1
DELICH ASSOCIATES Traffic & Transportation Engineering _.Jr 1,' _._
2272 Phone: Glen (970) Haven 669-2061 Drive Fax: Loveland, (970) 669-Colorado 5034 80538 711III • r
MEMORANDUM
FROM: Matt Delich
TO: Wayne Timura, Next Level Development
Angie Milewski, BHA Design
Matt Kraft, Ghafari Associates
Joe OlsonlWard Stanford, Fort Collins Traffic Operations
DATE: February 11,2014
SUBJECT: Woodward Governor, Phase 1 Addendum Transportation Impact Study
(File: 13103ME01)
This memorandum addresses the transportation impacts of a change in trip
generation for the Woodward Governor, Phase 1 site. The Woodward Governor, Phase
1 site is located in the southwest quadrant of the Lemay/Lincoln intersection in Fort
Collins. The site location is shown in Figure 1. Figure 2 shows the site plan for the
Woodward Governor, Phase 1 Addendum. The scope of this study was discussed with
the Fort Collins Traffic Engineer. A brief memorandum was requested. The
Transportation Impact Study Base Assumptions packet is provided in Appendix A. The
"Link-N-Greens Transportation Impact Study," (TIS) January 2013 was submitted and
accepted by the City of Fort Collins. This memorandum specifically addresses an
increase in the trip generation and analysis of the key intersections.
Trip Generation, 9th Edition, ITE was used as the reference document in
calculating the trip generation for the Woodward Governor, Phase 1 site. Table 1 shows
the trip generation from the cited January 2013 TIS. The trip generation from the cited TIS
resulted in 1220 daily trip ends, 233 morning peak hour trip ends, and 227 afternoon peak
hour trip ends.
Table 2 shows the new trip generation for Woodward Governor, Phase 1. Full
development of the new Woodward Governor, Phase 1 is expected to generate 1464
daily trip ends, 280 morning peak hour trip ends, and 273 afternoon peak hour trip ends.
Based upon a comparison of Tables 1 and 2, the new Woodward Governor,
Phase 1 will generate 244 more daily trip ends, 47 more morning peak hour trip ends,
and 46 more afternoon peak hour trip ends than that calculated for the former proposed
Phase 1 plan.
The directional distribution from the cited TIS was used and Figure 3 shows the
site generated peak hour traffic assignment of the new Woodward Governor, Phase 1.
Figure 4 shows the short range (2015) background peak hour traffic at the key
intersections. This is the same short range (2015) background peak hour traffic from
the cited January 2013 TIS (Figure 7).
The site generated peak hour traffic was combined with the background traffic.
Figure 5 shows the short range (2015) total morning and afternoon peak hour traffic at
the key intersections. Table 3 shows the short range (2015) total morning and
afternoon peak hour operation at the key intersections. Calculation forms are provided
in Appendix B. The key intersections will operate acceptably during the morning and
afternoon peak hours; similar to that shown in the cited January 2013 TIS.
It is concluded that the increase in the trip generation with the new Woodward
Governor, Phase 1 will not significantly impact the key intersections. The short range
(2015) total operation at the key intersections will be similar to that shown in the cited
January 2013 TIS.
DELICH Woodward Governor, Phase 1 Addendum, February 2014
ASSOCIATES
BURLINGTON NORTHERN RAILROAD
Lincoln
Buckingham
Lemay
Mulberry
Vine
Riverside
Willow
Jefferson
Woodward
Governor,
Phase 1
Magnolia
SCALE: 1"=1000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
Woodward Governor, Phase 1 Addendum, February 2014
SCALE: 1"=400'
PHASE 1 SITE PLAN Figure 2
DELICH
ASSOCIATES
Woodward Governor, Phase 1 Addendum, February 2014
TABLE 1
January 2013 TIS Phase 1 (2015) Trip Generation
Code Use Size
AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
Phase 1 (2015)
714 Office 56.43 KSF 7.98 450 1.41 80 0.11 6 0.14 8 1.27 72
140 Manufacturing (PSB,
ITS, Loading, Café)
201.861
KSF 3.82 770 0.57 115 0.16 32 0.26 52 0.47 95
Phase 1 (2015) Total 1220 195 38 60 167
TABLE 2
New Woodward Governor, Phase 1 Trip Generation
Code Use Size
AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
Phase 1
714 Office 60.895
KSF 7.98 486 1.41 86 0.11 7 0.14 9 1.27 77
140 Manufacturing (PSB,
ITS, Loading, Café)
255.763
KSF 3.82 978 0.57 146 0.16 41 0.26 67 0.47 120
New Phase 1 Total 1464 232 48 76 197
January 2013 TIS Phase 1 Total 1220 195 38 60 167
New Trips 244 37 10 16 30
DELICH Woodward Governor, Phase 1 Addendum, February 2014
ASSOCIATES
AM/PM
1/4
3/8
2/8
10/4
4/1
10/3
Vine
58/19
10/40
11/50
10/39
46/15
46/15
60/20
90/29
NOM
25/103
4/13
NOM
6/26
NOM
25/103
45/15
90/29
4/13
24/8
3/11
1/5
9/3
12/4
3/9
1/4
Lincoln
Magnolia
Mulberry
3/4 Access
Lemay
East Access
NOM
9/3
37/12
9/39
4/16
NEW PHASE 1 SITE
GENERATED PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
Woodward Governor, Phase 1 Addendum, February 2014
SHORT RANGE (2015)
BACKGROUND PEAK HOUR TRAFFIC Figure 4
DELICH
ASSOCIATES
Woodward Governor, Phase 1, February 2014
30/71
357/791
18/60
38/29
626/609
45/68
17/46
85/161
50/75
96/151
119/116
52/50
Vine
79/62
515/614
142/134
17/86
154/202
94/176
101/190
98/216
103/247
53/81
278/659
34/59
Lincoln
Existing Access
6/18
357/651
154/352
71/215
435/623
155/242
81/237
779/1048
10/8
139/201
1011/1061
248/395
Magnolia
Mulberry
Lemay
555/698
107/173
494/749
65/261
33/125
106/382
4/31
3/20
20/3
234/399
29/4
196/361
AM/PM
NEW SHORT RANGE (2015)
TOTAL PEAK HOUR TRAFFIC Figure 5
DELICH
ASSOCIATES
Woodward Governor, Phase 1 Addendum, February 2014
31/75
360/799
20/68
38/29
636/613
45/68
17/46
85/161
54/76
96/151
119/116
62/53
Vine
60/20
584/778
65/261
NOM
580/801
107/173
4/13
NOM
6/26
33/125
NOM
106/382
25/103
662/871
45/15
90/29
516/911
79/62
539/622
142/134
20/97
155/207
103/179
101/190
98/216
103/247
65/85
281/668
35/63
9/39
NOM
4/16
4/31
NOM
3/20
29/4
205/364
37/12
20/3
234/399
NOM
Lincoln
TABLE 6
Short Range (2015) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Mulberry/Lemay
(signal)
EB LT D D
EB T C D
EB RT A A
EB APPROACH C D
WB LT D E
WB T B D
WB RT A A
WB APPROACH C D
NB LT C C
NB T D D
NB RT A A
NB APPROACH D D
SB LT C D
SB T B B
SB RT A A
SB APPROACH B C
OVERALL C D
Lemay/Magnolia
(signal)
EB LT D D
EB T/RT A A
EB APPROACH D D
WB LT D D
WB T/RT A A
WB APPROACH D D
NB LT A A
NB T A A
NB RT A A
NB APPROACH A A
SB LT A A
SB T A B
SB RT A A
SB APPROACH A A
OVERALL A B
Lemay/¾ Access
(stop sign)
EB RT B B
NB LT A B
Continued on next page
DELICH Woodward Governor, Phase 1 Addendum, February 2014
ASSOCIATES
Continued from previous page
TABLE 6
Short Range (2015) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Lemay/Lincoln
(signal)
EB LT D D
EB T D D
EB RT D D
EB APPROACH D D
WB LT C D
WB T D D
WB RT D D
WB APPROACH D D
NB LT B A
NB T C B
NB RT A A
NB APPROACH B B
SB LT A B
SB T/RT B A
SB APPROACH B A
OVERALL C C
Lincoln/East Access
(stop sign)
NB LT/T/RT B C
SB LT/T/RT B C
EB LT A A
WB LT A A
Lemay/Vine
(signal)
EB LT C E
EB T/RT C D
EB APPROACH C D
WB LT C E
WB T/RT C E
WB APPROACH C E
NB LT/T/RT A E
SB LT/T/RT A C
OVERALL B D
DELICH Woodward Governor, Phase 1 Addendum, February 2014
ASSOCIATES
APPENDIX A
Chapter 4 - Attachments
Attachment A
Transportation Impact Study
Base Assumptions
Project Information
Project Name W~bwAR'b ... ~ASG I (CflANGG)
Project Location StJ @Ul\bR'AlJe C)'t:' 2tA)C!.oI..AJ /Let1Al(
TIS Assumptions
Type of Study Full: )J() In~ate: /.Af}1.A. 0
Study Area Boundaries North: VIAJ!; South: JAULeG£«" f(
East: LeM A« West:~,r<= 4c,~c::;.
