HomeMy WebLinkAboutCITY OF FORT COLLINS UTILITIES CUSTOMER SERVICES BUILDING - PDP - PDP140005 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSJEFFERSON ST.
WILLOW ST.
LINDEN ST.
N. COLLEGE AVE.
E. LINCOLN AVE.
BUCKINGHAM ST.
E. VINE DR.
OLD TOWN BASIN
CACHE LA POUDRE BASIN
CACHE LA POUDRE BASIN
DRY CREEK BASIN
MOUNTAIN AVE.
E. MULBERRY ST
S. COLLEGE AVE.
LAPORTE AVE.
MAPLE AVE.
S. MASON AVE.
S. HOWES AVE.
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
R
APRIL 2014
UTILITY PLANS FOR
CONTACT INFORMATION
PROJECT TEAM:
Northern Engineering Services, Inc.
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
(970) 221-4158
Northern Engineering Services, Inc.
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
(970) 221-4158
I hereby affirm that these final
construction plans were prepared
under my direct supervision, in
accordance with all applicable City
of Fort Collins and State of
Colorado standards and statutes,
respectively; and that I am fully
responsible for the accuracy of all
design. revisions, and record
conditions that I have noted on
these plans.
These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility
by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness
of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities
required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort
Collins for additional quantities of items shown that may be required during the construction phase.
DISCLAIMER STATEMENT:
CERTIFICATION STATEMENT:
PROJECT
LOCATION
VICINITY MAP
NORTH
BENCHMARK #1:
City of Fort Collins Benchmark 1-13
A. GENERAL NOTES
1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the
Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and
the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the
City of Fort Collins.
2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise.
3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins
Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to
commencement of any work shown in these plans.
4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as
beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort
Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by
law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all
liabilities, claims, and demands which may arise from any errors and omissions contained in these plans.
5. All sanitary sewer, storm sewer, and water line construction, as well as power and other "dry" utility installations, shall conform to the City of
Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer.
6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the
responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing
new construction. The Developer shall be responsible for unknown underground utilities.
7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning
excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to
be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading.
It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these
plans.
8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for
any utility crossings required.
9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the
engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction.
10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is
accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance,
all parties affected by any disruption of any utility service as well as the utility companies.
11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility
provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility
provider, a pre-construction meeting may be required prior to commencement of any work.
12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and
sanitary sewer should be constructed prior to installation of the water lines and dry utilities.
13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the
Water Utility.
14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is
discharged into a storm sewer, channel, irrigation ditch or any waters of the United States.
15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department
of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan.
16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of
onsite drainage facilities shall be the responsibility of the property owner(s).
17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be
submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at
least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be
submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed
prior to certification per the Development Agreement.
18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater
seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as
a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development.
19. All recommendations of the Final Drainage Report for City of Fort Collins Utilities Customer Service Building - Fort Collins dated May 7,
2014 by Northern Engineering Services, Inc., shall be followed and implemented.
20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall
be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping.
21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and
debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.)
or as approved by the the City of Fort Collins street inspector.
22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction
OHE
OHE OHE
OHE OHE
OHE OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE OHE
OHE
OHE OHE OHE
OHE OHE OHE
OHE
ST
ST
ST ST
G
G
G
G G G
G
G G
G G
G G
G
G
G G
E
E
E
E
E E E E E E E E E E E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E E
E
E
E
E
E E
E
E E
E E
E E
W W W W W W W W W
W
W W W W W W
W W W W W W
W W W
W
LAPORTE AVENUE
(100' ROW)
HOWES STREET
(100' ROW)
EXISTING
215 N. MASON BUILDING
PROPOSED CUSTOMER
SERVICE BUILDING
EXISTING
214 N. HOWES BUILDING
EXISTING
BUTTERFLY
BLDG
6'
6'
PROPOSED SEAT WALL
(RE: LANDSCAPE
9.1' ARCHITECT - TYP.)
15'
12'
15'
6'
PROPOSED PERMEABLE
PAVER TERRACE
6'
10'
8'
10.5'
6' WIDE PROPOSED SIDEWALK'
8.5'
EXISTING STORM
INLETS (TYP.)
PROPOSED WALLED SERVICE ENCLOSURE
FOR MECHANICAL UNITS, DUMPSTER, AND
GENERATOR (RE: ARCHITECT)
PROPOSED GREEN WALL
(RE: ARCHITECT)
10' 10'
10'
11.75'
25.0'
PROPOSED PERMEABLE
PAVER TERRACE
PROPOSED
WATER QUALITY
CONTROL POND
6.0'
5.6'
25.0'
EXISTING SIDEWALK
PROPOSED SIDEWALK
PROPOSED SIDEWALK
PROPOSED SIDEWALK
HANDICAP
OHE
OHE
OHE
OHE
OHE
OHE
OHE OHE
OHE OHE OHE
ST ST
ST
ST
G
G
G
G G G
G
G
G G
G
G G
G G
G G
E
E
E
E
E E E E E E E E E E E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E E
E
E
E
E
E E
E
E E
E E
E E E E
T
T
T
T
T
T T
T T
ST ST
ST
ST
ST
ST
W
W
W
W
W
W
W
W
W
W
W W
W W W
W W W
W W
W W W W W W W
W W W W W W W W
W W
W W W W W W
W W
W
SEAT WALL
(RE: LANDSCAPE
ARCHITECT)
EXISTING STORM
INLETS (TYP.)
