HomeMy WebLinkAboutPEDERSEN TOYOTA EXPANSION - PDP - PDP140007 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYPEDERSEN TOYOTA EXPANSION TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2014 Prepared for: Architectural Workshop 280 South Pennsylvania Street Denver, CO 80209 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 FAX: 970-669-5034 Project #1404 TABLE OF CONTENTS I. INTRODUCTION ........................................................................................................ 1 II. EXISTING CONDITIONS .......................................................................................... 2 Land Use ......................................................................................................................... 2 Roads .............................................................................................................................. 2 Existing Traffic ................................................................................................................. 5 Existing Operation ........................................................................................................... 5 Pedestrians Facilities ...................................................................................................... 5 Bicycle Facilities .............................................................................................................. 9 Transit Facilities .............................................................................................................. 9 III. PROPOSED DEVELOPMENT ............................................................................... 10 Trip Generation ............................................................................................................. 10 Trip Distribution ............................................................................................................. 10 Background Traffic Projections ..................................................................................... 10 Trip Assignment ............................................................................................................ 14 Signal Warrants ............................................................................................................. 14 Operation Analysis ........................................................................................................ 14 Geometry ...................................................................................................................... 14 Pedestrian Level of Service ........................................................................................... 20 Bicycle Level of Service ................................................................................................ 20 Transit Level of Service ................................................................................................. 20 IV. CONCLUSIONS/RECOMMENDATIONS .............................................................. 21 LIST OF TABLES 1. Current Peak Hour Operation .................................................................................... 8 2. Trip Generation ....................................................................................................... 10 3. Short Range (2019) Background Peak Hour Operation .......................................... 17 4. Short Range (2019) Total Peak Hour Operation ..................................................... 18 DELICH Pedersen Toyota Expansion TIS, May 2014 ASSOCIATES LIST OF FIGURES 1. Site Location ............................................................................................................. 3 2. Existing Intersection Geometry.................................................................................. 4 3. Recent Peak Hour Traffic .......................................................................................... 6 4. Averaged/Balanced Recent Peak Hour Traffic .......................................................... 7 5. Site Plan .................................................................................................................. 11 6. Trip Distribution ....................................................................................................... 12 7. Short Range (2019) Background Vehicle Peak Hour Traffic ................................... 13 8. Site Generated Peak Hour Traffic ........................................................................... 15 9. Short Range (2019) Total Peak Hour Traffic ........................................................... 16 10. Short Range (2019) Geometry ................................................................................ 19 APPENDICES A. Base Assumptions Packet B. Recent Peak Hour Traffic C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS Standards D. Short Range (2019) Background Peak Hour Operation E. Short Range (2019) Total Peak Hour Operation F. Pedestrian/Bicycle Level of Service DELICH Pedersen Toyota Expansion TIS, May 2014 ASSOCIATES I. INTRODUCTION This intermediate transportation impact study (ITIS) addresses the capacity, geometric, and control requirements at and near the proposed Pedersen Toyota Expansion. The proposed Pedersen Toyota Expansion site is located in the northeast quadrant of the Mason/Kensington intersection in Fort Collins, Colorado. During the course of the analysis, numerous contacts were made with the project architect (Architectural Workshop), project planner (BHA Design) and the Fort Collins Traffic Engineering staff. This study generally conforms to the format set forth in the Fort Collins transportation impact study guidelines contained in the “Larimer County Urban Area Street Standards” (LCUASS). Appendix A contains the Transportation Impact Study Base Assumptions form and related attachments for the Pedersen Toyota Expansion. The study involved the following steps: • Collect physical, traffic, and development data; • Perform trip generation, trip distribution, and trip assignment; • Determine peak hour traffic volumes; • Conduct capacity and operational level of service analyses on key intersections; • Analyze signal warrants; • Conduct level of service evaluation of pedestrian, bicycle, and transit modes of transportation. DELICH Pedersen Toyota Expansion TIS, May 2014 ASSOCIATES Page 1 II. EXISTING CONDITIONS The location of the Pedersen Toyota Expansion site is shown in Figure 1. It is important that a thorough understanding of the existing conditions be presented. Land Use Land uses in the area are primarily commercial. Land adjacent to the site is flat (<2% grade) from a traffic operations perspective. The center of Fort Collins is to the north of the site. Roads The primary streets near the Pedersen Toyota Expansion site are College Avenue, Harmony Road, Mason Street, and Kensington Drive. The existing geometry at the key intersections is shown in Figure 2. College Avenue is to the east of (adjacent to) the Pedersen Toyota Expansion site. It is classified as a six-lane arterial street on the Fort Collins Master Street Plan. Currently, College Avenue has a six-lane cross section, with auxiliary lanes at intersections. At the College/Kensington intersection, College Avenue has northbound and southbound left-turn lanes, three travel lanes in each direction, and a northbound right-turn lane. The College/Kensington intersection has signal control. The existing speed limit in this area is 40 mph. Harmony Road is to the south of the Pedersen Toyota Expansion site. It is classified as a four-lane arterial street on the Fort Collins Master Street Plan. Currently, Harmony Road has a four-lane cross section, with auxiliary lanes at intersections. At the Harmony/Mason intersection, Harmony Road has eastbound and westbound left- turn lanes, two travel lanes in each direction, and eastbound and westbound right-turn lanes. The Harmony/Mason intersection has signal control. The existing speed limit in this area is 40 mph. Mason Street is to the west of (adjacent to) the Pedersen Toyota Expansion site. In this area, it is a north-south street designated as a two-lane arterial street on the Fort Collins Master Street Plan. Currently, it has a two-lane cross section with no center turn lane. At the Harmony/Mason intersection, Mason Street has northbound and southbound left-turn lanes, one travel lane in each direction, and a northbound right-turn lane. At the Mason/Kensington intersection, Mason Street has the northbound leg combined in a single lane and the southbound leg combined in a single lane. The Mason/Kensington intersection has stop sign control on Kensington Drive. Kensington Drive is an east-west street designated as a local street on the Fort Collins Master Street Plan. Currently, Kensington Drive has a two-lane cross section. At the College/Kensington intersection, Kensington Drive has eastbound and DELICH Pedersen Toyota Expansion TIS, May 2014 ASSOCIATES Page 2 Harmony Kensington College Mason Mason Trail SCALE: 1"=1000' SITE LOCATION Figure 1 DELICH ASSOCIATES Pedersen Toyota Expansion TIS, May 2014 Page 3 EXISTING INTERSECTION GEOMETRY Figure 2 DELICH ASSOCIATES Pedersen Toyota Expansion TIS, May 2014 Page 4 College Jiffy Lube Tire Store Mini-Storage Pedersen Access Kensington - Denotes Lane Mason Harmony westbound left-turn lanes and one through lane in each direction. At the Mason/ Kensington intersection, Kensington Drive has the westbound left turns and right turns combined in a single lane. Existing Traffic Figure 3 shows recent peak hour traffic counts at the College/Kensington, Kensington/Pedersen-Jiffy Lube Access, Kensington/Tire Store-Storage Access, Mason/Kensington, and Harmony/Mason intersections. Recent count data at the College/Kensington intersection was obtained in October 2013 by the City of Fort Collins. Recent count data at the Harmony/Mason intersection was obtained in April 2013 by the City of Fort Collins. Recent count data at the other key intersections was obtained in February 2014. Raw count data is provided in Appendix B. Since traffic counts were performed on different days, the volumes at the intersections were averaged/balanced and are shown in Figure 4. Existing Operation The College/Kensington, Kensington/Pedersen-Jiffy Lube Access, Kensington/ Tire Store-Storage Access, Mason/Kensington, and Harmony/Mason intersections were evaluated and the peak hour operation is displayed in Table 1. Calculation forms are provided in Appendix C. The key intersections are currently operating acceptably with existing control, geometry, and signal timing in the morning and afternoon peak hours. The intersections were evaluated using techniques provided in the 2010 Highway Capacity Manual (2010HCM). A description of level of service for signalized and unsignalized intersections from the 2010 Highway Capacity Manual and a table showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are also provided in Appendix C. The College/Kensington and Harmony/Mason intersections are in an area termed “commercial corridor.” In areas termed “commercial corridor,” acceptable operation at signalized intersections during the peak hours is defined as level of service D or better for the overall intersection, and level of service E or better for any leg or movement. There is no level of service threshold for stop sign controlled intersections. It is important to note that, as an arterial street, Mason Street should have a center median left-turn lane at all intersections. There is no southbound left-turn lane at the Mason/Kensington intersection. Pedestrian Facilities There are sidewalks along College Avenue, Mason Street, Kensington Drive, and Harmony Road. DELICH Pedersen Toyota Expansion TIS, May 2014 ASSOCIATES Page 5 RECENT PEAK HOUR TRAFFIC Figure 3 DELICH ASSOCIATES Pedersen Toyota Expansion TIS, May 2014 Page 6 23/20 1395/1286 13/62 20/22 822/1738 12/75 18/35 5/25 27/50 21/90 6/34 14/109 102/336 19/44 192/261 21/35 33/57 5/43 1/7 0/0 4/8 15/28 2/0 7/42 14/21 45/68 1/6 18/25 15/45 2/2 1/0 30/66 3/8 0/1 22/73 9/6 College Jiffy Lube Tire Store Mini-Storage Pedersen Access Kensington 1/1 0/1 8/26 30/28 Mason AM/PM 97/147 54/121 75/121 56/219 72/120 33/64 128/146 AVERAGED/BALANCED RECENT PEAK HOUR TRAFFIC Figure 4 DELICH ASSOCIATES Pedersen Toyota Expansion TIS, May 2014 Page 7 21/20 1395/1286 13/62 18/21 822/1738 12/75 20/37 6/27 30/53 21/90 6/33 14/109 102/336 16/41 192/261 18/32 36/58 5/44 1/7 0/0 4/8 15/28 2/0 7/42 14/21 45/67 1/6 18/25 25/47 2/2 1/0 30/65 3/8 0/1 32/75 9/6 College Jiffy Lube Tire Store Mini-Storage Pedersen Access Kensington 1/1 0/1 8/26 30/28 Mason AM/PM Harmony 97/147 54/121 75/121 56/219 72/120 TABLE 1 Current Peak Hour Operation Intersection Movement Level of Service AM PM College/Kensington (signal) EB LT C D EB T/RT C C EB APPROACH C C WB LT C D WB T/RT C C WB APPROACH C D NB LT A D NB T A A NB RT A A NB APPROACH A A SB LT A D SB T/RT A B SB APPROACH A B OVERALL A B Kensington/Pedersen-Jiffy Lube Access (stop sign) NB LT/T/RT A A SB LT/T/RT A A EB LT/T/RT A A WB LT/T/RT A A Kensington/Tire Store-Storage Access (stop sign) NB LT/T/RT A A SB LT/T/RT A A EB LT/T/RT A A WB LT/T/RT A A Mason/Kensington (stop sign) WB LT/RT A B SB LT/T A A Harmony/Mason (signal) EB LT A B EB T A C EB RT A B EB APPROACH A C WB LT A B WB T A A WB RT A A WB APPROACH A A NB LT D E NB T C C NB RT C C NB APPROACH D D SB LT D C SB T/RT D C SB APPROACH D C OVERALL B B DELICH Pedersen Toyota Expansion TIS, May 2014 ASSOCIATES Page 8 DELICH Pedersen Toyota Expansion TIS, May 2014 ASSOCIATES Page 9 Bicycle Facilities Bicycle lanes exist on Mason Street. College Avenue has no bicycle lanes. Bike lanes are not required on local or connector streets. Access to the Mason Trail is located less than 1000 feet from the site. Transit Facilities Currently, Transfort serves this area of Fort Collins with Route 1 and the FLEX service. Route 1 runs along Harmony Road and College Avenue. The FLEX service operates on College Avenue providing service to Loveland. There are transit stops very close to this site. The MAX BRT is west of this site. DELICH Pedersen Toyota Expansion TIS, May 2014 ASSOCIATES Page 10 III. PROPOSED DEVELOPMENT Pedersen Toyota Expansion is a proposed expansion of the automobile sales and services building with an additional 34,600 square feet of usable space. There will also be a covered garage component that will not generate any vehicle trips. Figure 5 shows a site plan of the Pedersen Toyota