HomeMy WebLinkAboutTHE SUMMIT ON COLLEGE PARKING GARAGE - MJA/FDP - FDP130056 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTGGeoteechniical E
Par
Engin
rking Gar
Capsto
neer
rage at Th
1721
F
Terra
one Deve
Terr
ring R
he Summ
1 Choice
Fort Colli
O
acon Projec
lopment P
Birmingh
racon Con
Fort Coll
Repo
mit on Coll
Center D
ns, Color
ctober 29, 2
ct No. 20135
Prepared
Partners,
am, Alaba
Prepared
nsultants,
ins, Color
ort
lege
Drive
rado
2013
5039
d for:
LLC
ama
d by:
Inc.
rado
TABLE OF CONTENTS
Page
EXECUTIVE SUMMARY ............................................................................................................... i
1.0 INTRODUCTION ............................................................................................................... 1
2.0 PROJECT INFORMATION ............................................................................................... 2
2.1 Project Description ................................................................................................ 2
2.2 Site Location and Description ................................................................................ 2
3.0 SUBSURFACE CONDITIONS .......................................................................................... 2
3.1 Typical Subsurface Profile ..................................................................................... 2
3.2 Laboratory Testing ................................................................................................ 3
3.3 Groundwater .......................................................................................................... 3
4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION ....................................... 4
4.1 Geotechnical Considerations................................................................................. 4
4.1.1 Existing Fill ................................................................................................. 4
4.1.2 Shallow Groundwater ................................................................................ 4
4.1.3 Expansive Soils ......................................................................................... 5
4.2 Earthwork .............................................................................................................. 5
4.2.1 Site Preparation .......................................................................................... 5
4.2.2 Demolition .................................................................................................. 6
4.2.3 Excavation .................................................................................................. 6
4.2.4 Subgrade Preparation ................................................................................. 7
4.2.5 Fill Materials and Placement ....................................................................... 7
4.2.6 Compaction Requirements ......................................................................... 8
4.2.7 Utility Trench Backfill ................................................................................... 8
4.2.8 Grading and Drainage ................................................................................ 9
4.2.9 Exterior Slab Design and Construction ...................................................... 10
4.3 Foundations ......................................................................................................... 10
4.3.1 Drilled Piers Bottomed in Bedrock - Design Recommendations .............. 10
4.3.2 Drilled Piers Bottomed in Bedrock - Construction Considerations ........... 11
4.4 Seismic Considerations ....................................................................................... 12
4.5 Floor Systems ..................................................................................................... 12
4.5.1 Floor System - Design Recommendations .............................................. 12
4.5.2 Floor Systems - Construction Considerations .......................................... 13
4.6 Pavements .......................................................................................................... 13
4.6.1 Pavements – Subgrade Preparation ........................................................ 14
4.6.2 Pavements – Thickness Recommendations ............................................ 14
4.6.3 Pavements – Construction Considerations .............................................. 15
4.6.4 Pavements – Maintenance ...................................................................... 15
5.0 GENERAL COMMENTS ................................................................................................. 16
TABLE OF CONTENTS (continued)
Appendix A – FIELD EXPLORATION
Exhibit A-1 Site Location Map
Exhibit A-2 Boring Location Plan
Exhibit A-3 Field Exploration Description
Exhibits A-4 to A-6 Boring Logs
Appendix B – LABORATORY TESTING
Exhibit B-1 Laboratory Testing Description
Exhibit B-2 Atterberg Limits Test Results
Exhibit B-3 Grain-size Distribution Test Results
Exhibit B-4 Unconfined Compressive Strength Test Results
Exhibit B-5 Water-soluble Sulfate Test Results
Appendix C – SUPPORTING DOCUMENTS
Exhibit C-1 General Notes
Exhibit C-2 Unified Soil Classification System
Exhibit C-3 Description of Rock Properties
Exhibit C-4 Laboratory Test Significance and Purpose
Exhibits C-5 and C-6 Report Terminology
Geotechn
Parking G
October 2
Respons
EXECU
A geotec
on Colleg
borings,
3, were
specifical
in these a
Based on
the propo
need to b
E
a
te
p
th
co
W
sy
d
W
fu
re
p
p
T
la
co
T
si
C
a
re
This sum
should b
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
UTIVE SU
chnical invest
ge to be con
presented as
performed to
lly addresses
areas are for
n the informa
osed project
be considere
Existing fill wa
bout 1 to 4 f
esting during
arking lot oc
he field dens
ontent were
We recomme
ystem botto
Geotechn
Parking G
October 2
Respons
report m
herein. T
report lim
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
ust be read
The section
mitations.
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
d in its entire
titled GENE
t
College ■ For
ct No. 201350
able
ety for a co
ERAL COMM
rt Collins, Colo
039
omprehensiv
MENTS sho
orado
ve understan
ould be read
nding of the
d for an und
items conta
erstanding o
ii
ained
of the
Responsive ■ Resourceful ■ Reliable 1
GEOTECHNICAL ENGINEERING REPORT
Parking Garage at The Summit on College
1721 Choice Center Drive
Fort Collins, Colorado
Terracon Project No. 20135039
October 29, 2013
1.0 INTRODUCTION
This report presents the results of our geotechnical engineering services performed for the
proposed parking garage at The Summit on College to be located at 1721 Choice Center Drive in
Fort Collins, Colorado. The purpose of these services is to provide information and geotechnical
engineering recommendations relative to:
subsurface soil and bedrock conditions seismic considerations
groundwater conditions pavement construction
grading and drainage earthwork
foundation design and construction
Our geotechnical engineering scope of work for this project included the initial site visit, the
advancement of three (3) test borings to depths of approximately 30 feet below existing site
grades, laboratory testing for soil engineering properties and engineering analyses to provide
geotechnical design and construction recommendations for foundations, garage pavements,
and other parking garage site development elements.
