Loading...
HomeMy WebLinkAbout217 W. TRILBY ROAD SUBDIVISION - PDP - PDP120006 - SUBMITTAL DOCUMENTS - ROUND 3 - REVISIONSCommunity Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview April 23, 2014 Kenneth Merritt Landmark Engineering Ltd Fort Collins, CO 80525 Comment Summary: Department: Advance Planning Contact: Clark Mapes, 970-221-6225, cmapes@fcgov.com Topic: Building Elevations 04/09/2013: Elevations do not match plans - bldg. entries and garage doors are shown in differing locations. Comment Number: 11 Comment Originated: 04/09/2013 Topic: Landscape Plans 04/09/2013: Trees plantings around all buildings are required, particularly Lot 2. (Section 3.2.1(E)(1)) Comment Number: 12 Comment Originated: 04/09/2013 Contact: Timothy Wilder, 970-221-6756, twilder@fcgov.com Topic: Building Elevations 04/12/2013: Same comment. The character and image standards of 3.5.3(B)(1),(2),(3),(4),(6) apply, including site specific design, minimum wall articulation, facades, entrances, base and top treatments. 03/20/2012: 3.5.1 (B) Since the architectural character is not well-defined in this area, the project needs to set an enhanced standard of quality for future projects. The project does not appear to meet this standard because the buildings have limited architectural detailing. Comment Number: 5 Comment Originated: 03/20/2012 04/12/2013: Same comment. 03/20/2012: 3.5.3(D)(3) The primary entrances need to be clearly defined and recessed or framed by a sheltering element such as an awning, arcade or portico. Comment Number: 9 Comment Originated: 03/20/2012 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Rebecca Everette, at 970-416-2625 or reverette@fcgov.com. RE: 217 W Trilby Road Subdivision, PDP120006, Round Number 2 Page 1 of 16 04/12/2012: Same comment. 03/20/2012: 4.5(E)(2) Roof form - the buildings as proposed do not comply with the minimum roof pitch of 6:12. Also, an overhang for sloping roofs is required. (Section 3.5.3 (D)(6). Comment Number: 10 Comment Originated: 03/20/2012 04/11/2013: The City has building standards for commercial buildings in neighborhood settings. While this property is a transition from highway oriented land uses, Land Use Code standards applicable to this location address the scale, design, massing, and image of the buildings support human scale and predominantly residential neighborhood character as a first priority. (versus solely vehicular movement and access). As such, specific requirements are in Land Use Code sections 3.5.1, 3.5.3, and 4.5(E) (2). Prefabricated metal buildings would not typically meet these requirements, and need to be modified to do so in this case. While the Code states minimum requirements, it also generally encourages building design to set an enhanced level of quality for neighborhood development in this area. Comment Number: 13 Comment Originated: 04/11/2013 Topic: Landscape Plans 04/12/2013: The landscape area along the perimeter of the parking areas (west and east edges of the property) should be widened and planted with trees. In particular, a dense stand of trees and shrubs should be provided to screen the garage bays on Lot 4. Sections 3.2.1(E)(1) and 3.2.1(E)(6). Comment Number: 15 Comment Originated: 04/12/2013 04/12/2013: The parking lot areas for Lots 2/3 do not meet the standard for 6% landscaping of the interior space. According to our estimates, the parking area for Lots 2/3 would need approximately 500 square feet of landscaped area. 3.2.1(E)(5) and 3.2.2(M)(1). Comment Number: 16 Comment Originated: 04/12/2013 Topic: Site Plan 04/11/2013: For Lot 3, the walkway needs to be continuous and directly connected to the building entrance without a break in the walkway. Sections 3.2.2(C)(5)(a) and 3.5.3(B)(1). 03/20/2012: 3.5.3 (B)(1) The project does not comply with this standard. The buildings shall face and open directly onto a connecting walkway with pedestrian frontage. Comment Number: 7 Comment Originated: 03/20/2012 04/11/2013: The sidewalk for Lot 4 should be separated from the drive aisle in a manner that connects it directly to the pedestrian area adjoining Lot 4, rather than jogging around the parking in front of the building. Section 3.2.2(C)(5)(a). Comment Number: 14 Comment Originated: 04/11/2013 Department: Current Planning Contact: Steve Olt, 970-221-6341, solt@fcgov.com Topic: General Page 2 of 16 03/10/2013: Current Planning is still reviewing submittal documentation. Some comments will be made at staff review Wednesday morning, April 10, with department comments available in the "final" first round of review staff comment letter to be made available to the applicant by the end of the day Friday, April 12th. 03/20/2012: Current Planning is still reviewing the submittal documentation. Some comments will be made at staff review Wednesday morning, March 21st, with department comments available in the "final" first round of review staff comment letter to be made available to the applicant hopefully by the end of the day Friday, March 23rd. Comment Number: 1 Comment Originated: 03/20/2012 03/22/2012: Emma McArdle of Transfort has indicated that currently there are no bus routes on Trilby Road west of South College Avenue and none are anticipated. Comment Number: 3 Comment Originated: 03/22/2012 04/12/2013: Same comment. 