Expansion. The site plan shows two full- movement accesses to/from Kensington Drive and one full-movement access to/from Mason Street. All of the accesses will line up with existing accesses on the other side of the street. The short range analysis (Year 2019) includes development of the Pedersen Toyota Expansion site and an appropriate increase in background traffic, due to normal growth, and other approved developments in the area. Trip Generation Trip generation is important in considering the impact of a development such as this upon the existing and proposed street system. A compilation of trip generation information contained in Trip Generation, 9th Edition, ITE was used to estimate trips that would be generated by the proposed/expected use at this site. Table 2 shows the daily and peak hour trip generation for the Pedersen Toyota Expansion. TABLE 2 Trip Generation Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out 841 Automobile Sales 34.6 KSF 32.30 1118 1.44 50 0.48 17 1.05 36 1.57 54 Trip Distribution Directional distribution of the generated trips was determined for the Pedersen Toyota Expansion site. Figure 6 shows the vehicle trip distribution used for the Pedersen Toyota Expansion site. Background Traffic Projections Figure 7 shows the short range (2019) background peak hour traffic projections at the key intersections. The traffic at the key intersections was increased at a rate of one percent per year for the short range (2019) background traffic forecasts. SCALE: 1"=100' SITE PLAN Figure 5 DELICH ASSOCIATES Pedersen Toyota Expansion TIS, May 2014 Page 11 Total Expansion = 34,600 SF Kensington Drive College Avenue Mason Street Kensington College Mason 30% 10% 20% 40% NOM SCALE: 1"=200' TRIP DISTRIBUTION Figure 6 DELICH ASSOCIATES Pedersen Toyota Expansion TIS, May 2014 Page 12 SHORT RANGE (2019) BACKGROUND PEAK HOUR TRAFFIC Figure 7 DELICH ASSOCIATES Pedersen Toyota Expansion TIS, May 2014 Page 13 22/20 1466/1352 13/62 18/22 864/1827 12/75 20/38 6/27 31/53 21/90 6/33 14/109 107/353 16/42 202/274 18/33 36/58 5/45 1/7 0/0 4/8 15/28 2/0 7/42 14/21 46/68 1/6 18/25 26/48 2/2 College Jiffy Lube Tire Store Pedersen Access Kensington 33/77 9/6 31/67 3/8 8/26 30/28 Mason AM/PM 102/154 57/127 79/127 59/230 76/126 35/67 135/153 992/964 148/209 107/116 632/1284 Trip Assignment Trip assignment is how the generated and distributed trips are expected to be loaded on the street system. The assigned trips are the resultant of the trip distribution process. Using the trip distribution shown in Figure 6, Figure 8 shows the assignment of the site generated peak hour vehicle traffic. The site generated vehicle traffic was combined with the background traffic to determine the total forecasted vehicle traffic at the key intersections. Figure 9 shows the short range (2019) total peak hour vehicle traffic at the key intersections. Signal Warrants As a matter of policy, traffic signals are not installed at any location unless warrants are met according to the Manual on Uniform Traffic Control Devices (MUTCD). None of the stop sign controlled intersections are expected to meet peak hour signal warrants. Operation Analysis Operation analyses were performed at the key intersections. The operation analyses were conducted for the short range analysis, reflecting a year 2019 condition. Using the short range (2019) background peak hour traffic volumes, the key intersections operate as indicated in Table 3. Calculation forms for these analyses are provided in Appendix D. The key intersections operate acceptably with existing control, geometry, and signal timing in the morning and afternoon peak hours. Using the traffic volumes shown in Figure 9, the key intersections operate in the short range (2019) total condition as indicated in Table 4. Calculation forms for these analyses are provided in Appendix E. The key intersections operate similar to the background operation with existing control, geometry, and signal timing in the morning and afternoon peak hours. Geometry The short range (2019) geometry is shown in Figure 10. The geometry at the analyzed intersections is the existing geometry. As mentioned earlier, according to LCUASS, arterial streets (Mason Street) are required to have a center left-turn lane. Mason Street was constructed several years ago. A center left-turn lane was not included. It is doubtful that the City would consider widening Mason Street to have a center left-turn lane. Inclusion of a center left-turn lane on Mason Street would eliminate the bike lanes on this street. It is recommended that the left-turn lane on Mason Street should not be built unless the operation at the subject intersection is determined to be unacceptable. DELICH Pedersen Toyota Expansion TIS, May 2014 ASSOCIATES Page 14 SITE GENERATED PEAK HOUR TRAFFIC Figure 8 DELICH ASSOCIATES Pedersen Toyota Expansion TIS, May 2014 Page 15 1/2 5/6 2/1 3/2 4/7 1/3 2/6 2/5 5/4 1/4 5/4 4/3 Kensington College Jiffy Lube Tire Store Access B Access A Access C 1/2 2/7 6/4 4/8 2/2 6/6 1/5 8/26 24/17 9/7 5/3 3/10 14/10 19/14 6/21 5/15 Mason AM/PM 2/5 5/3 Harmony Pedersen SHORT RANGE (2019) TOTAL PEAK HOUR TRAFFIC Figure 9 DELICH ASSOCIATES Pedersen Toyota Expansion TIS, March 2014 Page 16 8/26 NOM 30/28 1/2 NOM 3/8 2/2 37/74 3/8 7/5 37/85 9/6 Kensington College Jiffy Lube Tire Store Access B Access A Access C 37/31 1466/1352 13/62 38/37 864/1827 12/75 27/60 6/27 36/70 21/90 6/33 14/109 108/355 21/49 204/276 21/35 40/65 6/48 1/7 NOM 4/8 16/33 2/0 15/69 19/24 50/80 1/6 43/43 36/56 2/2 Mason AM/PM Harmony Pedersen 11/35 NOM TABLE 3 Short Range (2019) Background Peak Hour Operation Intersection Movement Level of Service AM PM College/Kensington (signal) EB LT C D EB T/RT C C EB APPROACH C C WB LT C D WB T/RT C C WB APPROACH C D NB LT A D NB T A A NB RT A A NB APPROACH A A SB LT A D SB T/RT A B SB APPROACH A B OVERALL A B Kensington/Pedersen-Jiffy Lube Access (stop sign) NB LT/T/RT A A SB LT/T/RT A A EB LT/T/RT A A WB LT/T/RT A A Kensington/Tire Store-Storage Access (stop sign) NB LT/T/RT A A SB LT/T/RT A A EB LT/T/RT A A WB LT/T/RT A A Mason/Kensington (stop sign) WB LT/RT B B SB LT/T A A Harmony/Mason (signal) EB LT B B EB T B C EB RT A B EB APPROACH B C WB LT A B WB T A A WB RT A A WB APPROACH A A NB LT D E NB T C C NB RT C C NB APPROACH D D SB LT D C SB T/RT D C SB APPROACH D C OVERALL B B DELICH Pedersen Toyota Expansion TIS, May 2014 ASSOCIATES Page 17 TABLE 4 Short Range (2019) Total Peak Hour Operation Intersection Movement Level of Service AM PM College/Kensington (signal) EB LT C D EB T/RT C C EB APPROACH C D WB LT C D WB T/RT C C WB APPROACH C D NB LT A D NB T A A NB RT A A NB APPROACH A A SB LT A D SB T/RT A B SB APPROACH A B OVERALL A B Kensington/Pedersen-Jiffy Lube Access (stop sign) NB LT/T/RT A A SB LT/T/RT A B EB LT/T/RT A A WB LT/T/RT A A Kensington/Tire Store-Storage Access (stop sign) NB LT/T/RT A A SB LT/T/RT A A EB LT/T/RT A A WB LT/T/RT A A Mason/Kensington (stop sign) WB LT/RT B B SB LT/T A A Mason/Site Access (stop sign) EB LT/T/RT B C WB LT/T/RT B C NB LT/T/RT A A SB LT/T/RT A A Harmony/Mason (signal) EB LT B B EB T B C EB RT A B EB APPROACH B C WB LT A B WB T A A WB RT A A WB APPROACH A A NB LT D E NB T C C NB RT C C NB APPROACH D D SB LT D C SB T/RT D C SHORT RANGE (2019) GEOMETRY Figure 10 DELICH ASSOCIATES Pedersen Toyota Expansion TIS, May 2014 Page 19 College Jiffy Lube Tire Store Mini-Storage Pedersen Access Kensington - Denotes Lane Mason Harmony Pedersen Access C Pedestrian Level of Service Appendix F shows a map of the area that is within 1320 feet of the Pedersen Toyota Expansion site. The Pedersen Toyota Expansion site is located within an area termed as a “commercial corridor,” which sets the level of service threshold at LOS A & B for all measured factors. There are five destination areas within 1320 feet of the proposed Pedersen Toyota Expansion: 1) the commercial area to the north of the site; 2) the commercial area to the east of the site; 3) the commercial area to the south of the site; 4) the Mason Trail; and 5) the residential neighborhood west of the site. Sidewalks exist along all streets within the pedestrian influence area. Appendix F contains a Pedestrian LOS Worksheet. Bicycle Level of Service Based upon Fort Collins bicycle LOS criteria, there are three destination areas within 1320 feet of the Pedersen Toyota Expansion, as shown in Appendix F. The three destination areas are: 1) the commercial area to the north and east of the site; 2) the commercial area to the south of the site; and 3) the Mason Trail. There are bicycle lanes on most streets. Bicycles are not permitted on College Avenue. The bicycle level of service is acceptable. The bicycle LOS Worksheet is provided in Appendix F. Transit Level of Service Currently, Transfort serves this area of Fort Collins with Route 1 and the FLEX service. Route 1 runs along Harmony Road and College Avenue. The FLEX service operates on College Avenue providing service to Loveland. There are transit stops very close to this site. In addition, transit service and route frequency enhancements are planned to be implemented by/before 2019. Connections will be made to the Fort Collins MAX system west of this site. DELICH Pedersen Toyota Expansion TIS, May 2014 ASSOCIATES Page 20 DELICH Pedersen Toyota Expansion TIS, May 2014 ASSOCIATES Page 21 IV. CONCLUSIONS/RECOMMENDATIONS This study assessed the impacts of the Pedersen Toyota Expansion development on the short range (2019) street system in the vicinity of the proposed development. As a result of this analysis, the following is concluded:  The development of the Pedersen Toyota Expansion site is feasible from a traffic engineering standpoint. At full development, the Pedersen Toyota Expansion site will generate approximately 1118 daily vehicle trip ends, 67 morning peak hour vehicle trip ends, and 90 afternoon peak hour vehicle trip ends.  Current operation at the key intersections is acceptable.  In the short range (2019) future, given development of the Pedersen Toyota Expansion site and an increase in background traffic, the key intersections operate acceptably with existing control, geometry, and signal timing in the morning and afternoon peak hours.  No additional auxiliary lanes are recommended at the key intersections.  Acceptable level of service is achieved for pedestrian, bicycle, and transit modes based upon the measures in the multi-modal transportation guidelines. APPENDIX A Harmony Kensington College Mason SCALE: 1"=1000' SITE LOCATION Figure 1 DELICH ASSOCIATES Pedersen Toyota Expansion TIS, January 2014 Page 2 SCALE: 1"=100' SITE PLAN Figure 5 DELICH ASSOCIATES Pedersen Toyota Expansion TIS, March 2014 Page 9 TABLE 2 Trip Generation Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out 841 Automobile Sales 35.0 KSF 32.30 1130 1.44 50 0.48 17 1.05 37 1.57 55 Kensington College Mason 30% 10% 20% 40% NOM SCALE: 1"=200' TRIP DISTRIBUTION Figure 5 DELICH ASSOCIATES Pedersen Toyota Expansion TIS, January 2014 Page 2 APPENDIX B DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 4/24/2013 Observer: City of Fort Collins Day: Wednesday Jurisdiction: Fort Collins R = right turn Intersection: Harmony/Mason S = straight L = left turn Time Northbound: Mason Southbound: Mason Total Eastbound: Harmony Westbound: Harmony Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 22 10 8 40 8 19 12 39 79 30 258 35 323 21 151 23 195 518 597 7:45 24 18 22 64 9 19 8 36 100 40 268 44 352 15 182 32 229 581 681 8:00 23 10 25 58 3 16 18 37 95 32 213 26 271 22 133 23 178 449 544 8:15 28 16 20 64 13 18 18 49 113 26 205 36 267 21 135 24 180 447 560 7:30-8:30 97 54 75 226 33 72 56 161 387 128 944 141 1213 79 601 102 782 1995 2382 PHF 0.87 0.75 0.75 0.88 0.63 0.95 0.78 0.82 0.8 0.88 0.8 0.86 0.9 0.83 0.8 0.85 0.87 4:30 49 35 33 117 16 18 33 67 184 26 223 35 284 34 283 30 347 631 815 4:45 30 25 27 82 14 42 57 113 195 40 218 57 315 24 294 23 341 656 851 5:00 34 32 38 104 19 24 61 104 208 36 233 47 316 36 305 37 378 694 902 5:15 34 29 23 86 15 36 68 119 205 44 243 60 347 31 340 20 391 738 943 4:30-5:30 147 121 121 389 64 120 219 403 792 146 917 199 1262 125 1222 110 1457 2719 3511 PHF 0.75 0.86 0.8 0.83 0.84 0.71 0.81 0.85 0.83 0.94 0.83 0.91 0.87 0.9 0.74 0.93 0.93 DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 10/31/2013 Observer: City of Fort Collins Day: Thursday Jurisdiction: Fort Collins R = right turn Intersection: College/Kensington S = straight L = left turn Time Northbound: College Southbound: College Total Eastbound: Kensington Westbound: Kensington Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 6 386 0 392 2 223 4 229 621 7 1 6 14 1 3 5 9 23 644 7:45 6 351 3 360 3 240 6 249 609 5 1 6 12 3 0 3 6 18 627 8:00 5 354 3 362 3 181 7 191 553 4 1 7 12 5 1 7 13 25 578 8:15 6 304 7 317 4 178 3 185 502 2 2 8 12 5 2 6 13 25 527 7:30-8:30 23 1395 13 1431 12 822 20 854 2285 18 5 27 50 14 6 21 41 91 2376 PHF 0.96 0.9 0.46 0.91 0.75 0.86 0.71 0.86 0.64 0.63 0.84 0.89 0.7 0.5 0.75 0.79 0.92 4:30 6 311 11 328 12 439 2 453 781 10 5 17 32 31 7 23 61 93 874 4:45 5 329 14 348 21 431 8 460 808 12 7 8 27 19 6 15 40 67 875 5:00 5 310 18 333 25 433 8 466 799 11 4 12 27 34 10 23 67 94 893 5:15 4 336 19 359 17 435 4 456 815 2 9 13 24 25 11 29 65 89 904 4:30-5:30 20 1286 62 1368 75 1738 22 1835 3203 35 25 50 110 109 34 90 233 343 3546 PHF 0.83 0.96 0.82 0.95 0.75 0.99 0.69 0.98 0.73 0.69 0.74 0.86 0.8 0.77 0.78 0.87 0.98 DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 2/19/2014 Observer: Andy Day: Wednesday Jurisdiction: Fort Collins R = right turn Intersection: Kensington/Pedersen-Jiffy Lube Access S = straight L = left turn Time Northbound: Jiffy Lube Southbound: Pedersen Total Eastbound: Kensington Westbound: Kensington Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 1 0 0 1 2 0 2 4 5 2 5 0 7 1 2 3 6 13 18 7:45 0 0 1 1 5 2 5 12 13 3 15 0 18 1 3 7 11 29 42 8:00 0 0 2 2 0 0 3 3 5 5 10 1 16 0 5 2 7 23 28 8:15 0 0 1 1 0 0 5 5 6 4 15 0 19 0 5 6 11 30 36 7:30-8:30 1 0 4 5 7 2 15 24 29 14 45 1 60 2 15 18 35 95 124 PHF 0.25 n/a 0.5 0.63 0.35 0.25 0.75 0.5 0.7 0.75 0.25 0.79 0.5 0.75 0.64 0.8 0.74 4:30 1 0 3 4 9 0 7 16 20 8 14 3 25 0 14 7 21 46 66 4:45 1 0 1 2 12 0 10 22 24 7 19 3 29 1 11 7 19 48 72 5:00 3 0 2 5 12 0 6 18 23 4 17 0 21 1 10 7 18 39 62 5:15 2 0 2 4 9 0 5 14 18 2 18 0 20 0 10 4 14 34 52 4:30-5:30 7 0 8 15 42 0 28 70 85 21 68 6 95 2 45 25 72 167 252 PHF 0.58 n/a 0.67 0.75 0.88 n/a 0.7 0.8 0.66 0.89 0.5 0.82 0.5 0.8 0.89 0.86 0.88 DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 2/19/2014 Observer: Andy Day: Wednesday Jurisdiction: Fort Collins R = right turn Intersection: Kensington/Tire Store-Storage Access S = straight L = left turn Time Northbound: Tire Store Southbound: Storage Total Eastbound: Kensington Westbound: Kensington Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 1 0 0 1 0 0 1 1 2 0 7 1 8 3 2 0 5 13 15 7:45 1 0 10 11 0 0 0 0 11 0 8 1 9 3 5 0 8 17 28 8:00 1 0 9 10 0 0 0 0 10 0 7 0 7 1 7 0 8 15 25 8:15 5 0 11 16 0 0 0 0 16 1 8 1 10 2 8 0 10 20 36 7:30-8:30 8 0 30 38 0 0 1 1 39 1 30 3 34 9 22 0 31 65 104 PHF 0.4 n/a 0.68 0.59 n/a n/a 0.25 0.25 0.25 0.94 0.75 0.85 0.75 0.69 n/a 0.78 0.72 4:30 11 0 5 16 0 0 0 0 16 0 20 2 22 1 21 0 22 44 60 4:45 6 0 7 13 1 0 1 2 15 0 21 1 22 2 19 1 22 44 59 5:00 4 0 8 12 0 0 0 0 12 0 13 3 16 2 17 0 19 35 47 5:15 4 1 8 13 0 0 0 0 13 0 12 2 14 1 16 0 17 31 44 4:30-5:30 25 1 28 54 1 0 1 2 56 0 66 8 74 6 73 1 80 154 210 PHF 0.57 0.25 0.88 0.84 0.25 n/a 0.25 0.25 n/a 0.79 0.67 0.84 0.75 0.87 0.25 0.91 0.88 DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 2/18/2014 Observer: Andy Day: Tuesday Jurisdiction: Fort Collins R = right turn Intersection: Mason/Kensington S = straight L = left turn Time Northbound: Mason Southbound: Mason Total Eastbound: Westbound: Kensington Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 50 7 57 5 17 22 79 0 2 7 9 9 88 7:45 55 7 62 2 31 33 95 0 1 8 9 9 104 8:00 48 4 52 7 28 35 87 0 0 9 9 9 96 8:15 39 3 42 5 26 31 73 0 2 9 11 11 84 7:30-8:30 0 192 21 213 19 102 0 121 334 0 0 0 0 5 0 33 38 38 372 PHF n/a 0.87 0.75 0.86 0.68 0.82 n/a 0.86 n/a n/a n/a n/a 0.63 n/a 0.92 0.86 0.89 4:30 64 12 76 13 81 94 170 0 12 16 28 28 198 4:45 70 4 74 8 91 99 173 0 7 18 25 25 198 5:00 70 5 75 11 92 103 178 0 9 9 18 18 196 5:15 57 14 71 12 72 84 155 0 15 14 29 29 184 4:30-5:30 0 261 35 296 44 336 0 380 676 0 0 0 0 43 0 57 100 100 776 PHF n/a 0.93 0.63 0.97 0.85 0.91 n/a 0.92 n/a n/a n/a n/a 0.72 n/a 0.79 0.86 0.98 APPENDIX C HCM 2010 Signalized Intersection Summary Recent AM 143: College (US 287) & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent am.