January 21, 2014
Cathy Mathis
TB Group
444 Mountain Ave
Fort Collins, CO 80525
RE: Geico Office Building, PDP130039, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-224-6126
or jholland@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/15/2014
01/15/2014: Site Plan: Please see redlines for additional comments, dimensions and notes
to be added. Land sue table needs to break down parking by standard, compact, and
accessible. Show the compact parking percentage. Show light pole locations, buffer line,
etc.
RESPONSE: Changes have been made as requested.
Comment Number: 2 Comment Originated: 01/15/2014
01/15/2014: 3 parking stalls to the west need to be adjusted or removed.
RESPONSE: Parking stalls removed.
Comment Number: 3 Comment Originated: 01/15/2014
01/15/2014: Need a letter requesting alt. compliance for the added parking, which needs to
be based on the criteria. It's not clear whether the added parking meets the criteria.
RESPONSE: The revised site plan has the new parking numbers. Based on new updated
tenant mix, we don’t exceed the maximum number of spaces.
Comment Number: 4 Comment Originated: 01/15/2014
01/15/2014: Applicant may want to consider proposing additional uses in the land use table.
RESPONSE: Additional uses and tenants have been added.
Comment Number: 5 Comment Originated: 01/15/2014
01/15/2014: Building Elevations: Please add a canopy over the east-facing door. Please
identify the material and color for both the stone and brick cap course. Is this precast?
Please label the fascia material.
RESPONSE: Per the staff review meeting, it was discussed that this east-facing door was
to the fire riser room and not an entry to the building thus the intent was to not draw
attention to this door location by adding a canopy. The material for the stone and brick cap
courses have been identified.
Comment Number: 6 Comment Originated: 01/15/2014
01/15/2014: Landscape Plan: Is there a sheet L-1? Landscape plan needs to be drawn at
1:10 to be able to show all of the information. Landscape plan will also need to show tree
mitigation information. Please see redlines for additional comments and notations. Verify
species diversity. Add a dashed line on the site plan showing the defined parking lot area
and list the parking lot percentage coverage based on the defined area.
RESPONSE: Done.
Comment Number: 7 Comment Originated: 01/15/2014
01/15/2014: Please provide an equal to/better than modification request for the HC setback
and the plan will need to be updated/designed to include shrubs, perennials, berms, stone
walls and boulders in order to justify the HC landscape setback reduction from 50 feet to 15
feet. Turf grass can be used along the Timberline frontage, the remainder of the site needs
to be shrub beds at a high quality to support the modification. Building needs foundation
planting evergreen tree accents.
RESPONSE: Landscape plan has been updated to reflect the planning palette of the HC
Plan. Shrub beds and evergreen planting have been used as suggested.
Comment Number: 8 Comment Originated: 01/15/2014
01/15/2014: I need to confirm that Transfort and Ditch Co. have no comments prior to
hearing.
RESPONSE: The owner and civil engineer have been coordinating with the ditch cpmpany
regarding drainage.
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221-6501, tsiegmund@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/14/2014
01/14/2014: Due to the removal of the existing building, the site and parking lot will need to
be redesigned to function using the exiting western access point. The proposed right out
only access was agreed upon due to the constraints of the exiting building on-site in
relation to the new proposed office building. By removing the existing building as part of
this development project, the existing access should be adequate to serve the proposed
development without the additional right out only access.
RESPONSE: The existing right-out only access has been removed.
Comment Number: 2 Comment Originated: 01/14/2014
01/14/2014: A repay is due to the city for the E Harmony Rd frontage improvements
previously completed by the city in 2012. The repay for completed frontage improvements
is typically due prior to the issuance of building permit. Once calculated, the repay amount
will be communicated to the applicant.
RESPONSE: Acknowledged.
Comment Number: 3 Comment Originated: 01/14/2014
01/14/2014: Profile of the sewer service that crosses under Timberline will be needed at
final development plan submittal. Please note the minimum cover under the roadway is 3ft.
RESPONSE: Additional survey will be needed for the sanitary sewer service. The service
as it crosses Timberline is roughly 9’ deep and will be well below the 36” minimum
clearance.
Comment Number: 4 Comment Originated: 01/14/2014
01/14/2014: On the Utility plan sheet (C2.00) show the sidewalk removal limits needed to
trench the fire line and extend the water service into the site. See redlines
RESPONSE: The sidewalk removal has been shown on the Utility Plan.