03/22/2012: A copy of the letter, with comments, received from Terry Farrill of the Fort Collins Loveland Water District and the South Fort Collins Sanitation District is attached to this staff comment letter. Comment Number: 4 Comment Originated: 03/22/2012 04/10/2013: Another letter from Building Services, Plan Review, is attached to this staff comment letter. 03/22/2012: A copy of the standard letter from Building Services, Plan Review regarding a pre-submittal meeting and code requirements is attached to this staff comment letter. Comment Number: 5 Comment Originated: 03/22/2012 04/12/2013: Same comment. 03/22/2012: Don Kapperman of Comcast Cable TV indicated that Comcast needs a 6' utility easement on Lot 3 on the east side of the new entry drive up to the building from West Trilby Road. Comment Number: 6 Comment Originated: 03/22/2012 04/10/2013: Another round of development review is necessary to address previous and new staff comments on the revised site and landscaping plan provided after the first round of comments. 03/23/2012: Another round of development review is necessary; therefore, the item cannot yet be scheduled for the required Planning & Zoning Board public hearing. A copy of a Revision Routing Sheet is attached to the staff comment letter that shows the documents to be revised, the necessary modification of standard request, and the number of each document to submit. Comment Number: 19 Comment Originated: 03/23/2012 04/12/2013: Same comment. 03/23/2012: Please return all red-lined plans when the plan & document revisions are submitted for the second round of review. Comment Number: 22 Comment Originated: 03/23/2012 Topic: Landscape Plans 04/10/2103: Repeat comment. 03/23/2012: Any proposed phasing of the development plan must be shown on Sheet 3 of 8 of the Landscape Plans. This will help determine when installation or security of landscaping for each phase must occur. Comment Number: 18 Comment Originated: 03/23/2012 Topic: Site Plan Page 3 of 16 04/12/2013: Same comment. 03/22/2012: The existing and proposed contours should be removed from the Site Plan to help clean the plan up and make it more legible. The contours must remain on the Landscape Plan, however. Also, utilities could be removed from the Site Plan only. Comment Number: 8 Comment Originated: 03/22/2012 04/12/2013: Same comment. The access easement and location of future islands need to be shown on the site plan and subdivision plat. The east access from Trilby may need to be closed once the access to the recirculator is in place. 03/22/2012: An access/emergency access easement for possible future access from Lot 2 to a recirculation road to the east, as identified in the South College Avenue Access Control Plan, must be provided. The easement would be on the subdivision plat and shown in dashed form on the Site Plan. Comment Number: 9 Comment Originated: 03/22/2012 04/10/2013: The information regarding square footages on the Site Plan is still confusing. On Lots 2 & 3, the total of the office and garage equals 5,500 s.f., but the building is indicated as having 5,000 s.f. Also, the ground floor is indicated as 4,800 s.f. but the mezzanine is indicated as 1,000 s.f. Similarly, the square footages on Lot 4 do not appear to add up. 03/22/2012: The information on the Site Plan regarding new buildings square footages is confusing and difficult to determine what is what. Comment Number: 10 Comment Originated: 03/22/2012 Contact: Timothy Wilder, 970-221-6756, twilder@fcgov.com Topic: Landscape Plans 04/10/2013: The Site Plan indicates that "Existing Spruce Trees to Remain" along Trilby Road. However, the Landscape Plan indicates "Existing Trees to Remain". Please confirm which trees along Trilby will remain on both sets of plans. Comment Number: 23 Comment Originated: 04/12/2013 04/12/2013: I advise follow-up conversations with Lindsay Ex and the North Loudon Ditch and Reservoir Company to resolve issues with ditch landscaping and treatment. In particular, the ditch company objects to landscaping in its 70' easement. Comment Number: 24 Comment Originated: 04/12/2013 Department: Engineering Development Review Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com Topic: Construction Drawings 03/21/2012: Sheet 1 