Logs of the borings along with a Boring Location Plan (Exhibit A-2) are included in Appendix A.
The results of the laboratory testing performed on soil and bedrock samples obtained from the
site during the field exploration are included in Appendix B.
Previously, Terracon prepared a Geotechnical Engineering Report (Project No. 200850913; report
dated March 14, 2008) for the existing student housing/retail development currently occupying the
site. Our previous geotechnical study included completion of several borings in the area of the
existing parking lot. The borings completed as part of this study were performed to supplement
the previous data and geotechnical information from this previous study. Terracon also provided
construction materials testing and observation services (Project No. 20111062) during site
development and construction of the existing student housing/retail development.
Geotechn
Parking G
October 2
Respons
2.0 P
2.1 P
Site layo
Structur
Building
Maximu
Grading
Below-g
2.2 S
Location
Existing
Current
Existing
3.0 S
3.1 T
Specific
logs incl
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
PROJECT
Project Des
Item
out
res
g constructio
m loads
g
grade areas
Site Locatio
Item
n
g improveme
ground cove
g topography
SUBSUR
Typical Sub
conditions e
luded in Ap
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
T INFORM
scription
on
on and Des
ents
er
y
RFACE C
bsurface P
encountered
ppendix A.
t
Geotechn
Parking G
October 2
Respons
approxim
gradual.
generaliz
M
L
Fill mate
with v
Sa
S
3.2 L
Geotech
expansiv
compres
selected
ranging f
Results o
be speci
designed
Section 3
3.3 G
The bore
groundwa
observed
Borin
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
mate location
Based on t
zed as follow
Material Desc
Landscaping
erials consistin
varying amoun
Lean to fat c
and with silt an
Sandstone be
Laboratory
nical data f
ve at in-situ m
sive strengt
for plasticity
from 37 to 55
of water-solu
ified for all
d for low sulf
318, Chapte
Groundwat
eholes were
ater. In add
d in the boreh
ng Number
1
2
3
Geotechn
Parking G
October 2
Respons
These ob
may not
to fluctua
Groundw
Spring C
were per
of the pa
possibilit
and cons
Fluctuatio
monitorin
measure
4.0 R
4.1 G
Based o
proposed
design a
identified
parking g
4.1.1 E
As previo
drilled at
and cons
parking g
indicate t
If the foo
lot, the ne
typically
elements
footprint
compacti
4.1.2 S
As previo
below ex
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
bservations
be indicative
ate with vary
water level fl
Creek, amou
rformed. Th
arking garag
y of groundw
struction plan
ons in groun
ng plan. Suc
ment of grou
RECOMM
Geotechnic
n subsurfac
d constructio
and constru
d geotechnic
Geotechn
Parking G
October 2
Respons
our prev
services
least 3 fe
levels. I
levels in
4.1.3 E
Laborato
clayey fil
opinion t
loss of m
This rep
expansio
the struc
other dam
the site
moveme
risk of m
imperativ
report be
4.2 E
The follo
and plac
observed
include
preparati
construct
4.2.1 S
Prior to p
from the
lot. We
preparati
Stripped
areas or
site shou
relatively
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
vious study
provided du
eet between
t is also pos
the Spring C
Expansive S
ory testing d
l materials a
hese materi
moisture.
port provides
on. Howeve
ctures, pave
mage such a
results in ex
nt and distre
movement if
Geotechn
Parking G
October 2
Respons
4.2.2 D
Demolitio
garage fo
construct
pavemen
Consider
uniformly
size of 2-
4.2.3 E
Following
accompli
The soils
solely on
should ve
subsurfac
evaluated
Although
was not
construct
removed
Dependin
groundwa
sumps m
The subg
of the so
flatter tha
be made
maintain
shored in
excavatio
As a safe
distance
protected
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
Demolition
on of the exi
oundation el
tion area.
nts should be
ration could
y blended wi
-inches and b
Excavation
g demolition
shed with co
s to be excav
n the materia
erify that sim
ce conditions
d to determin
evidence of
observed d
tion. If une
Geotechn
Parking G
October 2
Respons
4.2.4 S
After com
islands,
condition
determin
If pocket
excavatio
establish
fill.
After the
the pave
with the r
The stab
other fac
drying.
may be
surface s
also be u
4.2.5 F
The on-s
as fill ma
as define
procedur
noted th
compact
Imported
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
Subgrade P
mpletion of
the top 8
ned, and re
ed by ASTM
s of soft, loo
ons below
hed by over-
bottom of t
ement subgr
recommenda
bility of the s
ctors. If uns
Alternatively
used, or cr
soil until a s
used to redu
Fill Material
ite soils or a
aterial. The s
ed by a field
res, can be r
at on-site s
ion criteria.
