HomeMy WebLinkAbout217 W. TRILBY ROAD SUBDIVISION - PDP - PDP120006 - REPORTS - DRAINAGE REPORTPRELIMINARY DRAINAGE REPORT For: 217 West Trilby Road Fort Collins, CO 80526 Prepared For: AFFORDABLE ROOFING, LLC 217 West Trilby Road Fort Collins, CO 80526 April 24, 2014 Project No. 39685.01 Prepared By: JR Engineering, LLC 2900 South College Avenue, Suite 3D Fort Collins, CO 80525 Page i TABLE OF CONTENTS Table of Contents ....................................................................................................................... i Engineer’s Certification Block .................................................................................................... ii General Description and Location ..............................................................................................1 Location And Existing Site Characteristics ..............................................................................1 Site Soils ..................................................................................................................................1 Storm Drainage Criteria..............................................................................................................3 Hydrologic Criteria ..................................................................................................................3 Hydraulic Criteria ....................................................................................................................3 Drainage Basins, Historic and Proposed Runoff...........................................................................5 Historic Basins .........................................................................................................................5 Developed Basins ....................................................................................................................6 Proposed Water Quality/ Detention Facilities ...........................................................................7 Stormwater Pollution Prevention .................................................................................................9 Temporary Erosion Control......................................................................................................9 Permanent Erosion Control ......................................................................................................9 Summary & Conclusions .............................................................................................................9 Existing & Proposed Conditions ..............................................................................................9 References ................................................................................................................................ 11 Appendices ............................................................................................................................... 12 Site & Soil Descriptions and Characteristics ............................................................................1 Proposed Rational & Detention Pond Calculations ...................................................................2 Existing & Proposed Condition Specific Drainage Maps ..........................................................2 A-1 A-2 A-3 Page ii ENGINEER’S CERTIFICATION BLOCK I hereby certify that this Preliminary Drainage Report for 217 W Trilby, Fort Collins, CO 80526 was prepared by me (or under my direct supervision) for JR Engineering, LLC and the owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. ________________________________________ Timothy J. Halopoff, PE Registered Professional Engineer State of Colorado No. 37953 Page 1 GENERAL DESCRIPTION AND LOCATION LOCATION AND EXISTING SITE CHARACTERISTICS 217 W. Trilby is located in the NORTHEAST QUARTER OF SECTION 14, TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO. More specifically, 217 W. Trilby is a 2.485 ac. piece of property that is currently used as a residence and a large open yard, but is zoned LMN and will support office uses on the east & west side of the property once subdivided. The future use of the site (2.485 ac.) entails subdividing the existing lot into 4 lots and dedicating additional Trilby Right-of-Way (0.083 ac.). The existing residence will remain on the new Lot 1, consisting of 0.344 ac. There will also be 3 lots created for the purpose of constructing 3 office buildings complimented with garage spaces. Lot 2 (0.323 ac.), will be located on the east side of the North Louden Ditch and will support a new office development with a footprint of 3,750 s.f. The remainder of the property