Revisit the benchmarks indicated on the cover as well as the descriptions listed in note 40 of the cover sheet. Comment Number: 8 Comment Originated: 03/21/2012 03/21/2012: Sheet 1 Update the title of the drainage and erosion control plan referenced in note 19 of the cover sheet. Comment Number: 9 Comment Originated: 03/21/2012 03/21/2012: Sheet 3 - Driveway cuts shall conform to the high volume driveway detail 707 which includes 24' driveway width for commercial and 20' curb return radii per 8.2.10 of LCUASS. Verify with Poudre Fire Authority that a radius larger than 20¿ is not required for access. Driveway must be concrete from the flowline of Trilby back to the right of way. Comment Number: 11 Comment Originated: 03/21/2012 Page 4 of 16 04/09/2013: The retaining walls have been modified since last submittal but a few of them are still in close proximity to adjacent properties. Additional detail will be required prior to hearing to ensure they can be constructed without agreement from adjacent property owners. Walls over 3 feet will be reviewed by building department with a building permit. Railing may be required for walls over 3' in height. 03/21/2012: Sheet 3 - Provide additional detail regarding the design and construction method of the retaining walls. It appears that the construction of these walls will require temporary grading/ construction easement from adjacent property owners in order to be built. Due to the height of these walls additional requirements may requested from the building department. Comment Number: 12 Comment Originated: 03/21/2012 04/09/2013: The vertical curve length for the sag at approximately sta. 13+00 needs to conform to the standards for design speed of 50 MPH. 03/21/2012: Sheet 6 - Revisit the vertical curve lengths for the Preliminary West Trilby Road Ultimate Plan and Profile. 2 lane arterials are to be designed using design speed of 50 mph which will lengthen the proposed vertical curve lengths and could alter the transition between the two sag curves. Comment Number: 15 Comment Originated: 03/21/2012 04/10/2013: The sidewalk along Trilby will need to be detached. It is understood that it is the applicant's desire to protect the existing trees so please work with staff to potentially run the sidewalk behind the existing trees. Streets department has also raised concerns with attached sidewalk along arterials for maintenance and snow removal. Comment Number: 25 Comment Originated: 04/10/2013 04/10/2013: During final submittal please separate the demolition, utility, horizontal control and erosion control into separate sheets. Comment Number: 26 Comment Originated: 04/10/2013 04/10/2013: Please add the standard City of Fort Collins street cut limits note to the utility sheet and show approximate limits. Comment Number: 27 Comment Originated: 04/10/2013 04/10/2013: Additional information is needed for the design of the proposed storm drainage connection underneath Trilby Road. Please provide design information such as a profile of the existing storm pipe and existing storm pipe to ensure it is meeting proper cover underneath the widened portion of Trilby. Comment Number: 28 Comment Originated: 04/10/2013 04/10/2013: Sheet 5 of 6 - Is the road side storm sewer shown on the south side of Trilby just west of the property intended to be temporary or permanent? Additional design information is requested for this storm pipe. Comment Number: 29 Comment Originated: 04/10/2013 04/10/2013: Please see redlines for additional comments. Comment Number: 30 Comment Originated: 04/10/2013 Topic: Traffic Impact Study 04/09/2013: Staff will discuss this week how the newly proposed site plan can accomodate for this requirement. 03/21/2012: The South College Avenue (US 287) access control plan designates a future recirculating access to be planned along the east property line of this property. The 217 west Trilby plans should accommodate for future access to this recirculating access from the parking lot in Lot 2 along with access easements to the east property line. Comment Number: 4 Comment Originated: 03/21/2012 Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com Page 5 of 16 Topic: General 03/28/2013: The building square footages changed with this submittal and the TDRFees changed. The project owes an additional $1,110.25 for the PDP application. Comment Number: 24 Comment Originated: 03/28/2013 Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General 04/03/2013: I need to begin with the following statement - this is the best first submittal of a Natural Habitat Buffer Zone I have ever seen - excellent work! The project's ECS was received digitally on March 8, 2013. The ECS describes the North Louden Ditch as being composed largely of non-native species (approx. 