WALLED SERVICE ENCLOSURE FOR
MECHANICAL UNITS, DUMPSTER, AND
GENERATOR (RE: ARCHITECT)
GREEN WALL
(RE: ARCHITECT)
LAPORTE AVENUE
(100' ROW)
HOWES STREET
(100' ROW)
EXISTING
215 N. MASON BUILDING
EXISTING 25' WIDE ALLEY
PROPOSED CUSTOMER
SERVICE BUILDING
FF = 4985.50
EXISTING
214 N. HOWES BUILDING
EXISTING
BUTTERFLY
BLDG
EX FF = 4983.53
PROPOSED PERMEABLE
PAVER TERRACE
MATCH FL INTO
EXISTING STORM
SEWER INLET
APPROXIMATE LOCATION
OF 16' WIDE x5' HIGH
CONCRETE BOX CULVERT
PROPOSED PERMEABLE
ST ST
ST
ST
ST
ST
UD
UD
UD
UD UD UD UD
UD
UD
UD
UD
UD
UD
UD
UD
EXISTING STORM
INLETS (TYP.)
LAPORTE AVENUE
(100' ROW)
HOWES STREET
(100' ROW)
EXISTING
215 N. MASON BUILDING
EXISTING 25' WIDE ALLEY
PROPOSED CUSTOMER
SERVICE BUILDING
FF = 4985.50
EXISTING
214 N. HOWES BUILDING
EXISTING
BUTTERFLY
BLDG
EX FF = 4983.53
PROPOSED PERMEABLE
PAVER TERRACE
APPROXIMATE LOCATION
OF 16' WIDE x5' HIGH
PROPOSED PERMEABLE CONCRETE BOX CULVERT
PAVER TERRACE
PROPOSED PERMEABLE
PAVER TERRACE
EXISTING
RIGHT-OF-WAY
EXISTING
RIGHT-OF-WAY
EXISTING
RIGHT-OF-WAY
EXISTING 100-YR
CITY FLOODPLAIN
EXISTING 100-YR
CITY FLOODWAY
4984.1 100-YR FLOOD ELEVATION
(FT.COLLINS NGVD29)
1
2
OS2
1
2
OS1 OS2
EXISTING RIGHT-OF-WAY
FLOWLINE OF PROPOSED
BIOSWALE AT 0.4% SLOPE
PROPOSED UNDERDRAIN
PROPOSED WATER QUALITY
OUTLET STRUCTURE
WATER QUALITY
CONTROL POND
OS1
NORTH
Monday, April 14, 2014 10:17 AM
D:\Projects\940-002\Dwg\Drng\940-002_DRNG.dwg
Wegert Provencio
C500
DRAINAGE PLAN
CITY OF FORT COLLINS
222 Laporte Avenue
Fort Collins, CO 80524
UTILITIES CUSTOMER
SERVICE BUILDING
PROJECT DEVELOPMENT PLAN
1050 17th STREET,
SUITE A200
DENVER, CO 80265
303 295 1717 t
303 292 0845 f
DRAWN BY: CHECKED BY:
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
1 2 3 4 5 6 7 8 9 10 11 12 13 14
14 13 12 11 10 9 8 7 6 5 4 3 2 1
15
15
K K
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
R
2 Project Development Plan 05/07/14
ST
NOTES:
LEGEND:
A
B2
1.45 ac
UD
NOT FOR CONSTRUCTION
PAVER TERRACE
PROPOSED PERMEABLE
PAVER TERRACE
RAIN GARDEN
(RE: LANDSCAPE
ARCHITECT - TYP.)
SEAT WALL
(RE: LANDSCAPE
ARCHITECT)
PROPOSED TREE GRATE
(RE: LANDSCAPE
ARCHITECT - TYP.)