Comment Number: 5 Comment Originated: 01/14/2014
01/14/2014: On the Utility plan sheet (C2.00) show and label the concrete repairs needed
in the median for the fire line connection. Add a note to the utility plan that the median is
exposed, colored concrete to match existing.
RESPONSE: Approximate Limits have been shown on the Utility Plan and a note has been
added to replace the concrete median to match existing finishes.
Comment Number: 6 Comment Originated: 01/14/2014
01/14/2014: Show the abandonment of the existing FCLWD water service (on Harmony
Rd) on the Utility plan sheet (C2.00) and show approximate asphalt patching limits
RESPONSE: The abandonment of the existing FCLWD water service is shown on the Utility
Plans.
Comment Number: 7 Comment Originated: 01/14/2014
01/14/2014: Show and label the (2) existing driveways off of Harmony Rd to be removed
and replaced with curb and gutter. Show approximate asphalt patching limits
RESPONSE: The two existing driveways have been shown to be removed and replaced
with 30” vertical curb & gutter.
Comment Number: 8 Comment Originated: 01/14/2014
01/14/2014: The demo plan references the existing sidewalk to be removed at the eastern
existing access point that is to be removed. Show and note on the utility plan if the
sidewalk is to be removed and replaced. Update the demo plan if the sidewalk is to remain.
Further evaluation may be necessary to determine if the existing sidewalk meets cross
slope standards. If not, the sidewalk will need to be removed and replaced.
RESPONSE: With the revision to the site layout, the entire existing sidewalk along
Timberline and Harmony is to remain.
Comment Number: 9 Comment Originated: 01/14/2014
01/14/2014: Label the existing bus stop along Harmony Rd on the Utility plan sheet (C2.00)
RESPONSE: The existing bus stop has been labeled and is shown on the Existing
Conditions and Horizontal Control Plan.
Comment Number: 10 Comment Originated: 01/14/2014
01/14/2014: Please add the following sidewalk note to the Utility plan sheet (C2.00):
RESPONSE: This note has been added to multiple sheets.
Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project, shall be replaced or restored to City of Fort Collins standards at the Developer's
expense prior to the acceptance of completed improvements and/or prior to the issuance of
the first Certificate of Occupancy.
RESPONSE: This note has been added to multiple sheets.
Comment Number: 11 Comment Originated: 01/14/2014
01/14/2014: COMMENT FROM THE STREETS DEPARTMENT- The soils appear to have
significant swell potential. Mitigation will be require for those improvements/reconstruction
in the ROW.
RESPONSE: Acknowledged.
Comment Number: 12 Comment Originated: 01/14/2014
01/14/2014: COMMENT FROM THE STREETS DEPARTMENT- We would prefer that the
fire supply connection is made via directional boring since they are doing that for the sewer
across timberline.
RESPONSE: The fire line is shown as being bored under Timberline Road.
Comment Number: 13 Comment Originated: 01/14/2014
01/14/2014: COMMENT FROM THE STREETS DEPARTMENT- Need to clarify the
pavement type and section for the connection of the parking to Harmony. This appears to
be concrete. If no, a pan will be necessary and would be preferably carried north of the
sidewalk.
RESPONSE: No work is proposed within the existing access point to the site.
Department: Environmental Planning
Contact: Kate Rentschlar, 970-224-6086, krentschlar@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 01/13/2014
A top-of-bank line needs to be added for the Dixon Canyon lateral on the
site/landscaping/utility plan.
RESPONSE: Top of bank added to the plans.
Comment Number: 2 Comment Originated: 01/13/2014
The natural habitat buffer zone needs to be delineated and labeled on the
site/landscaping/utility/grading plan.
RESPONSE: Buffer zone added to plans.
Comment Number: 3 Comment Originated: 01/13/2014
01/13/2014: Please add the following statement to the notes on the Utility and Grading
overall plans, and on any sheets that show the Dixon Canyon lateral buffer: Please see
Section 3.4.1 of the Land Use Code for allowable uses within the buffer zone.
RESPONSE: Note added.
Topic: General
Comment Number: 6 Comment Originated: 01/13/2014
After reviewing the site plan and the ECS, the width of the 50' buffer can be reduced to the
current distance shown on the plans of about 20'. To mitigate for this loss, more
landscaping will be required in the buffer zone than is currently present to protect the
function of the riparian and aquatic habitat.
