened.
The plans need to identify the locations of such equipment and how they are screened.
AW – Transformers and other equipment at ground level will be screened by split-face masonry enclosures.
At the roof level, mechanical equipment will be screened by parapets. In the existing building, parapets
will be extended higher to hide equipment. Please see exterior elevations.
Comment Number: 8 Comment Originated: 06/18/2014
06/18/2014: LUC 3.5.3(C)(1) Shall provide connecting walkway to main entrance of the building.
BHA – A connecting walkway has been provided to the main entrance of the dealership from College.
Comment Number: 9 Comment Originated: 06/18/2014
06/18/2014: LUC 3.5.3(2) Buidlings have a required built-to-line. 30% of the building length
shall meet the built-to-line. Along nonarterial street the build-to-line is 0-15ft. and along arterial
street the build-to-line is 10-25ft. When there is more than one street along a property then a
the building shall meet at least two of the built-to-line. Further there shall not be any vehicle use
area between the building and the facades of the building.
With this additional standard the average landscap setback standard already cited will need to
be met. No vehicle use area, including inventory, should be included the landscape set back.
Also pedestrian connection to college ave.
The build-to-line is not being met along Kensington Dr with the new buildig it is 2' and 11" away.
The new parking area on the west side of the building should not be in between the facade and
the street.
BHA – The build-to-line is being met along Kensington and Mason. The new retail building along Mason
lies within 8’ to 20’ from the proposed ROW. The new retail building along Kensington is 15’ from the
proposed ROW. Parking has been removed from the area between the building and Mason street on the
west side of the site.
Comment Number: 10 Comment Originated: 06/19/2014
06/19/2014: LUC 3.5.3(E)(2)(a)1. Requires walls that face streets be subdivided every 30ft. in
length to create a human scale.
LUC 3.5.3(E)(3) Facades that face the street shall be broken up with architectural elements for
at least 50% of the building
The parking structure wall that faces S Mason Street needs to be refined to include more
human scale architectural elements.
The Blank walls along college both with the existing structure and Parking structure should be
broken up with architectural elements to further create a human scale.
AW – New faux columns made of split-face masonry have been added along exterior walls directly facing
streets with smaller intermediate faux columns added so that it is broken up architecturally every 20’ to 30’.
Aluminum windows frames (without glazing) have also been added along street fronts to create greater
human scale and add refinement to relevant elevations.
Comment Number: 11 Comment Originated: 06/19/2014
06/19/2014: Is the arch element at east entrance attached to the building? This seems to be a
large sign rather than portion of the building.
Please provide further details
AW – Yes, the arch element is an entrance portal that is attached to the main building. At the entry and in
between the front of the portal and the main building, there will be a finished ceiling and down lighting as
well even though it will be part of the outdoor (unconditioned) space.
Comment Number: 12 Comment Originated: 06/19/2014
06/19/2014: LUC 3.5.3(E)(6) Requires buildings to have a recognizable "base" and "top"
such as a sills and cornices/stepped parapets.
There needs to be more emphasis on this the base and top. These are currently not
recognizable.
AW – A 4’-0” tall concrete masonry unit base has been added around the entire building to add a solid
base, and the tops have been refined to further define sections of glazing and entries along the new retail
spaces and renovated main building. This creates a recognizable rhythm and consistency along the top of
buildings. The top of the parking garage is mainly defined by its simplicity in comparison to its busy
core/middle levels which are now broken up by split-face masonry columns, aluminum window frames and
simpler intermediate columns.
Comment Number: 13 Comment Originated: 06/19/2014
06/19/2014: The planning set will need to provide a cover sheet with a sheet index and
signature blocks. Or the site plan with the signature blocks and sheet index.
BHA – A Sheet Index has been added to the Site Plan Sheet.
Comment Number: 14 Comment Originated: 06/19/2014
06/19/2014: Signs are not approved through this development process and a note will need to
indicate this or remove the signs from the plans.
BHA – A note has been added to the plans that all signage must be approved through the appropriate
approval process.