4984.1 100-YR FLOOD ELEVATION
(FT.COLLINS NGVD29)
ELEC
UD
UD
UD
UD UD UD UD
UD
UD
UD
UD
UD
UD
UD
UD
EXISTING 100-YR CITY FLOODPLAIN
EXISTING 100-YR CITY FLOODWAY
EXISTING
RIGHT-OF-WAY
EXISTING
RIGHT-OF-WAY
EXISTING
RIGHT-OF-WAY
EXISTING RIGHT-OF-WAY
PROPOSED ELECTRICAL
TRANSFORMER PAD
FLOWLINE OF PROPOSED
BIOSWALE AT 0.4% SLOPE
2' WIDE CONCRETE
CHASE WITH STEEL
WAFFLE PLATE
PROPOSED SWALE
@ 2% MINIMUM
CONNECT PROPOSED STORM
SEWER INTO EXISTING BOX
CULVERT
PROPOSED SWALE
@ 3.5% SLOPE
PROPOSED UNDERDRAIN
PROPOSED WATER QUALITY
OUTLET STRUCTURE
WATER QUALITY
CONTROL POND
NORTH
Monday, April 14, 2014 10:17 AM
D:\Projects\940-002\Dwg\Grad\940-002_GRAD.dwg
Wegert Provencio
C400
GRADING PLAN
CITY OF FORT COLLINS
222 Laporte Avenue
Fort Collins, CO 80524
UTILITIES CUSTOMER
SERVICE BUILDING
PROJECT DEVELOPMENT PLAN
1050 17th STREET,
SUITE A200
DENVER, CO 80265
303 295 1717 t
303 292 0845 f
DRAWN BY: CHECKED BY:
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
1 2 3 4 5 6 7 8 9 10 11 12 13 14
14 13 12 11 10 9 8 7 6 5 4 3 2 1
15
15
K K
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
R
2 Project Development Plan 05/07/14
ST
NOTES:
LEGEND:
NOT FOR CONSTRUCTION
UD
T
T
T
T
T
T
T T
T
T T
T
T
T T T
T
T
T
T
CTV
CTV
CTV
CTV
CTV CTV CTV CTV CTV CTV
CTV
CTV CTV
CTV
CTV
ST
ST
W
W
W
W
W
W
W
W
W
W
W W
W W W
W W W
W W
W W
W W W W W W W
W W W
W W W W W W
W W W W W W
W
W
LAPORTE AVENUE
(100' ROW)
HOWES STREET
(100' ROW)
EXISTING
215 N. MASON BUILDING
EXISTING 25' WIDE ALLEY
EX. 20' WIDE ALLEY
PROPOSED CUSTOMER
SERVICE BUILDING
EXISTING
214 N. HOWES BUILDING
EXISTING
BUTTERFLY
BLDG
INSTALL 8" PVC STORM SEWER
DRAIN TOWARDS RAIN GARDEN
INSTALL 4" PVC STORM SEWER
DRAIN TOWARDS RAIN GARDEN
CONNECT TO DOWNSPOUT
(RE: ARCHITECT)
CONNECT TO DOWNSPOUT
(RE: ARCHITECT)
TIE INTO EXISTING 12" WATER
MAIN WITH 12"x3" TAPPING
SADDLE AND THRUST BLOCK
INSTALL 3" WATER SERVICE AND CONNECT TO
BUILDING MECHANICAL SYSTEM (RE: MEP ENGINEER)
INSTALL 4" FIRE SERVICE AND CONNECT TO
BUILDING FIRE SYSTEM (RE: MEP ENGINEER)
INSTALL 6" PVC SANITARY SEWER SERVICE
AND CONNECT TO BUILDING SANITARY
SEWER SYSTEM (RE: MEP ENGINEER)
PROVIDE SPLASHBLOCK
AT DOWNSPOUT
(RE: ARCHITECT)
INSTALL ELECTRIC TRANSFORMER PER UTILITY
CITY OF FORT COLLINS ELECTRIC STANDARDS
AND REGULATIONS (SEE NOTE 17)
INSTALL ELECTRIC SERVICE TO BUILDING
PER CITY OF FORT COLLINS ELECTRIC
STANDARDS AND REGULATIONS
CO
F F F F F F F
W W W W W W
UGE
SS
SS
SS
CO
UGE UGE
UGE
ELEC
G
G
G
G G G G G
G
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UD
UD
UD
UD
UD
UD UD UD
T
T T
T T T
T
T
UD
UD
UD
UD
UD
UD
UD
INSTALL GAS SERVICE TO BUILDING PER UTILITY
COMPANY'S STANDARDS AND REGULATIONS
CONNECT TO EXISTING SANITARY
SEWER PER CITY OF FORT COLLINS
STANDARDS AND REGULATIONS
INSTALL CLEAN-OUT
EX 6" SANITARY SEWER
EX 8" SANITARY SEWER
PROVIDE SPLASHBLOCK
AT DOWNSPOUT
(RE: ARCHITECT)
EX 4" WATERLINE
EX 12" WATERLINE
(APPROXIMATE)
EX 6" SANITARY SEWER
EX 4" WATERLINE
EX 8" SANITARY SEWER
EX 8" SANITARY
SEWER
INSTALL 9'x7' VAULT AND WATER METER
,167$//%(1'
WITH THRUST BLOCK
WALLED SERVICE ENCLOSURE FOR MECHANICAL UNITS,
DUMPSTER, AND GENERATOR (RE: ARCHITECT)
EXISITNG SIDEWALK
PROPOSED SIDEWALK
PROPOSED SIDEWALK
PROPOSED SIDEWALK
PROPOSED
DRIVEWAY
PROPOSED SIDEWALK
PROPOSED SIDEWALK
INSTALL TELECOMMUNICATION SERVICE TO BUILDING
PER UTILITY COMPANY'S STANDARDS AND REGULATIONS
TIE INTO EXISTING 12" WATER
MAIN WITH 12"x4" TAPPING
SADDLE AND THRUST BLOCK
INSTALL CURB STOP
EXISTING SANITARY MH
RIM=4983.50
INV N=4975.12 (6")
INV W=4975.26 (6")
INV S=4975.10 (6")
APPROXIMATE LOCATION OF 16' WIDE
x5' HIGH CONCRETE BOX CULVERT
EXISTING STORM INLET
RIM=4979.10
INV N=4974.64
(BOX CULVERT)
PROVIDE NEW ELECTRIC SERVICE TO EXISTING
BUILDING PER CITY OF FORT COLLINS ELECTRIC
STANDARDS AND REGULATIONS
EXISTING TRAFFIC
SIGNAL AND
TRAFFIC VAULT
EXISTING
LIGHT POLE
EXISTING POWER POLE
EXISTING ELECTRIC VAULTS
STEPS
STEPS
STEPS
EXISTING ELECTRIC
BREAKER BOX
INSTALL CLEAN-OUT
PROPOSED
UNDERDRAIN
CONNECT PROPOSED UNDERDRAIN
INTO EXISTING BOX CULVERT
CONNECT TO EXISTING ELECTRIC
MAIN PER FORT COLLINS ELECTRIC
STANDARDS AND REGULATIONS
PROPOSED SWITCH GEAR
INSTALL BOLLARDS AT CORNERS
OF ELECTRIC SWITCH (TYP.)