RESPONSE: Native landscape has been added in the buffer zone.
Comment Number: 7 Comment Originated: 01/13/2014
01/13/2014: Although it is not required, I'd recommend the addition of a sitting area (bench,
etc) in the buffer zone to encourage interaction between employees and the natural habitat.
RESPONSE: Acknowledged.
Comment Number: 8 Comment Originated: 01/14/2014
Section 3.4.1 (G)(2) restricts the use of rip-rap for streambank stabilization to locations
where the use of native vegetation instead is not feasible. Please naturalize the section you
have identified as rip-rap to the maximum extent feasible.
RESPONSE: Scour Stop is now being proposed instead of Buried Riprap.
Topic: Landscape Plans
Comment Number: 4 Comment Originated: 01/13/2014
01/13/2014: Please add a note to the landscape plan stating: The objective of the buffer
zone is to protect the ecological character of the natural habitat from the impacts of the
activities associated with development and should be maintained as a native landscape.
RESPONSE: Note added.
Comment Number: 5 Comment Originated: 01/13/2014
01/13/2014: Please fix the number of shrubs and ornamental grasses estimated on the
plant list or show them on the plan.
RESPONSE: Shrubs and quantities added.
Topic: Lighting Plan
Comment Number: 9 Comment Originated: 01/14/2014
01/14/2014: Light spillage into the buffer zone is not permitted. Please consider the
addition of shielding on your lights or increased screening of the buffer zone with vegetation.
RESPONSE:
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 01/15/2014
01/15/2014:
Contact the City Forester and Environmental Planner for an on-site meeting to evaluate
existing trees and obtain species, condition and mitigation information. All existing trees
need to be inventoried and recorded by number in a table. Each tree needs to be identified
by species, condition size and mitigation. Significant trees need to be retained to the extent
reasonably feasible.
RESPONSE: We will set up a meeting with the Forester soon.
Comment Number: 2 Comment Originated: 01/15/2014
01/15/2014:
Provide street trees in the parkway between the sidewalks and curb in areas along
Harmony and Timberline at 40 foot spacing. Select street trees from the City of Fort Collins
Street Tree List.
RESPONSE: Street trees have been added along Harmony Road where possible. Due to
utility conflicts, there is not enough room to add street trees along the Timberline frontage.
Comment Number: 3 Comment Originated: 01/15/2014
01/15/2014:
Review Parking lot Perimeter Landscaping LUC 3.2.1 E 4 and provide tree spacing and
densities in parking lot perimeter areas. Existing retained significant trees can be applied to
this standard.
RESPONSE: Trees have been added where possible.
Comment Number: 4 Comment Originated: 01/15/2014
01/15/2014:
Attempt to retain the east existing street tree on Harmony currently shown to be removed
unless it is of a poor condition or an undesirable species. If sidewalk placement is the cause
for removal of this tree move sidewalk away from the tree as it passes. If this tree is not to
be retained provide an explanation why it is not feasible to retain it.
RESPONSE: The tree will not be removed.
Comment Number: 5 Comment Originated: 01/15/2014
01/15/2014:
Please edit landscape note number 6. There is not a tree separation standard for electric
and phone so that is not a LUC requirement. The 10 feet separation is for water and sewer
main lines.
RESPONSE: Note fixed.
Comment Number: 6 Comment Originated: 01/15/2014
01/15/2014:
Please show street light locations and provide street tree separations.
RESPONSE: We will need to work with Light and Power to find street light locations.
Better yet, when we have our on-site meeting, we can look at appropriate street tree
locations.
Comment Number: 7 Comment Originated: 01/15/2014
01/15/2014:
Tree protection Notes Changes:
Current tree protection note number 6 should be changed to be the same as LUC 3.2.1 G 2.
RESPONSE: Note changed.
Add these two tree protection specification LUC 3.2.1 6 and 7 and be sure and include the
table that is associated with specification number 7.
RESPONSE: Notes changed.
Comment Number: 8 Comment Originated: 01/15/2014
01/15/2014:
Please add the following street tree planting notes:
Street Trees shall be supplied and planted by the developer using a qualified landscape
contractor.
RESPONSE: Note changed.
The Developer shall replace dead or dying street trees after planting until final maintenance
inspection and acceptance by the City of Fort Collins Forestry Division. All street trees in
the project must be established, of an approved species and of acceptable condition prior to
acceptance.
RESPONSE: Note changed.