on the East side of the ditch will become Lot 3 (0.520 ac.) and will support an office containing another 3,750 s.f. footprint. On the west side of the North Louden Ditch/Drainage Swale will be Lot 4. Lot 4 consists of 1.215 ac. and will support an office structure with a garage in the back; having a foundation footprint of 6,000 s.f. The site generally slopes from the southwest to the northeast with slopes ranging between 2.8% and 11.0%. The property is generally covered with sparse native grasses. The North Louden Ditch traverses the property from the southeast corner to the northwest corner, flowing northwest and ultimately flowing into a corrugated metal pipe and crossing W. Trilby. The westerly portion of the property (proposed Lot 4) receives a small area of off-site flow (0.93 ac.) from the southwest and together with the on-site Lot 4 flows, accumulate a total area of 2.28 ac., which currently drains to two points on the ditch. On the east side of the ditch, which is where the residence is located, 0.78 ac. drains east to two existing sumps on the east property line. Ultimately, the historic flow from the residence and the major portion of the site east of the ditch, flow to the northeastern corner of the property and into the West Trilby Road right-of-way. The Southeast portion of the property, easterly Lots 2 and 3 drain to the north easterly neighboring property. The small portions of land on the extreme north of both sides of the ditch drain to the south roadside borrow ditch on Trilby. SITE SOILS The 217 West Trilby site consist of loams including: Fort Collins Loam, Thedalund Loam and Wiley Silt Loam. Fort Collins Loam (Classification #36), having 3-5% slopes, generally has a combined surface layer thickness of approx. 20 inches. Runoff is moderate, and the hazards of wind and water erosion are moderate. Thedalund Loam (Classification #108), having 3-9% slopes, occasionally has a surface layer of clay loam and small areas of Kim, Cushman, and Midway soils. Runoff is medium, and the hazard of erosion is moderate. Wiley Silt Loam (Classification #119), having 3-5% slopes, occasionally has a subsurface layer of silt loam or loam. Runoff is medium, and the hazard of erosion is medium. All of the loams on this site are classified as being in the Type B hydrologic group. According to USDA/Natural Resource Conservation Group, the earth on-site has a moderate infiltration rate when thoroughly wet. These soils consist chiefly of moderately deep or deep, moderately Page 2 well drained or well drained soils that have a moderately fine texture to moderately coarse texture. These soils also have a moderate rate of soils transmission. Supporting figures can be found in the Appendix, page A-1. Page 3 STORM DRAINAGE CRITERIA This preliminary report was prepared to meet or exceed the City of Fort Collins storm water criteria. The City of Fort Collin’s Storm Drainage Design Criteria and Construction Manual (with all current 2011 Revisions)(FCSDDCCM) and the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. HYDROLOGIC CRITERIA The rational method was performed to calculate the peak runoff rates for each basin. Weighted percent imperviousness and weighted runoff coefficients were calculated for each basin using USDCM Tables RO-3 and RO-5 based on Natural Resources Conservation Service (NRCS) Type B hydrologic soil classification and surface characteristics of each basin. The time of concentration was calculated using USDCM Equation RO-3 and the intensity was calculated using the corresponding storm rainfall depth and USDCM Equation RA-3. To account for the City of Fort Collins’ IDF Curve, Coefficient 3 of the UDFCD’s intensity formula was adjusted to 0.7867. The City of Fort Collins area has 2-yr 1-hr rainfall depth of 0.82 inches and a 100-yr 1- hr rainfall depth of 2.86 inches. These depths do account for the 1997 adjusted rainfall depths. HYDRAULIC CRITERIA The hydraulic calculations provided for in this report are limited to Detention Pond calculations. This report proves that the system of proposed detention ponds is able to reduce the 100-year developed condition flows to the 2-year historical release rates; thereby satisfying the City’s requirements. Once this Preliminary Report is accepted and approved, hydraulic calculations for storm drain pipe, water quality structures and rip-rap will be provided within the Final Drainage Report for 217 West Trilby. The ultimate 217 West Trilby storm drainage system will be designed to convey the minor and major storm events through the property with the proposed inlets, storm sewer pipes, and swales for the flows being calculated by this preliminary report. Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria and Construction Manual, all inlets and storm pipes will be designed to convey the 100-year storm flows. During the major storm event, the developed condition 100-yr storm, the accumulated water depth will be held to a maximum depth with a minimum of 1’ freeboard to the top of all building finished floors. Additionally, the detention ponds will be designed to detain all onsite flows and maintain 1’ of freeboard. This report shows that there are no changes to offsite flows, but in an effort to minimize the offsite flows passing through the site detention ponds 1 and 3 will detain a large majority of the flows. This will help to minimize damage and potential loss of life in the event of a storm equal to the 100-yr or greater. Page 4 All swale and pipe outlets will be protected with turf mat or riprap; whichever the City requires. Storm sewer pipe outlets will be protected using the requirements set by the USDCM for the protection of downstream conveyance channels and culverts. Page 5 DRAINAGE BASINS, HISTORIC AND PROPOSED RUNOFF HISTORIC BASINS 217 West Trilby is an infill development piece of property. As such, the existing and proposed drainage basins will need to follow the generally accepted principle of releasing the 100-yr developed condition storm flow at the same location and magnitude as the 2-yr. historic condition flow rate. There are offsite areas that flow across the proposed development site. Referring to the “Existing Drainage Plan” (Appx. - Sht. 1 of 2, included in the sleeve at back), the following describes the existing condition drainage basins. Existing Offsite Drainage Basins (OF): Sub-basin OF1 consists of 1.21 acres that flows northeasterly, across private property and the storm drainage travels on the south curb and gutter/southerly roadside ditch of Trilby Road. Along this path, the drainage from Sub-basin OF1 stays north of the subject development property in the existing condition. Sub-basin OF2 consists of 0.93 acres that flows easterly, across private property and enters the onsite development property at the southwest corner; where the flow is conveyed by Basin ON2 to the North Louden Ditch irrigation channel. Sub-basin OF3 consists of 2.48 acres that flows easterly, across private property and the storm drainage travels on the south curb and gutter/southerly roadside ditch of Trilby Road. Along this path, the drainage from Sub-basin OF3 stays north of the subject development property in the existing condition. Sub-basin OF4 consists of 0.56 acres that flows northeasterly, across private property and the drainage travels along the south side of the subject property. Along this path, the drainage from Sub-basin OF4 stays to the south of the subject development property and for this reason, is excluded from the hydraulic/detention pond calculations. Existing Onsite Drainage Basins (ON): Sub-basin ON1 consists of 0.43 acres that flows easterly, across the northwest ¼ of the development property, conveying flow from Sub-Basin OF1 and its own flow, making the total area flowing to the North Louden Ditch at the bottom of ON1 1.95 ac. Sub-basin ON2 consists of 0.92 acres that flows northeasterly, across the southwest ¼ of the development property, conveying flow from Sub-Basin OF2 and its own flow, making the total area flowing to the North Louden Ditch at the bottom of ON2 1.85 ac. Sub-basin ON3 consists of 0.55 acres that flows easterly, across the southeast ¼ of the development property. This Sub-basin drains to a sump area located midway of the easterly property line and flows directly to the neighboring property, where it makes its way back to Trilby’s south borrow ditch. Page 6 Sub-basin ON4 consists of 0.23 acres that flows easterly, across the northeast ¼ of the development property. This Sub-basin drains to a sump area located at the top of the easterly property line and flows directly to the neighboring property, where it makes its way to the south borrow ditch at Trilby. DEVELOPED BASINS The proposed developed condition sub-basins have been designed to mimic the historic basins, both on and off-site. The major difference between the proposed on-site sub-basins and the existing on-site sub-basins is that in the developed condition, all on-site flows west of the ditch, that historically flowed into the ditch, are routed through the detention pond system and conveyed to the northeast corner of the site. Furthermore, because we have been able to keep the off-site sub-basins nearly the same for the existing and proposed conditions, we were able to avoid