HomeMy WebLinkAboutBRINKMAN HEADQUARTERS - PDP/FDP - FDP130050 - REPORTS - ELEVATIONSPROJECT
LOCATION
141 S. Broadway, Suite 202
Denver, Colorado 80209
303 640 3173
open studio | architecture
COPYRIGHT
architect:
VICINITY MAP NTS
2013 open studio | architecture
contractor:
3003 E. Harmony Rd #300
Fort Collins, Colorado 80528
970 267 0954
structural engineer:
mechanical / plumbing engineers:
Brinkman Construction
19 Old Town Square, #238
Fort Collins, Colorado
80524
970 568 3355
Blake Larsen
Larsen Structural Design
electrical engineer:
owner:
3003 E. Harmony Rd #300
Fort Collins, Colorado 80528
970 267 0954
Brinkman Partners
landscape architect:
141 College Ave, #104
Fort Collins, Colorado 80524
970 484 8855
Paul Mills
Russell+Mills Studios
5587 W. 19th Street
Greeley, Colorado 80634
970 576 3260
Alicia Thorpe
AE Associates
9249 S. Broadway #200
Highlands Ranch,
Colorado 80129
303 287 8091
Chuck Polson
Adonai Professional
Services
civil engineer:
19 Old Town Square, #238
Fort Collins, Colorado 80524
970 419 4344
John Gooch
Aspen Engineers
2013-009
Harmony Technology Park
DESIGN DEVELOPMENT
JAN 24, 2014
Brinkman HQ
Brinkman HQ
DESIGN DEVELOPMENT
LEVEL 1
100'-0"
ROOF
128'-0"
LEVEL 2
114'-0"
F E D C B A
2'-0"
14'-0" 14'-0"
30'-0" 6'-0"
2'-0"
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 8'-0"
160'-0"
4
1
7
6 7
2
4
5
5
8
T.O. MECH
SCREEN
136'-0"
TYP.
TYP.
13
14
16
36'-0"
17
TYP.
LEVEL 1 CEILING
110'-0"
TYP.
6
TYP.
PARAPET
130'-0"
TYP.
LEVEL 1
100'-0"
ROOF
128'-0"
LEVEL 2
114'-0"
4 3 2 1
85'-0"
14'-0" 14'-0"
2'-0"
30'-0" 6'-0"
1
6
5
7
5
1
7
12
LEVEL 1
100'-0"
ROOF
128'-0"
LEVEL 2
114'-0"
1 2 3 4
2'-0"
14'-0" 14'-0"
30'-0" 6'-0"
6'-0" 40'-0" 40'-0" 40'-0" 3'-0"
129'-0"
14
1 4
2
7
5
6
5
8
T.O. MECH
SCREEN
136'-0"
TYP.
13
16
11
18 17
TYP.
36'-0"
2
TYP.
TYP.
LEVEL 1 CEILING
110'-0"
TYP.
PARAPET
130'-0"
LEVEL 1
100'-0"
ROOF
128'-0"
LEVEL 2
114'-0"
A B C D E F
8'-0" 30'-0" 30'-0" 28'-0"
2'-0"
10'-0" 20'-0" 30'-0"
2'-0"
96'-0" 64'-0"
2'-0"
14'-0" 14'-0"
30'-0" 6'-0"
5
4 2
12
7
2
9
9
5
1
8 10
6
4
T.O. MECH
SCREEN
136'-0"
13
TYP.
TYP.
TYP.
TYP.
TYP.
16 14
11
36'-0"
2
17
TYP.
TYP.
TYP.
8
TYP. @ VERTICALS
LEVEL 1 CEILING
110'-0"
PARAPET
130'-0"
LEVEL 1
100'-0"
ROOF
128'-0"
LEVEL 2
114'-0"
5
2
4
2'-0"
14'-0" 14'-0"
30'-0"
TYP.
TYP.
1'-0" 3'-10"
LEVEL 1 CEILING
110'-0"
PARAPET
130'-0"
LEVEL 1
100'-0"
ROOF
128'-0"
LEVEL 2
114'-0"
14'-0" 14'-0" 2'-0"
30'-0"
1
LEVEL 1 CEILING
110'-0"
PARAPET
130'-0"
11
1/8" = 1'-0"
2
SOUTH ELEVATION
1/8" = 1'-0"
