HomeMy WebLinkAboutRIGDEN FARM FILING 18 - PDP/FDP - FDP140011 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTSResponse to Review Comments Comment date: May 16, 2014 Name pf Project: Rigden Farm Filing Eighteen Rigden Farm Filing 18, FDP140011, Round Number 1 Department: Current Planning Topic: General Comment Number: 1 Comment Originated: 05/12/2014 05/12/2014: While the replatting is underway, it may make sense to create shared access easements for any driveways that are split between lots. These would be private easements, not dedicated to the City. The shared access easements have been added. Comment Number: 2 Comment Originated: 05/12/2014 05/12/2014: Please include a note on the plat: No building permit will be granted for construction until a site-specific landscape plan, site plan, architectural elevations and utility plans for such construction have been approved by the Planning Director. The decision of the director to be based upon compliance with the Land Use Code and all other applicable criteria and standards. The note has been added. Comment Number: 3 Comment Originated: 05/13/2014 05/13/2014: From GIS: Addresses will be assigned by the GIS Department after the plans have met final approval through Development Review and are recorded with the City. The comment is noted. Comment Number: 4 Comment Originated: 05/16/2014 05/16/2014: An additional round of review will be needed to verify these requested changes The comment is noted. Department: Engineering Development Review Topic: General Comment Number: 1 Comment Originated: 05/14/2014 05/14/2014: Mylar copies of existing sheets 6 and 18 will need to be provided with the areas for which the new sheets are being provided bubbled out and reference to see the new sheet on which changes for that area are shown. This will be revisions to these sheets. The same requirements will apply to the existing grading sheets if additional grading information for the lots is to be provided (additional lot corner elevations). Upon approval, we will provide the mylar copies. Comment Number: 2 Comment Originated: 05/14/2014 05/14/2014: The new utility plan revision sheets need to be numbered as part of the original Rigden Farm –Filing Six plans. I have suggested sheet numbering of 18 A, 18B, and 18C of 142. The plans have been revised as noted. Comment Number: 3 Comment Originated: 05/14/2014 05/14/2014: The new sheets need to include City signature blocks in the lower right hand corner of the page. The signature blocks have been provided. Comment Number: 4 Comment Originated: 05/14/2014 05/14/2014: The new sheets need to show the lot lines for the lots as proposed by the plat and label the lots as they will exist after the new plat is filed not per the old lot information. The lot lines have been added. Comment Number: 5 Comment Originated: 05/14/2014 05/14/2014: On the new utility sheets need to clarify what is to be constructed and what is existing. Many of the sheets seem to indicate that the mains and lines within the streets are to be constructed. The plans have been revised. Comment Number: 6 Comment Originated: 05/14/2014 05/14/2014: The following note needs to be included on the new utility plan sheets: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs and replacement of sidewalk, curb, gutter and asphalt shall be in accordance with City street repair standards. The work shown on these plans is not included within the existing DCP’s for Rigden Farm Six Filing. Permit(s) for all work shown on these plans shall be obtained prior to the start of any work shown on these plans. The note have been added. Comment Number: 7 Comment Originated: 05/14/2014 05/14/2014: It is a private drive not an alley and needs to be correctly labeled on sheet 18C. The label has been revised. Comment Number: 8 Comment Originated: 05/14/2014 05/14/2014: The proposed driveways on lots 19 and 20 do not align with the existing driveway locations. If new driveway locations are proposed the plans need to include notes and identify where the new driveways are to be located (either station information or distance from a property line) and identify that existing driveways are to be removed and that street cut and repaving requirements will apply. The plans have been revised to note removal of the existing driveways per City requirements and information has been added for the construction of the new driveways. Comment Number: 9 Comment Originated: 05/14/2014 05/14/2014: Need to show the sight distance on lot 16 on the plan. The site plan that shows this lot needs to note and identify that parking in the portion of the driveway that is covered by the sight