75% of the cover) including noxious weeds such as cheatgrass and Canada thistle. Of note are the few larger trees on the site, which have been used for roosting for raptors. All of the large trees, except for one blue spruce, will be preserved through the project. 03/15/2012: Based on the revised extent of the proposed development, an Ecological Characterization Study is required by Section 3.4.1 (D)(1) as the site is within 500 feet of a known natural habitat (Louden Ditch). Please note the buffer zone standard of 50' for irrigation ditches defined as wildlife corridors, as outlined in Section 3.4.1(E) of the Land Use Code. As the applicant is proposing to average the buffer, please address how the performance standards set forth in 3.4.1(E) (1) are addressed by this proposal. Staff has a few suggestions for how to meet these performance standards below. Comment Number: 1 Comment Originated: 03/15/2012 04/03/2013: I did not receive a lighting plan with the submittal - please provide this prior to hearing. (See Section 3.2.4(B)) 03/15/2012: Please provide a lighting plan in your next round of submttal. With respect to lighting, the City of Fort Collins Land Use Code, in Article 3.2.4(D)(6) requires that "natural areas and natural features shall be protected from light spillage from off-site sources." Thus, lighting from the parking areas or other site amenities shall not spill over to the buffer areas. Comment Number: 2 Comment Originated: 03/15/2012 Page 6 of 16 04/03/2013: The project has proposed an excellent treatment of native plantings to restore the value of the buffer zone and ditch as a wildlife corridor. The applicants are requesting to use smaller size planting materials, e.g., 1" caliper trees and 3 gallon shrubs, instead of the City's required sizes. I am supportive of this reduction as it provides additional plant materials, which, if planted and maintained correctly, will achieve similar bulk and values that the larger plant materials would have provided as soon as 4-6 years. However, an Alternative Compliance request will need to be submitted justifying the reduction in plant material sizes. 03/15/2012: In Section 3.4.1(E)(1)(g) of the Land Use Code, the City has the ability to determine if the existing landscaping within the buffer zone is incompatible with the purposes of the buffer zone. Please make sure your ECS reflects this performance standard. For example, the species selection in the buffer zone, such as the Scotch Pine and Austrian Pine, are not appropriate. In addition, there is little structural diversity proposed in this landscape plan, e.g., there are few shrubs to support the grass and tree layers. In addition, I found several seed mixes in the utility plans, but I need them on the landscape plans and more accurately labeled, e.g., GB2 on Sheet 3 of 6 in the Utility Plans references the "Prairie Grass" but I don't see that in this legend or on the landscape plan. Please clear this up. Also, please clarify that the seed mixes will be drill seeded or the rates may need to be adjusted. It would also be quite helpful if the units for seeding rates were the same (one is lb/1,000 sf and the other is PLS/LB/Acre). I am reviewing all of the proposed seed mixes to ensure the species and rates proposed are aligned with the performance standards set forth in 3.4.1(E)(1). I will also need the latin names of all of the plants proposed within this mix. Comment Number: 3 Comment Originated: 03/15/2012 04/03/2013: I don't see how this comment was addressed; we can discuss it further. 03/15/2012: Regarding the plan's grading, while it does meet the 4:1 grading standard, is there an opportunity to make the grading less formal and more naturalistic in the buffer zone? There is actually a bit of room to grade this property in a way that both benefits wildlife and meets the site's needs. Extending the grading out further into the buffer zone may conflict with wildlife if the existing vegetation is largely high quality. Please have the ECS address this comment, as this would help the project to meet the peformance standard outlined in Section 3.4.1(E)(1)(f) of the Code. Comment Number: 5 Comment Originated: 03/15/2012 04/03/2013: I see that the project is proposing 0.836 acres of buffer zone, but what was the area required by 50'? 