Comment Number: 15 Comment Originated: 06/19/2014
06/19/2014: There will need to be a set of plans for the site, landscape, and elevations. To
show the conditions of all phases.
It is not clear at all what is happening during the each phase.
Each phase will need to meet compliance with the LUC.
BHA – Noted. The general footprint will be constructed in phase one. Future phases will consist of the
upper three levels of the parking garage and minor extension of service bays (labeled & depicted with
dashed line on plans).
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/12/2014
06/12/2014: Per the submitted site plan there is 174,600 sq ft of new building being added to
the site, therefore the TDRF for PDP is less than was shown and calculated on the TDRF
applicaiton. Unless the square footage changes this project will only owe $125 for the TDRF
FDP fee because of the overpayment of the PDP fee.
BHA – Noted.
Comment Number: 2 Comment Originated: 06/25/2014
06/25/2014: The sidewalk along College Ave should be extended as the 10 foot wide sidewalk
further north and transition to a narrower sidewalk just before the property line.
BHA – We have extended the 10’ walk to the property line and shown a barricade until the future walk is
improved north of the property line.
Comment Number: 3 Comment Originated: 06/25/2014
06/25/2014: Driveways need to be shown constructed with concrete to the property line/back
of sidewalk. The radii shown seem greater than allowed – looks like just on Kensington.
INT – Concrete is now shown to the property line and the radii at the Kensington entrance revised to
15 feet
Comment Number: 4 Comment Originated: 06/25/2014
06/25/2014: Additional clarification will be needed on the plans to identify what improvements
are a part of phase 1 and what will be done with the area that will contain the structures being
built with phase 2.
BHA – Noted. The general footprint will be constructed in phase one. Future phases will consist of the
upper three levels of the parking garage and minor extension of service bays (labeled & depicted with
dashed line on plans).
Comment Number: 5 Comment Originated: 06/25/2014
06/25/2014: The ramps at the two corners need to be replaced with directional ramps.
INT – Directional ramps are now shown
Comment Number: 6 Comment Originated: 06/25/2014
06/25/2014: Are there any existing services that need to be removed?
INT – The existing services noted to be abandoned or removed
Comment Number: 7 Comment Originated: 06/25/2014
06/25/2014: No water or sewer services are shown for the car wash or the retail shop?
INT – Water and sewer will be served via the existing dealership service lines
Comment Number: 8 Comment Originated: 06/25/2014
06/25/2014: Need to look at the sight distance from the access point onto Mason Street based
on the future curb location. Will a sight distance easement be needed?
INT – Sight distance has been verified using AASHTO design criteria and a variance request has been
provided by Delich Associates to use this criteria in lieu of LCUASS
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 06/25/2014
06/25/2014:
Thank you for arranging the first tree evaluation meeting. Please set up a second onsite
meeting with the City Forester to complete the tree inventory and mitigation plan. As part of that
meeting some further review of the north most Ash on Mason can occur to consider desirability
of removal or retention. Initial discussion at the first meeting indicated the tree would remove
but some further discussion could be beneficial in making a final determination.
BHA – Noted and scheduled for 7-31-14.
Comment Number: 2 Comment Originated: 06/25/2014
06/25/2014:
Provide tree species diversity on final landscape plan and list percentages in the plant list.
BHA – Tree species will be determined for final plan and species diversity will be shown on the final plan.
Comment Number: 3 Comment Originated: 06/25/2014
06/25/2014:
Please add this landscape note:
The Developer shall replace dead or dying street trees after planting until final maintenance
inspection and acceptance by the City of Fort Collins Forestry Division. All City street trees in
the project must be established, of an approved species and of acceptable condition prior to
acceptance.
BHA – Note has been added to the Tree Protection Notes on the Tree Mitigation Plan.
Comment Number: 4 Comment Originated: 06/25/2014
06/25/2014:
Please add the table associated with tree protection specification LUC3.2.1 G 7
BHA – Table has been added to the Tree Protection Notes on the Tree Mitigation Plan.