distance easement is not allowed. It would actually be better if the driveway could be moved to the other side of the lot. The site distance has been added to the plans and a note has been added to indicate parking in the site distance easement is not allowed. Comment Number: 11 Comment Originated: 05/14/2014 05/14/2014: Where are trees going to be planted? With additional utilities being located behind the sidewalk this may limit landscaping on the properties. The landscape plans have been provided showing the tree locations. Comment Number: 12 Comment Originated: 05/14/2014 05/14/2014: Plat – the plat language on the proposed plat is not the current plat language. Current plat language needs to be used. I can email it to you if it is needed. The language has been updated. Comment Number: 13 Comment Originated: 05/14/2014 05/14/2014: Plat - Not showing all the easements that exist on the lots being platted. If you wish to vacate some of the easements they need to be identified and noted on the plat. The easements have been updated. Comment Number: 14 Comment Originated: 05/14/2014 05/14/2014: Plat – A shared private access easement needs to be shown and dedicated on lots 12 and 13 since these lots will share a driveway. The access easement has been added. Department: Outside Agencies Topic: General Comment Number: 1 Comment Originated: 05/14/2014 05/14/2014: Comcast is requesting a 6' side lot easement between lots 19 & 20 due to existing facilities. Contact: Don Kapperman at don_kapperman@cable.comcast.com or 970-484-7166 The easement has been added. Department: Stormwater Engineering Topic: Erosion Control Comment Number: 2 Comment Originated: 05/14/2014 05/14/2014: No Comment from Erosion Control. This revision does not significantly affect the current erosion control materials. If you need clarification concerning this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com The comment is noted. Topic: General Comment Number: 1 Comment Originated: 05/13/2014 05/13/2014: Please provide a grading plan for any lots that have a different footprint than the original approvals. The drainage on the lots has is not being revised from the original design. Elevations at the lot corners have been added to the grading plans. Department: Technical Services Topic: Construction Drawings Comment Number: 1 Comment Originated: 05/13/2014 05/13/2014: No comments. The comment is noted. Topic: Plat Comment Number: 2 Comment Originated: 05/13/2014 05/13/2014: There are many issues. Please make all changes marked on the redlines. The plans have been revised per the redlines. Department: Traffic Operation Topic: General Comment Number: 1 Comment Originated: 05/09/2014 05/09/2014: No comments. The comment is noted. Department: Water-Wastewater Engineering Topic: Construction Drawings Comment Number: 3 Comment Originated: 05/13/2014 05/13/2014: The curb stops on the branches from the private common water service line should be near the back of the utility easement to eliminate the conflicts with the gas lines shown on the plans. The curb stops have been revised. Comment Number: 4 Comment Originated: 05/13/2014 05/13/2014: Show the new lot lines on the utility plans. The lot lines have been added to the plans. Comment Number: 5 Comment Originated: 05/13/2014 05/13/2014: Add the "City" curb stop on the public portion of the water service extending from the main in the street. The curb stop has been added. Comment Number: 6 Comment Originated: 05/13/2014 05/13/2014: Show the sanitary sewer service clean-outs on the branch lines extending to each unit from the common private sewer service line. The cleanouts have been added. Topic: General Comment Number: 1 Comment Originated: 05/13/2014 05/13/2014: The proposed revisions to City Code which would provide some flexibility for water/sewer services for single family attached units passed on first reading at last week's Council meeting. Second reading is scheduled for next week. If passed, there is a 10 day appeal period before the ordinances would become effective. All comments below will be assuming that these do pass. The comment is noted. Topic: Plat Comment Number: 2 Comment Originated: 05/13/2014 05/13/2014: The curb stops on the branches from the private common water service line must be within a utility easement. Please check to see that the easements have been included. The easements have been added to the plan. Department: Zoning Topic: General Comment Number: 1 Comment Originated: 05/13/2014 Once the replat is approved we will need amended drawings showing the lot lines for each of the three minor amendments associated with this project. The comment is noted.