Loading...
HomeMy WebLinkAboutWOODWARD TECHNOLOGY CENTER FP#3 - FDP - FDP140005 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONS (3)FIRST FLOOR 100' - 0" ITS PARAPET 130' - 0" A.8 B C D E F G H J J.2 K L ITS ROOF 129' - 0" INSULATED RIBBED METAL WALL PANEL - PEWTER (074213.19) HOLLOW METAL DOOR AND FRAME (081113) INSULATED STRIATED METAL WALL PANEL - SILVER (074213.19) SECTIONAL DOOR (083613) CMU - SHADOW GRAY (042200) FIBERGLASS SANDWICH PANEL - WHITE (084523) COMPOSITE WALL PANEL - DARK FRAMING (084523) BRONZE (074213.23) COMPOSITE WALL PANEL - DARK BRONZE (074213.23) STEEL PIPE AND TUBE RAILINGS (055213) STEEL PIPE AND TUBE RAILINGS (055213) SECTIONAL DOOR (083613) CEP PARAPET 140' - 0" FIRST FLOOR 100' - 0" ITS PARAPET 130' - 0" T/ ITS LIGHT MONITOR 138' - 9" OFFICE PARAPET 134' - 0" 15 14.8 14 13 12 11 10 9 8 7 6 5 4 3 2 1 INSULATED RIBBED METAL WALL PANEL - DARK BRONZE (074213.19) PERFORATED FORMED WALL PANEL - PEWTER (074213.13) INSULATED STRIATED METAL WALL PANEL - SILVER (074213.19) FRAMING (084523) INSULATED RIBBED METAL WALL PANEL - PEWTER (074213.19) INSULATING-GLASS - CRYSTAL GRAY (084426) ENTRANCE DOOR SYSTEM (084213) FIBERGLASS SANDWICH PANEL - WHITE (084523) INSULATED RIBBED METAL WALL PANEL - DARK BRONZE (074213.19) PREFINISHED EXTRUDED REVEAL (074213.19) HIGH-PERFORMANCE COATING - PREFINISHED EXTRUDED REVEAL PEWTER (099600) (074213.19) STRUCTURAL GLASS CURTAIN WALL INSULATING-GLASS - CRYSTAL GRAY (084426) ARCHITECTURALLY EXPOSED STRUCTURAL STEEL FRAMING - HIGH-PERFORMANCE COATING - PEWTER (051213) PEWTER (099600) EXTRUDED-ALUMINUM SUN CONTROL (107113) STRUCTURAL GLASS CURTAIN WALL PERFORATED FORMED WALL PANEL - DARK BRONZE (074213.13) INSULATED STRIATED METAL WALL PANEL - SILVER (074213.19) DECORATIVE CMU - GROUND FACE BLACK (042200) DECORATIVE CMU - GROUND FACE BLACK (042200) COMPOSITE WALL PANEL - DARK BRONZE (074213.23) DECORATIVE CMU - GROUND FACE BLACK (042200) PERFORATED FORMED WALL PANEL - SILVER (074213.13) INSULATED RIBBED METAL WALL PANEL - DARK BRONZE (074213.19) CEP PARAPET 140' - 0" FIRST FLOOR 100' - 0" OFFICE ROOF 131' - 3" OFFICE SECOND FLOOR 116' - 0" OFFICE PARAPET 134' - 0" J.2 J H.8 H.5 H G.5 G F.5 F E.5 E D.5 D C.5 C B.7 B HIGH-PERFORMANCE COATING - PEWTER (099600) INSULATED RIBBED METAL WALL PANEL - PEWTER (074213.19) ENTRANCE DOOR SYSTEM (084213) STRUCTURAL-SEALANT-GLAZED CURTAIN WALL GLAZING CRYSTAL GRAY (088000) INSULATED RIBBED METAL WALL PANEL - DARK BRONZE (074213.19) PERFORATED FORMED WALL PANEL - PEWTER (074213.13) INSULATED STRIATED METAL WALL PANEL - SILVER (074213.19) STRUCTURAL-SEALANT-GLAZED CURTAIN WALL TYPE 1 VERTICAL (084423) ENTRANCE DOOR SYSTEM (084213) GLAZING CRYSTAL GRAY SOLID GRAY FRIT (088000) GLAZING CRYSTAL GRAY (088000) PERFORATED FORMED WALL PANEL - PEWTER (074213.13) EXTRUDED-ALUMINUM SUN CONTROL (107113) FIXED, EXTRUDED-ALUMINUM LOUVERS (089000) GLAZING CRYSTAL GRAY (088000) STRUCTURAL-SEALANT-GLAZED CURTAIN WALL TYPE 1 VERTICAL (084423) STRUCTURAL-SEALANT-GLAZED CURTAIN WALL TYPE 1 HORIZONTAL (084423) GLAZING CRYSTAL GRAY SOLID GRAY FRIT (088000) INSULATED STRIATED METAL WALL PANEL - PEWTER (074213.19) GRANITE - ACADEMY BLACK (044200) GLAZING CRYSTAL GRAY STRIPED GRAY FRIT (088000) GRANITE - SIERRA WHITE (044200) DECORATIVE