d soils (if req
Grad
Geotechn
Parking G
October 2
Respons
Maxi
1. Mea
dete
surch
4.2.6 C
Engineer
procedur
Fill lift th
Minimum
Moisture
Moisture
(sand)
1. We r
Shou
have
until
2. Spec
to be
3. Mois
these
wetti
4.2.7 U
All trenc
including
All under
couplings
in founda
that utility
backfilled
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
Soil Pro
Liquid
Plastic
mum Expan
sured on a sa
rmined by AS
harge and su
Compaction
red fill shou
res that will p
Ite
hickness
m compactio
e content co
e content co
recommend e
uld the results
e not been me
the specified
cifically, mois
e achieved wi
sture conditio
e materials c
Geotechn
Parking G
October 2
Respons
cohesive
through t
Utility tre
penetrate
flow throu
effective
The plug
optimum
compacte
It is stron
compacti
4.2.8 G
All grade
garage a
proposed
construct
Water pe
construct
report. A
relied up
the fill an
Exposed
beyond t
and/or ar
of the bu
free of al
of the pr
final gra
achieved
Flatwork
practical
addition,
of flatwo
structure
infiltration
Planters
mains an
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
fill in non-p
the trench ba
enches are a
e beneath th
ugh the tren
clay “trench
g material sh
water conte
ed in accord
ngly recomm
ion testing of
Grading and
es must be
and existing
d project. I
Geotechn
Parking G
October 2
Respons
Low-volu
should d
feet thro
have the
appropria
4.2.9 E
Exterior s
the site s
Potential
M
C
U
a
P
4.3 F
We reco
bottomed
garage a
4.3.1 D
Minimu
Minimu
Minimu
Maximu
Allowab
Void thi
1. D
Piers sho
pier diam
diameter
capacity
Capacity
action an
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
ume, drip sty
ischarge on
ugh the use
e roof drains
ate outfall.
Exterior Sla
slabs on-gra
soils will like
movement
Minimizing m
Controlling m
Using design
nd adjoining
Placing contr
Foundation
mmend con
d in bedroc
and related s
Drilled Pier
m pier length
Geotechn
Parking G
October 2
Respons
To satisfy
lateral loa
LPILE s
Unit we
Average
Average
Coeffic
Strain,
1. F
gr
4.3.2 D
Drilling to
majority o
layers. I
required
Groundw
should b
be place
bottom-d
concrete
raveling,
Casing s
concrete
Pier conc
tremie. P
We reco
bearing s
bearing s
should o
Free-fall
striking t
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
y forces in th
ad criteria:
soil type1
eight (pcf)
e undrained
e angle of in
ient of subgr
50 (%)
or purposes o
round surface
Drilled Pier
o design de
of the site; h
In addition,
to properly d
water should
e placed im
ed in dry co
dump hoppe
segregatio
foundation
Geotechn
Parking G
October 2
Respons
hopper,
segregat
4.4 S
20
1. In ge
2. The
dept
requ
max
bedr
explo
explo
more
unlik
4.5 F
A slab-o
parking g
to a dept
compact
4.5.1 F
Even wh
possible
moveme
structura
should be
For struc
subgrade
compacte
at least 1
Additiona
P
fo
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
or an elep
tion will be m
Seismic Co
Co
12 Internation
eneral accord
2012 Interna
th of 100 feet
uired 100 foot
imum depth o
rock condition
oration to dee
oration. Alter
e favorable se
kely.
Floor Syste
n-grade (if
garage build
th of at least
ion of subgra
Geotechn
Parking G
October 2
Respons
C
S
lo
In
w
F
A
p
fr
is
T
co
co
co
s
of
O
S
4.5.2 F
Moveme
report w
assume t
occur sh
potential
due to o
and/or b
this repo
4.6 P
Construc
the exist
landscap
pavemen
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
Control joints
Section 302.
ocation and e
nterior utility
with the recom
loor slabs sh
A minimum 2
laced on the
rames within
solated from
The use of a
overed with
overings, or
onditions wa
hould refer t
f a vapor ret
Other design
Section 302.1
Floor Syste
nts of slabs-
Geotechn
Parking G
October 2
Respons
4.6.1 P
On most
Fills are
this proje
subgrade
rainfall/sn
construct
at the tim
pavemen
repairs a
condition
paving.
4.6.2 P
In areas
of adjace
for differe
directly b
existing p
Where r
approved
Concrete
from the
followed.
Longitud
expansio
based up
material
Aggregat
specifica
Transpor
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
Pavements
project sites
typically pla
ect will be
e may be d
now melt.
tion and cor
me of pavem
nt subgrade
around parki
ned and prop
Pavements
where new
ent concrete
ential movem
below new p
pavement an
rigid paveme
d mix design
Prop
Compressi
Cemen
Geotechn
Parking G
October 2
Respons
concrete
should b
maximum
Pavemen
maintena
and layo
Site g
The s
surfa
Cons
Instal
Instal
Seal
subg
Placi
4.6.3 P
Openings
surround
subgrade
islands w
civil desi
collect a
connecte
barriers p
pavemen
We antic
with new
scarifying
fill in the
pavemen
4.6.4 P
Preventa
managem
maintena
and glob
priority w
return on
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
meeting the
be placed in
m dry unit we
nt performa
ance, the civ
ut of paveme
grades shou
subgrade an
ce drainage;
sider appropr
ll pavement
ll joint sealan
all landsca
rade soils; a
ng compacte
Geotechn
Parking G
October 2
Respons
5.0 G
Terracon
can be m
in the de
testing s
construct
The anal
from the
this repo
site, or d
variations
should b
can be p
The scop
environm
preventio
potential
This repo
project d
engineer
safety, ex
event tha
planned,
valid unle
report in
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
GENERAL
n should be
made regard
esign and sp
services dur
tion phases
lysis and rec
borings per
ort. This rep
due to the m
s may not b
be immediate
rovided.
pe of service
mental or bio
on of polluta
for such con
ort has been
discussed an
ring practice
xcavation su
at changes in
the conclus
ess Terracon
writing.
ering Report
e Summit on C
APPENDIX A
FIELD EXPLORATION
SITE LOCATION MAP
A-1
20135039
10/25/2013
EDB
EDB
JCG
EDB
Not to scale
Project Manager:
Drawn by:
Checked by:
Approved by:
Project No.