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 20 6 30 14 6 21 21 1395 13 12 822 18 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1788 1863 1824 1937 1863 1824 1863 1863 1937 1937 1863 1824 Adj Flow Rate, veh/h 22 7 1 15 7 1 23 1516 0 13 893 19 Adj No. of Lanes 110110131130 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 222222222222 Cap, veh/h 239 177 25 251 177 25 535 3539 1146 347 3527 75 Arrive On Green 0.11 0.11 0.11 0.11 0.11 0.11 0.03 0.70 0.00 0.03 0.69 0.69 Sat Flow, veh/h 1331 1592 227 1442 1592 227 1774 5085 1647 1845 5124 109 Grp Volume(v), veh/h 22 0 8 15 0 8 23 1516 0 13 591 321 Grp Sat Flow(s),veh/h/ln 1331 0 1820 1442 0 1820 1774 1695 1647 1845 1695 1843 Q Serve(g_s), s 1.1 0.0 0.3 0.7 0.0 0.3 0.3 9.7 0.0 0.2 4.9 4.9 Cycle Q Clear(g_c), s 1.4 0.0 0.3 1.0 0.0 0.3 0.3 9.7 0.0 0.2 4.9 4.9 Prop In Lane 1.00 0.13 1.00 0.13 1.00 1.00 1.00 0.06 Lane Grp Cap(c), veh/h 239 0 202 251 0 202 535 3539 1146 347 2333 1269 V/C Ratio(X) 0.09 0.00 0.04 0.06 0.00 0.04 0.04 0.43 0.00 0.04 0.25 0.25 Avail Cap(c_a), veh/h 767 0 924 823 0 924 665 3539 1146 496 2333 1269 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 0.53 0.53 0.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 30.3 0.0 29.7 30.1 0.0 29.7 3.1 4.9 0.0 3.6 4.4 4.4 Incr Delay (d2), s/veh 0.2 0.0 0.1 0.1 0.0 0.1 0.0 0.2 0.0 0.0 0.3 0.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.0 0.2 0.3 0.0 0.2 0.1 4.6 0.0 0.1 2.4 2.7 LnGrp Delay(d),s/veh 30.5 0.0 29.8 30.2 0.0 29.8 3.1 5.1 0.0 3.7 4.7 4.9 LnGrp LOS C C C C A A A A A Approach Vol, veh/h 30 23 1539 925 Approach Delay, s/veh 30.3 30.1 5.1 4.7 Approach LOS C C A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 5.5 91.2 13.3 4.9 91.8 13.3 Change Period (Y+Rc), s 4.0 5.5 6.0 4.0 5.5 6.0 Max Green Setting (Gmax), s 7.0 50.5 37.0 7.0 50.5 37.0 Max Q Clear Time (g_c+I1), s 2.3 6.9 3.4 2.2 11.7 3.0 Green Ext Time (p_c), s 0.0 14.9 0.1 0.0 14.5 0.1 Intersection Summary HCM 2010 Ctrl Delay 5.5 HCM 2010 LOS A Timing Report, Sorted By Phase Recent AM 143: College (US 287) & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent am.syn Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None C-Max None Maximum Split (s) 11 56 43 11 56 43 Maximum Split (%) 10.0% 50.9% 39.1% 10.0% 50.9% 39.1% Minimum Split (s) 11 22.5 43 11 22.5 42 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 113113 Minimum Initial (s) 4 10 7 4 10 7 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 10 30 10 29 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 94 105 51 94 105 51 End Time (s) 105 51 94 105 51 94 Yield/Force Off (s) 101 45.5 88 101 45.5 88 Yield/Force Off 170(s) 101 35.5 58 101 35.5 59 Local Start Time (s) 43 54 0 43 54 0 Local Yield (s) 50 104.5 37 50 104.5 37 Local Yield 170(s) 50 94.5 7 50 94.5 8 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 80 Offset: 51 (46%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 143: College (US 287) & Kensington HCM 2010 Signalized Intersection Summary Recent PM 143: College (US 287) & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent pm.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 37 27 53 109 33 90 20 1286 62 75 1738 21 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1788 1863 1824 1937 1863 1824 1863 1863 1937 1937 1863 1824 Adj Flow Rate, veh/h 38 28 8 111 34 13 20 1312 42 77 1773 20 Adj No. of Lanes 110110131130 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 222222222222 Cap, veh/h 251 219 63 276 202 77 86 3268 1054 120 3331 38 Arrive On Green 0.16 0.16 0.16 0.16 0.16 0.16 0.05 0.64 0.64 0.06 0.64 0.64 Sat Flow, veh/h 1290 1391 398 1412 1282 490 1774 5085 1640 1845 5184 58 Grp Volume(v), veh/h 38 0 36 111 0 47 20 1312 42 77 1159 634 Grp Sat Flow(s),veh/h/ln 1290 0 1789 1412 0 1772 1774 1695 1640 1845 1695 1852 Q Serve(g_s), s 2.4 0.0 1.6 6.8 0.0 2.1 1.0 11.5 0.9 3.8 17.2 17.2 Cycle Q Clear(g_c), s 4.6 0.0 1.6 8.4 0.0 2.1 1.0 11.5 0.9 3.8 17.2 17.2 Prop In Lane 1.00 0.22 1.00 0.28 1.00 1.00 1.00 0.03 Lane Grp Cap(c), veh/h 251 0 282 276 0 279 86 3268 1054 120 2178 1190 V/C Ratio(X) 0.15 0.00 0.13 0.40 0.00 0.17 0.23 0.40 0.04 0.64 0.53 0.53 Avail Cap(c_a), veh/h 578 0 734 633 0 727 163 3268 1054 199 2178 1190 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 0.70 0.70 0.70 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.7 0.0 33.5 37.1 0.0 33.8 42.4 8.0 6.1 42.2 9.0 9.0 Incr Delay (d2), s/veh 0.3 0.0 0.2 0.9 0.0 0.3 0.9 0.3 0.0 5.7 0.9 1.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 0.0 0.8 2.7 0.0 1.1 0.5 5.4 0.4 2.1 8.2 9.2 LnGrp Delay(d),s/veh 36.0 0.0 33.7 38.1 0.0 34.0 43.3 8.2 6.1 47.9 9.9 10.7 LnGrp LOS D C D C D A A D A B Approach Vol, veh/h 74 158 1374 1870 Approach Delay, s/veh 34.9 36.9 8.7 11.8 Approach LOS C D A B Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 36.4 64.0 19.6 9.0 91.4 19.6 Change Period (Y+Rc), s 5.5 * 5.5 6.0 4.0 5.5 6.0 Max Green Setting (Gmax), s 7.5 * 59 37.0 9.0 58.5 37.0 Max Q Clear Time (g_c+I1), s 3.0 19.2 6.6 5.8 13.5 10.4 Green Ext Time (p_c), s 2.5 9.1 0.8 0.0 6.8 0.7 Intersection Summary HCM 2010 Ctrl Delay 12.2 HCM 2010 LOS B Notes * HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier. Timing Report, Sorted By Phase Recent PM 143: College (US 287) & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent pm.syn Phase Number 124568 Movement NBL SBT EBTL SBL NBT WBTL Lead/Lag Lag Lead Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Recall Mode None C-Max None None C-Max None Maximum Split (s) 13 64 43 13 64 43 Maximum Split (%) 10.8% 53.3% 35.8% 10.8% 53.3% 35.8% Minimum Split (s) 11 22.5 43 11 22.5 42 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 113113 Minimum Initial (s) 4 10 7 4 10 7 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 10 30 10 29 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 62 118 75 118 11 75 End Time (s) 75 62 118 11 75 118 Yield/Force Off (s) 71 56.5 112 7 69.5 112 Yield/Force Off 170(s) 71 46.5 82 7 59.5 83 Local Start Time (s) 0 56 13 56 69 13 Local Yield (s) 9 114.5 50 65 7.5 50 Local Yield 170(s) 9 104.5 20 65 117.5 21 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 62 (52%), Referenced to phase 2:SBT and 6:NBT, Start of Red Splits and Phases: 143: College (US 287) & Kensington HCM 2010 TWSC Recent AM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent am.syn Intersection Int Delay, s/veh 2.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Vol, veh/h 14 45 1 2 25 18 1 0 4 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop RT Channelized - - None - - None - - None Storage Length - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - Peak Hour Factor 85 85 85 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 Mvmt Flow 16 53 1 2 29 21 1 0 5 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 51 0 0 54 0 0 141 141 54 Stage 1 - - - - - - 86 86 - Stage 2 - - - - - - 55 55 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 Pot Cap-1 Maneuver 1555 - - 1551 - - 829 750 1013 Stage 1 - - - - - - 922 824 - Stage 2 - - - - - - 957 849 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1555 - - 1551 - - 805 741 1013 Mov Cap-2 Maneuver - - - - - - 805 741 - Stage 1 - - - - - - 912 815 - Stage 2 - - - - - - 937 848 - Approach EB WB NB HCM Control Delay, s 1.7 0.3 8.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 963 1555 - - 1551 - - 934 HCM Lane V/C Ratio 0.006 0.011 - - 0.002 - - 0.03 HCM Control Delay (s) 8.8 7.3 0 - 7.3 0 - 9 HCM Lane LOS A A A - A A - A HCM 95th %tile Q(veh) 0 0 - - 0 - - 0.1 HCM 2010 TWSC Recent AM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent am.syn Intersection Int Delay, s/veh Movement SBL SBT SBR Vol, veh/h 7 2 15 Conflicting Peds, #/hr 0 0 0 Sign Control Stop Stop Stop RT Channelized - - None Storage Length - - - Veh in Median Storage, # - 0 - Grade, % - 0 - Peak Hour Factor 85 85 85 Heavy Vehicles, % 2 2 2 Mvmt Flow 8 2 18 Major/Minor Minor2 Conflicting Flow All 134 132 40 Stage 1 45 45 - Stage 2 89 87 - Critical Hdwy 7.12 6.52 6.22 Critical Hdwy Stg 1 6.12 5.52 - Critical Hdwy Stg 2 6.12 5.52 - Follow-up Hdwy 3.518 4.018 3.318 Pot Cap-1 Maneuver 838 759 1031 Stage 1 969 857 - Stage 2 918 823 - Platoon blocked, % Mov Cap-1 Maneuver 826 750 1031 Mov Cap-2 Maneuver 826 750 - Stage 1 958 856 - Stage 2 904 814 - Approach SB HCM Control Delay, s 9 HCM LOS A Minor Lane/Major Mvmt Lanes and Geometrics Recent AM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent am.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.998 0.945 0.887 0.913 Flt Protected 0.989 0.998 0.992 0.986 Satd. Flow (prot) 0 1839 0 0 1757 0 0 1639 0 0 1677 0 Flt Permitted 0.989 0.998 0.992 0.986 Satd. Flow (perm) 0 1839 0 0 1757 0 0 1639 0 0 1677 0 Link Speed (mph) 25 25 30 30 Link Distance (ft) 139 206 109 91 Travel Time (s) 3.8 5.6 2.5 2.1 Intersection Summary Area Type: Other HCM 2010 TWSC Recent PM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent pm.syn Intersection Int Delay, s/veh 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Vol, veh/h 21 67 6 2 47 25 7 0 8 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop RT Channelized - - None - - None - - None Storage Length - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 Mvmt Flow 24 76 7 2 53 28 8 0 9 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 82 0 0 83 0 0 215 213 80 Stage 1 - - - - - - 127 127 - Stage 2 - - - - - - 88 86 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 Pot Cap-1 Maneuver 1515 - - 1514 - - 742 684 980 Stage 1 - - - - - - 877 791 - Stage 2 - - - - - - 920 824 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1515 - - 1514 - - 708 672 980 Mov Cap-2 Maneuver - - - - - - 708 672 - Stage 1 - - - - - - 862 778 - Stage 2 - - - - - - 890 823 - Approach EB WB NB HCM Control Delay, s 1.7 0.2 9.4 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 831 1515 - - 1514 - - 822 HCM Lane V/C Ratio 0.021 0.016 - - 0.002 - - 0.097 HCM Control Delay (s) 9.4 7.4 0 - 7.4 0 - 9.8 HCM Lane LOS A A A - A A - A HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0.3 HCM 2010 TWSC Recent PM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent pm.syn Intersection Int Delay, s/veh Movement SBL SBT SBR Vol, veh/h 42 0 28 Conflicting Peds, #/hr 0 0 0 Sign Control Stop Stop Stop RT Channelized - - None Storage Length - - - Veh in Median Storage, # - 0 - Grade, % - 0 - Peak Hour Factor 88 88 88 Heavy Vehicles, % 2 2 2 Mvmt Flow 48 0 32 Major/Minor Minor2 Conflicting Flow All 204 203 68 Stage 1 72 72 - Stage 2 132 131 - Critical Hdwy 7.12 6.52 6.22 Critical Hdwy Stg 1 6.12 5.52 - Critical Hdwy Stg 2 6.12 5.52 - Follow-up Hdwy 3.518 4.018 3.318 Pot Cap-1 Maneuver 754 693 995 Stage 1 938 835 - Stage 2 871 788 - Platoon blocked, % Mov Cap-1 Maneuver 737 681 995 Mov Cap-2 Maneuver 737 681 - Stage 1 922 834 - Stage 2 848 775 - Approach SB HCM Control Delay, s 9.8 HCM LOS A Minor Lane/Major Mvmt Lanes and Geometrics Recent PM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent pm.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.991 0.954 0.929 0.946 Flt Protected 0.989 0.999 0.977 0.971 Satd. Flow (prot) 0 1826 0 0 1775 0 0 1691 0 0 1711 0 Flt Permitted 0.989 0.999 0.977 0.971 Satd. Flow (perm) 0 1826 0 0 1775 0 0 1691 0 0 1711 0 Link Speed (mph) 25 25 30 30 Link Distance (ft) 139 206 109 91 Travel Time (s) 3.8 5.6 2.5 2.1 Intersection Summary Area Type: Other HCM 2010 TWSC Recent AM 6: Tire Store Access/Mini-Storage & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent am.syn Intersection Int Delay, s/veh 3.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Vol, veh/h 1 30 3 9 32 0 8 0 30 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop RT Channelized - - None - - None - - None Storage Length - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - Peak Hour Factor 85 85 85 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 Mvmt Flow 1 35 4 11 38 0 9 0 35 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 38 0 0 39 0 0 98 98 37 Stage 1 - - - - - - 39 39 - Stage 2 - - - - - - 59 59 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 Pot Cap-1 Maneuver 1572 - - 1571 - - 884 792 1035 Stage 1 - - - - - - 976 862 - Stage 2 - - - - - - 953 846 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1572 - - 1571 - - 878 786 1035 Mov Cap-2 Maneuver - - - - - - 878 786 - Stage 1 - - - - - - 975 861 - Stage 2 - - - - - - 945 840 - Approach EB WB NB HCM Control Delay, s 0.2 1.6 8.