Study Years Short Range: 201d5AMeA~ TIS' Long Range: ~ IA-
Future Traffic Growth Rate BAe£:'QRouAJbi \='120M I( ts (A," rJC If&"b-:>
Study Intersections 1. All access drives 5. Le-MA~/Uut.Bfi!?i<r
2. V,AJ€ / L ~i-tA V 6.
3. L,Alc.ot. IV / U:M J( I( 7.
4. L~A-1 J4r/,UAC A./OL IA 8.
Time Period for Study ~: 7:UO-~ (PM: 4:00~ I SatNoon:A./O
Trip Generation Rates Ctl-JJ.AJae- OP ~vJ.A<5G ( (ArrACbl-BD")
Trip Adjustment Factors Passby: N/A I Market: Captive Al/A
Overall Trip Distribution SEE ATTACHED SKETCH
Mode Split Assumptions AI/A
Committed Roadway Improvements
Other Traffic Studies
}kcVIC>U s 'Pt> P I/Sj 1(13
Areas Requiring Special Study USS 2~ He M/ t1-R. Y,eSVlOUS 'bcs£'o~S'(~~
VINtJ/LeMAv APl= F't(OM Po'P TI S \/o("'u 1AFi"3
Date: __ --<....JA'--'N"-"UO-:..A...!....:e=.-L-y_2_4_,T---Z-_O_4- (_ _
Traffic Engineer: --c>BLfCH A~8CX:: {A-T 5" 8
Local Entity Engineer: _
Page 4-34 Larimer County Urban Area Street Standards - Repealed and Reenacted April 1, 2007
Adopted by Larimer County, City of Loveland, City of Fort Collins
/
I
(
I
r J /
\
~/ J
••
I
0" P'C8 (Co",g 714-)
bAlL.Y (~.9~ -
AM fA.) (J.40 -- 8(0 "7 9'3 TG'
OUT (D./I) -- 7 S
/AJ (0. t.0 - 9
(JUT (,,2,'"7) - 77
M4}J()~ACT()(l'OG (C(!)DG' 140 zS-S-. 7(P"3 kSP
(/C ,+TG)
"D,4fL r (6.82) - 9 7B It?
I AJ CP. '57) - 14(P
OUT (0. f{P ') - 41
IN (0.26>') - to 7
our (6.41':;- /20
S IS 7 TF
?'137 W
•
-ro-;AL-
l)A(LC( 14~4 I:&:
AM IAJ - 2 "3Z. S 2[30 TB'
oUT - 48
PM II\) - 7{P ? 27'3 I.E,
our- '91
TABLE 2
Phase 1 (2015) Trip Generation
.AWOTE., ' AM Peak Hour PM Peak Hour
Code' '. Use Size
R'ate Out' 'In, Rate,' Out
;: ,.~' . 'Rate Trips Rate . In Rate,
Phase 1 (2015)
714 Office 56.43 KSF 7,98 450 1.41 80 0,11 6
0.14 8 1.27 72
140
Manufacturing (PSB, 201.861 3.82 770 0.57 115
0.16 32 0.26 52 0.47 95
ITS, Loading, Cafe) KSF
Phase 1 (2015) Total 1220 195 38 60 167
/
~ TABLE3
Phases 1-4 & ,SY Com AWOTE cialiRetaii Area AM (2018) Peak Trip Hqdr peneration PM Peak Hour
Code Use
Rate Trips Rate ' In ~ Out R,ate In, Rate Out
/ Phase 2 /
714 Headquarters Office A' 75.0 KSF 7.98 598 1.41 1~
0.11 8 0.14 11 1/1 95
/ Phase 3 / /
714 Office / 62.0 KSF 7.98 494 1.4y 87 0.11 7 0.14 9/
1.27 79
140 ManUf~(ES
154.0 KSF 3.82 588 ~7 88 0.16 25 0.26 /0 0.47 72
A& T) /
/hase 3 Subtotal 1~ 175 32 / 49 151
/ ;Phase 4 L
;714/ /0 Office Manufacturing (ITS & 50.22.0 0 KSF KSF 7.98/ 176 1.41 31 0.11 2 10.14 3 1.27 28
Vs2 192 0.57 29 0.16 I 0.26 13 0.47
ES Test Center) }4
Phase 4 Subtotal / 368 60 J
10 16 V 52
Phase 1 Subtotal (from Table 2) / 1220 195 / 38 60 / 167
Office/Manufacturing Short Ran?018) 3268
Total 53;; / 88 136 / 465
J
/ Commercial Area / /
932 Sit-Down Restaur~ 5.0 KSF 127.15 636 5.95/ 30 4.86 24 5.91 /30 3.94 20
826 Retail / 8.0 KSF 44.32 354 0/6 6 0.60 5 1.1t 10 1.52
12
710 General Off~ 15.0 KSF 11.03 166 /1.37 20 0.19 3 l15 4 1.24 18
710 General ¢flee 15.0 KSF 11.03 10/ 1.37 20 0.19 3/ 0.25 4 1.24 18
912 Bank 5.4 KSF 148.15 ;IDO 6.89 37 5.19 .% 12.15 66 12.15 66
932 Sit-Down Restaurant 7.0 KSF 127.15 890 5.95 42 4.86/ 34 5.91 41 3.94 28
Commercial Area Total 3012 155 97 155 162
Short Range (2018) Total 6280 691 185 291 627
Link-N-Greens PDP TIS, January 2013
Page 13
I.eA~P'c.. CHAAJ~e- "DUG TO CI4-~vGg- ~p
?~A-~€r I
i)AIL'( - + 244 TEF
AM (A) - +37 J+4-7
1t7
oor- -+/0
PM. (JuT IN - - , + + 30 1(0 ? +4b IE
•N
- NOM •.. - 5% ~
Vine
·SlT.E
- •..
~
E
(])
...J
NOM
SCALE: 1"=1000'
TRIP DISTRIBUTION ~i~ure 6
71rASSOCIATES -/JL...DELICH
Link-N-Greens PDP TIS, January 2013
Page 14
'---961151
--1191116
17146~ '1 ,52150 t ( Vine •N
85/161--- ..-..- 0
t::0>(!)