Scale:
File Name:
Date:
Exhibit
Project Site
Parking Garage at The Summit on College
1721 Choice Center Drive
1901 Sharp Point Drive, Suite C Fort Collins, Colorado 80525 Fort Collins, Colorado
PH. (970) 484-0359 FAX. (970) 484-0454
BORING LOCATION PLAN
1901 Sharp Point Drive, Suite C Fort Collins, Colorado 80525 A-2
PH. (970) 484-0359 FAX. (970) 484-0454
20135039
10/25/2013
EDB
EDB
JCG
EDB
1” = 60’
Project Manager:
Drawn by:
Checked by:
Approved by:
Project No.
Scale:
File Name:
Date:
DIAGRAM IS FOR GENERAL LOCATION Exhibit
ONLY, AND IS NOT INTENDED FOR
CONSTRUCTION PURPOSES
0’ 30’ 60’
APPROXIMATE SCALE
Approximate Boring Location
1
Parking Garage at The Summit on College
1721 Choice Center Drive
Fort Collins, Colorado
Approximate Location of
Temporary Benchmark (Top of
Finished Concrete for
Transformer Pad – Assumed
Elevation 100.0’)
LEGEND
3 2 1
4
5
6
1
3
2
Geotechn
Parking G
October 2
Respons
Field Ex
The loca
site plan
ground s
benchma
The bori
hollow-st
by the fie
outside
Disturbed
recorded
the samp
inches. T
for stand
recorded
indicated
are not c
A CME a
this site.
conventio
the SPT
This high
the pene
method.
and analy
The stan
type mat
since the
addition,
particula
Groundw
several d
borings w
settleme
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
xploration
ations of bor
. The borin
surface elev
ark shown on
ngs were d
tem augers.
eld engineer
diameter sp
d bulk samp
d in a manne
pler into the
The number
dard split-sp
d as a stand
d on the bor
considered N
automatic SP
0.3
2.0
14.0
19.0
29.3
LANDSCAPE MULCH - 3 inches
FILL - LEAN CLAY, dark brown
SANDY LEAN CLAY (CL), dark brown to brown, very soft to
stiff
WELL GRADED SAND WITH SILT AND GRAVEL, brown,
medium dense
SEDIMENTARY BEDROCK - SANDSTONE, olive to light
brown, very hard
Boring Terminated at 29.3 Feet
.06
98.5
96.5
84.5
79.5
69.5
16 60
19
20
23
19
23
4-8
7-6
2-2
8-6-9
N=15
13-32-50/5"
N=82/11"
50/6"
N=50/6"
50/3"
N=50/3"
105 37-20-17
See Exhibit A-2
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
LOCATION
DEPTH
Latitude: 40.563519° Longitude: -105.078622°
GRAPHIC LOG
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20135039.GPJ TERRACON2012.GDT 10/17/13
1721 Choice Center Drive
Fort Collins, Colorado
SITE:
While drilling.
24-hour measurement.
WATER LEVEL OBSERVATIONS
PROJECT: Parking Garage at The Summit
on College
Page 1 of 1
Advancement Method:
4-inch hollow-stem augers
Abandonment Method:
Borings backfilled with soil cuttings upon completion.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
0.7
4.0
5.0
8.0
12.0
17.0
29.3
VEGETATIVE LAYER - 8 inches
FILL - LEAN CLAY, brown, medium stiff
SANDY LEAN CLAY, brown, medium stiff
POORLY GRADED SAND, brown
SANDY FAT CLAY (CH), brown, stiff
WELL GRADED SAND WITH SILT AND GRAVEL, brown,
medium dense
SEDIMENTARY BEDROCK - SANDSTONE, olive to light
brown, hard to very hard
Boring Terminated at 29.3 Feet
95
91.5
90.5
87.5
83.5
78.5
66.5
59
21
21
21
12
20
18
20
3-4
3-4
5-9
2-4-9
N=13
22-50/5"
N=72/11"
50/6"
N=50/6"
50/4"
N=50/4"
104
102
101 55-25-30
See Exhibit A-2
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
LOCATION
DEPTH
Latitude: 40.563001° Longitude: -105.078673°
GRAPHIC LOG
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20135039.GPJ TERRACON2012.GDT 10/17/13
1721 Choice Center Drive
Fort Collins, Colorado
SITE:
While drilling.
24-hour measurement.
WATER LEVEL OBSERVATIONS
PROJECT: Parking Garage at The Summit
0.3
1.0
14.0
17.0
29.4
LANDSCAPE MULCH - 3 inches
FILL - LEAN CLAY, dark brown
SANDY LEAN CLAY, dark brown, medium stiff to stiff
WELL GRADED SAND WITH SILT AND GRAVEL (SW-SM),
brown, medium dense
SEDIMENTARY BEDROCK - SANDSTONE, olive rust to light
brown, hard to very hard
Boring Terminated at 29.4 Feet
97
96.5
83.5
80.5
68
10
18
18
25
12
22
20
23
5-6
5-6
4-5
11-12-8
N=20
12-28-41
N=69
44-50/2"
N=94/8"
50/5"
N=50/5"
107
104
98
NP
See Exhibit A-2
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
LOCATION
DEPTH
Latitude: 40.56293° Longitude: -105.078081°
GRAPHIC LOG
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20135039.GPJ TERRACON2012.GDT 10/17/13
1721 Choice Center Drive
Fort Collins, Colorado
SITE:
While drilling.
24-hour measurement.