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 997 1572 - - 1571 - - 1034 HCM Lane V/C Ratio 0.045 0.001 - - 0.007 - - 0.001 HCM Control Delay (s) 8.8 7.3 0 - 7.3 0 - 8.5 HCM Lane LOS A A A - A A - A HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0 HCM 2010 TWSC Recent AM 6: Tire Store Access/Mini-Storage & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent am.syn Intersection Int Delay, s/veh Movement SBL SBT SBR Vol, veh/h 0 0 1 Conflicting Peds, #/hr 0 0 0 Sign Control Stop Stop Stop RT Channelized - - None Storage Length - - - Veh in Median Storage, # - 0 - Grade, % - 0 - Peak Hour Factor 85 85 85 Heavy Vehicles, % 2 2 2 Mvmt Flow 0 0 1 Major/Minor Minor2 Conflicting Flow All 116 100 38 Stage 1 59 59 - Stage 2 57 41 - Critical Hdwy 7.12 6.52 6.22 Critical Hdwy Stg 1 6.12 5.52 - Critical Hdwy Stg 2 6.12 5.52 - Follow-up Hdwy 3.518 4.018 3.318 Pot Cap-1 Maneuver 861 790 1034 Stage 1 953 846 - Stage 2 955 861 - Platoon blocked, % Mov Cap-1 Maneuver 827 784 1034 Mov Cap-2 Maneuver 827 784 - Stage 1 952 840 - Stage 2 922 860 - Approach SB HCM Control Delay, s 8.5 HCM LOS A Minor Lane/Major Mvmt Lanes and Geometrics Recent AM 6: Tire Store Access/Mini-Storage & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent am.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.986 0.893 0.865 Flt Protected 0.999 0.989 0.990 Satd. Flow (prot) 0 1835 0 0 1842 0 0 1647 0 0 1611 0 Flt Permitted 0.999 0.989 0.990 Satd. Flow (perm) 0 1835 0 0 1842 0 0 1647 0 0 1611 0 Link Speed (mph) 25 25 30 30 Link Distance (ft) 191 139 123 87 Travel Time (s) 5.2 3.8 2.8 2.0 Intersection Summary Area Type: Other HCM 2010 TWSC Recent PM 6: Tire Store Access/Mini-Storage & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent pm.syn Intersection Int Delay, s/veh 2.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Vol, veh/h 0 65 8 6 75 1 26 0 28 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop RT Channelized - - None - - None - - None Storage Length - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 74 9 7 85 1 30 0 32 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 86 0 0 83 0 0 178 178 78 Stage 1 - - - - - - 78 78 - Stage 2 - - - - - - 100 100 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 Pot Cap-1 Maneuver 1510 - - 1514 - - 784 716 983 Stage 1 - - - - - - 931 830 - Stage 2 - - - - - - 906 812 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1510 - - 1514 - - 780 712 983 Mov Cap-2 Maneuver - - - - - - 780 712 - Stage 1 - - - - - - 931 830 - Stage 2 - - - - - - 900 808 - Approach EB WB NB HCM Control Delay, s 0 0.5 9.4 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 874 1510 - - 1514 - - 840 HCM Lane V/C Ratio 0.07 - - - 0.005 - - 0.003 HCM Control Delay (s) 9.4 0 - - 7.4 0 - 9.3 HCM Lane LOS A A - - A A - A HCM 95th %tile Q(veh) 0.2 0 - - 0 - - 0 HCM 2010 TWSC Recent PM 6: Tire Store Access/Mini-Storage & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent pm.syn Intersection Int Delay, s/veh Movement SBL SBT SBR Vol, veh/h 1 0 1 Conflicting Peds, #/hr 0 0 0 Sign Control Stop Stop Stop RT Channelized - - None Storage Length - - - Veh in Median Storage, # - 0 - Grade, % - 0 - Peak Hour Factor 88 88 88 Heavy Vehicles, % 2 2 2 Mvmt Flow 1 0 1 Major/Minor Minor2 Conflicting Flow All 193 182 86 Stage 1 99 99 - Stage 2 94 83 - Critical Hdwy 7.12 6.52 6.22 Critical Hdwy Stg 1 6.12 5.52 - Critical Hdwy Stg 2 6.12 5.52 - Follow-up Hdwy 3.518 4.018 3.318 Pot Cap-1 Maneuver 767 712 973 Stage 1 907 813 - Stage 2 913 826 - Platoon blocked, % Mov Cap-1 Maneuver 739 708 973 Mov Cap-2 Maneuver 739 708 - Stage 1 907 809 - Stage 2 883 826 - Approach SB HCM Control Delay, s 9.3 HCM LOS A Minor Lane/Major Mvmt Lanes and Geometrics Recent PM 6: Tire Store Access/Mini-Storage & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent pm.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.985 0.999 0.930 0.932 Flt Protected 0.996 0.976 0.976 Satd. Flow (prot) 0 1835 0 0 1853 0 0 1691 0 0 1694 0 Flt Permitted 0.996 0.976 0.976 Satd. Flow (perm) 0 1835 0 0 1853 0 0 1691 0 0 1694 0 Link Speed (mph) 25 25 30 30 Link Distance (ft) 191 139 123 87 Travel Time (s) 5.2 3.8 2.8 2.0 Intersection Summary Area Type: Other HCM 2010 TWSC Recent AM 1: Mason & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent am.syn Intersection Int Delay, s/veh 1.4 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 5 36 192 18 16 102 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 89 89 89 89 89 89 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 6 40 216 20 18 115 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 377 226 0 0 236 0 Stage 1 226 - - - - - Stage 2 151 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 625 813 - - 1331 - Stage 1 812 - - - - - Stage 2 877 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 616 813 - - 1331 - Mov Cap-2 Maneuver 616 - - - - - Stage 1 812 - - - - - Stage 2 865 - - - - - Approach WB NB SB HCM Control Delay, s 9.9 0 1 HCM LOS A Minor Lane/Major Mvmt NBT NBR WBLn1 SBL SBT Capacity (veh/h) - - 782 1331 - HCM Lane V/C Ratio - - 0.059 0.014 - HCM Control Delay (s) - - 9.9 7.7 0 HCM Lane LOS - - A A A HCM 95th %tile Q(veh) - - 0.2 0 - Lanes and Geometrics Recent AM 1: Mason & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent am.syn Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.883 0.989 Flt Protected 0.994 0.993 Satd. Flow (prot) 1635 0 1842 0 0 1850 Flt Permitted 0.994 0.993 Satd. Flow (perm) 1635 0 1842 0 0 1850 Link Speed (mph) 25 30 30 Link Distance (ft) 191 531 274 Travel Time (s) 5.2 12.1 6.2 Intersection Summary Area Type: Other HCM 2010 TWSC Recent PM 1: Mason & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent pm.syn Intersection Int Delay, s/veh 2.2 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 44 58 261 32 41 336 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 98 98 98 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 45 59 266 33 42 343 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 710 283 0 0 299 0 Stage 1 283 - - - - - Stage 2 427 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 400 756 - - 1262 - Stage 1 765 - - - - - Stage 2 658 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 384 756 - - 1262 - Mov Cap-2 Maneuver 384 - - - - - Stage 1 765 - - - - - Stage 2 631 - - - - - Approach WB NB SB HCM Control Delay, s 13.4 0 0.9 HCM LOS B Minor Lane/Major Mvmt NBT NBR WBLn1 SBL SBT Capacity (veh/h) - - 533 1262 - HCM Lane V/C Ratio - - 0.195 0.033 - HCM Control Delay (s) - - 13.4 8 0 HCM Lane LOS - - B A A HCM 95th %tile Q(veh) - - 0.7 0.1 - Lanes and Geometrics Recent PM 1: Mason & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent pm.syn Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.923 0.985 Flt Protected 0.979 0.995 Satd. Flow (prot) 1683 0 1835 0 0 1853 Flt Permitted 0.979 0.995 Satd. Flow (perm) 1683 0 1835 0 0 1853 Link Speed (mph) 25 30 30 Link Distance (ft) 191 531 274 Travel Time (s) 5.2 12.1 6.2 Intersection Summary Area Type: Other HCM 2010 Signalized Intersection Summary Recent AM 112: Mason & Harmony Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent am.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 128 944 141 79 601 102 97 54 75 33 72 56 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 0.99 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 147 1085 133 91 691 83 111 62 3 38 83 32 Adj No. of Lanes 121121111110 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 222222222222 Cap, veh/h 516 2260 1010 377 2537 1134 239 347 291 282 238 92 Arrive On Green 0.64 0.64 0.64 0.10 1.00 1.00 0.19 0.19 0.19 0.19 0.19 0.19 Sat Flow, veh/h 693 3539 1582 1774 3539 1582 1272 1863 1563 1317 1281 494 Grp Volume(v), veh/h 147 1085 133 91 691 83 111 62 3 38 0 115 Grp Sat Flow(s),veh/h/ln 693 1770 1582 1774 1770 1582 1272 1863 1563 1317 0 1776 Q Serve(g_s), s 9.5 15.6 3.2 1.6 0.0 0.0 8.1 2.7 0.2 2.4 0.0 5.5 Cycle Q Clear(g_c), s 9.5 15.6 3.2 1.6 0.0 0.0 13.7 2.7 0.2 5.2 0.0 5.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.28 Lane Grp Cap(c), veh/h 516 2260 1010 377 2537 1134 239 347 291 282 0 330 V/C Ratio(X) 0.28 0.48 0.13 0.24 0.27 0.07 0.47 0.18 0.01 0.13 0.00 0.35 Avail Cap(c_a), veh/h 516 2260 1010 437 2537 1134 353 514 431 282 0 330 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.87 0.87 0.87 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 8.1 9.2 7.0 6.1 0.0 0.0 40.6 33.5 32.5 35.7 0.0 34.7 Incr Delay (d2), s/veh 1.4 0.7 0.3 0.3 0.2 0.1 1.4 0.2 0.0 0.2 0.0 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.0 7.8 1.5 0.7 0.1 0.0 3.0 1.4 0.1 0.9 0.0 2.8 LnGrp Delay(d),s/veh 9.5 10.0 7.2 6.4 0.2 0.1 42.0 33.8 32.5 35.9 0.0 35.3 LnGrp LOS AAAAAADCCD D Approach Vol, veh/h 1365 865 176 153 Approach Delay, s/veh 9.6 0.9 39.0 35.5 Approach LOS A A D D Timer 12345678 Assigned Phs 2 3 4 6 8 Phs Duration (G+Y+Rc), s 23.2 7.7 79.1 23.2 86.8 Change Period (Y+Rc), s * 6 4.0 5.5 6.0 * 5.5 Max Green Setting (Gmax), s * 9 7.0 61.5 26.0 * 60 Max Q Clear Time (g_c+I1), s 7.5 3.6 17.6 15.7 2.0 Green Ext Time (p_c), s 0.2 0.1 12.8 0.6 13.3 Intersection Summary HCM 2010 Ctrl Delay 10.2 HCM 2010 LOS B Notes * HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier. Timing Report, Sorted By Phase Recent AM 112: Mason & Harmony Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent am.syn Phase Number 23468 Movement SBTL WBL EBTL NBTL WBTL Lead/Lag Lead Lag Lead-Lag Optimize Recall Mode None None C-Max None C-Max Maximum Split (s) 15 11 67 32 65 Maximum Split (%) 13.6% 10.0% 60.9% 29.1% 59.1% Minimum Split (s) 15 11 23.5 32 22 Yellow Time (s) 3 3 4 3.5 4 All-Red Time (s) 2 1 1.5 2.5 1 Minimum Initial (s) 4 4 10 7 10 Vehicle Extension (s) 33333 Minimum Gap (s) 33333 Time Before Reduce (s) 00000 Time To Reduce (s) 00000 Walk Time (s) 7 7 7 Flash Dont Walk (s) 11 19 10 Dual Entry Yes No Yes Yes Yes Inhibit Max Yes Yes Yes Yes Yes Start Time (s) 108.5 30.5 41.5 108.5 30.5 End Time (s) 30.5 41.5 108.5 30.5 108.5 Yield/Force Off (s) 25.5 37.5 103 24.5 103.5 Yield/Force Off 170(s) 25.5 37.5 92 5.5 93.5 Local Start Time (s) 5.5 37.5 48.5 5.5 37.5 Local Yield (s) 32.5 44.5 0 31.5 0.5 Local Yield 170(s) 32.5 44.5 99 12.5 100.5 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 70 Offset: 103 (94%), Referenced to phase 4:EBTL and 8:WBTL, Start of Yellow Splits and Phases: 112: Mason & Harmony HCM 2010 Signalized Intersection Summary Recent PM 112: Mason & Harmony Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent pm.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 146 917 199 125 1222 110 147 121 121 64 120 219 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 157 986 140 134 1314 83 158 130 36 69 129 176 Adj No. of Lanes 121121111110 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 222222222222 Cap, veh/h 362 1764 788 322 1741 778 262 624 527 405 240 327 Arrive On Green 0.07 0.50 0.50 0.12 0.98 0.98 0.34 0.34 0.34 0.34 0.34 0.34 Sat Flow, veh/h 1774 3539 1582 1774 3539 1582 1070 1863 1572 1209 715 976 Grp Volume(v), veh/h 157 986 140 134 1314 83 158 130 36 69 0 305 Grp Sat Flow(s),veh/h/ln 1774 1770 1582 1774 1770 1582 1070 1863 1572 1209 0 1691 Q Serve(g_s), s 5.1 23.1 5.8 4.4 2.8 0.1 16.8 6.0 1.9 5.2 0.0 17.5 Cycle Q Clear(g_c), s 5.1 23.1 5.8 4.4 2.8 0.1 34.3 6.0 1.9 11.1 0.0 17.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.58 Lane Grp Cap(c), veh/h 362 1764 788 322 1741 778 262 624 527 405 0 566 V/C Ratio(X) 0.43 0.56 0.18 0.42 0.75 0.11 0.60 0.21 0.07 0.17 0.00 0.54 Avail Cap(c_a), veh/h 404 1764 788 331 1741 778 262 624 527 405 0 566 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.47 0.47 0.47 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 12.7 20.8 16.5 14.6 0.5 0.5 46.1 28.4 27.0 32.3 0.0 32.2 Incr Delay (d2), s/veh 0.8 1.3 0.5 0.4 1.5 0.1 9.9 0.8 0.3 0.2 0.0 1.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.6 11.5 2.6 2.2 0.8 0.1 5.7 3.2 0.8 1.7 0.0 8.3 LnGrp Delay(d),s/veh 13.5 22.1 17.0 15.0 2.0 0.6 56.0 29.1 27.3 32.5 0.0 33.2 LnGrp LOS B C BBAAECCC C Approach Vol, veh/h 1283 1531 324 374 Approach Delay, s/veh 20.5 3.1 42.0 33.1 Approach LOS C A D C Timer 12345678 Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 45.0 10.4 64.6 45.0 11.2 63.8 Change Period (Y+Rc), s 6.0 4.0 5.5 6.0 4.0 * 5.5 Max Green Setting (Gmax), s 39.0 7.0 58.5 39.0 10.0 * 56 Max Q Clear Time (g_c+I1), s 19.5 6.4 25.1 36.3 7.1 4.8 Green Ext Time (p_c), s 3.8 0.0 15.3 1.1 0.1 17.6 Intersection Summary HCM 2010 Ctrl Delay 16.2 HCM 2010 LOS B Notes * HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier. Timing Report, Sorted By Phase Recent PM 112: Mason & Harmony Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates recent pm.syn Phase Number 234678 Movement SBTL WBL EBTL NBTL EBL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None None C-Max Max None C-Max Maximum Split (s) 45 11 64 45 14 61 Maximum Split (%) 37.5% 9.2% 53.3% 37.5% 11.7% 50.8% Minimum Split (s) 15 11 23.5 32 11 22 Yellow Time (s) 3.5 3 4 3.5 3 4 All-Red Time (s) 2.5 1 1.5 2.5 1 1 Minimum Initial (s) 4 4 10 7 4 10 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 Flash Dont Walk (s) 11 19 10 Dual Entry Yes No Yes Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 108.5 33.5 44.5 108.5 33.5 47.5 End Time (s) 33.5 44.5 108.5 33.5 47.5 108.5 Yield/Force Off (s) 27.5 40.5 103 27.5 43.5 103.5 Yield/Force Off 170(s) 27.5 40.5 92 8.5 43.5 93.5 Local Start Time (s) 5.5 50.5 61.5 5.5 50.5 64.5 Local Yield (s) 44.5 57.5 0 44.5 60.5 0.5 Local Yield 170(s) 44.5 57.5 109 25.5 60.5 110.5 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 75 Offset: 103 (86%), Referenced to phase 4:EBTL and 8:WBTL, Start of Yellow Splits and Phases: 112: Mason & Harmony UNSIGNALIZED INTERSECTIONS Level-of-Service Average Total Delay sec/veh A < 10 B > 10 and < 15 C > 15 and < 25 D > 25 and < 35 E > 35 and < 50 F > 50 SIGNALIZED INTERSECTIONS Level-of-Service Average Total Delay sec/veh A < 10 B > 10 and < 20 C > 20 and < 35 D > 35 and < 55 E > 55 and < 80 F > 80 APPENDIX D HCM 2010 Signalized Intersection Summary Short Bkgrd AM 143: College (US 287) & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb am.