50175, o_co I'- -
C') I'- ..-
I()
en en C')
Q) oo
-.•.c ..•
en
ro
W
'---2013
--2341399
'---981216
--1031247
,53181
2914~
1961361---
17186~ rI t (
1541202--- .O'-.> N l.\> ""
941176, :;,.~"$
';3$
Lincoln
co 0>se~ :26 1'- C') \..
I(t )..- ~ ,106/'--- 382 33/125
t ( Magnolia
0> '<t:I": (!) .~ .-
'<1"1()
O>'<I" (!)
~AM/PM
'--- 1391201
--1011/1061
,2481395
81/237 ~ '1 t ( Mulberry
77911048--- CO..- N
1018 ---... (.- O!€ OJ") f.OJ"? )
, I'- '<I"
OJ") 10
C') ..-
SHORT RANGE (2015)
BACKGROUND PEAK HOUR TRAFFIC llgure~
71 ~/'-DELICH rASSOCIATES
Link-N-Greens POP TIS, January 2013
Page 15
,NOM
(/)
I/)
Q) ou
-.•.c ..•
(ro /)
ill
----AM/PM
.4b"t) IH-l S
10 ?fGf3V10U S
Vh\-A~~
V0..3i't"\ 1t ( Vine ••• N
~~;l
Magnolia
Mulberry
A1)1) rr t ()AJ A L-
PHASE 1 (2015) SITE
GENERATED PEAK HOUR TRAFFIC Figure e
7" -,/1 FASSOCIATES L....DELICH
Link-N-Greens pOP TIS, January 2013
Page 18
APPENDIX B
Signal Adjustments
Short Range (2015) Traffic
• Mulberry/Lemay – EB dual left-turn lanes and an additional WB through lane
were included. SB right-turn lane is not shown in the City’s analyses. SB right-
turn lane was included in these analyses. All right-turn lanes are channelized,
however the NB RT-lane is the only one that has a “Free” condition with an
acceleration lane. The other RT-lanes were analyzed with a “Yield” condition.
NB pedestrian phase had to be turned off during the afternoon peak hour due to
not enough green time.
• Lemay/Magnolia – Add the west leg of Magnolia. The addition of an EB left-turn
phase forces 8 seconds of NB through time and 20 seconds of SB through time
in the morning peak hour; and 9 seconds of NB through time and 20 seconds of
SB through time in the afternoon peak hour to the EB & WB legs. EB & WB
pedestrian phases had to be turned off during both peak hours due to not enough
green time, since the EB/WB through/right-turn phase was minimized at 22
seconds.
• Lemay/Lincoln – NB right-turn lane is channelized and analyzed with a “Free”
condition with an acceleration lane. EB & WB pedestrian phases had to be
turned off during the morning peak hour due to not enough green time.
• Lemay/Vine – During the afternoon peak hour, EB & WB left-turn lanes were not
shown in the City’s analyses. EB & WB left-turn lanes were included in the
afternoon peak hour analysis.
HCM Signalized Intersection Capacity Analysis 72: Lemay & Mulberry (State 14)
2015 Total AM
Link-N-Greens PDP 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (vph) 127 779 10 248 1011 185 6 415 154 165 446 81
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width 12 12 16 12 12 15 12 12 16 12 12 12
Total Lost time (s) 4.0 5.5 3.0 4.0 5.0 3.0 3.0 5.5 3.0 3.0 5.5 3.0
Lane Util. Factor 0.97 0.95 1.00 0.97 0.91 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 0.99 1.00 1.00 0.99 1.00 1.00 0.99
Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow (prot) 3433 3406 1769 3433 4893 1720 1768 3539 1772 1769 3539 1561
Flt Permitted 0.95 1.00 1.00 0.95 1.00 1.00 0.48 1.00 1.00 0.30 1.00 1.00
Satd. Flow (perm) 3433 3406 1769 3433 4893 1720 885 3539 1772 555 3539 1561
Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 138 847 11 270 1099 201 7 451 167 179 485 88
RTOR Reduction (vph) 000000000000
Lane Group Flow (vph) 138 847 11 270 1099 201 7 451 167 179 485 88
Confl. Peds. (#/hr) 2 7 7 2 2 2 2 2
Confl. Bikes (#/hr) 6
Heavy Vehicles (%) 2% 6% 2% 2% 6% 2% 2% 2% 2% 2% 2% 2%
Turn Type Prot NA Free Prot NA Free pm+pt NA Free pm+pt NA Free
Protected Phases 7 4 3 8 1 6 5 2
Permitted Phases Free Free 6 Free 2 Free
Actuated Green, G (s) 9.0 41.3 110.0 13.0 45.8 110.0 24.2 22.9 110.0 37.7 32.4 110.0
Effective Green, g (s) 10.0 42.3 110.0 14.0 46.8 110.0 26.2 23.9 110.0 38.7 33.4 110.0
Actuated g/C Ratio 0.09 0.38 1.00 0.13 0.43 1.00 0.24 0.22 1.00 0.35 0.30 1.00
Clearance Time (s) 5.0 6.5 5.0 6.0 4.0 6.5 4.0 6.5
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 312 1309 1769 436 2081 1720 229 768 1772 325 1074 1561
v/s Ratio Prot 0.04 c0.25 c0.08 0.22 0.00 0.13 c0.06 0.14
v/s Ratio Perm 0.01 0.12 0.01 0.09 c0.13 0.06
v/c Ratio 0.44 0.65 0.01 0.62 0.53 0.12 0.03 0.59 0.09 0.55 0.45 0.06
Uniform Delay, d1 47.4 27.7 0.0 45.5 23.4 0.0 32.0 38.6 0.0 26.3 30.9 0.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.81 0.82 1.00
Incremental Delay, d2 1.0 2.5 0.0 2.6 1.0 0.1 0.1 1.2 0.1 2.0 0.3 0.1
Delay (s) 48.4 30.2 0.0 48.1 24.4 0.1 32.1 39.8 0.1 23.4 25.5 0.1
Level of Service D C A D C A C D A C C A
Approach Delay (s) 32.4 25.4 29.1 22.1
Approach LOS CCCC
Intersection Summary
HCM 2000 Control Delay 27.1 HCM 2000 Level of Service C
HCM 2000 Volume to Capacity ratio 0.62
Actuated Cycle Length (s) 110.0 Sum of lost time (s) 18.0
Intersection Capacity Utilization 65.7% ICU Level of Service C
Analysis Period (min) 15
c Critical Lane Group
Timing Report, Sorted By Phase 72: Lemay & Mulberry (State 14)
2015 Total AM
Link-N-Greens PDP 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None None None C-Max None None None Max
Maximum Split (s) 11 37 18 44 15 33 14 48
Maximum Split (%) 10.0% 33.6% 16.4% 40.0% 13.6% 30.0% 12.7% 43.6%
Minimum Split (s) 11 30.5 11 29.5 11 32.5 11 28
Yellow Time (s) 3 4 3 4.5 3434
All-Red Time (s) 1 2.5 2 2 1 2.5 2 2
Minimum Initial (s) 4 10 4 15 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 17 16 19 15
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 79 90 17 35 79 94 65 17
End Time (s) 90 17 35 79 94 17 79 65
Yield/Force Off (s) 86 10.5 30 72.5 90 10.5 74 59
Yield/Force Off 170(s) 86 103.5 30 56.5 90 101.5 74 44
Local Start Time (s) 0 11 48 66 0 15 96 48
Local Yield (s) 7 41.5 61 103.5 11 41.5 105 90
Local Yield 170(s) 7 24.5 61 87.5 11 22.5 105 75
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 85
Offset: 79 (72%), Referenced to phase 4:EBT, Start of Red
Splits and Phases: 72: Lemay & Mulberry (State 14)
HCM Signalized Intersection Capacity Analysis 72: Lemay & Mulberry (State 14)
2015 Total PM
Woodward Governor, Phase 1 Addendum 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (vph) 252 1048 8 395 1061 216 18 670 352 281 673 255