CONNECT TO EXISTING GAS MAIN PER UTILITY
COMPANY'S STANDARDS AND REGULATIONS
CONNECT TO EXISTING TELEPHONE
MAIN PER UTILITY COMPANY'S
STANDARDS AND REGULATIONS
EXISTING 100-YR CITY
FLOODPLAIN
EXISTING 100-YR
CITY FLOODWAY
EXISTING
RIGHT-OF-WAY
EXISTING RIGHT-OF-WAY
EXISTING
RIGHT-OF-WAY
EXISTING RIGHT-OF-WAY
PROPOSED EMERGENCY
ACCESS ALIGNMENT
PROPOSED DRAINAGE
ALIGNMENT
PROPOSED DRAINAGE
ALIGNMENT
PROPOSED
DRAINAGE
ALIGNMENT
INSTALL STORM SEWER DRAIN TOWARDS
WATER QUALITY CONTROL POND
ENTRY PLAZA
CONNECT PROPOSED STORM
SEWER INTO EXISTING BOX
CULVERT
PROPOSED STONE TERRACE
(RE: LANDSCAPE ARCHITECT)
PROPOSED UNDERDRAIN
PROPOSED WATER QUALITY
OUTLET STRUCTURE
WATER QUALITY
CONTROL POND
NORTH
Monday, April 14, 2014 10:17 AM
D:\Projects\940-002\Dwg\Util\940-002_UTIL.dwg
Wegert Provencio
C300
UTILITY PLAN
CITY OF FORT COLLINS
222 Laporte Avenue
Fort Collins, CO 80524
UTILITIES CUSTOMER
SERVICE BUILDING
PROJECT DEVELOPMENT PLAN
1050 17th STREET,
SUITE A200
DENVER, CO 80265
303 295 1717 t
303 292 0845 f
DRAWN BY: CHECKED BY:
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
1 2 3 4 5 6 7 8 9 10 11 12 13 14
14 13 12 11 10 9 8 7 6 5 4 3 2 1
15
15
K K
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
R
NOTES: 2 Project Development Plan 05/07/14
LEGEND:
E
CTV
ST
SS
W
X
VAULT
ELEC
H
Y
D
FO
G
UGE UGE
G
SS
3" W
F
T
DRY UTILITY NOTES:
CO
T
UD
NOT FOR CONSTRUCTION
RAMP (TYP.)
EXISTING STORM
SEWER MANHOLE (TYP.)
RAIN GARDEN
(RE: LANDSCAPE
ARCHITECT - TYP.)
12' PROPOSED
DRIVEWAY
EXISTING SIDEWALK
122'
196'
1
:
1
(
6
(
6
:
10'
PROPOSED PERMEABLE
PAVER TERRACE
STEPS
STEPS
STEPS
PROPOSED TREE GRATE
(RE: LANDSCAPE
ARCHITECT - TYP.)
FL R = 10' FL R = 10'
FL R = 3'
FL R = 10'
FL R = 10'
FL R = 25'
FL R = 25'
5.0' 5.0'
10'
10'
PROPOSED CURB & GUTTER
PROPOSED CURB & GUTTER
EXISTING
20' WIDE
PUBLIC
ALLEY
PROPOSED CURB & GUTTER
PROPOSED ELECTRICAL
TRANSFORMER PAD
EXISTING
25' WIDE
PUBLIC
ALLEY
PROPOSED
CURB & GUTTER
5
5
5
5
5
3
3
1
1
3
1
23' TYP.
9' TYP.
8' TYP. 23' TYP.