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 20 6 31 14 6 21 22 1466 13 12 864 18 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1788 1863 1824 1937 1863 1824 1863 1863 1937 1937 1863 1824 Adj Flow Rate, veh/h 22 7 1 15 7 1 24 1593 0 13 939 19 Adj No. of Lanes 110110131130 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 222222222222 Cap, veh/h 239 177 25 250 177 25 517 3540 1146 329 3529 71 Arrive On Green 0.11 0.11 0.11 0.11 0.11 0.11 0.03 0.70 0.00 0.03 0.69 0.69 Sat Flow, veh/h 1331 1592 227 1442 1592 227 1774 5085 1647 1845 5130 104 Grp Volume(v), veh/h 22 0 8 15 0 8 24 1593 0 13 620 338 Grp Sat Flow(s),veh/h/ln 1331 0 1820 1442 0 1820 1774 1695 1647 1845 1695 1844 Q Serve(g_s), s 1.1 0.0 0.3 0.7 0.0 0.3 0.3 10.4 0.0 0.2 5.2 5.2 Cycle Q Clear(g_c), s 1.4 0.0 0.3 1.0 0.0 0.3 0.3 10.4 0.0 0.2 5.2 5.2 Prop In Lane 1.00 0.13 1.00 0.13 1.00 1.00 1.00 0.06 Lane Grp Cap(c), veh/h 239 0 202 250 0 202 517 3540 1146 329 2332 1268 V/C Ratio(X) 0.09 0.00 0.04 0.06 0.00 0.04 0.05 0.45 0.00 0.04 0.27 0.27 Avail Cap(c_a), veh/h 767 0 923 822 0 923 646 3540 1146 478 2332 1268 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 0.15 0.15 0.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 30.4 0.0 29.7 30.2 0.0 29.7 3.1 5.0 0.0 3.7 4.5 4.5 Incr Delay (d2), s/veh 0.2 0.0 0.1 0.1 0.0 0.1 0.0 0.1 0.0 0.0 0.3 0.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.0 0.2 0.3 0.0 0.2 0.1 4.7 0.0 0.1 2.5 2.8 LnGrp Delay(d),s/veh 30.5 0.0 29.8 30.3 0.0 29.8 3.1 5.1 0.0 3.8 4.7 5.0 LnGrp LOS C C C C A A A A A Approach Vol, veh/h 30 23 1617 971 Approach Delay, s/veh 30.3 30.1 5.1 4.8 Approach LOS C C A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 5.6 91.1 13.3 4.9 91.7 13.3 Change Period (Y+Rc), s 4.0 5.5 6.0 4.0 5.5 6.0 Max Green Setting (Gmax), s 7.0 50.5 37.0 7.0 50.5 37.0 Max Q Clear Time (g_c+I1), s 2.3 7.2 3.4 2.2 12.4 3.0 Green Ext Time (p_c), s 0.0 16.3 0.1 0.0 15.6 0.1 Intersection Summary HCM 2010 Ctrl Delay 5.5 HCM 2010 LOS A Timing Report, Sorted By Phase Short Bkgrd AM 143: College (US 287) & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb am.syn Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None C-Max None Maximum Split (s) 11 56 43 11 56 43 Maximum Split (%) 10.0% 50.9% 39.1% 10.0% 50.9% 39.1% Minimum Split (s) 11 22.5 43 11 22.5 42 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 113113 Minimum Initial (s) 4 10 7 4 10 7 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 10 30 10 29 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 94 105 51 94 105 51 End Time (s) 105 51 94 105 51 94 Yield/Force Off (s) 101 45.5 88 101 45.5 88 Yield/Force Off 170(s) 101 35.5 58 101 35.5 59 Local Start Time (s) 43 54 0 43 54 0 Local Yield (s) 50 104.5 37 50 104.5 37 Local Yield 170(s) 50 94.5 7 50 94.5 8 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 51 (46%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 143: College (US 287) & Kensington HCM 2010 Signalized Intersection Summary Short Bkgrd PM 143: College (US 287) & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb pm.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 38 27 53 109 33 90 20 1352 62 75 1827 22 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1788 1863 1824 1937 1863 1824 1863 1863 1937 1937 1863 1824 Adj Flow Rate, veh/h 39 28 8 111 34 13 20 1380 42 77 1864 21 Adj No. of Lanes 110110131130 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 222222222222 Cap, veh/h 251 219 63 276 202 77 86 3267 1054 120 3331 38 Arrive On Green 0.16 0.16 0.16 0.16 0.16 0.16 0.05 0.64 0.64 0.06 0.64 0.64 Sat Flow, veh/h 1290 1391 398 1412 1282 490 1774 5085 1640 1845 5184 58 Grp Volume(v), veh/h 39 0 36 111 0 47 20 1380 42 77 1219 666 Grp Sat Flow(s),veh/h/ln 1290 0 1789 1412 0 1772 1774 1695 1640 1845 1695 1852 Q Serve(g_s), s 2.5 0.0 1.6 6.8 0.0 2.1 1.0 12.3 0.9 3.8 18.6 18.6 Cycle Q Clear(g_c), s 4.6 0.0 1.6 8.4 0.0 2.1 1.0 12.3 0.9 3.8 18.6 18.6 Prop In Lane 1.00 0.22 1.00 0.28 1.00 1.00 1.00 0.03 Lane Grp Cap(c), veh/h 251 0 282 276 0 279 86 3267 1054 120 2178 1190 V/C Ratio(X) 0.16 0.00 0.13 0.40 0.00 0.17 0.23 0.42 0.04 0.64 0.56 0.56 Avail Cap(c_a), veh/h 578 0 734 633 0 727 163 3267 1054 199 2178 1190 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 0.38 0.38 0.38 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.8 0.0 33.5 37.1 0.0 33.8 42.4 8.1 6.1 42.3 9.2 9.2 Incr Delay (d2), s/veh 0.3 0.0 0.2 0.9 0.0 0.3 0.5 0.2 0.0 5.7 1.0 1.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 0.0 0.8 2.7 0.0 1.1 0.5 5.8 0.4 2.1 8.9 10.1 LnGrp Delay(d),s/veh 36.0 0.0 33.7 38.1 0.0 34.0 42.9 8.3 6.1 47.9 10.3 11.1 LnGrp LOS D C D C D A A D B B Approach Vol, veh/h 75 158 1442 1962 Approach Delay, s/veh 34.9 36.9 8.7 12.1 Approach LOS C D A B Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 36.4 64.0 19.6 9.0 91.4 19.6 Change Period (Y+Rc), s 5.5 * 5.5 6.0 4.0 5.5 6.0 Max Green Setting (Gmax), s 7.5 * 59 37.0 9.0 58.5 37.0 Max Q Clear Time (g_c+I1), s 3.0 20.6 6.6 5.8 14.3 10.4 Green Ext Time (p_c), s 2.6 9.9 0.8 0.0 7.3 0.7 Intersection Summary HCM 2010 Ctrl Delay 12.3 HCM 2010 LOS B Notes * HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier. Timing Report, Sorted By Phase Short Bkgrd PM 143: College (US 287) & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb pm.syn Phase Number 124568 Movement NBL SBT EBTL SBL NBT WBTL Lead/Lag Lag Lead Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Recall Mode None C-Max None None C-Max None Maximum Split (s) 13 64 43 13 64 43 Maximum Split (%) 10.8% 53.3% 35.8% 10.8% 53.3% 35.8% Minimum Split (s) 11 22.5 43 11 22.5 42 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 113113 Minimum Initial (s) 4 10 7 4 10 7 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 10 30 10 29 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 62 118 75 118 11 75 End Time (s) 75 62 118 11 75 118 Yield/Force Off (s) 71 56.5 112 7 69.5 112 Yield/Force Off 170(s) 71 46.5 82 7 59.5 83 Local Start Time (s) 0 56 13 56 69 13 Local Yield (s) 9 114.5 50 65 7.5 50 Local Yield 170(s) 9 104.5 20 65 117.5 21 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 62 (52%), Referenced to phase 2:SBT and 6:NBT, Start of Red Splits and Phases: 143: College (US 287) & Kensington HCM 2010 TWSC Short Bkgrd AM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb am.syn Intersection Int Delay, s/veh 2.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Vol, veh/h 14 46 1 2 26 18 1 0 4 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop RT Channelized - - None - - None - - None Storage Length - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - Peak Hour Factor 85 85 85 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 Mvmt Flow 16 54 1 2 31 21 1 0 5 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 52 0 0 55 0 0 144 144 55 Stage 1 - - - - - - 88 88 - Stage 2 - - - - - - 56 56 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 Pot Cap-1 Maneuver 1554 - - 1550 - - 825 747 1012 Stage 1 - - - - - - 920 822 - Stage 2 - - - - - - 956 848 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1554 - - 1550 - - 802 738 1012 Mov Cap-2 Maneuver - - - - - - 802 738 - Stage 1 - - - - - - 910 813 - Stage 2 - - - - - - 936 847 - Approach EB WB NB HCM Control Delay, s 1.7 0.3 8.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 962 1554 - - 1550 - - 933 HCM Lane V/C Ratio 0.006 0.011 - - 0.002 - - 0.03 HCM Control Delay (s) 8.8 7.3 0 - 7.3 0 - 9 HCM Lane LOS A A A - A A - A HCM 95th %tile Q(veh) 0 0 - - 0 - - 0.1 HCM 2010 TWSC Short Bkgrd AM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb am.syn Intersection Int Delay, s/veh Movement SBL SBT SBR Vol, veh/h 7 2 15 Conflicting Peds, #/hr 0 0 0 Sign Control Stop Stop Stop RT Channelized - - None Storage Length - - - Veh in Median Storage, # - 0 - Grade, % - 0 - Peak Hour Factor 85 85 85 Heavy Vehicles, % 2 2 2 Mvmt Flow 8 2 18 Major/Minor Minor2 Conflicting Flow All 136 134 41 Stage 1 46 46 - Stage 2 90 88 - Critical Hdwy 7.12 6.52 6.22 Critical Hdwy Stg 1 6.12 5.52 - Critical Hdwy Stg 2 6.12 5.52 - Follow-up Hdwy 3.518 4.018 3.318 Pot Cap-1 Maneuver 835 757 1030 Stage 1 968 857 - Stage 2 917 822 - Platoon blocked, % Mov Cap-1 Maneuver 824 748 1030 Mov Cap-2 Maneuver 824 748 - Stage 1 957 856 - Stage 2 903 813 - Approach SB HCM Control Delay, s 9 HCM LOS A Minor Lane/Major Mvmt Lanes and Geometrics Short Bkgrd AM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb am.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.998 0.947 0.887 0.913 Flt Protected 0.989 0.998 0.992 0.986 Satd. Flow (prot) 0 1839 0 0 1760 0 0 1639 0 0 1677 0 Flt Permitted 0.989 0.998 0.992 0.986 Satd. Flow (perm) 0 1839 0 0 1760 0 0 1639 0 0 1677 0 Link Speed (mph) 25 25 30 30 Link Distance (ft) 139 206 109 91 Travel Time (s) 3.8 5.6 2.5 2.1 Intersection Summary Area Type: Other HCM 2010 TWSC Short Bkgrd PM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb pm.syn Intersection Int Delay, s/veh 3.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Vol, veh/h 21 68 6 2 48 25 7 0 8 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop RT Channelized - - None - - None - - None Storage Length - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 Mvmt Flow 24 77 7 2 55 28 8 0 9 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 83 0 0 84 0 0 217 216 81 Stage 1 - - - - - - 128 128 - Stage 2 - - - - - - 89 88 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 Pot Cap-1 Maneuver 1514 - - 1513 - - 739 682 979 Stage 1 - - - - - - 876 790 - Stage 2 - - - - - - 918 822 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1514 - - 1513 - - 706 670 979 Mov Cap-2 Maneuver - - - - - - 706 670 - Stage 1 - - - - - - 861 777 - Stage 2 - - - - - - 888 821 - Approach EB WB NB HCM Control Delay, s 1.6 0.2 9.4 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 829 1514 - - 1513 - - 821 HCM Lane V/C Ratio 0.021 0.016 - - 0.002 - - 0.097 HCM Control Delay (s) 9.4 7.4 0 - 7.4 0 - 9.9 HCM Lane LOS A A A - A A - A HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0.3 HCM 2010 TWSC Short Bkgrd PM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb pm.syn Intersection Int Delay, s/veh Movement SBL SBT SBR Vol, veh/h 42 0 28 Conflicting Peds, #/hr 0 0 0 Sign Control Stop Stop Stop RT Channelized - - None Storage Length - - - Veh in Median Storage, # - 0 - Grade, % - 0 - Peak Hour Factor 88 88 88 Heavy Vehicles, % 2 2 2 Mvmt Flow 48 0 32 Major/Minor Minor2 Conflicting Flow All 206 205 69 Stage 1 73 73 - Stage 2 133 132 - Critical Hdwy 7.12 6.52 6.22 Critical Hdwy Stg 1 6.12 5.52 - Critical Hdwy Stg 2 6.12 5.52 - Follow-up Hdwy 3.518 4.018 3.318 Pot Cap-1 Maneuver 752 691 994 Stage 1 937 834 - Stage 2 870 787 - Platoon blocked, % Mov Cap-1 Maneuver 735 679 994 Mov Cap-2 Maneuver 735 679 - Stage 1 921 833 - Stage 2 847 774 - Approach SB HCM Control Delay, s 9.9 HCM LOS A Minor Lane/Major Mvmt Lanes and Geometrics Short Bkgrd PM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb pm.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.991 0.956 0.929 0.946 Flt Protected 0.989 0.999 0.977 0.971 Satd. Flow (prot) 0 1826 0 0 1779 0 0 1691 0 0 1711 0 Flt Permitted 0.989 0.999 0.977 0.971 Satd. Flow (perm) 0 1826 0 0 1779 0 0 1691 0 0 1711 0 Link Speed (mph) 25 25 30 30 Link Distance (ft) 139 206 109 91 Travel Time (s) 3.8 5.6 2.5 2.1 Intersection Summary Area Type: Other HCM 2010 TWSC Short Bkgrd AM 6: Tire Store Access/Mini-Storage & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb am.syn Intersection Int Delay, s/veh 3.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Vol, veh/h 1 31 3 9 33 0 8 0 30 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop RT Channelized - - None - - None - - None Storage Length - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - Peak Hour Factor 85 85 85 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 Mvmt Flow 1 36 4 11 39 0 9 0 35 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 39 0 0 40 0 0 102 101 38 Stage 1 - - - - - - 41 41 - Stage 2 - - - - - - 61 60 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 Pot Cap-1 Maneuver 1571 - - 1570 - - 879 789 1034 Stage 1 - - - - - - 974 861 - Stage 2 - - - - - - 950 845 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1571 - - 1570 - - 873 783 1034 Mov Cap-2 Maneuver - - - - - - 873 783 - Stage 1 - - - - - - 973 860 - Stage 2 - - - - - - 942 839 - Approach EB WB NB HCM Control Delay, s 0.2 1.6 8.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 995 1571 - - 1570 - - 1033 HCM Lane V/C Ratio 0.045 0.001 - - 0.007 - - 0.001 HCM Control Delay (s) 8.8 7.3 0 - 7.3 0 - 8.5 HCM Lane LOS A A A - A A - A HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0 HCM 2010 TWSC Short Bkgrd AM 6: Tire Store Access/Mini-Storage & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb am.syn Intersection Int Delay, s/veh Movement SBL SBT SBR Vol, veh/h 0 0 1 Conflicting Peds, #/hr 0 0 0 Sign Control Stop Stop Stop RT Channelized - - None Storage Length - - - Veh in Median Storage, # - 0 - Grade, % - 0 - Peak Hour Factor 85 85 85 Heavy Vehicles, % 2 2 2 Mvmt Flow 0 0 1 Major/Minor Minor2 Conflicting Flow All 118 102 39 Stage 1 60 60 - Stage 2 58 42 - Critical Hdwy 7.12 6.52 6.22 Critical Hdwy Stg 1 6.12 5.52 - Critical Hdwy Stg 2 6.12 5.52 - Follow-up Hdwy 3.518 4.018 3.318 Pot Cap-1 Maneuver 858 788 1033 Stage 1 951 845 - Stage 2 954 860 - Platoon blocked, % Mov Cap-1 Maneuver 824 782 1033 Mov Cap-2 Maneuver 824 782 - Stage 1 950 839 - Stage 2 921 859 - Approach SB HCM Control Delay, s 8.5 HCM LOS A Minor Lane/Major Mvmt Lanes and Geometrics Short Bkgrd AM 6: Tire Store Access/Mini-Storage & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb am.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.987 0.893 0.865 Flt Protected 0.999 0.989 0.990 Satd. Flow (prot) 0 1837 0 0 1842 0 0 1647 0 0 1611 0 Flt Permitted 0.999 0.989 0.990 Satd. Flow (perm) 0 1837 0 0 1842 0 0 1647 0 0 1611 0 Link Speed (mph) 25 25 30 30 Link Distance (ft) 191 139 123 87 Travel Time (s) 5.2 3.8 2.8 2.0 Intersection Summary Area Type: Other HCM 2010 TWSC Short Bkgrd PM 6: Tire Store Access/Mini-Storage & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb pm.syn Intersection Int Delay, s/veh 2.