Loading...
HomeMy WebLinkAboutCAPSTONE COTTAGES - PDP - PDP140004 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTMay 7, 2014 PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR CAPSTONE COTTAGES Fort Collins, Colorado Prepared for: Capstone Collegiate Communities 431 Office Park Drive Birmingham, Alabama 35223 Prepared by: 200 South College Avenue, Suite 10 Fort Collins, Colorado 80524 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 939-001  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. May 7, 2014 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Preliminary Drainage and Erosion Control Report for CAPSTONE COTTAGES Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies the Project Development Plan submittal for the proposed Capstone Cottages development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Aaron Cvar, PE Project Engineer Capstone Cottages Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 2 C. Floodplain.......................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4 A. Major Basin Description .................................................................................................................... 4 III. DRAINAGE DESIGN CRITERIA ................................................................................... 5 A. Regulations........................................................................................................................................ 5 B. Four Step Process .............................................................................................................................. 5 C. Development Criteria Reference and Constraints ............................................................................ 5 D. Hydrological Criteria ......................................................................................................................... 6 E. Hydraulic Criteria .............................................................................................................................. 6 G. Modifications of Criteria ................................................................................................................... 6 IV. DRAINAGE FACILITY DESIGN .................................................................................... 6 A. General Concept ............................................................................................................................... 6 B. Specific Details .................................................................................................................................. 7 V. CONCLUSIONS ........................................................................................................ 8 A. Compliance with Standards .............................................................................................................. 8 B. Drainage Concept .............................................................................................................................. 8 References ....................................................................................................................... 10 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B - Water Quality Design Computations APPENDIX C – Stormwater Management Model (SWMM) APPENDIX D – Erosion Control Report Capstone Cottages Preliminary Drainage Report LIST OF TABLES AND FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2– Proposed Site Plan ................................................................................................ 3 Figure 3 – Existing Floodplains ............................................................................................. 4 MAP POCKET: Proposed Drainage Exhibit Capstone Cottages Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. The project site is located in the west half of Section 7, Township 6 North, Range 68 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado . 3. The project site is located just northeast of the intersection of Lemay Avenue and Lincoln Avenue. 4. The project site lies within the Dry Creek Basin. Detention requirements are to detain the difference between the 100-year developed inflow rate and the historic 2-year release rate. The historic release rate for this basin is 0.20 cfs per acre. 5. The Mulberry Street Walmart and the Buffalo Run Apartment complex exist just to the south of the site, on the south side of Lincoln Avenue. The San Criso residential development exists to the north of the site. The Sunward Condos development exists to the east of the site. The Lincoln Channel (Storm Drainage) runs along the southern boundary of the project site, and will be utilized as the storm outfall for the majority of Capstone Cottages Preliminary Drainage Report 2 developed site runoff. 6. No offsite flows enter the site from the north, south, or east. The Lincoln Channel conveys regional flows from the west; this channel conveys flows east along the southern boundary of the project site. B. Description of Property 1. The development area is roughly 28.33 net acres. Figure 1 – Aerial Photograph 2. The subject property is an undeveloped parcel with native ground cover. Existing ground slopes are mild to moderate (i.e., 1 - 6±%) through the interior of the property. General topography slopes from northwest to southeast. The Lincoln Channel, running along the southern boundary of the project site, collects the majority of historic site runoff. 3. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey website: http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx, the site consists of Caruso Clay Loam, Loveland Clay Loam, and Nunn Clay Loam, which all fall into Hydrologic Soil Group C. 4. The proposed project site plan is composed of residential and commercial development. Associated roadways, water and sewer lines will be constructed with Capstone Cottages Preliminary Drainage Report 3 the development. Onsite detention is proposed within the subgrade of a permeable paver system. The proposed paver system is to be located throughout the site, predominantly within proposed parking areas. This paver system is anticipated to meet or exceed the current City LID requirements. Figure 2– Proposed Site Plan 5. There are no known irrigation laterals crossing the site. 6. The proposed land use is residential and commercial. C. Floodplain 1. The project site is not encroached by any City or FEMA 100-year floodplain. The site Capstone Cottages Preliminary Drainage Report 4 is located within the 500-year floodplain of the Cache La Poudre Rive. Figure 3 –Area Floodplain Mapping II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 2. The project site lies within the Dry Creek Basin. Detention requirements are to detain the difference between the 100-year developed inflow rate and the historic 2-year release rate. The historic release rate for this basin is 0.20 cfs per acre. The site outfall is the existing Lincoln Channel, running along the southern boundary of the site. B. Sub-Basin Description 1. The subject property historically drains overland from northwest to southeast. Runoff from the majority of the site has historically been collected in the Lincoln Channel, running along the southern boundary of the site. The Lincoln Channel captures regional flows from the west and conveys these flows east. 2. A more detailed description of the project drainage patterns follows in Section IV.A.4., below. Capstone Cottages Preliminary Drainage Report 5 III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the proposed project. B. Four Step Process The overall stormwater management strategy employed with the proposed project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Conserving existing amenities in the site including the existing vegetated areas. Providing vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through vegetated swales to increase time of concentration, promote infiltration and provide initial water quality. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, urban development of this intensity will still generate stormwater runoff that will require additional BMPs and water quality. The majority of stormwater runoff from the site will ultimately be intercepted and treated using extended detention methods prior to exiting the site. Step 3 – Stabilize Drainageways There are no major drainageways within the subject property (the Lincoln Channel is located outside of the property boundary). While this step may not seem applicable to proposed development, the project indirectly helps achieve stabilized drainageways nonetheless. By providing water quality where none previously existed, sediment with erosion potential is removed from the downstream drainageway systems. Furthermore, this project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve City-wide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: Trash, waste products, etc. that were previously left exposed with the historic trailer park will no longer be allowed to exposure to runoff and transport to receiving drainageways. The proposed development will eliminate these sources of potential pollution. C. Development Criteria Reference and Constraints The subject property is surrounded by currently developed properties. Thus, several constraints have been identified during the course of this analysis that will impact the Capstone Cottages Preliminary Drainage Report 6 proposed drainage system including: Existing elevations along the property lines will generally be maintained. As previously mentioned, overall drainage patterns of the existing site will be maintained. Elevations of existing downstream facilities that the subject property will release to will be maintained. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the proposed development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. Three separate design storms have been utilized to address distinct drainage scenarios. A fourth design storm has also been computed for comparison purposes. The first design storm considered is the 80th percentile rain event, which has been employed to design the project’s water quality features. The second event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The third event considered is the “Major Storm,” which has a 100-year recurrence interval. The fourth storm computed, for comparison purposes only, is the 10-year event. 4. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property maintains historic drainage patterns. 2. All drainage facilities proposed with the project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated above, the subject property is not located in a City or FEMA regulatory floodplain. 4. The proposed project does not propose to modify any natural drainageways. F. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the project drainage design are to maintain existing drainage patterns, and to ensure no adverse impacts to any adjacent properties. 2. Onsite detention will be provided primarily within the subgrade of the proposed permeable pavement systems. Water quality capture volume for the purpose of water quality treatment conforming to extended detention criteria will also be provided Capstone Cottages Preliminary Drainage Report 7 within the subgrade of the proposed permeable pavement systems. Detention and water quality release rates will be controlled through sub-surface control structures. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. The drainage patterns anticipated for proposed drainage basins are described below. Basins 1-7 Basins 1 through 7 will generally drain via overland flow and curb and gutter flow into inlets and storm line systems within the project site. A series of permeable paver systems will be designed to both capture direct runoff and collect runoff from storm line systems. The permeable paver sub-grade material will be utilized for both water quality capture volume and detention volume. Please see further discussion of water quality and detention requirements in Section IV.B, below. Basin OS-1 Basin OS-1 consists of a portion of the proposed Duff Drive (0.58 acres). This basin will drain via street curb and gutter west into Lemay Avenue without detention or water quality treatment. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Specific Details 1. Standard water quality treatment in the form of Extended Detention is being is proposed within the permeable paver sub-grade material. A series of sub- grade detention release structures will be designed at Final in order to provide the required water quality capture volume and to maintain the required site release rate. 2. Quantity detention is a requirement for the site, and full quantity detention is proposed to be provided within the permeable paver sub-grade material. A series of sub-grade detention release structures will be designed at Final in order to provide the required water quality capture volume and to maintain the required site release rate. The current stipulation for release rate is 0.20 cfs per acre per the Dry Creek. The project site encompasses 28.33 acres, thus a release rate of 5.67 cfs for the overall site would be required by this criteria. However, based on discussion with City Stormwater staff, the release rate may be modified pending modeling currently under way comparing the current effective Dry Creek Basin SWMM model with updated conditions reflecting the current development. A total detention volume within the subgrade of the paver systems of 5.04 acre-feet has been estimated for preliminary purposes using the computer program EPA SWMM (please see Appendix C). A total water quality capture volume of 0.79 acre-feet has been estimated for preliminary purposes using standard extended (40-hour) detention design methodology. Water quality capture volume will be provided within the subgrade of the permeable paver systems. 3. LID features will be incorporated in the design of the overall site at Final design. The site plan currently shows the majority of LID measures proposed with the development plan as consisting of a very significant permeable paver Capstone Cottages Preliminary Drainage Report 8 system. Water quality and detention will be provided within the permeable paver system. This system will greatly enhance filtration of storm runoff, and will provide significant storm runoff infiltration. 4. Final design details, construction documentation, and Standard Operating Procedures (SOP) Manual shall be provided to the City of Fort Collins for review prior to Final Development Plan approval. A final copy of the approved SOP manual shall be provided to City and must be maintained on-site by the entity responsible for the facility maintenance. Annual reports must also be prepared and submitted to the City discussing the results of the maintenance program (i.e. inspection dates, inspection frequency, volume loss due to sedimentation, corrective actions taken, etc.). 5. Proper maintenance of the drainage facilities designed with the proposed development is a critical component of their ongoing performance and effectiveness. The water quality pond will be designed at Final to be easily accessed by maintenance staff via gentle slopes provided to the bottom of the pond. 6. The drainage features associated with the proposed project are all private facilities, located on private property. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the proposed project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with this project complies with requirements for the Dry Creek Basin. 3. The drainage plan and stormwater management measures proposed with the proposed development are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit any potential damage associated with its stormwater runoff by providing detention and water quality mitigation features. 2. The drainage concept for the proposed development is consistent with requirements for the Dry Creek Basin. Capstone Cottages Preliminary Drainage Report 9 References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: 939-001 Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: ATC Asphalt ……....……………...……….....…...……………….………………………………….. 0.95 100% Date: Concrete …….......……………….….……….………………..….……………………………… 0.95 90% Gravel ……….…………………….….…………………………..………………………………. 0.50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. 1 168878 3.88 Note: For preliminary calculations, Composite Runoff Coefficients are 0.55 0.55 0.69 45% 2 140314 3.22 based on Table RO-10. 0.55 0.55 0.69 45% 3 156373 3.59 Composite % Imperviousness has been estimated based 0.55 0.55 0.69 45% 4 98681 2.27 on UDFCD USDCM, Vol. I, Figures RO-3 and RO-4. 0.55 0.55 0.69 45% 5 179067 4.11 0.55 0.55 0.69 45% 6 225906 5.19 0.55 0.55 0.69 45% 7 110644 2.54 0.55 0.55 0.69 45% 8 38598 0.89 0.55 0.55 0.69 45% OS1 25432 0.58 0.55 0.55 0.69 45% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Overland Flow, Time of Concentration: Project: 939-001 Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc Rational Method Equation: Project: 939-001 Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: 1 1 3.88 12 12 10 0.55 0.55 0.69 2.09 3.57 7.88 4.5 7.6 21.0 2 2 3.22 13 13 11 0.55 0.55 0.69 2.02 3.45 7.57 3.6 6.1 16.8 3 3 3.59 15 15 14 0.55 0.55 0.69 1.90 3.24 6.82 3.7 6.4 16.8 4 4 2.27 11 11 10 0.55 0.55 0.69 2.13 3.63 7.88 2.7 4.5 12.3 5 5 4.11 12 12 10 0.55 0.55 0.69 2.09 3.57 7.88 4.7 8.1 22.3 6 6 5.19 12 12 10 0.55 0.55 0.69 2.05 3.50 7.72 5.8 10.0 27.5 7 7 2.54 9 9 7 0.55 0.55 0.69 2.30 3.93 8.80 3.2 5.5 15.4 8 8 0.89 8 8 7 0.55 0.55 0.69 2.40 4.10 9.06 1.2 2.0 5.5 OS1 OS1 0.58 7 7 6 0.55 0.55 0.69 2.52 4.31 9.63 0.8 1.4 3.9 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) ATC April 1, 2014 Q  C f  C i  A APPENDIX B WATER WAWAWATER QUALITY DESIGN COMPUTATIONS WATER QUALITY DESIGN CALCULATIONS Total Req'd Water Quality Capture Volume Project: 939-001 By: ATC Date: 4/1/14 REQUIRED STORAGE & OUTLET WORKS: BASIN AREA = 25.680 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 45.