23'
8'
8'
8'
PROPOSED
CURB & GUTTER MATCH INTO EXISTING
CURB & GUTTER
MATCH INTO EXISTING
CURB & GUTTER
MATCH INTO EXISTING
CURB & GUTTER
APPROXIMATE LOCATION
OF 16' WIDE x5' TALL
CONCRETE BOX CULVERT
PROPOSED WALK
MATCH INTO EXISTING
CURB & GUTTER
PROPOSED SIDEWALK
EXISTING 100-YR CITY
FLOODPLAIN
EXISTING 100-YR
CITY FLOODWAY
EXISTING
RIGHT-OF-WAY
EXISTING
RIGHT-OF-WAY
EXISTING
RIGHT-OF-WAY
EXISTING RIGHT-OF-WAY
BUILDING COLUMN
(RE: ARCHITECT)
FLOWLINE OF
PROPOSED BIOSWALE
PROPOSED EMERGENCY
ACCESS ALIGNMENT
PROPOSED
DRAINAGE
ALIGNMENT
PROPOSED
DRAINAGE
ALIGNMENT
PROPOSED
DRAINAGE
ALIGNMENT
PROPOSED CONCRETE
SIDEWALK CULVERT PROPOSED STONE TERRACE
(RE: LANDSCAPE ARCHITECT)
PROPOSED
BIKE RACK
(SEE NOTE 5)
FIELD SURVEY BY:
NORTH
Monday, April 14, 2014 10:17 AM
D:\Projects\940-002\Dwg\940-002_HZ Control.dwg
Wegert Provencio
C200
HORIZONTAL
CONTROL PLAN
CITY OF FORT COLLINS
222 Laporte Avenue
Fort Collins, CO 80524
UTILITIES CUSTOMER
SERVICE BUILDING
PROJECT DEVELOPMENT PLAN
1050 17th STREET,
SUITE A200
DENVER, CO 80265
303 295 1717 t
303 292 0845 f
DRAWN BY: CHECKED BY:
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
1 2 3 4 5 6 7 8 9 10 11 12 13 14
14 13 12 11 10 9 8 7 6 5 4 3 2 1
15
15
K K
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
R
2 Project Development Plan 05/07/14
LEGEND:
NOTES:
X
T
STRIPING AND SIGNAGE LEGEND:
1
2
3
4
5
NOT FOR CONSTRUCTION
E E
T
T
T
T
T T T
T T
T
T
T
T
T
T
T T T
T
T
T
T
T T T
T
T
T
T
CTV
CTV
CTV
CTV
CTV CTV CTV CTV CTV CTV
CTV
CTV CTV
CTV
CTV
ST
ST
W
W
W
W
W
W
W
W
W
W
W W
W W W
W W W
W W
W
X
X
X
X
X
X X
X
X
X
X
X X
X X X
/
/
/
/
/ / / / / / / /
/
/
/
/
/
/
/
/ / / / / / / /
/
/
/
/
/
/
/
/
/
/ / / / / / / /
/
/
/
/
/
/
/
/ / / / / / / /
/
/
/
/
/
/
/
/
/
/ / / / / / / /
/
/
/
/
/
/
/
/ / / / / / / / / /
/
/
/
/
/
/
/
/ /
/ / / / / / / / / / / /
/
/ / / / / / / /
/ / /
/
/ / /
/
/ / / / / / / / / / / /
/
/ / / / / / / / / / / /
/
/ / / / / / / / / / / /
/
/ / /
/
/ / / / / / /
/
/ / / / / /
/
/
/
/
/
/ / / / / /
/
/
/
/ / / / / / / /
/
/
/
/ / / / / / / / / /
/
/ / /
/ / / / / / / / / / / / / / /
/
/ / / / / /
/
/ / / / / / / / / / / /
/
/ / / / /
/
/ / / / / / / / / / / / / / /
/
/
/ / / / / / / / / / /
/
/ /
/
/
/ / /
/
/ / / / / / / / / / / / /
/ /
/
/ / / / / / / / /
/
/ / / / / /
/
/ /
/
/ /
/
/ /
/
/ / /
/
(100' ROW)
25-FT WIDE ALLEY
20-FT WIDE ALLEY
(100' ROW)