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Vol, veh/h 0 67 8 6 77 1 26 0 28 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop RT Channelized - - None - - None - - None Storage Length - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 76 9 7 88 1 30 0 32 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 89 0 0 85 0 0 183 183 81 Stage 1 - - - - - - 81 81 - Stage 2 - - - - - - 102 102 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 Pot Cap-1 Maneuver 1506 - - 1512 - - 778 711 979 Stage 1 - - - - - - 927 828 - Stage 2 - - - - - - 904 811 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1506 - - 1512 - - 774 707 979 Mov Cap-2 Maneuver - - - - - - 774 707 - Stage 1 - - - - - - 927 828 - Stage 2 - - - - - - 898 807 - Approach EB WB NB HCM Control Delay, s 0 0.5 9.5 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 868 1506 - - 1512 - - 834 HCM Lane V/C Ratio 0.071 - - - 0.005 - - 0.003 HCM Control Delay (s) 9.5 0 - - 7.4 0 - 9.3 HCM Lane LOS A A - - A A - A HCM 95th %tile Q(veh) 0.2 0 - - 0 - - 0 HCM 2010 TWSC Short Bkgrd PM 6: Tire Store Access/Mini-Storage & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb pm.syn Intersection Int Delay, s/veh Movement SBL SBT SBR Vol, veh/h 1 0 1 Conflicting Peds, #/hr 0 0 0 Sign Control Stop Stop Stop RT Channelized - - None Storage Length - - - Veh in Median Storage, # - 0 - Grade, % - 0 - Peak Hour Factor 88 88 88 Heavy Vehicles, % 2 2 2 Mvmt Flow 1 0 1 Major/Minor Minor2 Conflicting Flow All 199 187 88 Stage 1 102 102 - Stage 2 97 85 - Critical Hdwy 7.12 6.52 6.22 Critical Hdwy Stg 1 6.12 5.52 - Critical Hdwy Stg 2 6.12 5.52 - Follow-up Hdwy 3.518 4.018 3.318 Pot Cap-1 Maneuver 760 708 970 Stage 1 904 811 - Stage 2 910 824 - Platoon blocked, % Mov Cap-1 Maneuver 732 704 970 Mov Cap-2 Maneuver 732 704 - Stage 1 904 807 - Stage 2 880 824 - Approach SB HCM Control Delay, s 9.3 HCM LOS A Minor Lane/Major Mvmt Lanes and Geometrics Short Bkgrd PM 6: Tire Store Access/Mini-Storage & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb pm.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.986 0.999 0.930 0.932 Flt Protected 0.996 0.976 0.976 Satd. Flow (prot) 0 1837 0 0 1853 0 0 1691 0 0 1694 0 Flt Permitted 0.996 0.976 0.976 Satd. Flow (perm) 0 1837 0 0 1853 0 0 1691 0 0 1694 0 Link Speed (mph) 25 25 30 30 Link Distance (ft) 191 139 123 87 Travel Time (s) 5.2 3.8 2.8 2.0 Intersection Summary Area Type: Other HCM 2010 TWSC Short Bkgrd AM 1: Mason & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb am.syn Intersection Int Delay, s/veh 1.4 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 5 36 202 18 16 107 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 89 89 89 89 89 89 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 6 40 227 20 18 120 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 393 237 0 0 247 0 Stage 1 237 - - - - - Stage 2 156 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 611 802 - - 1319 - Stage 1 802 - - - - - Stage 2 872 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 602 802 - - 1319 - Mov Cap-2 Maneuver 602 - - - - - Stage 1 802 - - - - - Stage 2 859 - - - - - Approach WB NB SB HCM Control Delay, s 10 0 1 HCM LOS B Minor Lane/Major Mvmt NBT NBR WBLn1 SBL SBT Capacity (veh/h) - - 771 1319 - HCM Lane V/C Ratio - - 0.06 0.014 - HCM Control Delay (s) - - 10 7.8 0 HCM Lane LOS - - B A A HCM 95th %tile Q(veh) - - 0.2 0 - Lanes and Geometrics Short Bkgrd AM 1: Mason & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb am.syn Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.883 0.989 Flt Protected 0.994 0.994 Satd. Flow (prot) 1635 0 1842 0 0 1852 Flt Permitted 0.994 0.994 Satd. Flow (perm) 1635 0 1842 0 0 1852 Link Speed (mph) 25 30 30 Link Distance (ft) 191 531 274 Travel Time (s) 5.2 12.1 6.2 Intersection Summary Area Type: Other HCM 2010 TWSC Short Bkgrd PM 1: Mason & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb pm.syn Intersection Int Delay, s/veh 2.2 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 45 58 274 33 42 353 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 98 98 98 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 46 59 280 34 43 360 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 742 296 0 0 313 0 Stage 1 296 - - - - - Stage 2 446 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 383 743 - - 1247 - Stage 1 755 - - - - - Stage 2 645 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 367 743 - - 1247 - Mov Cap-2 Maneuver 367 - - - - - Stage 1 755 - - - - - Stage 2 617 - - - - - Approach WB NB SB HCM Control Delay, s 13.8 0 0.8 HCM LOS B Minor Lane/Major Mvmt NBT NBR WBLn1 SBL SBT Capacity (veh/h) - - 513 1247 - HCM Lane V/C Ratio - - 0.205 0.034 - HCM Control Delay (s) - - 13.8 8 0 HCM Lane LOS - - B A A HCM 95th %tile Q(veh) - - 0.8 0.1 - Lanes and Geometrics Short Bkgrd PM 1: Mason & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb pm.syn Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.924 0.985 Flt Protected 0.979 0.995 Satd. Flow (prot) 1685 0 1835 0 0 1853 Flt Permitted 0.979 0.995 Satd. Flow (perm) 1685 0 1835 0 0 1853 Link Speed (mph) 25 30 30 Link Distance (ft) 191 531 274 Travel Time (s) 5.2 12.1 6.2 Intersection Summary Area Type: Other HCM 2010 Signalized Intersection Summary Short Bkgrd AM 112: Mason & Harmony Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb am.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 135 992 148 83 632 107 102 57 79 35 76 59 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 0.99 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 155 1140 122 95 726 87 117 66 4 40 87 36 Adj No. of Lanes 121121111110 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 222222222222 Cap, veh/h 496 2238 1000 357 2513 1124 242 361 303 288 243 100 Arrive On Green 0.63 0.63 0.63 0.10 1.00 1.00 0.19 0.19 0.19 0.19 0.19 0.19 Sat Flow, veh/h 669 3539 1582 1774 3539 1582 1263 1863 1564 1311 1253 518 Grp Volume(v), veh/h 155 1140 122 95 726 87 117 66 4 40 0 123 Grp Sat Flow(s),veh/h/ln 669 1770 1582 1774 1770 1582 1263 1863 1564 1311 0 1771 Q Serve(g_s), s 11.0 17.3 3.0 1.7 0.0 0.0 8.7 2.9 0.2 2.6 0.0 5.9 Cycle Q Clear(g_c), s 11.0 17.3 3.0 1.7 0.0 0.0 14.7 2.9 0.2 5.5 0.0 5.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.29 Lane Grp Cap(c), veh/h 496 2238 1000 357 2513 1124 242 361 303 288 0 343 V/C Ratio(X) 0.31 0.51 0.12 0.27 0.29 0.08 0.48 0.18 0.01 0.14 0.00 0.36 Avail Cap(c_a), veh/h 496 2238 1000 417 2513 1124 342 509 427 288 0 343 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.82 0.82 0.82 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 8.7 9.9 7.2 6.7 0.0 0.0 40.9 33.3 32.2 35.6 0.0 34.5 Incr Delay (d2), s/veh 1.6 0.8 0.2 0.3 0.2 0.1 1.5 0.2 0.0 0.2 0.0 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.3 8.7 1.4 0.8 0.1 0.0 3.2 1.5 0.1 1.0 0.0 3.0 LnGrp Delay(d),s/veh 10.3 10.7 7.5 7.0 0.2 0.1 42.4 33.6 32.2 35.8 0.0 35.2 LnGrp LOS BBAAAADCCD D Approach Vol, veh/h 1417 908 187 163 Approach Delay, s/veh 10.4 0.9 39.1 35.3 Approach LOS B A D D Timer 12345678 Assigned Phs 2 3 4 6 8 Phs Duration (G+Y+Rc), s 24.2 7.7 78.1 24.2 85.8 Change Period (Y+Rc), s * 6 4.0 5.5 6.0 * 5.5 Max Green Setting (Gmax), s * 9 7.0 61.5 26.0 * 60 Max Q Clear Time (g_c+I1), s 7.9 3.7 19.3 16.7 2.0 Green Ext Time (p_c), s 0.2 0.1 13.8 0.6 14.6 Intersection Summary HCM 2010 Ctrl Delay 10.7 HCM 2010 LOS B Notes * HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier. Timing Report, Sorted By Phase Short Bkgrd AM 112: Mason & Harmony Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb am.syn Phase Number 23468 Movement SBTL WBL EBTL NBTL WBTL Lead/Lag Lead Lag Lead-Lag Optimize Recall Mode None None C-Max None C-Max Maximum Split (s) 15 11 67 32 65 Maximum Split (%) 13.6% 10.0% 60.9% 29.1% 59.1% Minimum Split (s) 15 11 23.5 32 22 Yellow Time (s) 3 3 4 3.5 4 All-Red Time (s) 2 1 1.5 2.5 1 Minimum Initial (s) 4 4 10 7 10 Vehicle Extension (s) 33333 Minimum Gap (s) 33333 Time Before Reduce (s) 00000 Time To Reduce (s) 00000 Walk Time (s) 7 7 7 Flash Dont Walk (s) 11 19 10 Dual Entry Yes No Yes Yes Yes Inhibit Max Yes Yes Yes Yes Yes Start Time (s) 108.5 30.5 41.5 108.5 30.5 End Time (s) 30.5 41.5 108.5 30.5 108.5 Yield/Force Off (s) 25.5 37.5 103 24.5 103.5 Yield/Force Off 170(s) 25.5 37.5 92 5.5 93.5 Local Start Time (s) 5.5 37.5 48.5 5.5 37.5 Local Yield (s) 32.5 44.5 0 31.5 0.5 Local Yield 170(s) 32.5 44.5 99 12.5 100.5 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 75 Offset: 103 (94%), Referenced to phase 4:EBTL and 8:WBTL, Start of Yellow Splits and Phases: 112: Mason & Harmony HCM 2010 Signalized Intersection Summary Short Bkgrd PM 112: Mason & Harmony Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb pm.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 153 964 209 131 1284 116 154 127 127 67 126 230 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 165 1037 151 141 1381 87 166 137 41 72 135 188 Adj No. of Lanes 121121111110 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 222222222222 Cap, veh/h 324 1699 759 300 1674 748 267 653 551 418 248 345 Arrive On Green 0.07 0.48 0.48 0.13 0.95 0.95 0.35 0.35 0.35 0.35 0.35 0.35 Sat Flow, veh/h 1774 3539 1582 1774 3539 1582 1052 1863 1572 1196 706 983 Grp Volume(v), veh/h 165 1037 151 141 1381 87 166 137 41 72 0 323 Grp Sat Flow(s),veh/h/ln 1774 1770 1582 1774 1770 1582 1052 1863 1572 1196 0 1689 Q Serve(g_s), s 5.6 25.8 6.6 4.9 11.5 0.4 18.0 6.2 2.1 5.4 0.0 18.4 Cycle Q Clear(g_c), s 5.6 25.8 6.6 4.9 11.5 0.4 36.4 6.2 2.1 11.6 0.0 18.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.58 Lane Grp Cap(c), veh/h 324 1699 759 300 1674 748 267 653 551 418 0 592 V/C Ratio(X) 0.51 0.61 0.20 0.47 0.83 0.12 0.62 0.21 0.07 0.17 0.00 0.55 Avail Cap(c_a), veh/h 358 1699 759 303 1674 748 267 653 551 418 0 592 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.09 0.09 0.09 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 14.7 22.9 17.9 16.3 2.0 1.7 45.9 27.3 25.9 31.3 0.0 31.2 Incr Delay (d2), s/veh 1.2 1.6 0.6 0.1 0.5 0.0 10.4 0.7 0.3 0.2 0.0 1.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.8 12.9 3.0 2.3 4.3 0.2 6.0 3.3 0.9 1.8 0.0 8.8 LnGrp Delay(d),s/veh 15.9 24.6 18.5 16.4 2.5 1.8 56.2 28.0 26.2 31.5 0.0 32.3 LnGrp LOS B C BBAAECCC C Approach Vol, veh/h 1353 1609 344 395 Approach Delay, s/veh 22.8 3.7 41.4 32.1 Approach LOS C A D C Timer 12345678 Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 47.0 10.8 62.2 47.0 11.7 61.3 Change Period (Y+Rc), s 6.0 4.0 5.5 6.0 4.0 * 5.5 Max Green Setting (Gmax), s 41.0 7.0 56.5 41.0 10.0 * 54 Max Q Clear Time (g_c+I1), s 20.4 6.9 27.8 38.4 7.6 13.5 Green Ext Time (p_c), s 4.2 0.0 15.4 1.1 0.1 17.9 Intersection Summary HCM 2010 Ctrl Delay 17.2 HCM 2010 LOS B Notes * HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier. Timing Report, Sorted By Phase Short Bkgrd PM 112: Mason & Harmony Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates sb pm.syn Phase Number 234678 Movement SBTL WBL EBTL NBTL EBL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None None C-Max Max None C-Max Maximum Split (s) 47 11 62 47 14 59 Maximum Split (%) 39.2% 9.2% 51.7% 39.2% 11.7% 49.2% Minimum Split (s) 15 11 23.5 32 11 22 Yellow Time (s) 3.5 3 4 3.5 3 4 All-Red Time (s) 2.5 1 1.5 2.5 1 1 Minimum Initial (s) 4 4 10 7 4 10 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 Flash Dont Walk (s) 11 19 10 Dual Entry Yes No Yes Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 108.5 35.5 46.5 108.5 35.5 49.5 End Time (s) 35.5 46.5 108.5 35.5 49.5 108.5 Yield/Force Off (s) 29.5 42.5 103 29.5 45.5 103.5 Yield/Force Off 170(s) 29.5 42.5 92 10.5 45.5 93.5 Local Start Time (s) 5.5 52.5 63.5 5.5 52.5 66.5 Local Yield (s) 46.5 59.5 0 46.5 62.5 0.5 Local Yield 170(s) 46.5 59.5 109 27.5 62.5 110.5 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 80 Offset: 103 (86%), Referenced to phase 4:EBTL and 8:WBTL, Start of Yellow Splits and Phases: 112: Mason & Harmony APPENDIX E HCM 2010 Signalized Intersection Summary Short Total AM 143: College (US 287) & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 26 6 36 14 6 21 36 1466 13 12 864 37 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1788 1863 1824 1937 1863 1824 1863 1863 1937 1937 1863 1824 Adj Flow Rate, veh/h 28 7 2 15 7 1 39 1593 0 13 939 38 Adj No. of Lanes 110110131130 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 222222222222 Cap, veh/h 242 159 45 253 182 26 517 3536 1145 327 3402 137 Arrive On Green 0.11 0.11 0.11 0.11 0.11 0.11 0.04 0.70 0.00 0.03 0.68 0.68 Sat Flow, veh/h 1332 1390 397 1442 1592 227 1774 5085 1647 1845 5014 203 Grp Volume(v), veh/h 28 0 9 15 0 8 39 1593 0 13 634 343 Grp Sat Flow(s),veh/h/ln 1332 0 1788 1442 0 1820 1774 1695 1647 1845 1695 1826 Q Serve(g_s), s 1.5 0.0 0.3 0.7 0.0 0.3 0.5 10.5 0.0 0.2 5.6 5.6 Cycle Q Clear(g_c), s 1.7 0.0 0.3 1.1 0.0 0.3 0.5 10.5 0.0 0.2 5.6 5.6 Prop In Lane 1.00 0.22 1.00 0.13 1.00 1.00 1.00 0.11 Lane Grp Cap(c), veh/h 242 0 204 253 0 208 517 3536 1145 327 2300 1239 V/C Ratio(X) 0.12 0.00 0.04 0.06 0.00 0.04 0.08 0.45 0.00 0.04 0.28 0.28 Avail Cap(c_a), veh/h 756 0 895 810 0 911 628 3536 1145 474 2300 1239 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 0.15 0.15 0.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 30.7 0.0 29.9 30.4 0.0 29.9 3.2 5.1 0.0 3.9 4.8 4.8 Incr Delay (d2), s/veh 0.2 0.0 0.1 0.1 0.0 0.1 0.0 0.1 0.0 0.0 0.3 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 0.2 0.3 0.0 0.2 0.2 4.9 0.0 0.1 2.7 2.9 LnGrp Delay(d),s/veh 30.9 0.0 30.0 30.5 0.0 30.0 3.2 5.2 0.0 4.0 5.1 5.4 LnGrp LOS C C C C A A A A A Approach Vol, veh/h 37 23 1632 990 Approach Delay, s/veh 30.7 30.3 5.1 5.2 Approach LOS C C A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 6.2 90.1 13.7 5.0 91.4 13.7 Change Period (Y+Rc), s 4.0 5.5 6.0 4.0 5.5 6.0 Max Green Setting (Gmax), s 7.0 50.5 37.0 7.0 50.5 37.0 Max Q Clear Time (g_c+I1), s 2.5 7.6 3.7 2.2 12.5 3.1 Green Ext Time (p_c), s 0.0 16.4 0.2 0.0 15.8 0.2 Intersection Summary HCM 2010 Ctrl Delay 5.7 HCM 2010 LOS A Timing Report, Sorted By Phase Short Total AM 143: College (US 287) & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None C-Max None Maximum Split (s) 11 56 43 11 56 43 Maximum Split (%) 10.0% 50.9% 39.1% 10.0% 50.9% 39.1% Minimum Split (s) 11 22.5 43 11 22.5 42 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 113113 Minimum Initial (s) 4 10 7 4 10 7 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 10 30 10 29 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 94 105 51 94 105 51 End Time (s) 105 51 94 105 51 94 Yield/Force Off (s) 101 45.5 88 101 45.5 88 Yield/Force Off 170(s) 101 35.5 58 101 35.5 59 Local Start Time (s) 43 54 0 43 54 0 Local Yield (s) 50 104.5 37 50 104.5 37 Local Yield 170(s) 50 94.5 7 50 94.5 8 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 51 (46%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 143: College (US 287) & Kensington HCM 2010 Signalized Intersection Summary Short Total PM 143: College (US 287) & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 59 27 68 109 33 90 30 1352 62 75 1827 36 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1788 1863 1824 1937 1863 1824 1863 1863 1937 1937 1863 1824 Adj Flow Rate, veh/h 60 28 8 111 34 13 31 1380 42 77 1864 36 Adj No. of Lanes 110110131130 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 222222222222 Cap, veh/h 252 220 63 277 203 78 86 3264 1053 120 3297 64 Arrive On Green 0.16 0.16 0.16 0.16 0.16 0.16 0.05 0.64 0.64 0.06 0.64 0.64 Sat Flow, veh/h 1290 1391 398 1412 1282 490 1774 5085 1640 1845 5136 99 Grp Volume(v), veh/h 60 0 36 111 0 47 31 1380 42 77 1230 670 Grp Sat Flow(s),veh/h/ln 1290 0 1789 1412 0 1772 1774 1695 1640 1845 1695 1845 Q Serve(g_s), s 3.9 0.0 1.6 6.8 0.0 2.1 1.6 12.4 0.9 3.8 18.9 18.9 Cycle Q Clear(g_c), s 6.0 0.0 1.6 8.4 0.0 2.1 1.6 12.4 0.9 3.8 18.9 18.9 Prop In Lane 1.00 0.22 1.00 0.28 1.00 1.00 1.00 0.05 Lane Grp Cap(c), veh/h 252 0 283 277 0 281 86 3264 1053 120 2176 1184 V/C Ratio(X) 0.24 0.00 0.13 0.40 0.00 0.17 0.36 0.42 0.04 0.64 0.57 0.57 Avail Cap(c_a), veh/h 577 0 733 632 0 726 163 3264 1053 199 2176 1184 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 0.37 0.37 0.37 1.00 1.00 1.00 Uniform Delay (d), s/veh 36.3 0.0 33.5 37.1 0.0 33.7 42.7 8.2 6.1 42.3 9.3 9.3 Incr Delay (d2), s/veh 0.5 0.0 0.2 0.9 0.0 0.3 0.9 0.1 0.0 5.7 1.1 2.