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.4500 <-- CALCULATED WQCV (watershed inches) = 0.193 <-- CALCULATED from Figure EDB-2 WQCV (ac-ft) = 0.413 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WQ Depth (ft) = ** <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = ** <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = ** <-- INPUT from Figure 5 n = ** <-- INPUT from Figure 5 t (in) = ** <-- INPUT from Figure 5 number of rows = ** <-- CALCULATED from WQ Depth and row spacing **To be completed at final design APPENDIX C STORMWATER MANAGEMENT MODEL (SWMM) EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.022) -------------------------------------------------------------- ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ NOV-21-2012 00:00:00 Ending Date .............. NOV-21-2012 06:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:15:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 30.00 sec ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 7.852 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 1.833 0.857 Surface Runoff ........... 5.965 2.787 Final Surface Storage .... 0.097 0.045 Continuity Error (%) ..... -0.544 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 5.965 1.944 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 0.462 0.151 Internal Outflow ......... 0.000 0.000 Storage Losses ........... 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 5.497 1.791 Continuity Error (%) ..... 0.094 ******************************** SWMM 5 Page 1 Highest Flow Instability Indexes ******************************** All links are stable. ************************* Routing Time Step Summary ************************* Minimum Time Step : 30.00 sec Average Time Step : 30.00 sec Maximum Time Step : 30.00 sec Percent in Steady State : 0.00 Average Iterations per Step : 1.08 *************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------------------------- Total Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Coeff Subcatchment in in in in in 10^6 gal CFS -------------------------------------------------------------------------------------------------------- overall 3.67 0.00 0.00 0.86 2.79 1.94 160.55 0.760 ****************** Node Depth Summary ****************** --------------------------------------------------------------------- Average Maximum Maximum Time of Max Depth Depth HGL Occurrence Node Type Feet Feet Feet days hr:min --------------------------------------------------------------------- MH JUNCTION 0.21 1.25 98.75 0 00:40 outlet_overall OUTFALL 0.00 0.00 96.00 0 00:00 pond3 STORAGE 4.36 5.02 102.02 0 02:27 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Lateral Total Time of Max Inflow Inflow Inflow Inflow Occurrence Volume Volume Node Type CFS CFS days hr:min 10^6 gal 10^6 gal ------------------------------------------------------------------------------------- MH JUNCTION 160.55 160.55 0 00:40 1.944 1.944 outlet_overall OUTFALL 0.00 1.00 0 00:36 0.000 0.151 pond3 STORAGE 0.00 161.80 0 00:40 0.000 1.942 ********************** Node Surcharge Summary ********************** No nodes were surcharged. SWMM 5 Page 2 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** Storage Volume Summary ********************** -------------------------------------------------------------------------------------------- Average Avg E&I Maximum Max Time of Max Maximum Volume Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------------- pond3 208.039 21 0 251.609 25 0 02:26 1.00 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg. Max. Total Freq. Flow Flow Volume Outfall Node Pcnt. CFS CFS 10^6 gal ----------------------------------------------------------- outlet_overall 97.23 0.96 1.00 0.151 ----------------------------------------------------------- System 97.23 0.96 1.00 0.151 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- 9 CONDUIT 161.80 0 00:40 28.56 0.03 0.12 out3 DUMMY 1.00 0 00:36 ************************* Conduit Surcharge Summary ************************* No conduits were surcharged. Analysis begun on: Mon May 05 14:08:42 2014 Analysis ended on: Mon May 05 14:08:42 2014 Total elapsed time: < 1 sec SWMM 5 Page 3 APPENDIX D EROSION CONTROL REPORT Capstone Cottages Preliminary Erosion Control Report EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on the Utility Plans. The Final Plans will contain a full-size Erosion Control sheet as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in the Development Agreement for the development. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, prior to any earth disturbance activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. MAP POCKET DRAINAGE EXHIBITS (min) 10-yr Tc (min) 100-yr Tc (min) 11No0.55 0.55 0.69 110 2.00% 8.6 8.6 6.4 320 0.75% 1.73 3.1 0 0.00% N/A N/A 12 12 10 22No0.55 0.55 0.69 110 2.00% 8.6 8.6 6.4 430 0.75% 1.73 4.1 0 0.00% N/A N/A 13 13 11 33No0.55 0.55 0.69 45 2.00% 5.5 5.5 4.1 980 0.75% 1.73 9.4 0 0.00% N/A N/A 15 15 14 44No0.55 0.55 0.69 65 2.00% 6.6 6.6 4.9 510 0.75% 1.73 4.9 0 0.00% N/A N/A 11 11 10 55No0.55 0.55 0.69 85 2.00% 7.5 7.5 5.6 420 0.75% 1.73 4.0 0 0.00% N/A N/A 12 12 10 66No0.55 0.55 0.69 125 2.00% 9.1 9.1 6.8 340 0.75% 1.73 3.3 0 0.00% N/A N/A 12 12 10 77No0.55 0.55 0.69 75 2.00% 7.1 7.1 5.3 210 0.75% 1.73 2.0 0 0.00% N/A N/A 9 9 7 88No0.55 0.55 0.69 65 2.00% 6.6 6.6 4.9 190 0.75% 1.73 1.8 0 0.00% N/A N/A 8 8 7 OS1 OS1 No 0.55 0.55 0.69 45 2.00% 5.5 5.5 4.1 170 0.75% 1.73 1.6 0 0.00% N/A N/A 7 7 6 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow ATC April 1, 2014 Time of Concentration (Equation RO-4)  3 1 1 . 87 1 . 1 * S Ti C Cf L   Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 April 1, 2014