1
WEST ELEVATION
KEYNOTES - BUILDING ELEVATIONS
1 METAL WALL PANEL "A"
2 METAL WALL PANEL "B"
4 BREAK METAL, FINISH TO MATCH WALL PANEL "A"
5 STOREFRONT A: KAWNEER TRIFAB 451T WITH 1" INSULATED
GLASS TYPE 1. BASIS OF DESIGN = GUARDIAN SUNGUARD
SN-68 ON CRYSTALGRAY OR VIRACON EQUIVALENT
6 STOREFRONT B: KAWNEER TRIFAB 451T WITH 1" INSULATED
GLASS TYPE 2. BASIS OF DESIN = GUARDIAN SUNGUARD
SN-50 ON CLEAR OR VIRACON EQUIVALENT
7 4 x 4 x 12 BRICK VENEER, STACK BOND
8 3 1/2" T-SHAPED MULLION CAP
9 CURTAIN WALL SYSTEM w/ 1" INSULATED GLASS TYPE 2.
BASIS OF DESIN = GUARDIAN SUNGUARD SN-50 ON CLEAR
OR VIRACON EQUIVALENT
10 1" INSULATED SPANDREL GLASS TYPE 3. BASIS OF DESIN =
GUARDIAN SUNGUARD SN-50 SPANDRAL OR VIRACON
EQUIVALENT
11 BREAK METAL, TO MATCH WALL PANEL "C"
12 12" DIAMETER, TWO PIECE PRE-FINISHED COLUMN COVER
13 THROUGH WALL LAMB’S TONGUE SCUPPER
14 MECHANICAL SCREEN WALL, METAL PANEL, COLOR TO
MATCH PANEL TYPE B
15 OVERHEAD COILING DOOR
16 PREFINISHED METAL COPING TO MATCH METAL PANELS
BELOW
17 CONTROL JOINT
18 HM DOOR
0' 8' 16' 24'
0' 8' 16' 24'
1/8" = 1'-0"
3
NORTH CANOPY ELEVATION
1/8" = 1'-0"
4
SOUTH CANOPY ELEVATION
141 S. Broadway, Suite 202
Denver, Colorado 80209
303 640 3173
open studio | architecture
scale:
drawn by:
checked by:
OSA project no.:
FOR PLANNING
PURPOSES ONLY
THIS DOCUMENT MAY BE
OBSOLETE AT ANY TIME AND
SHOULD IN NO WAY BE
CONSIDERED BINDING OR
VALID FOR ANY TYPE OF
CONSTRUCITON.
copyright: 2013 open studio | architecture
architect:
project:
sheet title:
date:
1
2
3
4
5
6
Rev. Iss. Description Date
1/8" = 1'-0"
1/24/2014 5:29:10 PM
A9.01
EXTERIOR ELEVATIONS
Brinkman HQ
BV
JT
2013-009
DESIGN DEVELOPMENT
Harmony Technology Park
JAN 24, 2014
Brinkman HQ
DESIGN DEVELOPMENT 12/25/2013
JAN 27,2014
LEVEL 1
100'-0"
ROOF
128'-0"
LEVEL 2
114'-0"
F E D C B A
2'-0"
14'-0" 14'-0"
30'-0" 6'-0"
2'-0"
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 8'-0"
160'-0"
4
1
7
6 7
2
4
5
5
8
T.O. MECH
SCREEN
136'-0"
TYP.
TYP.
13
14
16
36'-0"
17
TYP.
LEVEL 1 CEILING
110'-0"
TYP.
6
TYP.
PARAPET
130'-0"
TYP.
LEVEL 1
100'-0"
ROOF
128'-0"
LEVEL 2
114'-0"
4 3 2 1
85'-0"
14'-0" 14'-0"
2'-0"
30'-0" 6'-0"
1
6
5
7
5
1
7
12
2
4
2'-0" 40'-0" 40'-0"
2'-0"
5'-0" 39'-0"
T.O. MECH
SCREEN
136'-0"
TYP.
14
16
16
11
36'-0"
15
2
LEVEL 1 CEILING
110'-0"
PARAPET
130'-0"
17
TYP.
1/8" = 1'-0"
1
EAST ELEVATION
1/8" = 1'-0"
2
NORTH ELEVATION
0' 8' 16' 24'
0' 8' 16' 24'