03/15/2012: Please provide a calculation of the difference between the area required by the standard buffer (50' along both sides of the Louden Ditch) and what is being proposed by the development. Comment Number: 6 Comment Originated: 03/15/2012 04/03/2013: The buffer zone and top of bank lines will need to be labeled on the landscape plan. Also in the eastern portion of the buffer zone, the line appears to include the sidewalk around the parking area. It may make more sense to exclude this area. 03/15/2012: Please add the top of bank and buffer zone delineations to the landscape, plat, and construction plans. Please label this area as "Natural Habitat Buffer Zone" and add the following note to the site, landscape and utility plans: "Please see Section 3.4.1 of the Land Use Code for allowable uses within the Natural Habitat Buffer Zone." Comment Number: 7 Comment Originated: 03/15/2012 Page 7 of 16 04/03/2013: The plant symbols in the buffer zone seem more graphical than representative of the actual plant sizes in 10 years, as required by the Code. For example, American Plum is represented as being only 4' wide, but it can be between 10 and 12' wide in 10 years. These graphics should be updated. Comment Number: 9 Comment Originated: 04/03/2013 Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com Topic: Landscape Plans 03/26/2012: Forestry Comments The Following Comments are offered. 1. Existing tree should be identified as to species size and condition. 2. Will there be any widening of Trilby or other construction along Trilby that could impact the existing row of trees along the road. 3. Please add these tree protection standards found in 3.2.1 G 4. The Narrowleaf Cottonwood produces a lot of sucker growth so most developments prefer to use these native cottonwoods. Plains Cottonwood Populus sargentii Lanceleaf Cottonwood Populus acuminata. 5. What are the plans to provide an irrigation system to the proposed trees and shrubs? 6. Will there be any grading within the drip line of existing trees. If so review with the City Forester. 7. Scotch pine is susceptible to Mountain Pine Beetle. A good possible substitution would be Southwest White Pine. Comment Number: 1 Comment Originated: 03/26/2012 04/10/2013: Contact the City forester for an on-site meeting to review and evaluate existing trees on the site. Plans will need to provide locations, species, size, condition, remove or retain, and any mitigation. Grading within the drip line of existing trees needs to be minimized and can be reviewed at the on-site meeting. Comment Number: 2 Comment Originated: 04/10/2013 04/10/2013: Check that the plans provide minimum species diversity as directed in LUC 3.2.1 D. 3. Comment Number: 3 Comment Originated: 04/10/2013 Page 8 of 16 04/10/2013: On the native woody plant list Populus acuminata is Lanceleaf Cottonwood. Please use this common name. Comment Number: 4 Comment Originated: 04/10/2013 04/10/2013: Specify method of transplant for all trees (B&B or container) Comment Number: 5 Comment Originated: 04/10/2013 04/10/2013: Specify Tannebaum Mugo pine at 10 gallon 5 feet height, which is typically the largest available size. Comment Number: 6 Comment Originated: 04/10/2013 04/10/2013: Consider providing permanent automatic drip/ bubbler irrigation to trees and shrubs in non- irrigated grass areas. Comment Number: 7 Comment Originated: 04/10/2013 04/10/2013: New cottonwood trees are shown very close to the large cottonwood to retain. Place new trees an appropriate distance from this mature tree to allow for growth. Comment Number: 8 Comment Originated: 04/10/2013 04/10/2013: Consider using a few 2.0 inch caliper cottonwoods in the Prairie Wetlands area to provide for a more natural tree size variation. Comment Number: 9 Comment Originated: 04/10/2013 Page 9 of 16 04/10/2013: Please add these landscape notes. • The soil in all landscape areas, including parkways and medians, shall be thoroughly loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly incorporated into the soil of all landscape areas to a depth of at least six (6) inches by tilling, discing or other suitable method, at a rate of at least three (3) cubic yards of soil amendment per one thousand (1,000) square feet of landscape area. Do not cultivate within the drip line of existing trees. • A permit must be obtained from the City forester before any trees or shrubs as noted on this plan are planted, pruned or removed on the public right-of-way. This includes zones between the sidewalk and curb, medians and other city property. This permit shall approve the location and species to be planted. Failure to obtain this permit may result in replacing or relocating trees and a hold on certificate of occupancy. • The developer shall contact the City Forester to inspect all street tree plantings at the completion of each phase of the development. All trees need to have been installed as shown on the landscape plan. Approval of street tree planting is required before final approval of each phase. Failure to obtain approval by the City Forester for street trees in a phase shall result in a hold on certificate of occupancy for future phases of the development. Comment Number: 10 Comment Originated: 04/10/2013 Department: Light And Power Contact: Alan Rutz, 970-224-6153, arutz@fcgov.com Topic: General 03/20/2012: Electric development charges will apply for each lot as it is developed. Comment Number: 1 Comment Originated: 03/20/2012 03/20/2012: Coordinate transformer locations for each building and submit C-1 form with load requirements. Will three phase power be required? Comment Number: 2 Comment Originated: 03/20/2012 03/20/2012: System modification charges may apply along Trilby. Comment Number: 3 Comment Originated: 03/20/2012 Contact: Rob Irish, 970-224-6167, rirish@fcgov.com Topic: General 04/09/2013: Contact Light & Power Engineering @ 970-221-6700 with power needs. 