WATER LEVEL OBSERVATIONS
PROJECT: Parking Garage at The Summit
on College
Page 1 of 1
Advancement Method:
4-inch hollow-stem augers
Abandonment Method:
APPENDIX B
LABORATORY TESTING
Geotechn
Parking G
October 2
Respons
Laborat
The soil
laborator
descriptio
determin
Laborato
tests are
geotechn
recomme
locally ac
Soil Clas
general a
nical Enginee
Garage at The
29, 2013 ■ Te
ive ■ Resour
tory Testin
and bedro
ry for obse
ons were re
e engineerin
ory tests wer
presented o
nical engine
endations. T
ccepted stan
ssification S
accordance w
Wate
Grai
Com
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
ng Descript
ock samples
rvation by
eviewed and
ng properties
re conducte
on the borin
eering anal
The laborato
ndards. Soil
ystem desc
with the desc
er content
n-size distrib
mpressive str
t
College ■ For
ct No. 201350
able
tion
s retrieved
0
10
20
30
40
50
60
0 20 40 60 80 100
CL or OL CH or OH
ML or OL
MH or OH
PL PI
2.0
9.0
14.0
Boring ID Depth Description
SANDY LEAN CLAY
SANDY FAT CLAY
WELL-GRADED SAND with SILT and GRAVEL
CL
CH
SW-SM
Fines
P
L
A
S
T
I
C
I
T
Y
I
N
D
E
X
LIQUID LIMIT
"U" Line
"A" Line
37
55
NP
20
25
NP
17
30
NP
60
59
10
LL USCS
1
2
3
ATTERBERG LIMITS RESULTS
ASTM D4318
1901 Sharp Point Drive, Suite C
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
100 10 1 0.1 0.01 0.001
6 16
20 30
40 50
1.5 6 200
810
34.4 10.5
14
LL PL PI
%Silt %Clay
1 4
3/4 1/2
60
fine
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER
NP NP 1.53
D100
Cc Cu
SILT OR CLAY
4
D30 D10 %Gravel %Sand
3 WELL-GRADED SAND with SILT and GRAVEL(SW-SM) NP
3 37.5 3.631 0.622
14.0 52.07
GRAIN SIZE IN MILLIMETERS
PERCENT FINER BY WEIGHT
coarse fine
3/8 3 100
3 2 140
COBBLES
GRAVEL SAND
USCS Classification
55.1
D60
coarse medium
14.0
Boring ID Depth
Boring ID Depth
GRAIN SIZE DISTRIBUTION
UNCONFINED COMPRESSION STRENGTH OF COHESIVE SOIL
ASTM D2166
NOTE: CONTROLLED STRAIN
MACHINE ID / LOAD CELL ID
WATER CONTENT, % 27.8 STRAIN AT FAILURE, % 15.0
DRY DENSITY, pcf 97.1 TIME TO FAILURE, minutes 7.5
VOID RATIO 0.74 RATE OF LOADING, %/min 2.0
SATURATION, % 102 SHEAR STRENGTH, psf 630
INITIAL DIAMETER, inch 2.36 INITIAL LENGTH, inch 5.21
LENGTH TO DIAMETER RATIO 2.20 SAMPLE TYPE UNDISTURBED
SAMPLE DESCRIPTION
BORING NO. 1 SAMPLE NO. DEPTH, feet 9.0
rms V01 12/20/08 Exhibit B-4
N:\Projects\2013\20135039\Working Files\Laboratory-Field Data-Boring Logs\[20135039 UC 1@9.xlsm]Report
20135039
10/11/2013
Sandy lean clay (CL)
LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX SPECIFIC GRAV.
GeoJack1972 / 235166 COMPRESSIVE STRENGTH, psf 1260
2.70 ASSUMED
0
200
400
600
800
1000
1200
1400
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
UNCONFINED COMPRESSIVE STRENGTH, psf
AXIAL STRAIN, %
Exhibit B-5
APPENDIX C
SUPPORTING DOCUMENTS
Exhibit: C-1
Unconfined
Compressive
Strength
Qu, (tsf)
0.25 to 0.50
1.00 to 2.00
> 4.00
less than 0.25
0.50 to 1.00
2.00 to 4.00
Non-plastic
Low
Medium
High
DESCRIPTION OF SYMBOLS AND ABBREVIATIONS
Hand Penetrometer
Torvane
Dynamic Cone Penetrometer
Photo-Ionization Detector
Organic Vapor Analyzer
SAMPLING
WATER LEVEL
FIELD TESTS
(HP)
(T)
(DCP)
(PID)
(OVA)
GENERAL NOTES
Over 12 in. (300 mm)
12 in. to 3 in. (300mm to 75mm)
3 in. to #4 sieve (75mm to 4.75 mm)
#4 to #200 sieve (4.75mm to 0.075mm
Passing #200 sieve (0.075mm)
Particle Size
< 5
5 - 12
> 12
Percent of
Dry Weight
Descriptive Term(s)
of other constituents
RELATIVE PROPORTIONS OF FINES
0
1 - 10
11 - 30
> 30
Plasticity Index
Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry
weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have
less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and
silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be
added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined
on the basis of their in-place relative density and fine-grained soils on the basis of their consistency.
LOCATION AND ELEVATION NOTES
Percent of
Dry Weight
Major Component
of Sample
UNIFIED SOIL CLASSIFICATION SYSTEM
Exhibit C-2
Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A
Soil Classification
Group
Symbol Group Name B
Coarse Grained Soils:
More than 50% retained
on No. 200 sieve
Gravels:
More than 50% of
coarse fraction retained
on No. 4 sieve
Clean Gravels:
Less than 5% fines C
Cu 4 and 1 Cc 3 E GW Well-graded gravel F
Cu 4 and/or 1 Cc 3 E GP Poorly graded gravel F
Gravels with Fines:
More than 12% fines C
Fines classify as ML or MH GM Silty gravel F,G,H
Fines classify as CL or CH GC Clayey gravel F,G,H
Sands:
50% or more of coarse
fraction passes No. 4
sieve
Clean Sands:
Less than 5% fines D
Cu 6 and 1 Cc 3 E SW Well-graded sand I
Cu 6 and/or 1 Cc 3 E SP Poorly graded sand I
Sands with Fines:
More than 12% fines D
Fines classify as ML or MH SM Silty sand G,H,I
Fines classify as CL or CH SC Clayey sand G,H,I
Fine-Grained Soils:
50% or more passes the
No. 200 sieve
Silts and Clays:
Liquid limit less than 50
Inorganic:
PI 7 and plots on or above “A” line J CL Lean clay K,L,M
PI 4 or plots below “A” line J ML Silt K,L,M
Organic:
Liquid limit - oven dried
0.75 OL
Organic clay K,L,M,N
Liquid limit - not dried Organic silt K,L,M,O
Silts and Clays:
Liquid limit 50 or more
Inorganic:
PI plots on or above “A” line CH Fat clay K,L,M
PI plots below “A” line MH Elastic Silt K,L,M
Organic:
Liquid limit - oven dried
0.75 OH
Organic clay K,L,M,P
Liquid limit - not dried Organic silt K,L,M,Q
Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-inch (75-mm) sieve
B If field sample contained cobbles or boulders, or both, add “with cobbles
or boulders, or both” to group name.