KEYNOTES - BUILDING ELEVATIONS
1 METAL WALL PANEL "A"
2 METAL WALL PANEL "B"
4 BREAK METAL, FINISH TO MATCH WALL PANEL "A"
5 STOREFRONT A: KAWNEER TRIFAB 451T WITH 1" INSULATED
GLASS TYPE 1. BASIS OF DESIGN = GUARDIAN SUNGUARD
SN-68 ON CRYSTALGRAY OR VIRACON EQUIVALENT
6 STOREFRONT B: KAWNEER TRIFAB 451T WITH 1" INSULATED
GLASS TYPE 2. BASIS OF DESIGN = GUARDIAN SUNGUARD
AG-50 ON CLEAR OR VIRACON EQUIVALENT
7 4 x 4 x 12 BRICK VENEER, STACK BOND
8 3 1/2" T-SHAPED MULLION CAP
9 CURTAIN WALL SYSTEM w/ 1" INSULATED GLASS TYPE 2.
BASIS OF DESIGN = GUARDIAN SUNGUARD AG-50 ON CLEAR
OR VIRACON EQUIVALENT
10 1" INSULATED SPANDREL GLASS TYPE 3. BASIS OF DESIGN =
GUARDIAN SUNGUARD AG-50 SPANDRAL OR VIRACON
EQUIVALENT
11 BREAK METAL, TO MATCH WALL PANEL "C"
12 12" DIAMETER, TWO PIECE PRE-FINISHED COLUMN COVER
13 THROUGH WALL LAMB’S TONGUE SCUPPER
14 MECHANICAL SCREEN WALL, METAL PANEL, COLOR TO
MATCH PANEL TYPE B
15 OVERHEAD SECTIONAL DOOR
16 PREFINISHED METAL COPING TO MATCH METAL PANELS
BELOW
17 CONTROL JOINT
18 HM DOOR
141 S. Broadway, Suite 202
Denver, Colorado 80209
303 640 3173
open studio | architecture
scale:
drawn by:
checked by:
OSA project no.:
FOR PLANNING
PURPOSES ONLY
THIS DOCUMENT MAY BE
OBSOLETE AT ANY TIME AND
SHOULD IN NO WAY BE
CONSIDERED BINDING OR
VALID FOR ANY TYPE OF
CONSTRUCITON.
copyright: 2013 open studio | architecture
architect:
project:
sheet title:
date:
1
2
3
4
5
6
Rev. Iss. Description Date
1/8" = 1'-0"
1/27/2014 6:15:54 PM
A9.00
EXTERIOR ELEVATIONS
Brinkman HQ
BV
JT
2013-009
DESIGN DEVELOPMENT
Harmony Technology Park
JAN 24, 2014
Brinkman HQ
DESIGN DEVELOPMENT 12/25/2013
2
4
2'-0" 40'-0" 40'-0"
2'-0"
5'-0" 39'-0"
T.O. MECH
SCREEN
136'-0"
TYP.
14
16
16
11
36'-0"
15
2
LEVEL 1 CEILING
110'-0"
PARAPET
130'-0"
17
TYP.
1/8" = 1'-0"
1
EAST ELEVATION
1/8" = 1'-0"
2
NORTH ELEVATION
0' 8' 16' 24'
0' 8' 16' 24'
KEYNOTES - BUILDING ELEVATIONS
1 METAL WALL PANEL "A"
2 METAL WALL PANEL "B"
4 BREAK METAL, FINISH TO MATCH WALL PANEL "A"
5 STOREFRONT A: KAWNEER TRIFAB 451T WITH 1" INSULATED
GLASS TYPE 1. BASIS OF DESIGN = GUARDIAN SUNGUARD
SN-68 ON CRYSTALGRAY OR VIRACON EQUIVALENT
6 STOREFRONT B: KAWNEER TRIFAB 451T WITH 1" INSULATED
GLASS TYPE 2. BASIS OF DESIN = GUARDIAN SUNGUARD
SN-50 ON CLEAR OR VIRACON EQUIVALENT
7 4 x 4 x 12 BRICK VENEER, STACK BOND
8 3 1/2" T-SHAPED MULLION CAP
9 CURTAIN WALL SYSTEM w/ 1" INSULATED GLASS TYPE 2.
BASIS OF DESIN = GUARDIAN SUNGUARD SN-50 ON CLEAR
OR VIRACON EQUIVALENT
10 1" INSULATED SPANDREL GLASS TYPE 3. BASIS OF DESIN =
GUARDIAN SUNGUARD SN-50 SPANDRAL OR VIRACON
EQUIVALENT
11 BREAK METAL, TO MATCH WALL PANEL "C"
12 12" DIAMETER, TWO PIECE PRE-FINISHED COLUMN COVER
13 THROUGH WALL LAMB’S TONGUE SCUPPER
14 MECHANICAL SCREEN WALL, METAL PANEL, COLOR TO
MATCH PANEL TYPE B
15 OVERHEAD COILING DOOR
16 PREFINISHED METAL COPING TO MATCH METAL PANELS
BELOW
17 CONTROL JOINT
18 HM DOOR
141 S. Broadway, Suite 202
Denver, Colorado 80209
303 640 3173
open studio | architecture
scale:
drawn by:
checked by:
OSA project no.:
FOR PLANNING
PURPOSES ONLY
THIS DOCUMENT MAY BE
OBSOLETE AT ANY TIME AND
SHOULD IN NO WAY BE
CONSIDERED BINDING OR
VALID FOR ANY TYPE OF
CONSTRUCITON.