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width 12 12 16 12 12 15 12 12 16 12 12 12
Total Lost time (s) 4.0 5.5 3.0 4.0 5.0 3.0 3.0 5.5 3.0 3.0 5.5 3.0
Lane Util. Factor 0.97 0.95 1.00 0.97 0.91 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 0.99 1.00 1.00 0.99 1.00 1.00 0.99
Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow (prot) 3433 3406 1769 3433 4893 1720 1769 3539 1772 1770 3539 1561
Flt Permitted 0.95 1.00 1.00 0.95 1.00 1.00 0.37 1.00 1.00 0.13 1.00 1.00
Satd. Flow (perm) 3433 3406 1769 3433 4893 1720 691 3539 1772 249 3539 1561
Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Adj. Flow (vph) 260 1080 8 407 1094 223 19 691 363 290 694 263
RTOR Reduction (vph) 000000000000
Lane Group Flow (vph) 260 1080 8 407 1094 223 19 691 363 290 694 263
Confl. Peds. (#/hr) 2 7 7 2 2 2 2 2
Confl. Bikes (#/hr) 6
Heavy Vehicles (%) 2% 6% 2% 2% 6% 2% 2% 2% 2% 2% 2% 2%
Turn Type Prot NA Free Prot NA Free pm+pt NA Free pm+pt NA Free
Protected Phases 7 4 3 8 1 6 5 2
Permitted Phases Free Free 6 Free 2 Free
Actuated Green, G (s) 21.0 38.7 120.0 15.8 34.0 120.0 30.3 27.5 120.0 47.5 40.7 120.0
Effective Green, g (s) 22.0 39.7 120.0 16.8 35.0 120.0 32.3 28.5 120.0 48.5 41.7 120.0
Actuated g/C Ratio 0.18 0.33 1.00 0.14 0.29 1.00 0.27 0.24 1.00 0.40 0.35 1.00
Clearance Time (s) 5.0 6.5 5.0 6.0 4.0 6.5 4.0 6.5
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 629 1126 1769 480 1427 1720 220 840 1772 316 1229 1561
v/s Ratio Prot 0.08 c0.32 c0.12 0.22 0.00 0.20 c0.13 0.20
v/s Ratio Perm 0.00 0.13 0.02 0.20 c0.24 0.17
v/c Ratio 0.41 0.96 0.00 0.85 0.77 0.13 0.09 0.82 0.20 0.92 0.56 0.17
Uniform Delay, d1 43.3 39.4 0.0 50.4 38.8 0.0 32.4 43.4 0.0 31.6 31.8 0.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.13 0.74 1.00
Incremental Delay, d2 0.4 18.6 0.0 13.1 4.0 0.2 0.2 6.5 0.3 26.6 0.5 0.2
Delay (s) 43.7 58.0 0.0 63.4 42.8 0.2 32.6 49.9 0.3 62.2 24.2 0.2
Level of Service D E A E D A C D A E C A
Approach Delay (s) 54.9 42.1 32.8 27.9
Approach LOS DDCC
Intersection Summary
HCM 2000 Control Delay 40.2 HCM 2000 Level of Service D
HCM 2000 Volume to Capacity ratio 0.94
Actuated Cycle Length (s) 120.0 Sum of lost time (s) 18.0
Intersection Capacity Utilization 90.2% ICU Level of Service E
Analysis Period (min) 15
c Critical Lane Group
Timing Report, Sorted By Phase 72: Lemay & Mulberry (State 14)
2015 Total PM
Woodward Governor, Phase 1 Addendum 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None None None C-Max None None None Max
Maximum Split (s) 11 41 21 47 20 32 26 42
Maximum Split (%) 9.2% 34.2% 17.5% 39.2% 16.7% 26.7% 21.7% 35.0%
Minimum Split (s) 11 30.5 11 29.5 11 32.5 11 28
Yellow Time (s) 3 4 3 4.5 3434
All-Red Time (s) 1 2.5 2 2 1 2.5 2 2
Minimum Initial (s) 4 10 4 15 4 10 4 10
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7 7
Flash Dont Walk (s) 17 16 15
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 35 46 87 108 35 55 9 87
End Time (s) 46 87 108 35 55 87 35 9
Yield/Force Off (s) 42 80.5 103 28.5 51 80.5 30 3
Yield/Force Off 170(s) 42 63.5 103 12.5 51 80.5 30 108
Local Start Time (s) 0 11 52 73 0 20 94 52
Local Yield (s) 7 45.5 68 113.5 16 45.5 115 88
Local Yield 170(s) 7 28.5 68 97.5 16 45.5 115 73
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 95
Offset: 35 (29%), Referenced to phase 4:EBT, Start of Red
Splits and Phases: 72: Lemay & Mulberry (State 14)
HCM Signalized Intersection Capacity Analysis 145: Lemay & Magnolia
2015 Total AM
Link-N-Greens PDP 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (vph) 4 0 6 106 0 33 60 584 65 107 580 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width 12 12 12 12 12 12 12 12 13 12 12 12
Total Lost time (s) 3.0 4.5 4.0 4.5 3.0 4.5 4.5 3.0 4.5
Lane Util. Factor 1.00 1.00 0.97 1.00 1.00 0.95 1.00 1.00 0.95
Frpb, ped/bikes 1.00 1.00 1.00 0.98 1.00 1.00 0.97 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 1.00 0.85 1.00 0.85 1.00 1.00 0.85 1.00 1.00
Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00
Satd. Flow (prot) 1770 1583 3433 1559 1770 3539 1589 1768 3539
Flt Permitted 0.95 1.00 0.95 1.00 0.39 1.00 1.00 0.36 1.00
Satd. Flow (perm) 1770 1583 3433 1559 718 3539 1589 675 3539
Peak-hour factor, PHF 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Adj. Flow (vph) 5 0 7 123 0 38 70 679 76 124 674 0
RTOR Reduction (vph) 07003500024000
Lane Group Flow (vph) 5 0 0 123 3 0 70 679 52 124 674 0
Confl. Peds. (#/hr) 1 3 3
Turn Type Prot NA Prot NA pm+pt NA Perm pm+pt NA Perm
Protected Phases 7 4 3 8 1 6 5 2
Permitted Phases 6 6 2 2
Actuated Green, G (s) 1.3 1.1 7.9 8.7 79.2 74.0 74.0 82.8 75.8
Effective Green, g (s) 2.3 2.1 8.9 9.7 81.2 75.0 75.0 84.8 76.8
Actuated g/C Ratio 0.02 0.02 0.08 0.09 0.74 0.68 0.68 0.77 0.70
Clearance Time (s) 4.0 5.5 5.0 5.5 4.0 5.5 5.5 4.0 5.5
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 37 30 277 137 589 2412 1083 599 2470
v/s Ratio Prot 0.00 0.00 c0.04 c0.00 0.01 c0.19 c0.02 0.19
v/s Ratio Perm 0.08 0.03 0.14
v/c Ratio 0.14 0.00 0.44 0.02 0.12 0.28 0.05 0.21 0.27
Uniform Delay, d1 52.9 52.9 48.2 45.8 3.9 6.9 5.8 3.3 6.2
Progression Factor 1.00 1.00 1.00 1.00 0.28 0.24 0.00 0.26 0.32
Incremental Delay, d2 1.7 0.1 1.1 0.1 0.1 0.3 0.1 0.1 0.2
Delay (s) 54.5 53.0 49.3 45.9 1.2 1.9 0.1 1.0 2.2
Level of Service D D D D AAAAA
Approach Delay (s) 53.6 48.5 1.7 2.0
Approach LOS D D A A
Intersection Summary
HCM 2000 Control Delay 6.4 HCM 2000 Level of Service A
HCM 2000 Volume to Capacity ratio 0.29
Actuated Cycle Length (s) 110.0 Sum of lost time (s) 16.0
Intersection Capacity Utilization 42.6% ICU Level of Service A
Analysis Period (min) 15
c Critical Lane Group
Timing Report, Sorted By Phase 145: Lemay & Magnolia
2015 Total AM
Link-N-Greens PDP 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 12 63 13 22 12 63 11 24
Maximum Split (%) 10.9% 57.3% 11.8% 20.0% 10.9% 57.3% 10.0% 21.8%
Minimum Split (s) 11 24.5 13 29.5 11 24.5 11 29.5
Yellow Time (s) 34343434
All-Red Time (s) 1 1.5 2 1.5 1 1.5 1 1.5
Minimum Initial (s) 47744747
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 12 12