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.4 0.0 0.8 2.7 0.0 1.1 0.8 5.8 0.4 2.1 9.0 10.1 LnGrp Delay(d),s/veh 36.8 0.0 33.7 38.0 0.0 34.0 43.6 8.3 6.1 47.9 10.4 11.3 LnGrp LOS D C D C D A A D B B Approach Vol, veh/h 96 158 1453 1977 Approach Delay, s/veh 35.6 36.8 9.0 12.2 Approach LOS D D A B Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 36.3 64.0 19.7 9.0 91.3 19.7 Change Period (Y+Rc), s 5.5 * 5.5 6.0 4.0 5.5 6.0 Max Green Setting (Gmax), s 7.5 * 59 37.0 9.0 58.5 37.0 Max Q Clear Time (g_c+I1), s 3.6 20.9 8.0 5.8 14.4 10.4 Green Ext Time (p_c), s 2.3 10.0 0.8 0.0 7.3 0.8 Intersection Summary HCM 2010 Ctrl Delay 12.6 HCM 2010 LOS B Notes * HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier. Timing Report, Sorted By Phase Short Total PM 143: College (US 287) & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Phase Number 124568 Movement NBL SBT EBTL SBL NBT WBTL Lead/Lag Lag Lead Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Recall Mode None C-Max None None C-Max None Maximum Split (s) 13 64 43 13 64 43 Maximum Split (%) 10.8% 53.3% 35.8% 10.8% 53.3% 35.8% Minimum Split (s) 11 22.5 43 11 22.5 42 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 113113 Minimum Initial (s) 4 10 7 4 10 7 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 10 30 10 29 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 62 118 75 118 11 75 End Time (s) 75 62 118 11 75 118 Yield/Force Off (s) 71 56.5 112 7 69.5 112 Yield/Force Off 170(s) 71 46.5 82 7 59.5 83 Local Start Time (s) 0 56 13 56 69 13 Local Yield (s) 9 114.5 50 65 7.5 50 Local Yield 170(s) 9 104.5 20 65 117.5 21 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 62 (52%), Referenced to phase 2:SBT and 6:NBT, Start of Red Splits and Phases: 143: College (US 287) & Kensington HCM 2010 TWSC Short Total AM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Intersection Int Delay, s/veh 2.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Vol, veh/h 19 49 1 2 35 42 1 0 4 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop RT Channelized - - None - - None - - None Storage Length - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - Peak Hour Factor 85 85 85 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 Mvmt Flow 22 58 1 2 41 49 1 0 5 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 91 0 0 59 0 0 184 198 58 Stage 1 - - - - - - 103 103 - Stage 2 - - - - - - 81 95 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 Pot Cap-1 Maneuver 1504 - - 1545 - - 777 698 1008 Stage 1 - - - - - - 903 810 - Stage 2 - - - - - - 927 816 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1504 - - 1545 - - 751 687 1008 Mov Cap-2 Maneuver - - - - - - 751 687 - Stage 1 - - - - - - 889 798 - Stage 2 - - - - - - 906 815 - Approach EB WB NB HCM Control Delay, s 2 0.2 8.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 943 1504 - - 1545 - - 862 HCM Lane V/C Ratio 0.006 0.015 - - 0.002 - - 0.045 HCM Control Delay (s) 8.8 7.4 0 - 7.3 0 - 9.4 HCM Lane LOS A A A - A A - A HCM 95th %tile Q(veh) 0 0 - - 0 - - 0.1 HCM 2010 TWSC Short Total AM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Intersection Int Delay, s/veh Movement SBL SBT SBR Vol, veh/h 15 2 16 Conflicting Peds, #/hr 0 0 0 Sign Control Stop Stop Stop RT Channelized - - None Storage Length - - - Veh in Median Storage, # - 0 - Grade, % - 0 - Peak Hour Factor 85 85 85 Heavy Vehicles, % 2 2 2 Mvmt Flow 18 2 19 Major/Minor Minor2 Conflicting Flow All 176 175 66 Stage 1 71 71 - Stage 2 105 104 - Critical Hdwy 7.12 6.52 6.22 Critical Hdwy Stg 1 6.12 5.52 - Critical Hdwy Stg 2 6.12 5.52 - Follow-up Hdwy 3.518 4.018 3.318 Pot Cap-1 Maneuver 786 718 998 Stage 1 939 836 - Stage 2 901 809 - Platoon blocked, % Mov Cap-1 Maneuver 773 707 998 Mov Cap-2 Maneuver 773 707 - Stage 1 925 835 - Stage 2 883 797 - Approach SB HCM Control Delay, s 9.4 HCM LOS A Minor Lane/Major Mvmt Lanes and Geometrics Short Total AM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.998 0.928 0.887 0.934 Flt Protected 0.987 0.999 0.992 0.977 Satd. Flow (prot) 0 1835 0 0 1727 0 0 1639 0 0 1700 0 Flt Permitted 0.987 0.999 0.992 0.977 Satd. Flow (perm) 0 1835 0 0 1727 0 0 1639 0 0 1700 0 Link Speed (mph) 25 25 30 30 Link Distance (ft) 139 206 109 91 Travel Time (s) 3.8 5.6 2.5 2.1 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total PM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Intersection Int Delay, s/veh 4.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Vol, veh/h 24 78 6 2 55 42 7 0 8 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop RT Channelized - - None - - None - - None Storage Length - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 Mvmt Flow 27 89 7 2 62 48 8 0 9 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 110 0 0 95 0 0 257 262 92 Stage 1 - - - - - - 147 147 - Stage 2 - - - - - - 110 115 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 Pot Cap-1 Maneuver 1480 - - 1499 - - 696 643 965 Stage 1 - - - - - - 856 775 - Stage 2 - - - - - - 895 800 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1480 - - 1499 - - 659 630 965 Mov Cap-2 Maneuver - - - - - - 659 630 - Stage 1 - - - - - - 840 760 - Stage 2 - - - - - - 860 799 - Approach EB WB NB HCM Control Delay, s 1.7 0.1 9.6 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 793 1480 - - 1499 - - 767 HCM Lane V/C Ratio 0.021 0.018 - - 0.002 - - 0.15 HCM Control Delay (s) 9.6 7.5 0 - 7.4 0 - 10.5 HCM Lane LOS A A A - A A - B HCM 95th %tile Q(veh) 0.1 0.1 - - 0 - - 0.5 HCM 2010 TWSC Short Total PM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Intersection Int Delay, s/veh Movement SBL SBT SBR Vol, veh/h 68 0 33 Conflicting Peds, #/hr 0 0 0 Sign Control Stop Stop Stop RT Channelized - - None Storage Length - - - Veh in Median Storage, # - 0 - Grade, % - 0 - Peak Hour Factor 88 88 88 Heavy Vehicles, % 2 2 2 Mvmt Flow 77 0 38 Major/Minor Minor2 Conflicting Flow All 242 241 86 Stage 1 91 91 - Stage 2 151 150 - Critical Hdwy 7.12 6.52 6.22 Critical Hdwy Stg 1 6.12 5.52 - Critical Hdwy Stg 2 6.12 5.52 - Follow-up Hdwy 3.518 4.018 3.318 Pot Cap-1 Maneuver 712 660 973 Stage 1 916 820 - Stage 2 851 773 - Platoon blocked, % Mov Cap-1 Maneuver 695 647 973 Mov Cap-2 Maneuver 695 647 - Stage 1 899 819 - Stage 2 827 758 - Approach SB HCM Control Delay, s 10.5 HCM LOS B Minor Lane/Major Mvmt Lanes and Geometrics Short Total PM 3: Jiffy Lube Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.992 0.942 0.929 0.955 Flt Protected 0.989 0.999 0.977 0.968 Satd. Flow (prot) 0 1828 0 0 1753 0 0 1691 0 0 1722 0 Flt Permitted 0.989 0.999 0.977 0.968 Satd. Flow (perm) 0 1828 0 0 1753 0 0 1691 0 0 1722 0 Link Speed (mph) 25 25 30 30 Link Distance (ft) 139 206 109 91 Travel Time (s) 3.8 5.6 2.5 2.1 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total AM 6: Tire Store Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Intersection Int Delay, s/veh 3.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Vol, veh/h 2 37 3 9 37 6 8 0 30 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop RT Channelized - - None - - None - - None Storage Length - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - Peak Hour Factor 85 85 85 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 Mvmt Flow 2 44 4 11 44 7 9 0 35 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 51 0 0 47 0 0 119 122 45 Stage 1 - - - - - - 50 50 - Stage 2 - - - - - - 69 72 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 Pot Cap-1 Maneuver 1555 - - 1560 - - 857 768 1025 Stage 1 - - - - - - 963 853 - Stage 2 - - - - - - 941 835 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1555 - - 1560 - - 851 762 1025 Mov Cap-2 Maneuver - - - - - - 851 762 - Stage 1 - - - - - - 962 852 - Stage 2 - - - - - - 933 829 - Approach EB WB NB HCM Control Delay, s 0.3 1.3 8.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 983 1555 - - 1560 - - 863 HCM Lane V/C Ratio 0.045 0.002 - - 0.007 - - 0.004 HCM Control Delay (s) 8.8 7.3 0 - 7.3 0 - 9.2 HCM Lane LOS A A A - A A - A HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0 HCM 2010 TWSC Short Total AM 6: Tire Store Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Intersection Int Delay, s/veh Movement SBL SBT SBR Vol, veh/h 2 0 1 Conflicting Peds, #/hr 0 0 0 Sign Control Stop Stop Stop RT Channelized - - None Storage Length - - - Veh in Median Storage, # - 0 - Grade, % - 0 - Peak Hour Factor 85 85 85 Heavy Vehicles, % 2 2 2 Mvmt Flow 2 0 1 Major/Minor Minor2 Conflicting Flow All 136 120 47 Stage 1 68 68 - Stage 2 68 52 - Critical Hdwy 7.12 6.52 6.22 Critical Hdwy Stg 1 6.12 5.52 - Critical Hdwy Stg 2 6.12 5.52 - Follow-up Hdwy 3.518 4.018 3.318 Pot Cap-1 Maneuver 835 770 1022 Stage 1 942 838 - Stage 2 942 852 - Platoon blocked, % Mov Cap-1 Maneuver 801 764 1022 Mov Cap-2 Maneuver 801 764 - Stage 1 941 832 - Stage 2 909 851 - Approach SB HCM Control Delay, s 9.2 HCM LOS A Minor Lane/Major Mvmt Lanes and Geometrics Short Total AM 6: Tire Store Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.989 0.985 0.893 0.955 Flt Protected 0.998 0.991 0.990 0.968 Satd. Flow (prot) 0 1839 0 0 1818 0 0 1647 0 0 1722 0 Flt Permitted 0.998 0.991 0.990 0.968 Satd. Flow (perm) 0 1839 0 0 1818 0 0 1647 0 0 1722 0 Link Speed (mph) 25 25 30 30 Link Distance (ft) 191 139 123 87 Travel Time (s) 5.2 3.8 2.8 2.0 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total PM 6: Tire Store Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Intersection Int Delay, s/veh 2.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Vol, veh/h 2 73 8 6 85 4 26 0 28 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop RT Channelized - - None - - None - - None Storage Length - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 Mvmt Flow 2 83 9 7 97 5 30 0 32 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 101 0 0 92 0 0 206 207 88 Stage 1 - - - - - - 92 92 - Stage 2 - - - - - - 114 115 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 Pot Cap-1 Maneuver 1491 - - 1503 - - 752 690 970 Stage 1 - - - - - - 915 819 - Stage 2 - - - - - - 891 800 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1491 - - 1503 - - 747 686 970 Mov Cap-2 Maneuver - - - - - - 747 686 - Stage 1 - - - - - - 914 818 - Stage 2 - - - - - - 884 796 - Approach EB WB NB HCM Control Delay, s 0.2 0.5 9.6 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 848 1491 - - 1503 - - 751 HCM Lane V/C Ratio 0.072 0.002 - - 0.005 - - 0.014 HCM Control Delay (s) 9.6 7.4 0 - 7.4 0 - 9.9 HCM Lane LOS A A A - A A - A HCM 95th %tile Q(veh) 0.2 0 - - 0 - - 0 HCM 2010 TWSC Short Total PM 6: Tire Store Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Intersection Int Delay, s/veh Movement SBL SBT SBR Vol, veh/h 7 0 2 Conflicting Peds, #/hr 0 0 0 Sign Control Stop Stop Stop RT Channelized - - None Storage Length - - - Veh in Median Storage, # - 0 - Grade, % - 0 - Peak Hour Factor 88 88 88 Heavy Vehicles, % 2 2 2 Mvmt Flow 8 0 2 Major/Minor Minor2 Conflicting Flow All 221 210 99 Stage 1 113 113 - Stage 2 108 97 - Critical Hdwy 7.12 6.52 6.22 Critical Hdwy Stg 1 6.12 5.52 - Critical Hdwy Stg 2 6.12 5.52 - Follow-up Hdwy 3.518 4.018 3.318 Pot Cap-1 Maneuver 735 687 957 Stage 1 892 802 - Stage 2 897 815 - Platoon blocked, % Mov Cap-1 Maneuver 708 683 957 Mov Cap-2 Maneuver 708 683 - Stage 1 891 798 - Stage 2 867 814 - Approach SB HCM Control Delay, s 9.9 HCM LOS A Minor Lane/Major Mvmt Lanes and Geometrics Short Total PM 6: Tire Store Access/Site Access & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.987 0.994 0.930 0.973 Flt Protected 0.999 0.997 0.976 0.962 Satd. Flow (prot) 0 1837 0 0 1846 0 0 1691 0 0 1744 0 Flt Permitted 0.999 0.997 0.976 0.962 Satd. Flow (perm) 0 1837 0 0 1846 0 0 1691 0 0 1744 0 Link Speed (mph) 25 25 30 30 Link Distance (ft) 191 139 123 87 Travel Time (s) 5.2 3.8 2.8 2.0 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total AM 1: Mason & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Intersection Int Delay, s/veh 1.6 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 6 40 204 21 21 108 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 89 89 89 89 89 89 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 7 45 229 24 24 121 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 410 241 0 0 253 0 Stage 1 241 - - - - - Stage 2 169 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 598 798 - - 1312 - Stage 1 799 - - - - - Stage 2 861 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 586 798 - - 1312 - Mov Cap-2 Maneuver 586 - - - - - Stage 1 799 - - - - - Stage 2 844 - - - - - Approach WB NB SB HCM Control Delay, s 10.1 0 1.3 HCM LOS B Minor Lane/Major Mvmt NBT NBR WBLn1 SBL SBT Capacity (veh/h) - - 762 1312 - HCM Lane V/C Ratio - - 0.068 0.018 - HCM Control Delay (s) - - 10.1 7.8 0 HCM Lane LOS - - B A A HCM 95th %tile Q(veh) - - 0.2 0.1 - Lanes and Geometrics Short Total AM 1: Mason & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.883 0.987 Flt Protected 0.993 0.992 Satd. Flow (prot) 1633 0 1839 0 0 1848 Flt Permitted 0.993 0.992 Satd. Flow (perm) 1633 0 1839 0 0 1848 Link Speed (mph) 25 30 30 Link Distance (ft) 191 531 401 Travel Time (s) 5.2 12.1 9.1 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total PM 1: Mason & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Intersection Int Delay, s/veh 2.4 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 48 65 275 35 48 355 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 98 98 98 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 49 66 281 36 49 362 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 758 298 0 0 316 0 Stage 1 298 - - - - - Stage 2 460 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 375 741 - - 1244 - Stage 1 753 - - - - - Stage 2 636 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 357 741 - - 1244 - Mov Cap-2 Maneuver 357 - - - - - Stage 1 753 - - - - - Stage 2 605 - - - - - Approach WB NB SB HCM Control Delay, s 14.1 0 1 HCM LOS B Minor Lane/Major Mvmt NBT NBR WBLn1 SBL SBT Capacity (veh/h) - - 509 1244 - HCM Lane V/C Ratio - - 0.227 0.039 - HCM Control Delay (s) - - 14.1 8 0 HCM Lane LOS - - B A A HCM 95th %tile Q(veh) - - 0.9 0.1 - Lanes and Geometrics Short Total PM 1: Mason & Kensington Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 1 0 0 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.923 0.985 Flt Protected 0.979 0.994 Satd. Flow (prot) 1683 0 1835 0 0 1852 Flt Permitted 0.979 0.994 Satd. Flow (perm) 1683 0 1835 0 0 1852 Link Speed (mph) 25 30 30 Link Distance (ft) 191 531 437 Travel Time (s) 5.2 12.1 9.9 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total AM 9: Mason & Site Access Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Intersection Int Delay, s/veh 1.