Loading...
HomeMy WebLinkAboutUPTOWN PLAZA - FDP - FDP140010 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONS (9)FIRST FLOOR 40' - 3" ROOF 56' - 9" 29'-10 1/2" 22'-0" 22'-6" 22'-0" 8" 12" 8" 12" 8" 12" 8" 12" 29'-4" 29'-7" 29'-1 1/2" 10'-0" 8" 12" 3 14 20 13 15 25 15 13 FIRST FLOOR 40' - 3" ROOF 56' - 9" 22'-0" 29'-7" 29'-10 1/2" 10'-0" 8" 12" 8" 12" 8" 12" 8" 12" 8" 12" 29'-2 1/2" ? 15 3 8A3 ? 13 25 inc 2150 W. 29th AVE #110 Hillhouse Architects Inc. DENVER, CO 80211 Architects - Planners - CMa Checked By: Drawn By: Orig. Issue Date: Job No: Issued: 1453 1453 JH ARH Revisions: 04/04/2014 UPTOWN PLAZA FDP 1501 W. ELIZABETH ST. D.K. INVESTMENTS, INC - DEVELOPER MR. SAPAN KAPOOR, PRES. 04/04/2014 1 04/04/2014 EXTERIOR ELEVATIONS FDP-A4 FDP-A4 1/8" = 1'-0" 1 EAST ELEVATION FDP-A4 1/8" = 1'-0" 2 WEST ELEVATION 4 4 FDP-A4 3 PERSPECTIVE LOOKING NORTH WEST FROM PARKING LOT EXTERIOR MATERIAL LIST Mark Description 3 RAISED RIB METAL ROOFING 8A3 EIFS CORNICE COLOR A3 9B EIFS COLOR B 12 ALUMINUM STOREFRONT/WINDOW/DOOR 13 BRICK - RUNNING BOND 14 BRICK - SOLDIER COURSE 15 4x8x16 SPLIT FACE CMU 20 CERAMIC TILE 25 RETRACTABLE ROOF ACCESS LADDER NOTE: all signage will comply with the sign code. Signs shown are for location illustrative purposes only. Signs are not permitted with this application and require a separate sign permit; building-mounted and pole- mounted light fixtures will be shielded and down directional; mechanical units will be screened from view, meters and conduits attached to the wall will be painted to match the building color, and roof vents will be painted to match the roof