Comment Number: 9 Comment Originated: 01/15/2014
01/15/2014:
Will irrigated lawn be provided in the parkway between the sidewalk and curb and shown in
the City Streetscape and median standards. Review this requirement with the City Planner.
RESPONSE: Yes this is irrigated lawn as of now.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/07/2014
01/07/2014: Light & Power has existing electric facilities along the N. side of Harmony and
the W. side of Timberline adjacent to this site. Any modification or relocation to existing
electric facilities will be at the developers expense.
RESPONSE: Acknowledged.
Comment Number: 2 Comment Originated: 01/07/2014
01/07/2014: The landscape plan shows the routing for the electric primary running around
the N. end of the building. This route may be problematic with the retaining wall, the
staircase and elevation change. It maybe necessary to go around the south end of the
building.
RESPONSE: The routing has been revised to travel around the south of the proposed
building.
Comment Number: 3 Comment Originated: 01/07/2014
01/07/2014: The existing electrical vault along Timberline is at capacity for 3-phase. If this
site will require 3-phase power it will be necessary to install a new vault either next to the
existing vault or along Harmony splicing into the existing duct line provided it's not under the
asphalt. Field locating this line will be necessary.
RESPONSE: A new vault is being proposed along Timberline Road.
Comment Number: 4 Comment Originated: 01/07/2014
01/07/2014: Transformer location looks good. A C-1 Form and One-line diagram must be
submitted to Light & Power Engineering with your load requirements.
RESPONSE: Due to the rerouting of the primary service, the Transformer has been
relocated to minimize this distance.
Comment Number: 5 Comment Originated: 01/07/2014
01/07/2014: Developer will be responsible for Electric Capacity Fee, Building Site charges
and system modification charges where applicable. Credit will be given for existing services.
Contact Light & Power Engineering @ 970-221-6700 with any questions.
RESPONSE: Acknowledged.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 01/15/2014
01/15/2014: FIRE LANES
In order to meet basic fire access requirements for the proposed building, a fire lane is
required. As the site plan remains under consideration and possible revision, please contact
me should you require input regarding further fire lane design.
RESPONSE: Fire access has been resolved based on our meetings with a modified
hammerhead design.
Comment Number: 2 Comment Originated: 01/15/2014
01/15/2014: EMERGENCY ACCESS EASEMENTS
Emergency access, fire lanes shall be designated on the plat as an Emergency Access
Easement.
RESPONSE: Fire access has been resolved based on our meetings with a modified
hammerhead design.
Comment Number: 3 Comment Originated: 01/15/2014
01/15/2014: FDC
06IFC 912.2: Fire Department Connections shall be installed in accordance with NFPA
standards. Fire department connections shall be located on the side of buildings, fully
visible and recognizable from the street or nearest point of fire department vehicle access.
The location of the FDC shall be approved by the fire department.
RESPONSE: Acknowledged.
Comment Number: 4 Comment Originated: 01/15/2014
01/15/2014: KEY BOXES REQUIRED
06IFC 506.1 and Poudre Fire Authority Bureau Policy 88-20: Poudre Fire Authority
requires at least one key box ("Knox Box") to be mounted in approved location(s) on every
new building equipped with a required fire sprinkler or fire alarm system. The top shall not
be higher than 6 feet above finished floor.
RESPONSE: Acknowledged.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 01/09/2014
01/09/2014: The site disturbs more than 10,000 sq-ft, therefore Erosion and Sediment
Control Materials need to be submitted for FDP. The erosion control requirements are in the
Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3.
Current Erosion Control Materials Submitted does not meet requirements. Please submit;
Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you
need clarification concerning this section, or if there are any questions please contact Jesse
Schlam 970-218-2932 or email @ jschlam@fcgov.com
RESPONSE: A erosion control report, and escrow will be supplied at Final Compliance.
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 01/14/2014
01/14/2014: The site will need a variance for using the irrigation ditch as an outfall. Please
prepare a variance letter detailing the justifications to allow the ditch as the outfall.
RESPONSE: A variance has been provided.
Comment Number: 3 Comment Originated: 01/14/2014
01/14/2014: Please explain in the text of the drainage report where the Harmony Road
drainage will flow since it will not enter the site as it currently does.
RESPONSE: As discussed at our site visit, the drainage will be rerouted into a natural low
spot west of St. Pete’s Fly Shop. There is an existing storm drain that travels under
Harmony that has been plugged. This area is acting as an existing retention pond.