DESCRIPTION OF ROCK PROPERTIES
Exhibit C-3
WEATHERING
Fresh Rock fresh, crystals bright, few joints may show slight staining. Rock rings under hammer if crystalline.
Very slight Rock generally fresh, joints stained, some joints may show thin clay coatings, crystals in broken face show
bright. Rock rings under hammer if crystalline.
Slight Rock generally fresh, joints stained, and discoloration extends into rock up to 1 in. Joints may contain clay. In
granitoid rocks some occasional feldspar crystals are dull and discolored. Crystalline rocks ring under hammer.
Moderate Significant portions of rock show discoloration and weathering effects. In granitoid rocks, most feldspars are dull
and discolored; some show clayey. Rock has dull sound under hammer and shows significant loss of strength
as compared with fresh rock.
Moderately severe All rock except quartz discolored or stained. In granitoid rocks, all feldspars dull and discolored and majority
show kaolinization. Rock shows severe loss of strength and can be excavated with geologist’s pick.
Severe All rock except quartz discolored or stained. Rock “fabric” clear and evident, but reduced in strength to strong
soil. In granitoid rocks, all feldspars kaolinized to some extent. Some fragments of strong rock usually left.
Very severe All rock except quartz discolored or stained. Rock “fabric” discernible, but mass effectively reduced to “soil” with
only fragments of strong rock remaining.
Complete Rock reduced to ”soil”. Rock “fabric” not discernible or discernible only in small, scattered locations. Quartz may
be present as dikes or stringers.
HARDNESS (for engineering description of rock – not to be confused with Moh’s scale for minerals)
Very hard Cannot be scratched with knife or sharp pick. Breaking of hand specimens requires several hard blows of
geologist’s pick.
Hard Can be scratched with knife or pick only with difficulty. Hard blow of hammer required to detach hand specimen.
Moderately hard Can be scratched with knife or pick. Gouges or grooves to ¼ in. deep can be excavated by hard blow of point of
a geologist’s pick. Hand specimens can be detached by moderate blow.
Medium Can be grooved or gouged 1/16 in. deep by firm pressure on knife or pick point. Can be excavated in small
chips to pieces about 1-in. maximum size by hard blows of the point of a geologist’s pick.
Soft Can be gouged or grooved readily with knife or pick point. Can be excavated in chips to pieces several inches in
size by moderate blows of a pick point. Small thin pieces can be broken by finger pressure.
Very soft Can be carved with knife. Can be excavated readily with point of pick. Pieces 1-in. or more in thickness can be
broken with finger pressure. Can be scratched readily by fingernail.
Joint, Bedding, and Foliation Spacing in Rock
a
Spacing Joints Bedding/Foliation
Less than 2 in. Very close Very thin
2 in. – 1 ft. Close Thin
1 ft. – 3 ft. Moderately close Medium
3 ft. – 10 ft. Wide Thick
More than 10 ft. Very wide Very thick
a. Spacing refers to the distance normal to the planes, of the described feature, which are parallel to each other or nearly so.
Rock Quality Designator (RQD) a Joint Openness Descriptors
RQD, as a percentage Diagnostic description Openness Descriptor
Exceeding 90 Excellent No Visible Separation Tight
90 – 75 Good Less than 1/32 in. Slightly Open
75 – 50 Fair 1/32 to 1/8 in. Moderately Open
50 – 25 Poor 1/8 to 3/8 in. Open
Less than 25 Very poor 3/8 in. to 0.1 ft. Moderately Wide
a. RQD (given as a percentage) = length of core in pieces Greater than 0.1 ft. Wide
4 in. and longer/length of run.
References: American Society of Civil Engineers. Manuals and Reports on Engineering Practice - No. 56. Subsurface Investigation for
Design and Construction of Foundations of Buildings. New York: American Society of Civil Engineers, 1976. U.S.
Department of the Interior, Bureau of Reclamation, Engineering Geology Field Manual.
Exhibit C-4
LABORATORY TEST
SIGNIFICANCE AND PURPOSE
Test Significance Purpose
California Bearing
Ratio
Used to evaluate the potential strength of subgrade soil,
subbase, and base course material, including recycled
materials for use in road and airfield pavements.
Pavement Thickness
Design
Consolidation
Used to develop an estimate of both the rate and amount of
both differential and total settlement of a structure. Foundation Design
Direct Shear
Used to determine the consolidated drained shear strength
of soil or rock.
Bearing Capacity,
Foundation Design,
and Slope Stability
Dry Density
Used to determine the in-place density of natural, inorganic,
fine-grained soils.
Index Property Soil
Behavior
Expansion
Used to measure the expansive potential of fine-grained
soil and to provide a basis for swell potential classification.