re-calculating and reiterating the information provided for off-site in the prior section. Referring to the “Proposed Drainage Plan” (Appx. - Sht. 2 of 2, included in the sleeve at back), the following describes the proposed condition on-site drainage basins. Proposed Onsite Drainage Basins (ON): Sub-basin A1 consists of 0.07 acres and flows from the high point on the Lot 4 access drive. From there, flows are routed north to the inlet at design point 2 found on the east side of the Lot 4 access drive. Captured flows are piped to Detention Pond 2. Sub-basin A2 consists of 0.12 acres and flows from the high point on the bermed area east of the relocated North Louden Ditch and will flow directly into an area inlet in the rear of the existing building on Lot 1. Once the flows are captured by the area inlet at design point 3 they are piped to Detention Pond 5. Sub-basin A3 consists of 0.32 acres including the building on Lot 4 and flows from the back of curb where Sub-basin A1 enters the inlet at design point 2. From there, flows are routed to the southeast where it combines with the runoff from sub-basin A1 into Detention Pond 2. Once the storm flows reach Pond 2, they are detained using a water quality detention structure at design point 4. Then storm water is conveyed to Detention Pond 5, via storm pipe that passes under the newly aligned ditch and down the easterly common drive. Sub-basin A4 consists of 0.10 acres and flows from the high point on the Lot 2 access drive as well as the existing building on Lot 1. From there, flows are routed north to the inlet at design point 5 found on the east side of the Lot 2 access drive. Once the flows are captured by the inlet they are piped to Detention Pond 5. Sub-basin A5 consists of 0.06 acres and is made up of the area used for Detention Pond 5. From there, flows are routed northeast to the water quality/ detention structure at design point 6. Once the flows are detained by the structure, they are piped to design point 10 where the flows are combined with flows from Sub-basins B1&2. Page 7 Sub-basin B1 consists of 0.52 acres and flows from the pick-up point where Off-site Sub-basin OF2 enters the site in the southwest. From there, flows are routed down the back of the parking lot retaining wall in a trickle pan. The trickle pan conveys flows to Detention Pond 3, behind the building on Lot 4. This detention pond utilizes retaining walls and provides adequate detention prior to conveying flows through storm pipe, under the newly aligned ditch and into Pond 4, on Lot 3. Sub-basin B2 consists of 0.70 acres and flows from the high points on the bermed areas east of the relocated North Louden Ditch and will flow directly into the new native/low water tolerant grassed Detention Pond 4 located in the rear of the proposed building on future Lot 3. Flows are routed down a trickle pan in Pond 4 and through the water quality/detention structure. Following the water quality/detention structure, the flows are routed down the easterly property boundary via a small concrete channel. PROPOSED WATER QUALITY/ DETENTION FACILITIES Water quality and detention will be provided with four on-site water quality/detention ponds and one off-site water quality/ detention pond. The detention pond release rates were calculated using the on-site 2-year historic flows and portions of the off-site 100-yr flows for contributing basins. See Appendix A3 for maps showing the on-site 2-year historic flows and off-site 100-yr historic flows. The modified Detention Pond Calculator “FAA12” (Fater, Judish & Li; 1998) was used to calculate the required detained storm water volume, to which the volume calculated for Water Quality, was then added. The additional storage found in Ponds 1 & 3 is used to minimize the off-site runoff from sub-basins OF1-3 and lowers the overall release rate of the entire site. See Table 1 below for pond sized and release rates. The weir sizes for each pond were calculated using the 100-year storm flows from both the historic off-site and developed on-site, which assumes that the outlet structure is completely clogged. All five detention ponds will be fitted with water quality structures to maximize on-site storage and to detain developed condition storm flows. Table 1 Detention Pond Values Detention Pond Storage Volume Required (acre-ft) Storage Volume Provided (acre-ft) 100-yr Max Inflow Rate (cfs) 100-yr Max Release Rate (cfs) 1 0 0.07 10.00 7.48 2 0.04 0.04 1.77 0.27 3 0.07 0.12 4.63 1.73 4 0.07 0.07 4.29 2.37 5 0.02 0.02 1.28 0.63 Proposed Water Quality/Detention Facilities: Pond 1 is an off-site water quality and detention pond located in the