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 06/23/2014
06/23/2014:
Building Permit Pre-Submittal Meeting
Pre-Submittal meetings are offered to assist the designer/builder by assuring, early on in the
design, that the new commercial or multi-family projects are on track to complying with all of the
adopted City codes and Standards listed below. The proposed project should be in the early
to mid-design stage for this meeting to be effective and is typically scheduled after the Current
Planning conceptual review meeting. Applicants of new commercial or multi-family projects are
advised to call 416-2341 to schedule a pre-submittal meeting. Applicants should be prepared
to present site plans, floor plans, and elevations and be able to discuss code issues of
occupancy, square footage and type of construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2011 National Electrical Code (NEC) as amended by the State of Colorado
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi-family and Condominiums 3 stories max: 2012 IECC residential chapter.
3. Commercial and Multi-family 4 stories and taller: 2012 IECC commercial chapter.
Fort Collins Green Code Amendments effective starting 1-1-2012. A copy of these
requirements can be obtained at the Building Office or contact the above phone number.
Pederson Toyota expansion – project specific concerns:
1. Fire-sprinkler systems are required for buildings more than 5k s.ft. unless fire containment
is provided.
2. Building code and State statute CRS 9-5 requires project provide accessible units.
3. For an non-sprinkled parking garage that is attached to other buildings, the Building Code
will limit the height to 3 stories and approx 30k per floor.
4. New Green Code requires:
a. Upgraded insulation is required for buildings using electric heat or cooling.
b. Exterior walls and roof must meet a STC (sound resistance) rating of 40 min. if building
located within 1000ft to train tracks.
c. Low-flow Watersense plumbing fixtures (toilet, faucets, shower heads) are required.
d. Special combustion safety requirements for natural draft gas appliances.
e. Low VOC interior finishes.
City of Fort Collins
Building Services
Plan Review
416-2341
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/10/2014
06/10/2014: The existing electric capacity to this service is 1600 amps at 120/208 volt
three-phase. Additional electric capacity fee for any increase will apply. A Commercial Electric
Service (C-1) form will need to be completed and supplied to Light & Power Engineering.
INT - Noted
Comment Number: 2 Comment Originated: 06/10/2014
06/10/2014: Relocation of the electric transformer will be at the owner's expense. The space
shown on the utility plan for the relocated transformer may not be adequate. Based on likely
electric capacity, and the resulting likely transformer size, the minimum east to west dimension
required will be at least 10 feet. If the transformer is larger, additional space will be necessary.
The transformer can be sized upon receipt of a completed C-1 form. Contact Light & Power
Engineering at (970)221-6700 with any questions.
INT – Noted. The final location of the transformer will be coordinated prior to final plan approval.
Department: Outside Agencies
Contact: Gloria Hice-Idler, ,
Topic: General
Comment Number: 1 Comment Originated: 06/16/2014
06/16/2014: I've reviewed the above submittal. Based upon the TIS, it appears that the
intersection of Kensington and College will see an increase of traffic of more than 20%. Per the
State Highway Access Code, the increase allows CDOT to re-evaluate the access and to
require a new access permit.
The review of the intersection indicates that no new highway improvements are necessary, but
the applicant should be required to obtain a new access permit.
If you have any questions, please do not hesitate to contact me.
P 970.350.2148 | C 970.381.2475 | F 970.350.2198
1420 2nd Street, Greeley, CO 80631
gloria.hice-idler@state.co.us
INT – If required, a new access permit will be obtained prior to final plan approval
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 06/25/2014
06/25/2014: STRUCTURES EXCEEDING 30'
Due to the height of the parking garage, a 30' wide fire lane is required adjacent to the longest
side of the structure. This requirement has not been satisfactorily met with the proposed site
plan and further discussion is needed. Additionally, the 30' EAE width requirement shall be
reflected on the plat.
IFC Appendix D; Poudre Fire Authority Administrative Policy 85-5: In order to accommodate the
access requirements for aerial fire apparatus (ladder trucks), required fire lanes shall be 30 foot
wide minimum on at least one long side of the building. At least one of the required access
routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30
feet from the building, and shall be positioned parallel to one entire side of the building.