Dual Entry No Yes Yes Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 72 84 37 50 72 84 37 48
End Time (s) 84 37 50 72 84 37 48 72
Yield/Force Off (s) 80 31.5 45 66.5 80 31.5 44 66.5
Yield/Force Off 170(s) 80 19.5 45 66.5 80 19.5 44 66.5
Local Start Time (s) 35 47 0 13 35 47 0 11
Local Yield (s) 43 104.5 8 29.5 43 104.5 7 29.5
Local Yield 170(s) 43 92.5 8 29.5 43 92.5 7 29.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 37 (34%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 145: Lemay & Magnolia
HCM Signalized Intersection Capacity Analysis 145: Lemay & Magnolia
2015 Total PM
Woodward Governor, Phase 1 Addendum 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (vph) 13 0 26 382 0 125 20 778 261 173 801 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width 12 12 12 12 12 12 12 12 13 12 12 12
Total Lost time (s) 3.0 4.5 4.0 4.5 3.0 4.5 4.5 3.0 4.5
Lane Util. Factor 1.00 1.00 0.97 1.00 1.00 0.95 1.00 1.00 0.95
Frpb, ped/bikes 1.00 1.00 1.00 0.99 1.00 1.00 0.97 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 1.00 0.85 1.00 0.85 1.00 1.00 0.85 1.00 1.00
Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00
Satd. Flow (prot) 1770 1583 3433 1561 1770 3539 1588 1769 3539
Flt Permitted 0.95 1.00 0.95 1.00 0.33 1.00 1.00 0.29 1.00
Satd. Flow (perm) 1770 1583 3433 1561 619 3539 1588 548 3539
Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Adj. Flow (vph) 14 0 27 398 0 130 21 810 272 180 834 0
RTOR Reduction (vph) 0 26 0 0 114 0 0 0 98 0 0 0
Lane Group Flow (vph) 14 1 0 398 16 0 21 810 174 180 834 0
Confl. Peds. (#/hr) 1 3 3
Turn Type Prot NA Prot NA pm+pt NA Perm pm+pt NA Perm
Protected Phases 7 4 3 8 1 6 5 2
Permitted Phases 6 6 2 2
Actuated Green, G (s) 2.8 3.5 12.0 13.7 78.3 75.8 75.8 88.5 82.0
Effective Green, g (s) 3.8 4.5 13.0 14.7 80.3 76.8 76.8 89.5 83.0
Actuated g/C Ratio 0.03 0.04 0.11 0.12 0.67 0.64 0.64 0.75 0.69
Clearance Time (s) 4.0 5.5 5.0 5.5 4.0 5.5 5.5 4.0 5.5
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 56 59 371 191 447 2264 1016 507 2447
v/s Ratio Prot 0.01 0.00 c0.12 c0.01 0.00 0.23 c0.03 0.24
v/s Ratio Perm 0.03 0.11 c0.24
v/c Ratio 0.25 0.02 1.07 0.08 0.05 0.36 0.17 0.36 0.34
Uniform Delay, d1 56.7 55.6 53.5 46.7 6.7 10.1 8.7 5.1 7.5
Progression Factor 1.00 1.00 1.00 1.00 0.25 0.22 0.16 0.40 0.55
Incremental Delay, d2 2.3 0.1 67.5 0.2 0.0 0.3 0.3 0.4 0.3
Delay (s) 59.1 55.7 121.0 46.9 1.7 2.6 1.7 2.4 4.4
Level of Service E E F D AAAAA
Approach Delay (s) 56.9 102.7 2.3 4.1
Approach LOS E F A A
Intersection Summary
HCM 2000 Control Delay 23.6 HCM 2000 Level of Service C
HCM 2000 Volume to Capacity ratio 0.44
Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0
Intersection Capacity Utilization 59.5% ICU Level of Service B
Analysis Period (min) 15
c Critical Lane Group
Timing Report, Sorted By Phase 145: Lemay & Magnolia
2015 Total PM
Woodward Governor, Phase 1 Addendum 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 70 17 22 11 70 11 28
Maximum Split (%) 9.2% 58.3% 14.2% 18.3% 9.2% 58.3% 9.2% 23.3%
Minimum Split (s) 11 24.5 13 29.5 11 24.5 11 29.5
Yellow Time (s) 34343434
All-Red Time (s) 1 1.5 2 1.5 1 1.5 1 1.5
Minimum Initial (s) 47744747
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 12 12
Dual Entry No Yes Yes Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 32 43 113 10 32 43 113 4
End Time (s) 43 113 10 32 43 113 4 32
Yield/Force Off (s) 39 107.5 5 26.5 39 107.5 0 26.5
Yield/Force Off 170(s) 39 95.5 5 26.5 39 95.5 0 26.5
Local Start Time (s) 39 50 0 17 39 50 0 11
Local Yield (s) 46 114.5 12 33.5 46 114.5 7 33.5
Local Yield 170(s) 46 102.5 12 33.5 46 102.5 7 33.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 113 (94%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 145: Lemay & Magnolia
HCM 2010 TWSC 2: Lemay & 3/4 Access
2015 Total AM
Link-N-Greens PDP 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total am.syn
Intersection
Intersection Delay, s/veh 0.9
Movement EBL EBR NBL NBT SBT SBR
Vol, veh/h 0 25 90 516 662 45
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 335 - - 235
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 29 106 607 779 53
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1294 389 779 0 - 0
Stage 1 779 - - - - -
Stage 2 515 - - - - -
Follow-up Headway 3.52 3.32 2.22 - - -
Pot Capacity-1 Maneuver 154 610 834 - - -
Stage 1 413 - - - - -
Stage 2 565 - - - - -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver 134 610 834 - - -
Mov Capacity-2 Maneuver 134 - - - - -
Stage 1 413 - - - - -
Stage 2 493 - - - - -
Approach EB NB SB
HCM Control Delay, s 11.2 1.5 0
HCM LOS B
Minor Lane / Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 834 - 610 - -
HCM Lane V/C Ratio 0.127 - 0.048 - -
HCM Control Delay (s) 9.943 - 11.2 - -
HCM Lane LOS A B
HCM 95th %tile Q(veh) 0.434 - 0.152 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics 2: Lemay & 3/4 Access
2015 Total AM
Link-N-Greens PDP 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total am.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 335 235
Storage Lanes 0 1 1 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00
Ped Bike Factor
Frt 0.865 0.850
Flt Protected 0.950
Satd. Flow (prot) 0 1611 1770 3539 3539 1583
Flt Permitted 0.950
Satd. Flow (perm) 0 1611 1770 3539 3539 1583
Link Speed (mph) 30 35 35
Link Distance (ft) 478 873 725
Travel Time (s) 10.9 17.0 14.1
Intersection Summary
Area Type: Other
HCM 2010 TWSC 2: Lemay & 3/4 Access
2015 Total PM
Woodward Governor, Phase 1 Addendum 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total pm.syn
Intersection
Intersection Delay, s/veh 0.9
Movement EBL EBR NBL NBT SBT SBR
Vol, veh/h 0 103 29 911 871 15
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 335 - - 235
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 94 93 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 121 34 969 937 18
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1490 468 937 0 - 0
Stage 1 937 - - - - -
Stage 2 553 - - - - -
Follow-up Headway 3.52 3.32 2.22 - - -