212 LAPORTE AVE.
215 N. MASON STREET
BUILDING
230 LAPORTE AVE.
208 N. HOWES STREET
222 LAPORTE AVE.
214 N. HOWES STREET
1-STORY BLOCK
AND STUCCO
EXISTING
SANITARY MH
RIM=4983.50
INV N=4975.12 (6")
INV W=4975.26 (6")
INV S=4975.10 (6")
PRESERVE
& PROTECT
BRICK WALL
1
:
DEMOLISH 1-STORY
BRICK BUILDING
3-STORY BRICK
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
PRESERVE & PROTECT
EXISTING TREE
1
(
LAPORTE AVENUE
HOWES STREET
1
(
6
(
6
:
DEMOLISH 1-STORY
BRICK BUILDING
PRESERVE & PROTECT 1
STORY BRICK BUILDING
REMOVE EXISTING CURB STOP AND
PLUG WATER SERVICE AT MAIN PER
CITY OF FORT COLLINS STANDARDS
AND REGULATIONS
DEMOLISH GATE
AND FENCE
REMOVE EXISTING CURB STOP AND PLUG
WATER SERVICE AT MAIN PER CITY OF FORT
COLLINS STANDARDS AND REGULATIONS
REMOVE OVERHEAD
ELECTRIC LINE
PRESERVE AND PROTECT POWER
POLE & OVERHEAD ELECTRIC LINE
DEMOLISH EXISTING
GUTTER, FLOWLINE , &
CONCRETE DRIVEWAY
PRESERVE & PROTECT EXISTING
TELECOMMUNICATIONS,
ELECTRIC, AND TV LINES
REMOVE ELECTRIC
METER AND SERVICE
REMOVE STRIPING
PRESERVE &
PROTECT TRAFFIC
SIGNAL & TRAFFIC
CONTROL VAULTS
PRESERVE &
PROTECT
STORM INLET
RIM=4982.09
INV W=4980.01
PRESERVE & PROTECT
TELECOMMUNICATIONS
PEDESTALS PRESERVE & PROTECT
ELECTRIC POLE & VAULTS
DEMOLISH
HANDICAP RAMP PRESERVE & PROTECT
HANDICAP RAMP
DEMOLISH
ASPHALT
DRIVEWAY
REMOVE "NO PARKING
ANYTIME" SIGN & SIGN POST REMOVE "NO PARKING
ANYTIME" SIGN & SIGN POST
REMOVE TREE
REMOVE EXISTING GAS
METER AND PLUG SERVICE
PER UTILITY COMPANY'S
STANDARDS & REGULATIONS
REMOVE TREE
REMOVE TREE
REMOVE CONCRETE CHASE
DEMOLISH
CONCRETE
DRIVEWAY
DEMOLISH
CONCRETE
DRIVEWAY
DEMOLISH CONCRETE DECK
DEMOLISH FENCE
DEMOLISH EXISTING
IRRIGATION SYSTEM
AND CONTROL BOXES
DEMOLISH EXISTING
IRRIGATION SYSTEM
AND CONTROL BOXES
REMOVE TREE
REMOVE TREE
DEMOLISH GATE
AND FENCE
DEMOLISH
ASPHALT CURB
REMOVE AC UNIT
DEMOLISH EXISTING IRRIGATION
SYSTEM AND CONTROL VALVES
DEMOLISH 1-STORY
WOOD BUILDING
DEMOLISH DECK
REMOVE OVERHEAD
ELECTRIC LINE
PRESERVE & PROTECT
EXISTING ELECTRIC BOX
PRESERVE & PROTECT
EXISTING ELECTRIC AND
GAS METERS & SERVICES
REMOVE "PEDESTRIAN
CROSSING" SIGN AND SIGN POST REMOVE 4" PVC ROOF DRAIN
PRESERVE AND
PROTECT TREE
PRESERVE AND PROTECT EXISTING
STORM INLETS TO BOX CULVERT
(RIM=4979.10, INV N=4974.64)
REMOVE WATER METER
REMOVE CONCRETE STEPS
REMOVE STEEL POLES AND
CHAIN LINK FENCE (TYP.)
DEMOLISH FENCE
PRESERVE & PROTECT EXISTING
TELECOMMUNICATIONS LINE
APPROXIMATE LOCATION
OF 16' WIDE x5' TALL
CONCRETE BOX CULVERT
PRESERVE AND
PROTECT TREE
DEMOLISH CONCRETE WALL
DEMOLISH CONCRETE
RAMP AND WALL
DEMOLISH WOOD WALL
REMOVE TREE
REMOVE GAS METER
REMOVE GAS SERVICE
REMOVE CURB
AND GUTTER
REMOVE CURB AND GUTTER
TREE PLANTER (TYP.)
DEMOLISH DECK
EXISTING 100-YR
CITY FLOODPLAIN
EXISTING 100-YR
CITY FLOODWAY
EXISTING
RIGHT-OF-WAY
EXISTING
RIGHT-OF-WAY
EXISTING
RIGHT-OF-WAY
EXISTING
RIGHT-OF-WAY
REMOVE EXISTING
TELEPHONE PEDESTAL
NORTH
Monday, April 14, 2014 10:17 AM
D:\Projects\940-002\Dwg\Exist\940-002_EXST.dwg
Wegert Provencio
C100
EXISTING CONDITIONS
& DEMOLITION PLAN
CITY OF FORT COLLINS
222 Laporte Avenue
Fort Collins, CO 80524
UTILITIES CUSTOMER
SERVICE BUILDING
PROJECT DEVELOPMENT PLAN
1050 17th STREET,
SUITE A200
DENVER, CO 80265
303 295 1717 t
303 292 0845 f
DRAWN BY: CHECKED BY:
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
1 2 3 4 5 6 7 8 9 10 11 12 13 14
14 13 12 11 10 9 8 7 6 5 4 3 2 1
15
15
K K
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
R
2 Project Development Plan 05/07/14
LEGEND:
CTV
FIELD SURVEY BY:
NOTES:
SS
W
X
VAULT
ELEC
H
Y
D
CONTROL
IRR
/ / / / / / / / / / / / / / / / / E / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / X / / / / / / / / / / / / / / / /
FO
G
T
ST
E
NOT FOR CONSTRUCTION
Permit is obtained, if applicable.