northwest corner of the site and collects flows from off-site basins OF1 and OF3. Pond 1 was not Page 8 required but 0.072 acre-feet is provided to detain some of the off-site flow coming through the north portion of the site, then releasing back to the Trilby Road Borrow Ditch. Pond 2 is an on-site water quality and detention pond located in the northern portion of Lot 4 and collects flows from sub-basins A1 and A3. This pond detains the 100-yr developed on-site flows and releases 0.27 cfs in the 100-year event. Flows released from Pond 2 are piped to Pond 5. The emergency weir overflow weir for Pond 2 flows into the North Louden Ditch. Pond 3 is an on-site water quality and detention pond located in the southern portion of Lot 4 and collects flows from sub-basins B1 and OF2. This pond detains the 100-yr developed on-site flows as well as the 100-yr historic off-site flows. Pond 3 releases 1.73 cfs in the 100-year event. Flows released from Pond 3 are piped to Pond 4. The emergency overflow weir from Pond 3 flows into the North Louden Ditch. Pond 4 is an on-site water quality and detention pond located in the southeastern corner of the site on Lot 3 and collects flows from sub-basin B2 as well as flows piped from Pond 3. This pond detains the 100-yr developed on-site flows in addition to the flows piped from Pond 3. Pond 4 releases 2.37 cfs in the 100-year event. Flows released from Pond 4 are routed along the easterly property boundary via a small concrete channel to design point 10. The emergency overflow weir for Pond 4 flows east offsite. Pond 5 is an on-site water quality and detention pond located in the northeastern corner of the site on Lot 2 and collects flows from sub-basins A2, A4 and A5 as well as flows piped from Pond 2. This pond detains the 100-yr developed on-site flows in addition to the flows piped from Pond 2. Pond 5 releases 0.63 cfs in the 100-year event. Flows released from Pond 5 are piped to design point 10 where they combine with flows released from Pond 4. The emergency overflow weir for Pond 5 flows north into the right-of-way. Page 9 STORMWATER POLLUTION PREVENTION TEMPORARY EROSION CONTROL A temporary erosion control plan is to be implemented for the site during construction. Temporary erosion control measures include, but are not limited to, slope and swale protection, silt fence placed around downstream areas of disturbance, construction vehicle tracking pad at entrances, a designated concrete truck washout basin, designated vehicle fueling areas, inlet protection, etc. All temporary erosion control measures are to be removed after they are deemed unnecessary. PERMANENT EROSION CONTROL Permanent erosion control measures include, but are not limited to, the constructed detention/water quality ponds, riprap pads placed for culvert outlet protection, seeding and mulch placed to enable and established vegetative growth, etc. Long-term maintenance of these erosion control measures shall be the responsibility of the owner of the property. A general erosion control plan will be included with the Final Development Plan, Utility Plan set and in the appendix of the Final Development Plan Drainage Report. Ultimately before construction of this project, a more detailed Storm Water Management Plan (SWMP) will need to be performed per the storm drainage criteria requirements of the City of Fort Collins. SUMMARY & CONCLUSIONS To summarize the flow rates and detention pond characteristics, we have shown calculations per the City’s requirements for Preliminary Drainage reports in Appendix A-2, “Proposed Rational and Detention Pond Calculations”. To calculate on-site release rates, we calculated the 2-year historic on-site flows for contributing basins (1.49 cfs). The 2-year historic on-site flows west of the ditch were then reduced by actual area developed. By combining these reduced 2-year historic on-site flows we get the total allowable site release rate (1.23 cfs). We then used the modified Detention Pond Calculator “FAA12” (Fater, Judish & Li; 1998) to calculate the required detained storm water volume, to which the volume calculated for Water Quality, was then added. A SWMM model was also created to ensure that the detention pond volumes were fully utilized. The weir size was calculated using the 100-year storm flows from both the historic off-site and developed on-site, which assumes that the outlet structure is completely clogged. All five detention ponds will be fitted with water quality structures to maximize on-site storage and to detain developed condition storm flows to a flow rate below the allowable release rate of 14.63 cfs which includes 100-year