Pot Capacity-1 Maneuver 115 542 727 - - -
Stage 1 342 - - - - -
Stage 2 540 - - - - -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver 110 542 727 - - -
Mov Capacity-2 Maneuver 110 - - - - -
Stage 1 342 - - - - -
Stage 2 515 - - - - -
Approach EB NB SB
HCM Control Delay, s 13.5 0.3 0
HCM LOS B
Minor Lane / Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 727 - 542 - -
HCM Lane V/C Ratio 0.047 - 0.224 - -
HCM Control Delay (s) 10.196 - 13.5 - -
HCM Lane LOS B B
HCM 95th %tile Q(veh) 0.147 - 0.85 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics 2: Lemay & 3/4 Access
2015 Total PM
Woodward Governor, Phase 1 Addendum 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total pm.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 335 235
Storage Lanes 0 1 1 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00
Ped Bike Factor
Frt 0.865 0.850
Flt Protected 0.950
Satd. Flow (prot) 0 1611 1770 3539 3539 1583
Flt Permitted 0.950
Satd. Flow (perm) 0 1611 1770 3539 3539 1583
Link Speed (mph) 30 35 35
Link Distance (ft) 478 873 725
Travel Time (s) 10.9 17.0 14.1
Intersection Summary
Area Type: Other
HCM Signalized Intersection Capacity Analysis 73: Lemay & Lincoln
2015 Total AM
Link-N-Greens PDP 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (vph) 20 155 103 65 103 98 101 281 35 142 539 79
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width 14 14 13 13 13 12 13 13 13 12 12 12
Total Lost time (s) 3.0 5.0 5.0 3.0 4.5 4.5 3.0 5.0 3.0 3.0 5.0
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 0.97 1.00 1.00 0.98 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.98
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Satd. Flow (prot) 1882 1987 1608 1828 1925 1542 1829 1925 1599 1764 1827
Flt Permitted 0.65 1.00 1.00 0.39 1.00 1.00 0.23 1.00 1.00 0.50 1.00
Satd. Flow (perm) 1292 1987 1608 747 1925 1542 440 1925 1599 924 1827
Peak-hour factor, PHF 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Adj. Flow (vph) 24 182 121 76 121 115 119 331 41 167 634 93
RTOR Reduction (vph) 0 0 104 0 0 96 000050
Lane Group Flow (vph) 24 182 17 76 121 19 119 331 41 167 722 0
Confl. Peds. (#/hr) 2 1 1 2 5 5
Confl. Bikes (#/hr) 2
Turn Type pm+pt NA Perm pm+pt NA Perm pm+pt NA Free pm+pt NA
Protected Phases 7 4 3 8 1 6 5 2
Permitted Phases 4 4 8 8 6 Free 2
Actuated Green, G (s) 19.0 14.9 14.9 22.5 16.9 16.9 68.2 60.8 110.0 70.8 62.1
Effective Green, g (s) 21.0 15.9 15.9 24.5 17.9 17.9 70.2 61.8 110.0 72.8 63.1
Actuated g/C Ratio 0.19 0.14 0.14 0.22 0.16 0.16 0.64 0.56 1.00 0.66 0.57
Clearance Time (s) 4.0 6.0 6.0 4.0 5.5 5.5 4.0 6.0 4.0 6.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 274 287 232 231 313 250 386 1081 1599 685 1048
v/s Ratio Prot 0.00 c0.09 c0.02 0.06 c0.02 0.17 c0.02 c0.40
v/s Ratio Perm 0.01 0.01 0.05 0.01 0.17 0.03 0.14
v/c Ratio 0.09 0.63 0.08 0.33 0.39 0.07 0.31 0.31 0.03 0.24 0.69
Uniform Delay, d1 36.5 44.3 40.7 34.9 41.1 39.0 11.2 12.8 0.0 7.2 16.5
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.94 0.89 1.00 0.95 1.02
Incremental Delay, d2 0.1 4.5 0.1 0.8 0.8 0.1 0.4 0.7 0.0 0.2 3.1
Delay (s) 36.6 48.8 40.8 35.8 41.9 39.2 10.9 12.1 0.0 7.0 20.0
Level of Service DDDDDDBBAAB
Approach Delay (s) 45.0 39.4 10.8 17.6
Approach LOS D D B B
Intersection Summary
HCM 2000 Control Delay 23.7 HCM 2000 Level of Service C
HCM 2000 Volume to Capacity ratio 0.62
Actuated Cycle Length (s) 110.0 Sum of lost time (s) 16.0
Intersection Capacity Utilization 65.5% ICU Level of Service C
Analysis Period (min) 15
c Critical Lane Group
Timing Report, Sorted By Phase 73: Lemay & Lincoln
2015 Total AM
Link-N-Greens PDP 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 12 65 11 22 14 63 11 22
Maximum Split (%) 10.9% 59.1% 10.0% 20.0% 12.7% 57.3% 10.0% 20.0%
Minimum Split (s) 11 30 11 29 11 30 11 24.5
Yellow Time (s) 3 3.5 3 3.5 3434
All-Red Time (s) 1 2.5 1 2.5 1 2 1 1.5
Minimum Initial (s) 47474747
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 17 17
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 20 32 97 108 20 34 97 108
End Time (s) 32 97 108 20 34 97 108 20
Yield/Force Off (s) 28 91 104 14 30 91 104 14.5
Yield/Force Off 170(s) 28 74 104 14 30 74 104 14.5
Local Start Time (s) 33 45 0 11 33 47 0 11
Local Yield (s) 41 104 7 27 43 104 7 27.5
Local Yield 170(s) 41 87 7 27 43 87 7 27.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 85
Offset: 97 (88%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 73: Lemay & Lincoln
HCM Signalized Intersection Capacity Analysis 73: Lemay & Lincoln
2015 Total PM
Woodward Governor, Phase 1 Addendum 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (vph) 97 207 179 85 247 216 190 668 63 134 622 62
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width 14 14 13 13 13 12 13 13 13 12 12 12
Total Lost time (s) 3.0 5.0 5.0 3.0 4.5 4.5 3.0 5.0 3.0 3.0 5.0
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 0.97 1.00 1.00 0.98 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.99
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Satd. Flow (prot) 1887 1987 1610 1828 1925 1542 1829 1925 1599 1770 1836
Flt Permitted 0.23 1.00 1.00 0.34 1.00 1.00 0.18 1.00 1.00 0.21 1.00
Satd. Flow (perm) 466 1987 1610 646 1925 1542 344 1925 1599 392 1836
Peak-hour factor, PHF 0.85 0.86 0.85 0.85 0.89 0.87 0.85 0.94 0.85 0.85 0.93 0.87
Adj. Flow (vph) 114 241 211 100 278 248 224 711 74 158 669 71
RTOR Reduction (vph) 0 0 172 0 0 201 000030
Lane Group Flow (vph) 114 241 39 100 278 47 224 711 74 158 737 0
Confl. Peds. (#/hr) 2 1 1 2 5 5
Confl. Bikes (#/hr) 2
Turn Type pm+pt NA Perm pm+pt NA Perm pm+pt NA Free pm+pt NA
Protected Phases 7 4 3 8 1 6 5 2
Permitted Phases 4 4 8 8 6 Free 2
Actuated Green, G (s) 28.1 21.1 21.1 28.6 21.6 21.6 72.8 64.1 120.0 71.0 63.2
Effective Green, g (s) 30.1 22.1 22.1 30.6 22.6 22.6 74.8 65.1 120.0 73.0 64.2
Actuated g/C Ratio 0.25 0.18 0.18 0.26 0.19 0.19 0.62 0.54 1.00 0.61 0.54
Clearance Time (s) 4.0 6.0 6.0 4.0 5.5 5.5 4.0 6.0 4.0 6.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 211 365 296 243 362 290 334 1044 1599 339 982