INT – Parking spaces have been eliminated at the northwest corner of the parking structure and the
drive aisle realigned closer to the structure. A 30 foot EAE has been provided along the north and
south sides of the building.
Department: Stormwater Engineering
Contact: Dan Mogen, , dmogen@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/27/2014
06/27/2014: The discussions up to this point have indicated that significant changes to the
plans are expected; therefore, these plans and numbers have not been reviewed in detail.
INT - Noted
Comment Number: 2 Comment Originated: 06/27/2014
06/27/2014: Underground detention is not allowed without approval through a formal variance
request. This request will need to include justification of the variance through presentation of
alternatives to the underground detention.
INT – A variance request has been provided within the Drainage Report.
Comment Number: 3 Comment Originated: 06/27/2014
06/27/2014: EDB is not considered LID . Please refer back to conceptual comment #5 for
details on meeting the LID requirement.
INT – Urban Drainage indicates that EDBs are considered “somewhat” of an LID. To supplement
the EDB we have added a soft pond bottom section to promote infiltration.
Comment Number: 4 Comment Originated: 06/27/2014
06/27/2014: Per conceptual comment #1, please provide a simple plan view exhibit
documenting existing, proposed, and net change in impervious areas.
INT – An exhibit will be provided during Final Plan review in order to generate the fees associated with
any change in impervious area
Comment Number: 5 Comment Originated: 06/27/2014
06/27/2014: The retaining wall around the detention pond in the NW corner is at or near the
50% maximum listed on page 7 of the Landscape Design Standards and Guidelines for
Detention Facilities. Please consider using as little retaining wall as possible and using
articulated block or other methods to maximize aesthetic value.
INT – Articulated block or other methods will be specified with the final plans
Comment Number: 6 Comment Originated: 06/27/2014
06/27/2014: A Stormwater Maintenance Plan (SWMP) is required at final plan stage. Please
contact Jesse Schlam at 224-6015 for requirements.
INT - Noted
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 06/19/2014
06/19/2014: No comments.
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 06/19/2014
06/19/2014: Please correct the sub-title as marked on sheet 1. This should match the
Subdivision Plat. See redlines.
INT – Title corrected
Comment Number: 3 Comment Originated: 06/19/2014
06/19/2014: The City has moved to the NAVD88 vertical datum. Please state the project datum
on sheets 1 & 2, and provide an equation to get from NAVD88 to NGVD29 unadjusted, i.e.
NAVD88 = NGVD29 Unadjusted + _______.
INT – An adjustment equation has been added
Comment Number: 4 Comment Originated: 06/19/2014
06/19/2014: There are line over text issues. See redlines.
INT - Corrected
Comment Number: 5 Comment Originated: 06/19/2014
06/19/2014: There are text over text issues. See redlines.
INT - Corrected
Comment Number: 6 Comment Originated: 06/19/2014
06/19/2014: There is text that needs to be rotated 180 degrees. See redlines.
INT - Corrected
Comment Number: 7 Comment Originated: 06/19/2014
06/19/2014: Please change the right of way widths shown on sheet 5. Mason Street is platted
as a 60' right of way. See redlines.
INT - Corrected
Topic: Landscape Plans
Comment Number: 8 Comment Originated: 06/19/2014
06/19/2014: Please add the subdivision information for the surrounding properties as marked
on sheet 1. See redlines.
BHA – Added the subdivision information for surrounding properties to plans.
Topic: Plat
Comment Number: 15 Comment Originated: 06/20/2014
06/20/2014: Please make changes as marked. See redlines. If changes are not made or you
disagree with comments, please provide written response of why corrections were not made.
King – Comments addressed unless otherwise noted
Topic: Site Plan
Comment Number: 9 Comment Originated: 06/19/2014
06/19/2014: Please correct the legal description as marked. This should match the Subdivision
Plat. See redlines.
BHA – The legal description has been corrected.