3-phase power is not readily available at this site. The nearest 3-phase available is on the Northside of Trilby Rd. Comment Number: 5 Comment Originated: 04/09/2013 04/09/2013: A C-1 form and a one-line diagram will need to be submitted to Light & Power Engineering and transformer locations need to be coordinated within 10' of an all weather drive over surface. Comment Number: 6 Comment Originated: 04/09/2013 04/09/2013: The existing single-phase pad mount transformer will need to be relocated outside of the 10' parkway. Comment Number: 7 Comment Originated: 04/09/2013 Page 10 of 16 04/09/2013: Electric Capacity Fee and Building Site charges will apply along with any system modification charges necessary. Comment Number: 8 Comment Originated: 04/09/2013 Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General 04/10/2013: FIRE CONTAINMENT Buildings exceeding 5000 square feet shall be sprinklered or fire contained. If containment is used, the containment construction shall be reviewed and approved by the Poudre Fire Authority prior to installation. Comment Number: 3. Comment Originated: 04/10/2013 04/10/2013: WATER SUPPLY Hydrant spacing and flow must meet minimum requirements based on type of occupancy. COMMERCIAL REQUIREMENTS: Hydrants to provide 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers thereafter. 2006 International Fire Code 508.1 and Appendix B Currently, the proposed building on Lot 3 exceeds the allowable maximum distance to a hydrant. Comment Number: 4. Comment Originated: 04/10/2013 Contact: Ron Gonzales, 970-416-2864, rgonzales@poudre-fire.org Topic: General 03/20/2012: The entry drive aisles and turn arounds shall be platted by separate instrument as Emergency Access Easements. The fire lanes shall be identified on the property with signage or painting and stencilling of the curbs with "Fire Lane - No Parking" This fire lane shall support 40 ton. Comment Number: 1. Comment Originated: 03/20/2012 03/20/2012: The individual addresses shall be plainly visible from the street fronting the property. Comment Number: 2. Comment Originated: 03/20/2012 Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control 04/09/2013: The site disturbs more than 10,000 sq-ft therefore Erosion and Sediment Control Materials need to be submitted for FDP. The erosion control requirements are in the Stormwater Design Criteria Under the Amendments of Volume 3 Chapter 7 Section 1.3.3. If you need clarification concerning this section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Comment Number: 8 Comment Originated: 04/09/2013 Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General Page 11 of 16 04/09/2013: Repeat Comment. 03/21/2012: City criteria does not allow for drainage to be discharged into an irrigation ditch or channel. All outfalls for the detention ponds need to be released into a system that drains to the drainage swale and pipes along the south side of Trilby. Comment Number: 1 Comment Originated: 03/21/2012 04/09/2013: 03/22/2012: Drainage easements are required for all detention facilities and storm sewer outfalls. Comment Number: 3 Comment Originated: 03/22/2012 04/09/2013: 03/22/2012: Detention pond 3 is outfalling onto the property to the east. Outfalls need to be into established public drainage facilities unless a drainage easement is obtained from the property owner. Comment Number: 4 Comment Originated: 03/22/2012 04/09/2013: 03/22/2012: Some of the retaining walls are close to the property line. These walls, including the footers, need to be located on the property and be built without disturbing the adjoining properties, unless a temporary construction easement and/or a drainage easement is obtained. Comment Number: 5 Comment Originated: 03/22/2012 04/09/2013: 03/22/2012: The drainage swale that exists along the south side of Trilby Road deviates into the private property to the east. If flows are increased into this swale, a drainage easement would be required from the property owner. Comment Number: 6 Comment Originated: 03/22/2012 03/22/2012: Please see the attached document for the specific erosion control requirements during each stage of the development review process. Comment Number: 7 Comment Originated: 03/22/2012 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Building Elevations 04/10/2013: No comments. 