v/s Ratio Prot c0.04 0.12 0.03 c0.14 c0.05 0.37 0.03 c0.40
v/s Ratio Perm 0.10 0.02 0.08 0.03 0.36 0.05 0.25
v/c Ratio 0.54 0.66 0.13 0.41 0.77 0.16 0.67 0.68 0.05 0.47 0.75
Uniform Delay, d1 36.7 45.5 40.9 35.7 46.2 40.8 17.0 19.9 0.0 14.9 21.7
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.56 0.96 1.00 0.84 0.88
Incremental Delay, d2 2.8 4.4 0.2 1.1 9.4 0.3 5.1 3.5 0.1 0.8 4.2
Delay (s) 39.5 49.9 41.1 36.8 55.6 41.0 31.5 22.7 0.1 13.3 23.4
Level of Service DDDDEDCCABC
Approach Delay (s) 44.5 46.8 23.0 21.6
Approach LOS DDCC
Intersection Summary
HCM 2000 Control Delay 31.3 HCM 2000 Level of Service C
HCM 2000 Volume to Capacity ratio 0.73
Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0
Intersection Capacity Utilization 80.2% ICU Level of Service D
Analysis Period (min) 15
c Critical Lane Group
Timing Report, Sorted By Phase 73: Lemay & Lincoln
2015 Total PM
Woodward Governor, Phase 1 Addendum 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 67 11 31 11 67 11 31
Maximum Split (%) 9.2% 55.8% 9.2% 25.8% 9.2% 55.8% 9.2% 25.8%
Minimum Split (s) 11 30 11 29 11 30 11 24.5
Yellow Time (s) 3 3.5 3 3.5 3434
All-Red Time (s) 1 2.5 1 2.5 1 2 1 1.5
Minimum Initial (s) 47474747
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 17 13 17 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 92 103 50 61 92 103 50 61
End Time (s) 103 50 61 92 103 50 61 92
Yield/Force Off (s) 99 44 57 86 99 44 57 86.5
Yield/Force Off 170(s) 99 27 57 73 99 27 57 74.5
Local Start Time (s) 42 53 0 11 42 53 0 11
Local Yield (s) 49 114 7 36 49 114 7 36.5
Local Yield 170(s) 49 97 7 23 49 97 7 24.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 85
Offset: 50 (42%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 73: Lemay & Lincoln
HCM 2010 TWSC 4: East Access & Lincoln
2015 Total AM
Link-N-Greens PDP 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total am.syn
Intersection
Intersection Delay, s/veh 0.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 29 205 37 0 234 20 904304
Conflicting Peds, #/hr 000000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - 160 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 222222222222
Mvmt Flow 34 241 44 0 275 24 11 05405
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 299 0 0 241 0 0 598 608 241 599 596 287
Stage 1 ------ 309 309- 287 287-
Stage 2 ------ 289 299- 312 309-
Follow-up Headway 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Capacity-1 Maneuver 1262 - - 1326 - - 414 410 798 413 417 752
Stage 1 ------ 701 660- 720 674-
Stage 2 ------ 719 666- 699 660-
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 1262 - - 1326 - - 403 399 798 402 406 752
Mov Capacity-2 Maneuver ------ 403 399- 402 406-
Stage 1 ------ 682 642- 701 674-
Stage 2 ------ 715 666- 676 642-
Approach EB WB NB SB
HCM Control Delay, s 0.8 0 12.8 11.7
HCM LOS B B
Minor Lane / Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 475 1262 - - 1326 - - 548
HCM Lane V/C Ratio 0.032 0.027 ----- 0.015
HCM Control Delay (s) 12.8 7.932 - - 0 - - 11.7
HCM Lane LOS B A A B
HCM 95th %tile Q(veh) 0.1 0.083 - - 0 - - 0.046
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics 4: East Access & Lincoln
2015 Total AM
Link-N-Greens PDP 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total am.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 250 160 250 0 0 0 0 0
Storage Lanes 1 1 1 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.988 0.958 0.925
Flt Protected 0.950 0.967 0.978
Satd. Flow (prot) 1770 1863 1583 1863 1840 0 0 1726 0 0 1685 0
Flt Permitted 0.950 0.967 0.978
Satd. Flow (perm) 1770 1863 1583 1863 1840 0 0 1726 0 0 1685 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 2717 1377 381 357
Travel Time (s) 61.8 31.3 8.7 8.1
Intersection Summary
Area Type: Other
HCM 2010 TWSC 4: East Access & Lincoln
2015 Total PM
Woodward Governor, Phase 1 Addendum 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total pm.syn
Intersection
Intersection Delay, s/veh 2.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 4 364 12 0 399 3 39 0 16 20 0 31
Conflicting Peds, #/hr 000000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - 160 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 222222222222
Mvmt Flow 5 428 14 0 469 4 46 0 19 24 0 36
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 473 0 0 428 0 0 927 911 428 918 909 471
Stage 1 ------ 438 438- 471 471-
Stage 2 ------ 489 473- 447 438-
Follow-up Headway 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Capacity-1 Maneuver 1089 - - 1131 - - 249 274 627 252 275 593
Stage 1 ------ 597 579- 573 560-
Stage 2 ------ 561 558- 591 579-
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 1089 - - 1131 - - 233 273 627 244 274 593
Mov Capacity-2 Maneuver ------ 233 273- 244 274-
Stage 1 ------ 594 576- 570 560-
Stage 2 ------ 526 558- 571 576-
Approach EB WB NB SB
HCM Control Delay, s 0.1 0 21.3 16.2
HCM LOS C C
Minor Lane / Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 285 1089 - - 1131 - - 380
HCM Lane V/C Ratio 0.227 0.004 ----- 0.158
HCM Control Delay (s) 21.3 8.32 - - 0 - - 16.2
HCM Lane LOS C A A C
HCM 95th %tile Q(veh) 0.855 0.013 - - 0 - - 0.555
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics 4: East Access & Lincoln
2015 Total PM
Woodward Governor, Phase 1 Addendum 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total pm.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 250 160 250 0 0 0 0 0
Storage Lanes 1 1 1 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.999 0.961 0.919
Flt Protected 0.950 0.966 0.980
Satd. Flow (prot) 1770 1863 1583 1863 1861 0 0 1729 0 0 1678 0
Flt Permitted 0.950 0.966 0.980
Satd. Flow (perm) 1770 1863 1583 1863 1861 0 0 1729 0 0 1678 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 2717 1377 381 357
Travel Time (s) 61.8 31.3 8.7 8.1
Intersection Summary
Area Type: Other
HCM Signalized Intersection Capacity Analysis 127: Lemay & Vine
2015 Total AM
Link-N-Greens PDP 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (vph) 17 85 54 62 119 96 31 360 20 45 636 38