Comment Number: 4 Comment Originated: 01/14/2014
01/14/2014: The riprap is required to be buried.
RESPONSE: Scour Stop is now being proposed.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 01/14/2014
01/14/2014: There is a text over text issue on sheet A4.1. See redlines.
RESPONSE: This has been corrected.
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 01/14/2014
01/14/2014: Please change the "Southwest" in the sub-title to "Southeast". See redlines.
RESPONSE: This has been corrected.
Comment Number: 3 Comment Originated: 01/14/2014
01/14/2014: Please provide benchmark elevations in both NGVD 1929 Datum Unadjusted
& NAVD 1988 Datum. See redlines.
RESPONSE: This has been added.
Comment Number: 4 Comment Originated: 01/14/2014
01/14/2014: Please change the "37" in the Basis Of Bearings to a "31". See redlines.
RESPONSE: This has been corrected.
Comment Number: 5 Comment Originated: 01/14/2014
01/14/2014: There is a line over text issue on sheet C1.00. See redlines.
RESPONSE: This has been corrected.
Topic: Landscape Plans
Comment Number: 6 Comment Originated: 01/14/2014
01/14/2014: No comments.
RESPONSE: Thank you.
Topic: Lighting Plan
Comment Number: 7 Comment Originated: 01/14/2014
01/14/2014: No comments.
RESPONSE: Thank you.
Topic: Plat
Comment Number: 8 Comment Originated: 01/14/2014
01/14/2014: Plat names cannot begin with addresses and/or numbers. Please change this
name.
RESPONSE: This has been corrected.
Comment Number: 9 Comment Originated: 01/14/2014
01/14/2014: Please correct the sub-title & legal description as marked. See redlines.
RESPONSE: This has been corrected.
Comment Number: 10 Comment Originated: 01/14/2014
01/14/2014: Please revise the legal description with metes & bounds.
RESPONSE: This has been corrected.
Comment Number: 11 Comment Originated: 01/14/2014
01/14/2014: Please add Subdivision name to the Statement Of Ownership And Subdivision.
RESPONSE: This has been corrected.
Comment Number: 12 Comment Originated: 01/14/2014
01/14/2014: Please provide current acceptable monument records for the aliquot corners
shown. Please email these directly to Jeff County at jcounty@fcgov.com.
RESPONSE: Those have been emailed to Jeff County
Comment Number: 13 Comment Originated: 01/14/2014
01/14/2014: Please revise the title commitment date as newer issues become available.
RESPONSE: The one shown on the plat is the latest title commitment.
Comment Number: 14 Comment Originated: 01/14/2014
01/14/2014: Does Book L, Page 21 extend to the east onto the metes & bounds portion of
the Plat?
RESPONSE: It does not, but with this plat, a new easement has been provided.
Comment Number: 15 Comment Originated: 01/15/2014
01/15/2014: Please add the missing bearings & distances along the 15' access & utility
easement. See redlines.
RESPONSE: This has been corrected.
Comment Number: 16 Comment Originated: 01/15/2014
01/15/2014: Please change the line type on the east line of the 15' access & utility
easement. See redlines.
RESPONSE: This has been corrected.
Comment Number: 17 Comment Originated: 01/15/2014
01/15/2014: Please add "to the City of Fort Collins" to the construction & maintenance
easement note. See redlines.
RESPONSE: This has been corrected.
Comment Number: 18 Comment Originated: 01/15/2014
01/15/2014: Please add record reference for the south half of the Harmony Road & east
half of Timberline Road rights of way. Reference to subdivision plats is acceptable.
RESPONSE: This has been corrected.
Comment Number: 19 Comment Originated: 01/15/2014
01/15/2014: Please show the south right of way line of Harmony Road, and the east right of
way line of Timberline Road.
RESPONSE: This has been corrected.
Comment Number: 20 Comment Originated: 01/15/2014
01/15/2014: Please make the text sizes of like notes consistent. See redlines.
RESPONSE: This has been corrected.
Comment Number: 21 Comment Originated: 01/15/2014
01/15/2014: Please label all surrounding properties as either unplatted or subdivision name,
including the properties east of Timberline Road and south of Harmony Road. See redlines.
RESPONSE: This has been corrected.
Topic: Site Plan
Comment Number: 22 Comment Originated: 01/15/2014
01/15/2014: There are line over text issues on sheet LS 00. See redlines.