23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction.
The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control
Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all
public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the
Developer may commence work in the Engineer's absence. However, the City of Fort Collins reserves the right not to accept the
improvement if subsequent testing reveals an improper installation.
24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench
work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not
correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement
section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final
soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a
minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur
until the City of Fort Collins Engineer approves the final report.
25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter
flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must
certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be
noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets.
26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction.
For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be
stubbed to the property lines and marked so as to reduce the excavation necessary for building connections.
27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional
criteria for roads within these districts.
28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as
established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval.
29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any
tree removal requiring a permit.
30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and
security. Refer to OSHA Publication 2226, Excavating and Trenching.
31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The
the City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way.
The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities.
32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins
Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor
moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed.
33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the
Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing
traffic access to and from the Development.
34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site
construction activities on Sundays or holidays, unless there is prior written approval by the City of Fort Collins.
35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on
these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise.
36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer
for clarification, and annotate the dimension on the as-built record drawings.
37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and
specifications, and a copy of any permits and extension agreements needed for the job.
38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or
specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately.
39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available
to the City of Fort Collins Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of
Fort Collins Engineer.
40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (1) for the project as
well as the basis of bearings. The information shall be as follows:
BENCHMARK #1:
City of Fort Collins Benchmark 1-13 located at the southwest corner of College Avenue and Maple Street, on a concrete traffic signal base.
Elevation= 4976.58 (Fort Collins NGVD29 Unadjusted)
BASIS OF BEARING:
Basis of Bearings is the :HVWOLQHRI%ORFNEHDULQJ6
:
DVVXPHGEHDULQJ .
41. All stationing is based on centerline of roadways unless otherwise noted.
42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters,
landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored
in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements
and/or prior to the issuance of the first Certificate of Occupancy.
43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The
existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be
done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing
surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the
entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the
Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made.
44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before
construction, or to the grades and condition as required by these plans.
45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections.
46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and
workmanship defects for a minimum period of two years from the date of acceptance.
47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage
structures and pipes, for the following private streets: N.A.
48. Approved Variances are listed as follows:
- None
CONSTRUCTION NOTES
A. Grading and Erosion Control Notes
1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site.
2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans.
3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc).
All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the
approved project schedule, construction plans, and erosion control report.
4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the
property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining
all erosion control facilities shown herein.
5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be
limited to the area(s) required for immediate construction operations, and for the shortest practical period of time.
6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened
condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils
in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required
temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County.
7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall:
a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as
necessary in order to ensure the continued performance of their intended function.
b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control
inspector.
c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector.
8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment
and debris from all drainage infrastructure and other public facilities.
9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public
rights of way, and make sure streets and walkways are cleaned at the end of each working day.
10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not
to cause their release into any waters of the United States.
11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening,
watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched.
12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project
and before turning the maintenance over to the City/County or Homeowners Association (HOA).
13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any
pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete
truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are
necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and
federal regulations.
14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout
material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the
concrete washout material will be removed and properly disposed of prior to the area being restored.
15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement
whatever measures are determined necessary, as directed by the City.
B. Street Improvement Notes
1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed
here.
2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for
approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt).
The job mix shall be submitted for approval prior to placement of any asphalt.
3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing
edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean
construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins.
4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the
subgrade has been inspected and approved by the City of Fort Collins Engineer.
5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting
rings are not allowed.
6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The
existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in
conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The
determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with
adjacent landowners such that future projects do not cut the new asphalt overlay work.
7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement)
and as per the Right-of-Way Work Permit traffic control plan.
8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of
asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain
properly.
9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a
full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will
be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than
50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall
not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as
determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface.
The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence
of an Inspector.
C. Traffic Signing and Pavement Marking Construction Notes
1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking
Construction Notes listed here.
2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic.
3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD.
4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads.
5. All lane lines for concrete pavement should be epoxy paint.
6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and
placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of
striping and symbols.
7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards.
8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction.
9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings.
10. All sign posts shall utilize break-away assemblies and fasteners per the Standards.
11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer or their designate. All
discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin.
12. The Developer installing signs shall be responsible for locating and protecting all underground utilities.
13. Special care shall be taken in sign location to ensure an unobstructed view of each sign.
14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of
Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer
determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and
striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings).
15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail.
D. Storm Drainage Notes
1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of
onsite drainage facilities shall be the responsibility of the property owner(s).