Comment Number: 10 Comment Originated: 06/19/2014
06/19/2014: Please add the subdivision information for the surrounding properties as marked.
See redlines.
BHA – Added the subdivision information for surrounding properties to plans.
Comment Number: 11 Comment Originated: 06/19/2014
06/19/2014: There are line over text issues. See redlines.
BHA – Line over text has been corrected.
Comment Number: 12 Comment Originated: 06/19/2014
06/19/2014: There are text over text issues. See redlines.
BHA – Text over text has been corrected.
Comment Number: 13 Comment Originated: 06/19/2014
06/19/2014: Mask text within hatching. See redlines.
BHA – Text within hatching has been masked.
Comment Number: 14 Comment Originated: 06/19/2014
06/19/2014: Why is the City of Fort Collins shown as an owner in the Owner's Certification?
BHA – Owner has been updated to Pedersen Properties LTD.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: Construction Drawings
Comment Number: 4 Comment Originated: 06/24/2014
06/24/2014: Sheet 2 of 5 Section C Traffic Signing and Pavement Marking Construction Notes:
Notes 6, 11, and 14 need to edited to read "Local Entity TRAFFIC Engineer" instead of Local
Entity Engineer.
INT – Notes have been revised
Topic: General
Comment Number: 2 Comment Originated: 06/24/2014
06/24/2014: Transportation Planning notes that the submittal is well done, improvements are
considerable, and this submittal appears to meet the intent of the Mid Town Plan.
INT - Noted
Topic: Site Plan
Comment Number: 3 Comment Originated: 06/24/2014
06/24/2014: The curb ramps at the intersection corners need to be directional.
INT – Curb ramps have been changed to directional
Topic: Traffic Impact Study
Comment Number: 1 Comment Originated: 06/24/2014
06/24/2014: TIS reviewed and conclusions noted.
BHA – Noted.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/25/2014
06/25/2014: Irrigation plans are required no later than at the time of building permit. The
irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use
Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or
eolson@fcgov.com
BHA – Noted. Irrigation plans will be provided for the Final Plan submittal.
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 06/24/2014
06/24/2014: Show all existing water and sewer mains and services.
INT – All known services have been noted on the plans
Comment Number: 2 Comment Originated: 06/24/2014
06/24/2014: Show/label existing curb stops and meter pit.
INT – Known locations of curb stop and meter pit has been noted on the plans for the existing dealership.
However, the site survey and subsequent field visit did not indicate the locations for the existing
Self Storage office building. Additional field reconnaissance and coordination may be required.
Comment Number: 3 Comment Originated: 06/24/2014
06/24/2014: Protect the existing sewer service clean-outs in the paved/paver areas by
converting to traffic-rated clean-outs. Add traffic-rated clean-out detail.
INT – Traffic rated cleanouts have been noted and details will be provided with the final plans
Comment Number: 4 Comment Originated: 06/24/2014
06/24/2014: Will the 6" fire line be adequate for the entire building? Water pressure in that area
is approximately 65 psi.
INT – The MEP has indicated that the existing fire line is adequate or an internal pump will be provided.
Final calculations will be performed during the final plan stage.
Topic: General
Comment Number: 5 Comment Originated: 06/24/2014
06/24/2014: Explain the phasing shown on the site plan. Will Phase 1 include a building
addition that covers the entire footprint or will the portion labeled Phase 1 Detail/Carwash be a
separate building at that time?
BHA – Noted. The general footprint will be constructed in phase one. Future phases will consist of the
upper three levels of the parking garage and minor extension of service bays (labeled & depicted with
dashed line on plans).
Department: Zoning
Contact: Ali van Deutekom, 970-416-2743, avandeutekom@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/24/2014
06/24/2014: I understand you would like to phase this project however, I will still need the
landscape, parking, handicap parking and bicycle parking calculations of both phases with
drawings in order to approve this development plan along with a phasing plan.
BHA – Noted. The general footprint will be constructed in phase one. Future phases will consist of the
upper three levels of the parking garage and minor extension of service bays (labeled & depicted with
dashed line on plans).