RESPONSE: Fixed.
Comment Number: 23 Comment Originated: 01/15/2014
01/15/2014: Please rotate the marked text 180 degrees. See redlines.
RESPONSE: Text rotated.
Comment Number: 24 Comment Originated: 01/15/2014
01/15/2014: Please mask all text within hatched areas. See redlines.
RESPONSE: Text masked.
Comment Number: 25 Comment Originated: 01/15/2014
01/15/2014: Please change the legal description to match the subdivision plat.
RESPONSE: Legal now matches plat.
Comment Number: 26 Comment Originated: 01/15/2014
01/15/2014: There was no sheet LS 1 routed to us. Is this sheet part of the set? If not,
please remove it from the sheet index, and renumber sheet LS 2 to LS 1.
RESPONSE: The sheet index has been fixed.
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 01/10/2014
01/10/2014: The site has been changed and no longer has the issue that promoted the
need for two access points. Please remove the eastern access and revise the parking lot to
function with one access. Please keep the access as far west as possible on the site.
RESPONSE: Access removed.
Topic: Traffic Impact Study
Comment Number: 2 Comment Originated: 01/10/2014
01/10/2014: The TIS requirement was waived for the previous use of 4000sf. The scale
has been increased to 7000sf and needs to be re-evaluated for the need of a TIS. Please
contact Ward Stanford at 970-221-6605 to discuss the new proposal.
RESPONSE: Our understanding is that current plans do not require a TIS.
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 01/16/2014
01/16/2014: Get utility locates and show ALL underground utilities on the plans to identify
possible conflicts with the sewer service.
RESPONSE: An additional plat with Utility Locates will be provided at Final Compliance.
Comment Number: 2 Comment Originated: 01/16/2014
01/16/2014: Is there any possibility of extending an 8" public sewer west across Timberline
and connecting the sewer service to a MH at the end of that line?
RESPONSE: The reason we routed the service on the east side of Timberline Road is
because those properties east have been platted and provide a 10’ Utility Easement for us
to utilize. The properties to the west do not have any utility easements.
Department: Zoning
Contact: Gary Lopez, 970-416-2338, glopez@fcgov.com
Topic: Landscape Plans
Comment Number: 5 Comment Originated: 12/30/2013
12/30/2013: List the species of the existing trees to remain and their approx. sizes in height.
These should be pruned if needed with such a note listed on the landscaping plan. This is
in addition to trees overhanging outside the property line as noted in the landscaping plan.
RESPONSE: We will have an on-site meeting with the City Forester, which hasn’t
happened yet. Then we can properly label and identify existing trees that will be remaining
on the site.
Comment Number: 6 Comment Originated: 12/30/2013
12/30/2013: Landscaping note no. 29 should read that "All landscaping must be secured
with an irrevocable letter of credit, performance bond, or escrow account for 125% of the
valuation remaining of the materials and labor prior to the issuance of any Certificate of
Occupancy or Temporary Certificate of Occupancy".
RESPONSE: Note revised.
Topic: Site Plan
Comment Number: 1 Comment Originated: 12/30/2013
12/30/2013: A conflict may be created by placing the 3 compact vehicle spaces along the
west property line. In order for the drivers of any vehicles parked there and faced fwd. the
driver would have to back up and make a complete u-turn in order to exit. You could
provide an added compact parking space to the two facing the street and west of the right
providing a backup for the three spaces and eliminating the three compact spaces facing
west. Therefore you would only be reducing 2 compact parking spaces overall.
RESPONSE: 3 spaces removed.
Comment Number: 2 Comment Originated: 12/30/2013
12/30/2013: Based on the building square footage a maximum of 21 vehicle spaces is
allowed. A modification of standards or alternative compliance is required for excess
spaces.
RESPONSE: The building is actually smaller and we have added additional users so we
think we are fine on parking.
Comment Number: 3 Comment Originated: 12/30/2013
12/30/2013: Trash Enclosure - In addition to the separate entry opening for an individual to
gain access interior bollards or other measures should be made to prevent the opening
from being blocked within the trash enclosure.
RESPONSE: Trash enclosure has been revised to reflect a man-door and has been moved
with the site re-design so we think this works better.
Comment Number: 4 Comment Originated: 12/30/2013
12/30/2013: Provide length and depth dimensions of the building.
RESPONSE: Dimensions added.