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Vol, veh/h 11 0 7 2 0 2 21 218 5 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free RT Channelized - - None - - None - - None Storage Length - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - Peak Hour Factor 85 85 85 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 Mvmt Flow 13 0 8 2 0 2 25 256 6 Major/Minor Minor2 Minor1 Major1 Conflicting Flow All 482 484 160 485 500 259 179 0 0 Stage 1 172 172 - 309 309 - - - - Stage 2 310 312 - 176 191 - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - Pot Cap-1 Maneuver 495 483 885 492 473 780 1397 - - Stage 1 830 756 - 701 660 - - - - Stage 2 700 658 - 826 742 - - - - Platoon blocked, % -- Mov Cap-1 Maneuver 484 470 885 478 461 780 1397 - - Mov Cap-2 Maneuver 484 470 - 478 461 - - - - Stage 1 813 752 - 686 646 - - - - Stage 2 683 644 - 814 738 - - - - Approach EB WB NB HCM Control Delay, s 11.4 11.1 0.7 HCM LOS B B Minor Lane/Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR Capacity (veh/h) 1397 - - 588 593 1302 - - HCM Lane V/C Ratio 0.018 - - 0.036 0.008 0.005 - - HCM Control Delay (s) 7.6 0 - 11.4 11.1 7.8 0 - HCM Lane LOS A A - BBAA- HCM 95th %tile Q(veh) 0.1 - - 0.1 0 0 - - HCM 2010 TWSC Short Total AM 9: Mason & Site Access Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Intersection Int Delay, s/veh Movement SBL SBT SBR Vol, veh/h 5 120 32 Conflicting Peds, #/hr 0 0 0 Sign Control Free Free Free RT Channelized - - None Storage Length - - - Veh in Median Storage, # - 0 - Grade, % - 0 - Peak Hour Factor 85 85 85 Heavy Vehicles, % 2 2 2 Mvmt Flow 6 141 38 Major/Minor Major2 Conflicting Flow All 262 0 0 Stage 1 - - - Stage 2 - - - Critical Hdwy 4.12 - - Critical Hdwy Stg 1 - - - Critical Hdwy Stg 2 - - - Follow-up Hdwy 2.218 - - Pot Cap-1 Maneuver 1302 - - Stage 1 - - - Stage 2 - - - Platoon blocked, % - - Mov Cap-1 Maneuver 1302 - - Mov Cap-2 Maneuver - - - Stage 1 - - - Stage 2 - - - Approach SB HCM Control Delay, s 0.2 HCM LOS Minor Lane/Major Mvmt Lanes and Geometrics Short Total AM 9: Mason & Site Access Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.949 0.932 0.997 0.972 Flt Protected 0.970 0.976 0.996 0.998 Satd. Flow (prot) 0 1715 0 0 1694 0 0 1850 0 0 1807 0 Flt Permitted 0.970 0.976 0.996 0.998 Satd. Flow (perm) 0 1715 0 0 1694 0 0 1850 0 0 1807 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 108 117 401 75 Travel Time (s) 2.5 2.7 9.1 1.7 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total PM 9: Mason & Site Access Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Intersection Int Delay, s/veh 1.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR Vol, veh/h 35 0 23 5 0 6 16 320 4 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free RT Channelized - - None - - None - - None Storage Length - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - Peak Hour Factor 85 85 85 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 Mvmt Flow 41 0 27 6 0 7 19 376 5 Major/Minor Minor2 Minor1 Major1 Conflicting Flow All 884 883 455 894 894 379 468 0 0 Stage 1 464 464 - 416 416 - - - - Stage 2 420 419 - 478 478 - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - Pot Cap-1 Maneuver 266 285 605 262 280 668 1094 - - Stage 1 578 564 - 614 592 - - - - Stage 2 611 590 - 568 556 - - - - Platoon blocked, % -- Mov Cap-1 Maneuver 258 277 605 245 272 668 1094 - - Mov Cap-2 Maneuver 258 277 - 245 272 - - - - Stage 1 565 561 - 600 579 - - - - Stage 2 591 577 - 539 553 - - - - Approach EB WB NB HCM Control Delay, s 18.5 15 0.4 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR Capacity (veh/h) 1094 - - 334 374 1177 - - HCM Lane V/C Ratio 0.017 - - 0.204 0.035 0.004 - - HCM Control Delay (s) 8.3 0 - 18.5 15 8.1 0 - HCM Lane LOS A A - C C A A - HCM 95th %tile Q(veh) 0.1 - - 0.8 0.1 0 - - HCM 2010 TWSC Short Total PM 9: Mason & Site Access Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Intersection Int Delay, s/veh Movement SBL SBT SBR Vol, veh/h 4 375 23 Conflicting Peds, #/hr 0 0 0 Sign Control Free Free Free RT Channelized - - None Storage Length - - - Veh in Median Storage, # - 0 - Grade, % - 0 - Peak Hour Factor 85 85 85 Heavy Vehicles, % 2 2 2 Mvmt Flow 5 441 27 Major/Minor Major2 Conflicting Flow All 381 0 0 Stage 1 - - - Stage 2 - - - Critical Hdwy 4.12 - - Critical Hdwy Stg 1 - - - Critical Hdwy Stg 2 - - - Follow-up Hdwy 2.218 - - Pot Cap-1 Maneuver 1177 - - Stage 1 - - - Stage 2 - - - Platoon blocked, % - - Mov Cap-1 Maneuver 1177 - - Mov Cap-2 Maneuver - - - Stage 1 - - - Stage 2 - - - Approach SB HCM Control Delay, s 0.1 HCM LOS Minor Lane/Major Mvmt Lanes and Geometrics Short Total PM 9: Mason & Site Access Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.946 0.927 0.998 0.992 Flt Protected 0.971 0.977 0.998 0.999 Satd. Flow (prot) 0 1711 0 0 1687 0 0 1855 0 0 1846 0 Flt Permitted 0.971 0.977 0.998 0.999 Satd. Flow (perm) 0 1711 0 0 1687 0 0 1855 0 0 1846 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 78 124 437 59 Travel Time (s) 1.8 2.8 9.9 1.3 Intersection Summary Area Type: Other HCM 2010 Signalized Intersection Summary Short Total AM 112: Mason & Harmony Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 140 992 148 83 632 107 102 57 79 35 76 61 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 0.99 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 161 1140 121 95 726 87 117 66 4 40 87 37 Adj No. of Lanes 121121111110 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 222222222222 Cap, veh/h 495 2236 1000 357 2512 1123 241 362 304 289 241 103 Arrive On Green 0.63 0.63 0.63 0.10 1.00 1.00 0.19 0.19 0.19 0.19 0.19 0.19 Sat Flow, veh/h 669 3539 1582 1774 3539 1582 1262 1863 1564 1311 1242 528 Grp Volume(v), veh/h 161 1140 121 95 726 87 117 66 4 40 0 124 Grp Sat Flow(s),veh/h/ln 669 1770 1582 1774 1770 1582 1262 1863 1564 1311 0 1770 Q Serve(g_s), s 11.6 17.3 3.0 1.7 0.0 0.0 8.8 2.9 0.2 2.6 0.0 6.0 Cycle Q Clear(g_c), s 11.6 17.3 3.0 1.7 0.0 0.0 14.8 2.9 0.2 5.5 0.0 6.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.30 Lane Grp Cap(c), veh/h 495 2236 1000 357 2512 1123 241 362 304 289 0 344 V/C Ratio(X) 0.33 0.51 0.12 0.27 0.29 0.08 0.48 0.18 0.01 0.14 0.00 0.36 Avail Cap(c_a), veh/h 495 2236 1000 416 2512 1123 341 508 427 289 0 344 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.82 0.82 0.82 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 8.8 9.9 7.3 6.7 0.0 0.0 40.9 33.3 32.2 35.6 0.0 34.5 Incr Delay (d2), s/veh 1.7 0.8 0.2 0.3 0.2 0.1 1.5 0.2 0.0 0.2 0.0 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.3 8.7 1.4 0.8 0.1 0.0 3.2 1.5 0.1 1.0 0.0 3.0 LnGrp Delay(d),s/veh 10.6 10.7 7.5 7.1 0.2 0.1 42.4 33.5 32.2 35.8 0.0 35.2 LnGrp LOS BBAAAADCCD D Approach Vol, veh/h 1422 908 187 164 Approach Delay, s/veh 10.4 0.9 39.1 35.3 Approach LOS B A D D Timer 12345678 Assigned Phs 2 3 4 6 8 Phs Duration (G+Y+Rc), s 24.2 7.7 78.1 24.2 85.8 Change Period (Y+Rc), s * 6 4.0 5.5 6.0 * 5.5 Max Green Setting (Gmax), s * 9 7.0 61.5 26.0 * 60 Max Q Clear Time (g_c+I1), s 8.0 3.7 19.3 16.8 2.0 Green Ext Time (p_c), s 0.2 0.1 13.9 0.6 14.7 Intersection Summary HCM 2010 Ctrl Delay 10.7 HCM 2010 LOS B Notes * HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier. Timing Report, Sorted By Phase Short Total AM 112: Mason & Harmony Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st am.syn Phase Number 23468 Movement SBTL WBL EBTL NBTL WBTL Lead/Lag Lead Lag Lead-Lag Optimize Recall Mode None None C-Max None C-Max Maximum Split (s) 15 11 67 32 65 Maximum Split (%) 13.6% 10.0% 60.9% 29.1% 59.1% Minimum Split (s) 15 11 23.5 32 22 Yellow Time (s) 3 3 4 3.5 4 All-Red Time (s) 2 1 1.5 2.5 1 Minimum Initial (s) 4 4 10 7 10 Vehicle Extension (s) 33333 Minimum Gap (s) 33333 Time Before Reduce (s) 00000 Time To Reduce (s) 00000 Walk Time (s) 7 7 7 Flash Dont Walk (s) 11 19 10 Dual Entry Yes No Yes Yes Yes Inhibit Max Yes Yes Yes Yes Yes Start Time (s) 108.5 30.5 41.5 108.5 30.5 End Time (s) 30.5 41.5 108.5 30.5 108.5 Yield/Force Off (s) 25.5 37.5 103 24.5 103.5 Yield/Force Off 170(s) 25.5 37.5 92 5.5 93.5 Local Start Time (s) 5.5 37.5 48.5 5.5 37.5 Local Yield (s) 32.5 44.5 0 31.5 0.5 Local Yield 170(s) 32.5 44.5 99 12.5 100.5 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 75 Offset: 103 (94%), Referenced to phase 4:EBTL and 8:WBTL, Start of Yellow Splits and Phases: 112: Mason & Harmony HCM 2010 Signalized Intersection Summary Short Total PM 112: Mason & Harmony Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 156 964 209 131 1284 116 154 127 127 67 126 235 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 168 1037 151 141 1381 87 166 137 41 72 135 193 Adj No. of Lanes 121121111110 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 222222222222 Cap, veh/h 324 1698 759 300 1670 747 263 653 551 418 243 348 Arrive On Green 0.07 0.48 0.48 0.13 0.94 0.94 0.35 0.35 0.35 0.35 0.35 0.35 Sat Flow, veh/h 1774 3539 1582 1774 3539 1582 1048 1863 1572 1196 695 993 Grp Volume(v), veh/h 168 1037 151 141 1381 87 166 137 41 72 0 328 Grp Sat Flow(s),veh/h/ln 1774 1770 1582 1774 1770 1582 1048 1863 1572 1196 0 1688 Q Serve(g_s), s 5.7 25.8 6.6 4.9 11.9 0.4 18.2 6.2 2.1 5.4 0.0 18.8 Cycle Q Clear(g_c), s 5.7 25.8 6.6 4.9 11.9 0.4 37.0 6.2 2.1 11.6 0.0 18.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.59 Lane Grp Cap(c), veh/h 324 1698 759 300 1670 747 263 653 551 418 0 592 V/C Ratio(X) 0.52 0.61 0.20 0.47 0.83 0.12 0.63 0.21 0.07 0.17 0.00 0.55 Avail Cap(c_a), veh/h 357 1698 759 303 1670 747 263 653 551 418 0 592 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.09 0.09 0.09 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 14.8 22.9 17.9 16.3 2.1 1.8 46.3 27.3 25.9 31.3 0.0 31.4 Incr Delay (d2), s/veh 1.3 1.6 0.6 0.1 0.5 0.0 11.0 0.7 0.3 0.2 0.0 1.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.9 12.9 3.0 2.3 4.3 0.2 6.1 3.3 0.9 1.8 0.0 8.9 LnGrp Delay(d),s/veh 16.1 24.6 18.5 16.4 2.6 1.8 57.2 28.0 26.2 31.5 0.0 32.5 LnGrp LOS B C BBAAECCC C Approach Vol, veh/h 1356 1609 344 400 Approach Delay, s/veh 22.8 3.7 41.9 32.3 Approach LOS C A D C Timer 12345678 Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 47.0 10.8 62.2 47.0 11.8 61.2 Change Period (Y+Rc), s 6.0 4.0 5.5 6.0 4.0 * 5.5 Max Green Setting (Gmax), s 41.0 7.0 56.5 41.0 10.0 * 54 Max Q Clear Time (g_c+I1), s 20.8 6.9 27.8 39.0 7.7 13.9 Green Ext Time (p_c), s 4.2 0.0 15.4 0.9 0.1 17.8 Intersection Summary HCM 2010 Ctrl Delay 17.3 HCM 2010 LOS B Notes * HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier. Timing Report, Sorted By Phase Short Total PM 112: Mason & Harmony Pedersen Toyota Expansion 5/20/2014 Synchro 8 Light Report Delich Associates st pm.syn Phase Number 234678 Movement SBTL WBL EBTL NBTL EBL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None None C-Max Max None C-Max Maximum Split (s) 47 11 62 47 14 59 Maximum Split (%) 39.2% 9.2% 51.7% 39.2% 11.7% 49.2% Minimum Split (s) 15 11 23.5 32 11 22 Yellow Time (s) 3.5 3 4 3.5 3 4 All-Red Time (s) 2.5 1 1.5 2.5 1 1 Minimum Initial (s) 4 4 10 7 4 10 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 Flash Dont Walk (s) 11 19 10 Dual Entry Yes No Yes Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 108.5 35.5 46.5 108.5 35.5 49.5 End Time (s) 35.5 46.5 108.5 35.5 49.5 108.5 Yield/Force Off (s) 29.5 42.5 103 29.5 45.5 103.5 Yield/Force Off 170(s) 29.5 42.5 92 10.5 45.5 93.5 Local Start Time (s) 5.5 52.5 63.5 5.5 52.5 66.5 Local Yield (s) 46.5 59.5 0 46.5 62.5 0.5 Local Yield 170(s) 46.5 59.5 109 27.5 62.5 110.5 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 80 Offset: 103 (86%), Referenced to phase 4:EBTL and 8:WBTL, Start of Yellow Splits and Phases: 112: Mason & Harmony APPENDIX F Mason Trail Harmony Kensington College Mason SCALE: 1"=500' PEDESTRIAN INFLUENCE AREA DELICH ASSOCIATES Pedersen Toyota Expansion TIS, May 2014 Pedestrian LOS Worksheet Project Location Classification: Commercial Corridor Description of Applicable Destination Area Within 1320’ Destination Area Classification Level of Service (minimum based on project location classification) Directness Continuity Street Crossings Visual Interest & Amenities Security Commercial area to the north of the site Commercial Minimum B B C B B 1 Actual A B A B B Proposed A B A B B Commercial area to the east of the site Commercial Minimum B B C B B 2 Actual A B C B A Proposed A B C B A Commercial area to the south of the site Commercial Minimum B B C B B 3 Actual A B C B B Proposed A B C B B Mason Trail Recreational Minimum B B C B B 4 Actual B B B B B Proposed B B B B B Residential area to the west of the site Residential Minimum B B C B B 5 Actual B B B B B Proposed B B B B B Minimum 6 Actual Proposed Minimum 7 Actual Proposed Minimum 8 Actual Proposed Minimum 9 Actual Proposed Minimum 10 Actual Proposed Mason Trail Harmony Kensington College Mason SCALE: 1"=500' BICYCLE INFLUENCE AREA DELICH ASSOCIATES Pedersen Toyota Expansion TIS, May 2014 Bicycle LOS Worksheet Level of Service – Connectivity Minimum Actual Proposed Base Connectivity: C B B Specific connections to priority sites: Description of Applicable Destination Area Within 1320’ Destination Area Classification Commercial area to the north and east of the site 1 Commercial B B B Commercial area to the 2 south of the site Commercial B B B 3 Mason Trail Recreational B B B 4 SB APPROACH D C OVERALL B B DELICH Pedersen Toyota Expansion TIS, May 2014 ASSOCIATES Page 18 7/23 2/7 NOM 2/6 6/4 120/375 32/23 5/5 218/320 21/16 102/154 57/127 79/127 61/235 76/126 35/67 140/157 992/964 148/209 107/116 632/1284 83/131 83/131 Harmony 33/64 128/146 944/917 141/199 102/110 601/1222 79/125 944/917 141/199 102/110 601/1222 79/125 Harmony