copyright: 2013 open studio | architecture
architect:
project:
sheet title:
date:
1
2
3
4
5
6
Rev. Iss. Description Date
1/8" = 1'-0"
1/24/2014 5:29:08 PM
A9.00
EXTERIOR ELEVATIONS
Brinkman HQ
BV
JT
2013-009
DESIGN DEVELOPMENT
Harmony Technology Park
JAN 24, 2014
Brinkman HQ
DESIGN DEVELOPMENT 12/25/2013
JAN 27,2014
LEVEL 1
100'-0"
ROOF
128'-0"
LEVEL 2
114'-0"
F E D C B A
2'-0"
14'-0" 14'-0"
30'-0" 6'-0"
2'-0"
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 8'-0"
160'-0"
4
1
7
6 7
2
4
5
5
8
T.O. MECH
SCREEN
136'-0"
TYP.
TYP.
13
14
16
36'-0"
17
TYP.
LEVEL 1 CEILING
110'-0"
TYP.
6
TYP.
PARAPET
130'-0"
TYP.
LEVEL 1
100'-0"
ROOF
128'-0"
LEVEL 2
114'-0"
4 3 2 1
85'-0"
14'-0" 14'-0"
2'-0"
30'-0" 6'-0"
1
6
5
7
5
1
7
12
2
4
2'-0" 40'-0" 40'-0"
2'-0"
5'-0" 39'-0"
T.O. MECH
SCREEN
136'-0"
TYP.
14
16
16
11
36'-0"
15
2
LEVEL 1 CEILING
110'-0"
PARAPET
130'-0"
17
TYP.
1/8" = 1'-0"
1
EAST ELEVATION
1/8" = 1'-0"
2
NORTH ELEVATION
0' 8' 16' 24'
0' 8' 16' 24'
KEYNOTES - BUILDING ELEVATIONS
1 METAL WALL PANEL "A"
2 METAL WALL PANEL "B"
4 BREAK METAL, FINISH TO MATCH WALL PANEL "A"
5 STOREFRONT A: KAWNEER TRIFAB 451T WITH 1" INSULATED
GLASS TYPE 1. BASIS OF DESIGN = GUARDIAN SUNGUARD
SN-68 ON CRYSTALGRAY OR VIRACON EQUIVALENT
6 STOREFRONT B: KAWNEER TRIFAB 451T WITH 1" INSULATED
GLASS TYPE 2. BASIS OF DESIGN = GUARDIAN SUNGUARD
AG-50 ON CLEAR OR VIRACON EQUIVALENT
7 4 x 4 x 12 BRICK VENEER, STACK BOND
8 3 1/2" T-SHAPED MULLION CAP
9 CURTAIN WALL SYSTEM w/ 1" INSULATED GLASS TYPE 2.
BASIS OF DESIGN = GUARDIAN SUNGUARD AG-50 ON CLEAR
OR VIRACON EQUIVALENT
10 1" INSULATED SPANDREL GLASS TYPE 3. BASIS OF DESIGN =
GUARDIAN SUNGUARD AG-50 SPANDRAL OR VIRACON
EQUIVALENT
11 BREAK METAL, TO MATCH WALL PANEL "C"
12 12" DIAMETER, TWO PIECE PRE-FINISHED COLUMN COVER
13 THROUGH WALL LAMB’S TONGUE SCUPPER
14 MECHANICAL SCREEN WALL, METAL PANEL, COLOR TO
MATCH PANEL TYPE B
15 OVERHEAD SECTIONAL DOOR
16 PREFINISHED METAL COPING TO MATCH METAL PANELS
BELOW
17 CONTROL JOINT
18 HM DOOR
141 S. Broadway, Suite 202
Denver, Colorado 80209
303 640 3173
open studio | architecture
scale:
drawn by:
checked by:
OSA project no.:
FOR PLANNING
PURPOSES ONLY
THIS DOCUMENT MAY BE
OBSOLETE AT ANY TIME AND
SHOULD IN NO WAY BE
CONSIDERED BINDING OR
VALID FOR ANY TYPE OF
CONSTRUCITON.
copyright: 2013 open studio | architecture
architect:
project:
sheet title:
date:
1
2
3
4
5
6
Rev. Iss. Description Date
1/8" = 1'-0"
1/27/2014 6:15:54 PM
A9.00
EXTERIOR ELEVATIONS
Brinkman HQ
BV
JT
2013-009
DESIGN DEVELOPMENT
Harmony Technology Park
JAN 24, 2014
Brinkman HQ
DESIGN DEVELOPMENT 12/25/2013
FDP JAN JAN 24, 27, 2014 2014
FDP