2. All recommendations of the Final Drainage Report for City of Fort Collins Utilities Customer Service Building - Fort Collins dated May 7,
2014 by Northern Engineering Services, Inc., shall be followed and implemented.
3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by
submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at
least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by
submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed
prior to certification per the Development Agreement.
E. Utility Notes
1. All waterline and sanitary sewer construction shall conform to the Fort Collins Utility standards and specifications current to date of
construction.
2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the
water utility.
3. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire.
4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and
ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer
wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal box and tracer
wire test lid per City Water Detail 25.
Monday, April 14, 2014 10:17 AM
D:\Projects\940-002\Dwg\940-002_COVR.dwg
Wegert Provencio
C001
GENERAL &
CONSTRUCTION NOTES
CITY OF FORT COLLINS
222 Laporte Avenue
Fort Collins, CO 80524
UTILITIES CUSTOMER
SERVICE BUILDING
PROJECT DEVELOPMENT PLAN
1050 17th STREET,
SUITE A200
DENVER, CO 80265
303 295 1717 t
303 292 0845 f
DRAWN BY: CHECKED BY:
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
1 2 3 4 5 6 7 8 9 10 11 12 13 14
14 13 12 11 10 9 8 7 6 5 4 3 2 1
15
15
K K
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
R
2 Project Development Plan 05/07/14
NOT FOR CONSTRUCTION
Southwest corner of College Avenue and Maple Street, on a concrete traffic signal base.
Elevation= 4976.58 (Fort Collins NGVD29 Unadjusted)
Basis of Bearings
Basis of Bearings is the :HVWOLQHRI%ORFNEHDULQJ6
:
DVVXPHG
bearing).
Northern Engineering Services, Inc
NE Project No. 100-010
Date: February 2013
ORIGINAL FIELD SURVEY BY:
CTL Thompson
351 Linden Street, Suite 140
Fort Collins, Colorado 80524
(970) 206-9455
SUBSURFACE EXPLORATION BY:
PROJECT BENCHMARKS:
SHEET INDEX
BLOCK 32, CITY OF FORT COLLINS, LOCATED IN SECTION 11, TOWNSHIP 7 NORTH, RANGE 69
WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
C000 COVER SHEET
C001 GENERAL & CONSTRUCTION NOTES
SUBDIVISION PLAT (FOR REFERENCE ONLY)
C100 EXISTING CONDITIONS & DEMOLITION PLAN
C200 HORIZONTAL CONTROL PLAN
C300 UTILITY PLAN
C400 GRADING PLAN
GAS----------------- Xcel Energy----------------------------- Stephanie Rich (970) 225-7828 C500 DRAINAGE PLAN
ELECTRIC-------- City of Fort Collins Light & Power -- Doug Martine (970) 224-6152
CABLE------------- Xfinity-------------------------------------- Don Kapperman (970) 567-0245
TELECOM.--------Centurylink------------------------------- Robert Rulli (970) 490-7503
WATER------------ City of Fort Collins Utilities----------- Roger Buffington (970) 221-6854
WASTEWATER--City of Fort Collins Utilities----------- Roger Buffington (970) 221-6854
STORMWATER- City of Fort Collins Utilities----------- Glen Schlueter (970) 224-6065
UTILITY CONTACT LIST: *
UTILITY COMPANY
* This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for
the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for
locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of
Colorado (UNCC) at 811 for additional information.
PHONE NUMBER
** The underground utility locates provided by SiteWise are based upon the best available information at the
time of locating. Contractor acknowledges that it is common for underground facility owner maps to have errors
and omissions of data shown. Consequently, it is the Contractor's sole responsibility to field verify the location
of all utilities prior to construction, and notify the Engineer of any discrepancies found.
RNL Design
1050 17th Street, Suite A200
Denver, Colorado 80265
(303) 295-1717
City of Fort Collins
PO Box 580
Fort Collins, Colorado 80522
(970) 221-6804
Logan Simpson Design
123 North College Avenue, Suite 206
Fort Collins, Colorado
(970) 449-4100
Delich Associates
2272 Glen Haven Drive
Loveland, Colorado 80538
(970) 669-2061
SiteWise
7000 N. Broadway
Building 3, Suite 305
Denver, Colorado 80221
(303) 430-1414
Monday, April 14, 2014 10:17 AM
D:\Projects\940-002\Dwg\940-002_COVR.dwg
Wegert Provencio
C000
COVER SHEET
CITY OF FORT COLLINS
222 Laporte Avenue
Fort Collins, CO 80524
UTILITIES CUSTOMER
SERVICE BUILDING
PROJECT DEVELOPMENT PLAN
2
N O R T H E RN
N O R T H E RN
1050 17th STREET,
SUITE A200
DENVER, CO 80265
303 295 1717 t
303 292 0845 f
DRAWN BY: CHECKED BY:
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
1 2 3 4 5 6 7 8 9 10 11 12 13 14
14 13 12 11 10 9 8 7 6 5 4 3 2 1
15
15
K K
Project Development Plan 05/07/14
NOT FOR CONSTRUCTION