runoff from off-site basins OF1-3 (13.40 cfs) and the 2-year historic allowable on-site runoff (1.23 cfs). EXISTING & PROPOSED CONDITIONS For the Existing & Proposed Condition Specific Drainage Map see Appendix A3. Sub basins outlined in green have storm runoff that flow into the right-of-way. Sub basins outlined in red Page 10 have storm runoff that flows into the north louden ditch. Sub basins outlined in blue have storm runoff that flows to property east of the site. The major differences between the existing condition and the proposed condition are as follows: 1. In the existing conditions offsite flow was allowed to flow along Trilby Road and into the row, now those same areas drain to Detention Pond 1 where they are reduced before being piped to the row. 2. In the existing conditions some offsite and onsite runoff was allowed to drain into the north louden ditch, now those same areas drain to Detention Pond 3 where the runoff is detained. From Pond 3 the runoff is reduced and piped under the ditch to Pond 4 where the flows are detained and reduced before being released to property east of the site. 3. In the existing condition the total runoff draining to the property east of the site was 11.54 cfs assuming 100-year storm runoff for off-site basins and historic 2-year runoff for on-site basins. In the proposed condition the total runoff draining to the property east of the site is 10.94 cfs which includes all additional runoff from sub basins OF2, A1, A3, and B1. This outfall reduction was accomplished by reducing on-site and off-site runoff during the 100-year storm. On-site runoff was reduced to 2-year historic rates by using the detention pond system. Off-site runoff was minimized by adding Detention Pond 1 which handles runoff from off-site basins OF1 & OF3, and oversizing Detention Pond 3 which handles runoff from off-site basin OF2. In conclusion, all of the City of Fort Collins hydrology calculations were performed using the required methods and all of the 217 Trilby Project drainage amenities, meet or exceed the necessary drainage feature requirements. Furthermore, this preliminary drainage report and the complimenting Overall Utility Plans show appropriate grading, permanent landscaping, riprap, and on-site construction facilities (e.g. storm pipes, inlets, etc.) that will be calculated hydraulically and discussed in the Final Drainage Report and on it’s accompanying Maps. Page 11 REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage and Flood Control District, June 2001. 2. Storm Drainage Criteria Manual and Construction Standards, City of Fort Collins Storm Water Utility, City of Fort Collins, Colorado, Updated January, 1997. 3. “Hydrologic Group Rating for Larimer County Area, Colorado”, USDA-Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov. [July 21, 2010] Page 12 APPENDICES Site & Soil Descriptions and Characteristics (A-1) Proposed Rational & Detention Pond Calculations (A-2) Existing & Proposed Condition Specific Drainage Map (A-3) Existing & Proposed Drainage Plans (Sleeve) SITE & SOIL DESCRIPTIONS AND CHARACTERISTICS PROPOSED RATIONAL & DETENTION POND CALCULATIONS Subdivision: Affordable Roofing Project Name: Affordable Roofing Location: User Defined Project No.: Calculated By: Joey Checked By: 0 Date: 3/24/14 A1 0.0666 95 0.07 95.0 5 0.00 0.0 42 0.00 0.0 95.0 A2 0.1240 95 0.00 0.0 5 0.12 5.0 42 0.00 0.0 5.0 A3 0.3164 95 0.16 48.6 5 0.15 2.4 42 0.00 0.0 51.0 A4 0.1038 95 0.10 88.7 5 0.01 0.3 42 0.00 0.0 89.0 A5 0.0590 95 0.01 16.1 5 0.05 4.2 42 0.00 0.0 20.3 B1 0.5225 95 0.30 54.9 5 0.22 2.1 42 0.00 0.0 57.0 B2 0.7027 95 0.46 61.6 5 0.25 1.8 42 0.00 0.0 63.4 OF1 1.2088 95 0.00 0.0 5 1.21 5.0 42 0.00 0.0 5.0 OF2 0.9300 95 0.00 0.0 5 0.93 5.0 42 0.00 0.0 5.0 OF3 2.1460 95 0.51 22.5 5 1.64 3.8 42 0.00 0.0 26.3 OF4 0.5200 95 0.00 0.0 5 0.52 5.0 42 0.00 0.0 5.0 OF5 0.0740 95 0.00 0.0 5 0.07 5.0 42 0.00 0.0 5.0 OF6 0.1998 95 0.10 47.6 6 0.10 3.0 42 0.00 0.0 50.6 OF7 0.0940 95 0.05 47.5 5 0.05 2.5 42 0.00 0.0 50.0 Area (ac) Weighted % Imp. Hardscape Landscaping Weighted % Imp. % Imp. Area (ac) 39685.01 COMPOSITE % IMPERVIOUS CALCULATIONS Weighted % Imp. Basins Total Weighted % Basin ID Total Area (ac) % Imp. Area (ac) Imp. Building % Imp. X:\3960000.all\3968500\Excel\Drainage\Drainage Calcs.xls Page 7 of 24 4/24/2014 Subdivision: Affordable Roofing Project Name: Affordable Roofing Location: User Defined Project No.: Calculated By: Joey Checked By: 0 Date: 3/24/14 FINAL BASIN D.A. Hydrologic Impervious C100 C2 C5 L S Ti L S Cv VEL. Tt COMP. Tc TOTAL Urbanized Tc Tc ID (AC) Soils Group (%) (FT) (%) (MIN) (FT) (%) (FPS) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) A1 