Foundation and Slab
Design
Gradation
Used for the quantitative determination of the distribution of
particle sizes in soil. Soil Classification
Liquid & Plastic Limit,
Plasticity Index
Used as an integral part of engineering classification
systems to characterize the fine-grained fraction of soils,
and to specify the fine-grained fraction of construction
materials.
Soil Classification
Permeability
Used to determine the capacity of soil or rock to conduct a
liquid or gas.
Groundwater Flow
Analysis
pH
Used to determine the degree of acidity or alkalinity of a
soil. Corrosion Potential
Resistivity
Used to indicate the relative ability of a soil medium to carry
electrical currents. Corrosion Potential
R-Value
Used to evaluate the potential strength of subgrade soil,
subbase, and base course material, including recycled
materials for use in road and airfield pavements.
Pavement Thickness
Design
Soluble Sulfate
Used to determine the quantitative amount of soluble
sulfates within a soil mass. Corrosion Potential
Exhibit C-5
REPORT TERMINOLOGY
(Based on ASTM D653)
Allowable Soil
Bearing Capacity
The recommended maximum contact stress developed at the interface of the foundation
element and the supporting material.
Alluvium
Soil, the constituents of which have been transported in suspension by flowing water and
subsequently deposited by sedimentation.
Aggregate Base
Course
A layer of specified material placed on a subgrade or subbase usually beneath slabs or
pavements.
Backfill A specified material placed and compacted in a confined area.
Bedrock
A natural aggregate of mineral grains connected by strong and permanent cohesive forces.
Usually requires drilling, wedging, blasting or other methods of extraordinary force for
excavation.
Bench A horizontal surface in a sloped deposit.
Caisson (Drilled
Pier or Shaft)
A concrete foundation element cast in a circular excavation which may have an enlarged
base. Sometimes referred to as a cast-in-place pier or drilled shaft.
Coefficient of
Friction
A constant proportionality factor relating normal stress and the corresponding shear stress
at which sliding starts between the two surfaces.
Colluvium
Soil, the constituents of which have been deposited chiefly by gravity such as at the foot of a
slope or cliff.
Compaction The densification of a soil by means of mechanical manipulation
Concrete Slab-on-
Grade
A concrete surface layer cast directly upon a base, subbase or subgrade, and typically used
as a floor system.
Differential
Movement
Unequal settlement or heave between, or within foundation elements of structure.
Earth Pressure The pressure exerted by soil on any boundary such as a foundation wall.
ESAL
Equivalent Single Axle Load, a criteria used to convert traffic to a uniform standard, (18,000
pound axle loads).
Engineered Fill
Specified material placed and compacted to specified density and/or moisture conditions
under observations of a representative of a geotechnical engineer.
Equivalent Fluid
A hypothetical fluid having a unit weight such that it will produce a pressure against a lateral
support presumed to be equivalent to that produced by the actual soil. This simplified
approach is valid only when deformation conditions are such that the pressure increases
linearly with depth and the wall friction is neglected.
Existing Fill (or
Man-Made Fill)
Materials deposited throughout the action of man prior to exploration of the site.
Existing Grade The ground surface at the time of field exploration.
Exhibit C-6
REPORT TERMINOLOGY
(Based on ASTM D653)
Expansive Potential The potential of a soil to expand (increase in volume) due to absorption of moisture.
Finished Grade The final grade created as a part of the project.
Footing A portion of the foundation of a structure that transmits loads directly to the soil.
Foundation The lower part of a structure that transmits the loads to the soil or bedrock.
Frost Depth The depth at which the ground becomes frozen during the winter season.
Grade Beam
A foundation element or wall, typically constructed of reinforced concrete, used to span
between other foundation elements such as drilled piers.
Groundwater Subsurface water found in the zone of saturation of soils or within fractures in bedrock.
Heave Upward movement.
Lithologic
The characteristics which describe the composition and texture of soil and rock by
observation.
Native Grade The naturally occurring ground surface.
Native Soil Naturally occurring on-site soil, sometimes referred to as natural soil.
Optimum Moisture
Content
The water content at which a soil can be compacted to a maximum dry unit weight by a given
compactive effort.
Perched Water
Groundwater, usually of limited area maintained above a normal water elevation by the
presence of an intervening relatively impervious continuous stratum.
Scarify To mechanically loosen soil or break down existing soil structure.
Settlement Downward movement.
Skin Friction (Side
Shear)
The frictional resistance developed between soil and an element of the structure such as a
drilled pier.
Soil (Earth)
Sediments or other unconsolidated accumulations of solid particles produced by the physical
and chemical disintegration of rocks, and which may or may not contain organic matter.
Strain The change in length per unit of length in a given direction.
Stress The force per unit area acting within a soil mass.
Strip To remove from present location.
Subbase A layer of specified material in a pavement system between the subgrade and base course.
Subgrade The soil prepared and compacted to support a structure, slab or pavement system.
Unconfined
Compression
To obtain the approximate compressive strength of soils
that possess sufficient cohesion to permit testing in the
unconfined state.
Bearing Capacity
Analysis for
Foundations
Water Content
Used to determine the quantitative amount of water in a soil
mass.
Index Property Soil
Behavior
C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded
gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly
graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded
sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded
sand with silt, SP-SC poorly graded sand with clay
E Cu = D60/D10 Cc =
10 60
2
30
D x D
(D )
F If soil contains 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
H If fines are organic, add “with organic fines” to group name.
I If soil contains 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,”
whichever is predominant.
L If soil contains 30% plus No. 200 predominantly sand, add “sandy” to
group name.
M If soil contains 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
N PI 4 and plots on or above “A” line.