03/21/2012: No comments. Comment Number: 14 Comment Originated: 03/21/2012 Topic: Construction Drawings 04/10/2013: The index does not match sheets 3, 4, 5 & 6 now. Please spell out "Plan & Profile" (P&P) in the index. 03/21/2012: Sheet 3 in the drawing index doesn't match the name on sheet 3. Comment Number: 15 Comment Originated: 03/21/2012 04/10/2013: This has not been corrected. 03/21/2012: Please provide benchmarks that are near the project site. Comment Number: 16 Comment Originated: 03/21/2012 04/10/2013: There are line over text issues on sheets 3, 5 & 6. There is also a text over text issue on sheet 3. 03/21/2012: There are line over text issues on sheets 3 & 5. Comment Number: 17 Comment Originated: 03/21/2012 Page 12 of 16 Topic: Landscape Plans 04/10/2013: There are issues with the hatching on sheet LP3. All text needs to be masked. There are also line over text issues on sheet LP1. 03/21/2012: The color shading will not scan on sheet 5. It will need to be hatching or grayscale. Comment Number: 13 Comment Originated: 03/21/2012 Topic: Plat 04/10/2013: This has not been corrected. 03/21/2012: The legal description & record boundary does not close or match each other. The measured boundary closes. Comment Number: 1 Comment Originated: 03/21/2012 04/10/2013: This has not been corrected. 03/21/2012: The subdivision plat name will need to change. We do not accept addresses as plat names. A simple suggestion might be West Trilby Subdivision. Comment Number: 2 Comment Originated: 03/21/2012 04/10/2013: This has not been corrected. 03/21/2012: Please add "City of Fort Collins" to the legal desription as shown on the redlines. Comment Number: 3 Comment Originated: 03/21/2012 04/10/2013: The owners signature block has been added. Since no responses were routed to us, we don't know if there are lienholders or not. 03/21/2012: Please add Owners & Lienholders(if applicable) signature blocks to sheet 1. Comment Number: 4 Comment Originated: 03/21/2012 04/10/2013: This has not been corrected. 03/21/2012: Please add the statement of lineal units per C.R.S. 38-51-106(l). Comment Number: 5 Comment Originated: 03/21/2012 04/10/2013: No monument records were provided. 03/21/2012: Please provide current monument records for all public land corners shown. Comment Number: 6 Comment Originated: 03/21/2012 04/10/2013: This has not been added. 03/21/2012: Please provide dedication/recording information for West Trilby Road. Comment Number: 7 Comment Originated: 03/21/2012 04/10/2013: This has not been corrected. 03/21/2012: Please label the point of commencement. Comment Number: 8 Comment Originated: 03/21/2012 04/10/2013: This has not been added. 03/21/2012: Please provide the source for record easements per C.R.S. 38-51-106(b). Comment Number: 9 Comment Originated: 03/21/2012 04/10/2013: This has not been corrected. 03/21/2012: The legal cannot be traced on the plat. Please call John Von Nieda with the City. Comment Number: 10 Comment Originated: 03/21/2012 04/10/2013: Please add a signature block for the Louden Ditch easement acceptance. Comment Number: 18 Comment Originated: 04/10/2013 Page 13 of 16 04/10/2013: The legal description includes 30' of right of way. Either revise the outer boundary of the Plat, or revise the legal description to exclude the 30' of right of way. Comment Number: 19 Comment Originated: 04/10/2013 04/10/2013: All easements must be locatable. Please add the missing information shown on sheet 2. Comment Number: 20 Comment Originated: 04/10/2013 04/10/2013: Please add the missing bearings & distances as shown on sheet 2. Comment Number: 21 Comment Originated: 04/10/2013 04/10/2013: Is the bearing of the west boundary line a northeast or a northwest bearing? See redlines. Comment Number: 22 Comment Originated: 04/10/2013 04/10/2013: Please correct the sheet number of sheet 2. Comment Number: 23 Comment Originated: 04/10/2013 Topic: Site Plan 04/10/2013: This has not been corrected. 03/21/2012: Please change the subdivision name to match the plat. The plat will need to change. We do not accept addresses as plat names. Comment Number: 11 Comment Originated: 03/21/2012 04/10/2013: There are still line over text issues on sheet SP2. 03/21/2012: There are line over text & text over text issues on sheet 2. Comment Number: 12 Comment Originated: 03/21/2012 Department: Traffic Operation Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com Topic: Construction Drawings 04/10/2013: Issue remains. Comment continued. 