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width 12 16 12 12 16 8 12 13 12 12 14 12
Total Lost time (s) 4.5 4.5 4.5 4.5 4.0 3.5
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frpb, ped/bikes 1.00 0.99 1.00 0.99 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00
Frt 1.00 0.94 1.00 0.93 0.99 0.99
Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00
Satd. Flow (prot) 1767 1929 1770 1918 1902 1964
Flt Permitted 0.33 1.00 0.54 1.00 0.91 0.95
Satd. Flow (perm) 613 1929 1014 1918 1731 1865
Peak-hour factor, PHF 0.85 0.93 0.85 0.85 0.85 0.85 0.85 0.86 0.85 0.85 0.85 0.85
Adj. Flow (vph) 20 91 64 73 140 113 36 419 24 53 748 45
RTOR Reduction (vph) 0 24 0 0 27 0020020
Lane Group Flow (vph) 20 131 0 73 226 0 0 477 0 0 844 0
Confl. Peds. (#/hr) 1 1
Confl. Bikes (#/hr) 1 9 3
Heavy Vehicles (%) 2% 5% 2% 2% 5% 2% 2% 2% 2% 2% 2% 2%
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 4862
Permitted Phases 4862
Actuated Green, G (s) 20.9 20.9 20.9 20.9 78.6 79.1
Effective Green, g (s) 21.9 21.9 21.9 21.9 79.6 80.1
Actuated g/C Ratio 0.20 0.20 0.20 0.20 0.72 0.73
Clearance Time (s) 5.5 5.5 5.5 5.5 5.0 4.5
Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0
Lane Grp Cap (vph) 122 384 201 381 1252 1358
v/s Ratio Prot 0.07 c0.12
v/s Ratio Perm 0.03 0.07 0.28 c0.45
v/c Ratio 0.16 0.34 0.36 0.59 0.38 0.62
Uniform Delay, d1 36.5 37.9 38.0 40.0 5.8 7.4
Progression Factor 1.00 1.00 1.00 1.00 0.56 1.00
Incremental Delay, d2 1.8 1.5 3.1 4.5 0.9 2.2
Delay (s) 38.3 39.3 41.2 44.5 4.1 9.6
Level of Service D D D D A A
Approach Delay (s) 39.2 43.8 4.1 9.6
Approach LOS D D A A
Intersection Summary
HCM 2000 Control Delay 17.1 HCM 2000 Level of Service B
HCM 2000 Volume to Capacity ratio 0.62
Actuated Cycle Length (s) 110.0 Sum of lost time (s) 8.5
Intersection Capacity Utilization 76.6% ICU Level of Service D
Analysis Period (min) 15
c Critical Lane Group
Timing Report, Sorted By Phase 127: Lemay & Vine
2015 Total AM
Link-N-Greens PDP 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total am.syn
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Min None C-Min None
Maximum Split (s) 81 29 81 29
Maximum Split (%) 73.6% 26.4% 73.6% 26.4%
Minimum Split (s) 21.5 22.5 22 22.5
Yellow Time (s) 3.5 4 3.5 4.5
All-Red Time (s) 1 1.5 1.5 1
Minimum Initial (s) 7777
Vehicle Extension (s) 6666
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 10 10 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 76 47 76 47
End Time (s) 47 76 47 76
Yield/Force Off (s) 42.5 70.5 42 70.5
Yield/Force Off 170(s) 32.5 60.5 32 60.5
Local Start Time (s) 29 0 29 0
Local Yield (s) 105.5 23.5 105 23.5
Local Yield 170(s) 95.5 13.5 95 13.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 47 (43%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 127: Lemay & Vine
HCM Signalized Intersection Capacity Analysis 127: Lemay & Vine
2015 Total PM
Woodward Governor, Phase 1 Addendum 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (vph) 46 161 76 53 116 151 75 799 68 68 613 29
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width 12 16 12 12 16 8 12 13 12 12 14 12
Total Lost time (s) 4.5 4.5 4.5 4.5 4.0 3.5
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frpb, ped/bikes 1.00 0.99 1.00 0.99 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00
Frt 1.00 0.95 1.00 0.91 0.99 0.99
Flt Protected 0.95 1.00 0.95 1.00 1.00 0.99
Satd. Flow (prot) 1767 1954 1770 1882 1893 1964
Flt Permitted 0.18 1.00 0.27 1.00 0.87 0.81
Satd. Flow (perm) 343 1954 508 1882 1658 1600
Peak-hour factor, PHF 0.85 0.88 0.85 0.85 0.85 0.85 0.85 0.91 0.85 0.85 0.90 0.85
Adj. Flow (vph) 54 183 89 62 136 178 88 878 80 80 681 34
RTOR Reduction (vph) 0 15 0 0 40 0020010
Lane Group Flow (vph) 54 257 0 62 274 0 0 1044 0 0 794 0
Confl. Peds. (#/hr) 1 1
Confl. Bikes (#/hr) 1 9 3
Heavy Vehicles (%) 2% 5% 2% 2% 5% 2% 2% 2% 2% 2% 2% 2%
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 4862
Permitted Phases 4862
Actuated Green, G (s) 22.5 22.5 22.5 22.5 87.0 87.5
Effective Green, g (s) 23.5 23.5 23.5 23.5 88.0 88.5
Actuated g/C Ratio 0.20 0.20 0.20 0.20 0.73 0.74
Clearance Time (s) 5.5 5.5 5.5 5.5 5.0 4.5
Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0
Lane Grp Cap (vph) 67 382 99 368 1215 1180
v/s Ratio Prot 0.13 0.15
v/s Ratio Perm c0.16 0.12 c0.63 0.50
v/c Ratio 0.81 0.67 0.63 0.74 0.86 0.67
Uniform Delay, d1 46.1 44.7 44.2 45.4 11.5 8.2
Progression Factor 1.00 1.00 1.00 1.00 0.75 1.00
Incremental Delay, d2 55.8 7.0 19.2 10.5 6.5 3.1
Delay (s) 101.9 51.7 63.5 55.9 15.1 11.3
Level of Service F D E E B B
Approach Delay (s) 60.0 57.2 15.1 11.3
Approach LOS EEBB
Intersection Summary
HCM 2000 Control Delay 25.9 HCM 2000 Level of Service C
HCM 2000 Volume to Capacity ratio 0.85
Actuated Cycle Length (s) 120.0 Sum of lost time (s) 8.5
Intersection Capacity Utilization 95.5% ICU Level of Service F
Analysis Period (min) 15
c Critical Lane Group
Timing Report, Sorted By Phase 127: Lemay & Vine
2015 Total PM
Woodward Governor, Phase 1 Addendum 2/6/2014 Synchro 8 Light Report
Delich Associates 2015 total pm.syn
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Min None C-Min None
Maximum Split (s) 90 30 90 30
Maximum Split (%) 75.0% 25.0% 75.0% 25.0%
Minimum Split (s) 21.5 22.5 22 22.5
Yellow Time (s) 3.5 4 3.5 4.5
All-Red Time (s) 1 1.5 1.5 1
Minimum Initial (s) 7777
Vehicle Extension (s) 6666
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 10 10 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 43 13 43 13
End Time (s) 13 43 13 43
Yield/Force Off (s) 8.5 37.5 8 37.5
Yield/Force Off 170(s) 118.5 27.5 118 27.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 115.5 24.5 115 24.5
Local Yield 170(s) 105.5 14.5 105 14.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 13 (11%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 127: Lemay & Vine
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
Magnolia
6/18
415/670
154/352
81/255
446/673
165/281
127/252
779/1048
10/8
185/216
1011/1061
248/395
Mulberry
3/4 Access
Lemay
East Access
AM/PM