Loading...
HomeMy WebLinkAboutPLUM & SHIELDS EXTRA OCCUPANCY RENTAL HOUSE - PDP/FDP - FDP130053 - REPORTS - DRAINAGE REPORTPage 1 of 2 D:\Projects\970-001\Drainage\Reports\Drainage Report\970-001_Drainage-Letter.docx Drainage Letter Report Date: July 14, 2014 Project: Plum & Shields Greek Housing Project No. 970-001 Project Development Plan/Final Plan Fort Collins, Colorado Attn: Mr. Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Dear Wes: This letter serves to address the stormwater impacts of the Plum & Shields Greek Housing project. The existing building is situated towards the northern portion of the site. The site currently consists of rooftop, concrete walks, asphalt parking areas, turf, trees, and other vegetation. It presently functions similar to a ‘B’ lot, with historic drainage being split towards Plum Street to the north and towards Shields Street to the east. The total impervious area of the existing site is approximately 12,326 square-feet. The existing percent impervious for the entire site is 65.1%. The existing total runoff from the site is 3.7 cfs in the 100-yr event. The proposed redevelopment will leave the existing building footprint unchanged, aside from the removal of a small addition on the west side of the building, while expanding the parking area south of the building. Portions of existing paving will be modified, and a paver area will be added at the northeast corner of the new parking area. A second paver area will be added at the driveway entrance from Plum Street. While very minor grading changes will occur, the addition of the paver area at the Plum Street entrance will modify the existing drainage basins so that some areas of the site that have historically flowed to Plum Street will now be directed to Shields Street via the paver subdrain. The total impervious area of the proposed redevelopment is roughly 12,861 square-feet. This is a slight increase from the existing condition. The proposed percent impervious for the entire site also increases slightly to 67.0%. However, due to the addition of pavers, the removal of some concrete paving along the north side of the building and the redirection of some flows to Shields Street, total runoff from the site will decrease to 3.4 cfs in the 100-yr event. The site is located in the Old Town Drainage Basin. On-site detention is not required so long as there is no increase in runoff. Since the redevelopment does not propose an increase in runoff, detention storage is not required. Calculations using the rational method to determine the existing and proposed runoff are attached to this letter, as is a drainage exhibit. An exhibit depicting existing and proposed impervious areas has also been provided. There are no regulatory floodplains associated with the project. Page 2 of 2 D:\Projects\970-001\Drainage\Reports\Drainage Report\970-001_Drainage-Letter.docx Although stormwater quantity detention is not required, stormwater quality mitigation will be addressed by both temporary and permanent Best Management Practices (BMPs). During construction, the Contractor will follow the appropriate and applicable City of Fort Collins standards for erosion and sediment control. Since the approximately 11,707 sf area of disturbance for the project is less than one acre, a comprehensive Stormwater Management Plan will not be prepared for this project. Post construction water quality and erosion control will be achieved by a fully established and stabilized site. All areas disturbed during construction will receive permanent hardscape, landscape, or building structure. There are no existing stormwater BMP’s currently on-site. In order to bring the site into compliance with the Low Impact Development Standards adopted by the city, water quality mitigation and permeable pavers will be provided on-site. Water quality treatment will occur through a variety of methods. The first method is the use of a raised bio-retention area (Infiltration Planter) along the south side of the existing building that intercepts runoff from rooftop downspouts. This planter bed will have an engineered section designed to remove particulates and contaminants from the runoff. While most minor events are expected to infiltrate into the ground, a subdrain is provided to drain the Infiltration Garden should it become overburdened. The underdrain will outfall directly into Shields. In addition to treating the roof runoff, a paver area is being provided in 3 of the new parking stalls, which will allow minor rain events to infiltrate into the soil rather than leaving the site. An additional paver area is also being provided at the entrance from Plum Street. The final method that is being utilized on the north side of the building is to discharge roof drains into landscaped areas. The City LID requirements specify that no less than 25% of all new paving shall be treated using permeable paving technique. In the case of this project, 792 sf of permeable pavers will be provided, which is 74% of the total 1,069 sf of new paving, which far exceeds the requirement. The City LID requirements also specify that no less than 50% of any new impervious areas must be treated using LID techniques. The combination of treatment provided