0.07 B 95.0 0.88 0.79 0.81 25 2.0 2.1 100 1.0 20.0 2.0 0.8 2.9 125.0 10.7 5.0 A2 0.12 B 5.0 0.38 0.04 0.10 50 2.0 10.3 100 2.0 7.0 1.0 1.7 12.0 150.0 10.8 10.8 A3 0.32 B 51.0 0.53 0.30 0.36 50 2.0 7.6 65 2.0 7.0 1.0 1.1 8.7 115.0 10.6 8.7 A4 0.10 B 89.0 0.80 0.69 0.71 50 2.0 4.0 70 1.0 20.0 2.0 0.6 4.6 120.0 10.7 5.0 A5 0.06 B 20.3 0.44 0.12 0.20 25 2.0 6.5 50 2.0 10.0 1.4 0.6 7.1 75.0 10.4 7.1 B1 0.52 B 57.0 0.55 0.34 0.39 50 2.0 7.3 300 1.0 20.0 2.0 2.5 9.8 350.0 11.9 9.8 B2 0.70 B 63.4 0.58 0.39 0.44 90 2.0 9.1 265 1.0 20.0 2.0 2.2 11.3 355.0 12.0 11.3 OF1 1.21 B 5.0 0.38 0.04 0.10 50 2.0 10.3 450 2.0 7.0 1.0 7.6 17.9 500.0 12.8 12.8 OF2 0.93 B 5.0 0.38 0.04 0.10 50 2.0 10.3 350 2.0 7.0 1.0 5.9 16.2 400.0 12.2 12.2 OF3 2.15 B 26.3 0.46 0.15 0.23 50 2.0 8.9 900 2.0 7.0 1.0 15.2 24.1 950.0 15.3 15.3 OF4 0.52 B 5.0 0.38 0.04 0.10 50 2.0 10.3 450 2.0 7.0 1.0 7.6 17.9 500.0 12.8 12.8 OF5 0.07 B 5.0 0.38 0.04 0.10 50 2.0 10.3 265 2.0 7.0 1.0 4.5 14.7 315.0 11.8 11.8 OF6 0.20 B 50.6 0.53 0.30 0.35 20 2.0 4.9 195 2.0 7.0 1.0 3.3 8.2 215.0 11.2 8.2 OF7 0.09 B 50.0 0.52 0.29 0.35 20 2.0 4.9 120 2.0 7.0 1.0 2.0 6.9 140.0 10.8 6.9 OF8 0.34 B 5.0 0.38 0.04 0.10 50 20.0 4.8 320 1.5 15.0 1.8 2.9 7.7 370.0 12.1 7.7 NOTES: Ti = (0.395*(1.1 - C5)*(L)^0.5)/((S)^0.33), S in ft/ft Tt=L/60V (Velocity From Fig. 501) Velocity V=Cv*S^0.5, S in ft/ft Tc Check = 10+L/180 For Urbanized basins a minimum Tc of 5.0 minutes is required. For non-urbanized basins a minimum Tc of 10.0 minutes is required STANDARD FORM SF-2 TIME OF CONCENTRATION SUB-BASIN Tc CHECK 39685.01 DATA (URBANIZED BASINS) INITIAL/OVERLAND (Ti) TRAVEL TIME (Tt) X:\3960000.all\3968500\Excel\Drainage\Drainage Calcs.xls Page 8 of 24 4/24/2014 Project Name: Affordable Roofing Subdivision: Affordable Roofing Project No.: Location: User Defined Calculated By: Joey Design Storm: Checked By: 0 Date: TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS OF1 1.21 0.04 12.78 0.05 2.00 0.1 OF3 2.15 0.15 15.28 0.32 1.85 0.6 Combines OF1 & OF3 in basin OF1 Detention Pond 1 1 15.28 0.37 1.85 0.7 0.7 1.00 17 90 3.3 0.5 Captured by Sump and Piped to DP 9 2 A1 0.07 0.79 5.00 0.05 2.78 0.1 0.1 1.00 12 115 2.1 0.9 Captured by Sump and Piped to DP 4 3 A2 0.12 0.04 10.83 0.01 2.15 0.0 0.0 0.50 12 70 0.7 1.6 Captured by Sump and Piped to DP 5 A3 0.32 0.30 8.70 0.09 2.34 0.2 combines A1 with Basin A3 in Detention Pond 2 4 8.70 0.14 2.34 0.3 0.3 0.50 12 196 2.1 1.5 Captured by Sump and Piped to DP 5 A4 0.10 0.69 5.00 0.07 2.78 0.2 Combines pipe flows from DP 3 & 4 w/ basin A4 5 10.23 0.22 2.20 0.5 0.5 0.5 12 30 2.4 0.2 Captured by Sump and Piped to basin A5 Detention Pond 5 A5 0.06 0.12 7.13 0.01 2.51 0.0 Combines basin A5 w/ Pipe flows from DP5 6 10.44 0.23 2.18 0.5 0.5 0.50 12 33 2.5 0.2 Captured by Sump and Piped to DP 10 OF2 0.93 0.04 12.22 0.04 2.04 0.1 B1 0.52 0.34 9.80 0.18 2.24 0.4 Combines B1 & OF2 in basin B1 Detention Pond 3 7 12.22 0.22 2.04 0.4 0.4 0.50 12 90 2.4 0.6 Captured by Sump and Piped to DP 8 B2 0.70 0.39 11.31 0.27 2.11 0.6 Combines Basin B2 w/ pipe flows from DP7 8 12.86 0.49 2.00 1.0 1.0 0.50 19 275 2.8 1.6 Captured by Sump and Piped to DP 10 OF6 0.20 0.30 8.16 0.06 2.39 0.1 combines flows from Dp1 with Basin OF6 9 15.74 0.43 1.82 0.8 0.8 1.00 17 50 3.4 0.2 Captured by Sump and Piped to DP 10 OF7 0.09 0.29 6.89 0.03 2.53 0.1 10 16.0 1.18 1.81 2.1 Total DIRECT RUNOFF TOTAL RUNOFF STREET PIPE 3/24/14 STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Project Name: Affordable Roofing Subdivision: Affordable Roofing Project No.: Location: User Defined Calculated By: Joey Design Storm: Checked By: 0 Date: 3/24/14 TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS OF1 1.21 0.38 12.78 0.46 6.99 3.2 OF3 2.15 0.46 15.28 0.99 6.44 6.4 Combines OF1 & OF3 in basin OF1 Detention Pond 1 1 15.28 1.45 6.44 9.3 9.3 0.50 17 90 5.9 0.3 Captured by Sump and Piped to DP 9 2 A1 0.07 0.88 5.00 0.06 9.70 0.6 0.6 2.00 12 115 4.3 0.4 Captured by Sump and Piped to DP 4 3 A2 0.12 0.38 10.83 0.05 7.49 0.4 0.4 0.50 12 70 2.2 0.5 Captured by Sump and Piped to DP 5 A3 0.32 0.53 8.70 0.17 8.16 1.4 combines A1 with Basin A3 in Detention Pond 2 4 8.70 0.23 8.16 1.9 1.9 0.50 12 196 3.5 0.9 Captured by Sump and Piped to DP 5 A4 0.10 0.80 5.00 0.08 9.70 0.8 Combines pipe flows from DP 3 & 4 w/ basin A4 5 9.64 0.36 7.85 2.8 2.8 0.5 12 30 3.6 0.1 Captured by Sump and Piped to basin A5 Detention Pond 5 A5 0.06 0.44 7.13 0.03 8.74 0.3 Combines basin A5 w/ Pipe flows from DP5 6 9.78 0.39 7.81 3.0 3.0 0.50 12 33 3.9 0.1 Captured by Sump and Piped to DP 10 OF2 0.93 0.38 12.22 0.35 7.12 2.5 B1 0.52 0.55 9.80 0.29 7.80 2.3 Combines B1 & OF2 in basin B1 Detention Pond 3 7 12.22 0.64 7.12 4.6 4.6 0.50 12 90 5.8 0.3 Captured by Sump and Piped to DP 8 B2 0.70 0.58 11.31 0.41 7.36 3.0 Combines Basin B2 w/ pipe flows from DP7 8 12.48 1.05 7.06 7.4 7.4 0.50 19 275 4.9 0.9 Captured by Sump and Piped to DP 10 OF6 0.20 0.53 8.16 0.11 8.35 0.9 combines flows from Dp1 with Basin OF6 9 15.53 1.56 6.39 10.0 10.0 1.00 17 50 6.3 0.1 Captured by Sump and Piped to DP 10 OF7 0.09 0.52 6.89 0.05 8.83 0.4 10 15.7 3.05 6.36 19.4 Total 39685.01 PIPE STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Project Name: Affordable Roofing Subdivision: Affordable Roofing Project No.: Location: User Defined Calculated By: Joey Design Storm: Checked By: 0 Date: 3/24/14 TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS 39685.01 PIPE 100-Year DIRECT RUNOFF TOTAL RUNOFF STREET A1 0.07 0.88 5.00 0.06 9.70 0.6 A2 0.12 0.38 10.83 0.05 7.49 0.4 A3 0.32 0.53 8.70 0.17 8.16 1.4 A4 0.10 0.80 5.00 0.08 9.70 0.8 A5 0.06 0.44 7.13 0.03 8.74 0.3 B1 0.52 0.55 9.80 0.29 7.80 2.3 B2 0.70 0.58 11.31 0.41 7.36 3.0 OF1 1.21 0.38 12.78 0.46 6.99 3.2 OF2 0.93 0.38 12.22 0.35 7.12 2.5 OF3 2.15 0.46 15.28 0.99 6.44 6.4 OF4 0.52 0.38 12.78 0.20 6.99 1.4 OF5 0.07 0.38 11.75 0.03 7.24 0.2 OF6 0.20 0.53 8.16 0.11 8.35 0.9 OF7 0.09 0.52 6.89 0.05 8.83 0.4 OF8 0.34 0.38 7.68 0.13 8.53 1.1 X:\3960000.all\3968500\Excel\Drainage\Drainage Calcs.xls Page 11 of 24 4/24/2014 a 3 4 2 5 B 1 6 Pond3Outlet Pond4Outlet Pond2Outlet Pond5Outlet Pond1Outlet 8 3 4 2 5 9 1 6 OutfallB Pond3 Pond4 Pond2 Pond5 Pond1 01/01/2005 00:05:00 Affordable Roofing Subdivision Drainage System (04/24/2014) SWMM 5 Node Inflow Summary Maximum Maximum Lateral Total Flow Lateral Total Day of Hour of Inflow Inflow Balance Inflow Inflow Maximum Maximum Volume Volume Error Node Type CFS CFS Inflow Inflow 10^6 gal 10^6 gal Percent 1 JUNCTION 10.00 10.00 0 00:35 0.176 0.176 0.000 2 JUNCTION 1.77 1.77 0 00:30 0.0209 0.0209 0.000 3 JUNCTION 4.63 4.63 0 00:35 0.0857 0.0857 0.000 4 JUNCTION 3.02 3.02 0 00:35 0.0455 0.0455 0.000 5 JUNCTION 1.07 1.07 0 00:35 0.0167 0.0167 0.000 6 JUNCTION 1.49 1.49 0 00:30 0.0176 0.0176 0.000 8 JUNCTION 0.00 1.73 0 01:13 0 0.0857 0.000 9 JUNCTION 0.00 0.27 0 01:09 0 0.0209 0.000 OutfallB OUTFALL 0.00 10.94 0 00:48 0 0.362 0.000 Pond1 STORAGE 0.00 10.00 0 00:35 0 0.176 0.203 Pond2 STORAGE 0.00 1.77 0 00:30 0 0.0209 0.031 Pond3 STORAGE 0.00 4.63 0 00:35 0 0.0857 0.024 Pond4 STORAGE 0.00 4.29 0 00:35 0 0.131 0.073 Pond5 STORAGE 0.00 1.28 0 00:35 0 0.0376 0.234 Affordable Roofing Subdivision Drainage System (04/24/2014) SWMM 5 Node Pond1 Total Inflow (CFS) Node Pond2 Total Inflow (CFS) Node Pond3 Total Inflow (CFS) Node Pond4 Total Inflow (CFS) Node Pond5 Total Inflow (CFS) Elapsed Time (hours) 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 4 4.1 Total Inflow (CFS) 10.0 9.8 9.6 9.4 9.2 9.0 8.8 8.6 8.4 8.2 8.0 7.8 7.6 7.4 7.2 7.0 6.8 6.6 6.4 6.2 6.0 5.8 5.6 5.4 5.2 5.0 4.8 4.6 4.4 4.2 4.0 3.8 3.6 3.4 3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.8 1.6 1.4 1.2 1.0 0.8 0.6 0.4 0.2 0.0 Affordable Roofing Subdivision Drainage System (04/24/2014) SWMM 5 Storage Volume Summary Average Average Evap Infil Maximum Maximum Day of Hour of Storage Volume Percent Percent Percent Volume Percent Maximum Maximum Unit 1000 ft3 Full Loss Loss 1000 ft3 Full Volume Volume Pond1 0.410 13 0 0 3.064 99 0 00:50 Pond2 0.821 45 0 0 1.818 99 0 01:08 Pond3 1.558 30 0 0 5.071 99 0 01:12 Pond4 1.118 35 0 0 3.176 99 0 01:09 Pond5 0.331 31 0 0 1.059 99 0 01:06 Affordable Roofing Subdivision Drainage System (04/24/2014) SWMM 5 Storage Volume Summary Maximum Storage Outflow Unit CFS Pond1 7.48 Pond2 0.27 Pond3 1.73 Pond4 2.37 Pond5 0.63 Affordable Roofing Subdivision Drainage System (04/24/2014) SWMM 5 Node Pond1 Volume (ft3) Node Pond2 Volume (ft3) Node Pond3 Volume (ft3) Node Pond4 Volume (ft3) Node Pond5 Volume (ft3) Elapsed Time (hours) 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 4 4.1 Volume (ft3) 5100.0 5000.0 4900.0 4800.0 4700.0 4600.0 4500.0 4400.0 4300.0 4200.0 4100.0 4000.0 3900.0 3800.0 3700.0 3600.0 3500.0 3400.0 3300.0 3200.0 3100.0 3000.0 2900.0 2800.0 2700.0 2600.0 2500.0 2400.0 2300.0 2200.0 2100.0 2000.0 1900.0 1800.0 1700.0 1600.0 1500.0 1400.0 1300.0 1200.0 1100.0 1000.0 900.0 800.0 700.0 600.0 500.0 400.0 300.0 200.0 100.0 0.0 Affordable Roofing Subdivision Drainage System (04/24/2014) SWMM 5 EXISTING & PROPOSED CONDITION SPECIFIC DRAINAGE MAPS 100-Year DIRECT RUNOFF TOTAL RUNOFF STREET X:\3960000.all\3968500\Excel\Drainage\Drainage Calcs.xls Page 10 of 24 4/24/2014 2-Year 39685.01 X:\3960000.all\3968500\Excel\Drainage\Drainage Calcs.xls Page 9 of 24 4/24/2014