03/26/2012: Construction Notes, C. 6 & 14: Revise each note to state the local entity Traffic Engineer instead of the local entity engineer. Consider this a permanent revision to the Construction Notes Comment Number: 3 Comment Originated: 03/26/2012 04/10/2013: Sht 5: The west end of the two way left turn lane begins its taper on the approach to the west driveway. The left turn lane should stay full width, at a minimum, to the west side of the west access. Comment Number: 6 Comment Originated: 04/10/2013 04/10/2013: Please remove the arrows from the two way left turn lane on Trilby. Comment Number: 7 Comment Originated: 04/10/2013 04/10/2013: Please state a "4" broken line" instead of "4" space" when describing the yellow two way left turn lane striping. Comment Number: 8 Comment Originated: 04/10/2013 04/10/2013: Please include R1-1 (STOP) signage at the access/trilby intersections. Comment Number: 9 Comment Originated: 04/10/2013 Topic: General Page 14 of 16 04/10/2013: No reply. Comment continued. 03/26/2012: Was there any effort made to try to attain a joint access agreement with the private drive access just west of this development? Now that we have plans of the proposal and get a better understanding of the location its hard to believe two parallel driveways, 20' apart, can not be combined into one to both parties mutual benefit and satisfaction. Comment Number: 2 Comment Originated: 03/26/2012 Topic: Traffic Impact Study 04/10/2013: TIS states area land use as "other". Staff's review provides Low Density Mixed Use. The analysis in the TIS isn't affected as the LOS findings are higher than the minimum requirements of either land use designation. Please revise study language to reflect the Low Density Mixed Use designation. Comment Number: 4 Comment Originated: 04/10/2013 04/10/2013: TIS is accepted. Comment Number: 5 Comment Originated: 04/10/2013 Department: Zoning Contact: Peter Barnes, 970-416-2355, pbarnes@fcgov.com Topic: Building Elevations 03/26/2013: Repeat comment. 03/08/2012: The building design standards in Sec. 3.5.3 of the LUC will apply. i.e. facade treatments, base and top treatment, defining building entrances, etc. Comment Number: 8 Comment Originated: 03/08/2012 Topic: General 03/26/2013: The Round 2 narrative and site plan give the impression that the current uses of the property, office and outside storage, are legal uses. They aren't and the language should be changed. For instance, the 'current use' listed on sheet SP1 of 8 should be changed from 'existing office use' to 'existing single family dwelling'. 03/08/2012: Office use as a principal use in the LMN zone is allowed subject to Planning & Zoning Board review. The garage space in the building will be considered accessory use. Comment Number: 1 Comment Originated: 03/08/2012 03/26/2013: Comment still active. 03/08/2012: Additional notes should be added to the Title Sheet with respect to: the manner of trash collection as described in the Planning Objectives; all light fixtures shall be down directional and shielded; no exterior storage of material, equipment of vehicles will occur on the site. Comment Number: 4 Comment Originated: 03/08/2012 03/26/2013: repeat comment. 03/08/2012: Are there parking lot light poles? if so, show location on site plan and provide detail of height and fixture. Show wall location of light fixtures. Comment Number: 5 Comment Originated: 03/08/2012 03/26/2013: Phase one includes the house conversion to office and a new building with 2700 sq. ft. of garage space. The existing illegal outside storage of equipment, vehicles and storage needs to be inside to be legal. Will the proposed 2700 square feet be large enough to accomodate this? Comment Number: 9 Comment Originated: 03/26/2013 Topic: Landscape Plans Page 15 of 16 03/26/2013: repeat comment. 03/08/2012: add note to plan that all landscaping will be installed prior to issuance of a CO or a financial guarantee will be provided to the City in the amount of 125% of the valuation of labor and material to complete landscaping and irrigation. Comment Number: 6 Comment Originated: 03/08/2012 03/26/2013: Repeat comment. 03/08/2012: A 5' wide landscape strip with decidious trees planted every 40' along the west, east, and south lot lines adjacent to the parking and driveway areas. At least 6% of the area of the parking lots need to be interior parking lot landscape islands. Additional street trees may be needed along Trilby. Other Departments might have more specific comments regarding that issue. Comment Number: 7 Comment Originated: 03/08/2012 Topic: Site Plan 03/26/2013: Repeat comment. Nothing's changed. 03/08/2012: The site plan is too cluttered with lines. Please remove topo lines, etc. Show building envelope dimensions on site plan Comment Number: 2 Comment Originated: 03/08/2012 Page 16 of 16