CMU - GROUND FACE BLACK (042200) STANDING-SEAM METAL ROOF PANEL - PEWTER (074113.16) COMPOSITE WALL PANEL - DARK BRONZE (074213.23) COMPOSITE WALL PANEL - DARK BRONZE (074213.23) INSULATED STRIATED METAL WALL PANEL - SILVER (074213.19) CUSTOM STAINLESS STEEL RAILINGS (055213) DECORATIVE CMU - GROUND FACE BLACK (042200) ARCHITECTURALLY EXPOSED STRUCTURAL STEEL FRAMING - PEWTER (051213) STANDING-SEAM METAL ROOF PANEL - PEWTER (074113.16) PERFORATED FORMED WALL PANEL - PEWTER (074213.13) PENTHOUSE LEVEL 125' - 0" CEP PARAPET 140' - 0" FIRST FLOOR 100' - 0" ITS PARAPET 130' - 0" OFFICE PARAPET 134' - 0" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 14.8 15 CAFE 125'-0" 126' - 4" CAFE TOS 126' - 4" INSULATED RIBBED METAL WALL PANEL - DARK BRONZE (074213.19) INSULATED RIBBED METAL WALL PANEL - PEWTER (074213.19) INSULATED STRIATED METAL WALL PANEL - SILVER (074213.19) INSULATED RIBBED METAL WALL PANEL - DARK BRONZE (074213.19) PREFINISHED EXTRUDED REVEAL (074213.19) HOLLOW METAL DOOR AND FRAME (081113) INSULATED RIBBED METAL WALL PANEL - PEWTER (074213.19) DECORATIVE CMU - GROUND FACE BLACK (042200) ENTRANCE DOOR SYSTEM (084213) STAINLESS STEEL SCREEN (108213) GLAZING CRYSTAL GRAY (088000) INSULATED STRIATED METAL WALL PANEL - SILVER (074213.19) STRUCTURAL-SEALANT-GLAZED CURTAIN WALL TYPE 1 HORIZONTAL (084423) GLAZING CRYSTAL GRAY (088000) ARCHITECTURALLY EXPOSED STRUCTURAL STEEL FRAMING - PEWTER (051213) FIBERGLASS SANDWICH PANEL - WHITE (084523) FRAMING (084523) PERFORATED FORMED WALL PANEL - SILVER (074213.13) COMPOSITE WALL PANEL - DARK BRONZE (074213.23) COMPOSITE WALL PANEL - DARK BRONZE (074213.23) COMPOSITE WALL PANEL - PEWTER (074213.23) STEEL PIPE AND TUBE RAILINGS (055213) METAL BAR GRATING STAIRS (055119) SECTIONAL DOOR (083613) PERFORATED FORMED WALL PANEL - SILVER (074213.13) CEP PARAPET 140' - 0" DRAWN BY SHEET TITLE PROJECT MANAGER QUALCHECK DESIGNED BY PROJECT # SHEET NUMBER 1"=1000'-0" 0 1000' 2000' 1"=500'-0" 0 500' 1000' 1"=400'-0" 0 400' 800' 1"=200'-0" 0 200' 400' 1"=100'-0" 0 100' 200' 1"=80'-0" 0 80' 160' 1"=60'-0" 0 60' 120' 1"=50'-0" 0 50' 100' 1"=40'-0" 0 40' 80' 1"=30'-0" 0 30' 60' 1"=20'-0" 0 20' 40' 1"=10'-0" 0 10' 20' 1 16"=1'-0" 0 16' 32' 3 32"=1'-0" 0 16' 32' 1 8"=1'-0" 0 8' 16' 3 16"=1'-0" 0 8' 16' 1 4"=1'-0" 04'8' 3 8"=1'-0" 04'8' 1 2"=1'-0" 02'4' 3 4"=1'-0" 02'4' 1"=1'-0" 01'2' 01'2' 1 "=1'-0" 1 2 GHAFARI ASSOCIATES, LLC www.ghafari.com REV DATE ISSUED FOR GHAFARI ASSOCIATES © 2013 ARCHITECTURE II ENGINEERING CONSULTING 122 S. MICHIGAN AVE, SUITE 1500 CHICAGO, IL 60603-6152 USA TEL +1.312.984.2300 CIVIL ENGINEERING AND LAND SURVEYING 1218 ASH STREET WINDSOR, CO 80550 777 E LINCOLN AVENUE FORT COLLINS, CO 80524 (USA) LINCOLN CAMPUS - ITS BHA DESIGN, INC 1603 OAKRIDGE DRIVE FORT COLLINS, CO 80525 GENSLER & ASSOCIATES 1625 BROADWAY, #400 DENVER, CO 80202 FOOD FACILITIES DESIGN & HOSPITALITY CONSULTANTS 875 JACKSON STREET, SUITE 111 DUBUQUE, IA 52001-7014 GENERAL CONTRACTOR 1621 18TH STREET, #400 DENVER, CO 80202 2/10/2014 7:41:42 PM 127213.001 AE2-00-1 M. KRAFT ARCHITECTURAL ELEVATIONS - ITS A 02/12/14 FINAL PLAN - PHASE ONE SCALE: 1" = 30'-0" NORTH ELEVATION SCALE: 1" = 30'-0" EAST ELEVATION SCALE: 1" = 30'-0" SOUTH ELEVATION SCALE: 1" = 30'-0" WEST ELEVATION