by the Permeable Pavers, Infiltration Planter, and Landscaping Strips will treat 6,365 sf of impervious area on the site, which is 804% of the new impervious areas proposed with the project, which again far exceeds the amount required by city code. Of the total impervious area on the site, including all existing and proposed areas, 48% will be treated as a result of the improvements proposed with this project. To summarize, the proposed grading concept closely matches existing elevations and drainage patterns. On-site detention is proven to be unnecessary. Stormwater quality has been provided, and exceeds the city requirements for Low Impact Development paving and treatment. Therefore, it is my professional opinion that the Plum & Shields Greek Housing satisfies all applicable stormwater criteria. Please do not hesitate to contact me if you have questions or require additional information. Sincerely, Andrew Reese Nicholas W. Haws, PE Project Engineer Project Manager enc. CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Shields & Plum Greek Housing Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Reese Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.50 . 40 Roofs …….…….………………..……………….…………………………………………….0..95 90 Concrete Pavers…………………………...………………..…………………………………………….0.40 . 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. N 7,785 0.18 0.02 0.05 0.03 0.00 0.00 0.08 0.64 0.64 0.81 52.1 S 10,186 0.23 0.11 0.02 0.05 0.00 0.00 0.05 0.80 0.80 0.99 75.0 Total 17,971 0.41 0.14 0.07 0.07 0.00 0.00 0.13 0.73 0.73 0.91 65.1 EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 Overland Flow, Time of Concentration: Project: Shields & Plum Greek Housing Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) EXISTING TIME OF CONCENTRATION COMPUTATIONS A. Reese July 14, 2014 3 1 1 . 87 1 . 1 * S Ti C Cf L  Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Rational Method Equation: Project: Shields & Plum Greek Housing Calculations By: Date: From Section 3.2.1 of the CFCSDDC EXISTING RUNOFF COMPUTATIONS A. Reese July 14, 2014 Q C f C i A From Section 3.2.1 of the CFCSDDC Rainfall Intensity: N N 0.18 5.0 5.0 5.0 0.64 0.64 0.81 2.85 4.87 9.95 0.3 0.6 1.4 S S 0.23 5.2 5.2 5.1 0.80 0.80 0.99 2.85 4.87 9.95 0.5 0.9 2.3 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Existing.xlsx\Direct-Runoff DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q10 (cfs) Q100 (cfs) N N 0.18 0.64 0.64 0.81 5.0 5.0 5.0 0.3 0.6 1.4 S S 0.23 0.80 0.80 0.99 5.2 5.2 5.1 0.5 0.9 2.3 EXISTING RUNOFF SUMMARY TABLE D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Existing.xlsx\Summary Table CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Shields & Plum Greek Housing Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Reese Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.50 . 40 Roofs …….…….………………..……………….…………………………………………….0..95 90 Concrete Pavers…………………………...………………..…………………………………………….0.40 . 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. N 5,710 0.13 0.00 0.04 0.03 0.00 0.00 0.07 0.58 0.58 0.73 43.0 S 12,261 0.28 0.14 0.04 0.04 0.00 0.02 0.04 0.82 0.82 1.00 78.2 Total 17,971 0.41 0.14 0.08 0.07 0.00 0.02 0.11 0.74 0.74 0.93 67.0 DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 Overland Flow, Time of Concentration: Project: Shields & Plum Greek Housing Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) DEVELOPED TIME OF CONCENTRATION COMPUTATIONS A. Reese July 14, 2014 3 1 1 . 87 1 . 1 * S Ti C Cf L  Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Rational Method Equation: Project: Shields & Plum Greek Housing Calculations By: Date: From Section 3.2.1 of the CFCSDDC DEVELOPED RUNOFF COMPUTATIONS A. Reese July 14, 2014 Q C f C i A From Section 3.2.1 of the CFCSDDC Rainfall Intensity: N N 0.13 5.0 5.0 5.0 0.58 0.58 0.73 2.85 4.87 9.95 0.2 0.4 1.0 S S 0.28 8.5 8.5 8.2 0.82 0.82 1.00 2.40 4.10 8.38 0.6 0.9 2.4 C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Proposed.xlsx\Direct-Runoff DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q10 (cfs) Q100 (cfs) N N 0.13 0.58 0.58 0.73 5.0 5.0 5.0 0.2 0.4 1.0 S S 0.28 0.82 0.82 1.00 8.5 8.5 8.2 0.6 0.9 2.4 DEVELOPED RUNOFF SUMMARY TABLE D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Proposed.xlsx\Summary Table Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) N N No 0.95 0.95 1.00 45 2.8 1.3 1.3 0.9 194 0.6 1.55 2.1 0 0.0 0.00 N/A 5.0 5.0 5.0 S S No 0.15 0.15 0.19 22 2.2 6.4 6.4 6.2 270 1.2 2.19 2.1 0 0.0 0.00 N/A 8.5 8.5 8.2 Gutter Flow Swale Flow Design Point Basin Overland Flow Time of Concentration (Equation RO-4) D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Proposed.xlsx\Tc-2-yr_&_100-yr July 14, 2014 D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Proposed.xlsx\C-Values Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) N N No 0.95 0.95 1.00 45 2.8 1.3 1.3 0.9 194 0.6 1.55 2.1 0 0.0 0.00 N/A 5.0 5.0 5.0 S S No 0.15 0.15 0.19 5 1.0 3.8 3.8 3.7 184 1.2 2.17 1.4 0 0.0 0.00 N/A 5.2 5.2 5.1 Gutter Flow Swale Flow Design Point Basin Overland Flow Time of Concentration (Equation RO-4) D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Existing.xlsx\Tc-2-yr_&_100-yr July 14, 2014 D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Existing.xlsx\C-Values