O PI 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
Trace
With
Modifier
RELATIVE PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE TERMINOLOGY
Trace
With
Modifier
DESCRIPTIVE SOIL CLASSIFICATION
Boulders
Cobbles
Gravel
Sand
Silt or Clay
Descriptive Term(s)
of other constituents
< 15
15 - 29
> 30
Term
PLASTICITY DESCRIPTION
Water levels indicated on the soil boring
logs are the levels measured in the
borehole at the times indicated.
Groundwater level variations will occur
over time. In low permeability soils,
accurate determination of groundwater
levels is not possible with short term water
level observations.
Water Level After
a Specified Period of Time
Water Level After a
Specified Period of Time
Water Initially
Encountered
Modified
Dames &
Moore Ring
Sampler
Standard
Penetration
Test
Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device. The accuracy
of such devices is variable. Surface elevation data annotated with +/- indicates that no actual topographical survey was
conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic
maps of the area.
STRENGTH TERMS
BEDROCK
Loose
Medium Dense
Dense
0 - 3
4 - 9
10 - 29
30 - 50
7 - 18
19 - 58
Very Soft
Soft
Medium-Stiff
Stiff
Very Stiff
Standard
Penetration or
N-Value
Blows/Ft.
2 - 4
4 - 8
8 - 15
< 3
5 - 9
19 - 42
> 42
30 - 49
50 - 89
20 - 29
Medium Hard
Very Dense
RELATIVE DENSITY OF COARSE-GRAINED
SOILS
Descriptive
Term
(Density)
Very Loose
> 50
Ring
Sampler
Blows/Ft.
0 - 6
59 - 98
> 99
Descriptive
Term
(Consistency)
Hard
0 - 1
Ring
Sampler
Blows/Ft.
3 - 4
10 - 18
Ring
Sampler
Blows/Ft.
< 30
90 - 119
Standard
Penetration or
N-Value
Blows/Ft.
Descriptive
Term
(Consistency)
Weathered
Firm
Very Hard
CONSISTENCY OF FINE-GRAINED SOILS
(More than 50% retained on No. 200 sieve.)
Density determined by
Standard Penetration Resistance
(50% or more passing the No. 200 sieve.)
Consistency determined by laboratory shear strength testing, field
visual-manual procedures or standard penetration resistance
Standard
Penetration or
N-Value
Blows/Ft.
_ 15 - 30
> 30
> 119
< 20
30 - 49
50 - 79
>79
Hard
ASTM D422
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
PROJECT NUMBER: 20135039
PROJECT: Parking Garage at The Summit on
College
SITE: 1721 Choice Center Drive
Fort Collins, Colorado
CLIENT: Capstone Development Partners,
LLC
Birmingham, Alabama
EXHIBIT: B-3
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GRAIN SIZE: USCS-2 20135039.GPJ TERRACON2012.GDT 10/17/13
Fort Collins, Colorado
PROJECT NUMBER: 20135039
PROJECT: Parking Garage at The Summit on
College
SITE: 1721 Choice Center Drive
Fort Collins, Colorado
CLIENT: Capstone Development Partners,
LLC
Birmingham, Alabama
EXHIBIT: B-2
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. ATTERBERG LIMITS 20135039.GPJ TERRACON2012.GDT 10/17/13
CL-ML
the project
d an applica
s of the subs
d on selecte
ng logs and
yses, and
ory tests we
l samples we
ribed in App
cription of ro
bution
rength
rt Collins, Colo
039
during the
t geotechnic
able laborat
surface mate
ed soil and
in this appe
the develo
re performe
ere classifie
pendix C. R
ck properties
orado
field explor
cal enginee
tory testing
erials.
bedrock sam
ndix. The te
opment of
ed in genera
ed in general
Rock sample
s presented
Plasti
Dry d
Wate
ration were
er. At that
program wa
mples. The
est results w
foundation
l accordanc
l accordance
es were visu
in Appendix
icity index
density
er-soluble sul
Exhib
returned to
t time, the
as formulate
e results of t
were used fo
and earth
ce with applic
e with the U
ually classifi
x C.
lfate content
bit B-1
o the
field
ed to
these
or the
hwork
cable
nified
ied in
t
Borings backfilled with soil cuttings upon completion.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20135039
Drill Rig: CME-55
Boring Started: 10/3/2013
BORING LOG NO. 3
CLIENT: Capstone Development Partners, LLC
Birmingham, Alabama
Driller: Terracon Consultants, Inc
Boring Completed: 10/3/2013
Exhibit: A-6
See Exhibit A-3 for description of field
procedures.
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
abbreviations.
SULFATES (%)
ELEVATION (Ft.)
PERCENT FINES
WATER
CONTENT (%)
FIELD TEST
RESULTS
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
Surface Elev.: 97.4 (Ft.)
DEPTH (Ft.)
5
10
15
20
25
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
on College
Page 1 of 1
Advancement Method:
4-inch hollow-stem augers
Abandonment Method:
Borings backfilled with soil cuttings upon completion.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20135039
Drill Rig: CME-55
Boring Started: 10/3/2013
BORING LOG NO. 2
CLIENT: Capstone Development Partners, LLC
Birmingham, Alabama
Driller: Terracon Consultants, Inc
Boring Completed: 10/3/2013
Exhibit: A-5
See Exhibit A-3 for description of field
procedures.
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
abbreviations.
SULFATES (%)
ELEVATION (Ft.)
PERCENT FINES
WATER
CONTENT (%)
FIELD TEST
RESULTS
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
Surface Elev.: 95.6 (Ft.)
DEPTH (Ft.)
5
10
15
20
25
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Notes:
Project No.: 20135039
Drill Rig: CME-55
Boring Started: 10/3/2013
BORING LOG NO. 1
CLIENT: Capstone Development Partners, LLC
Birmingham, Alabama
Driller: Terracon Consultants, Inc
Boring Completed: 10/3/2013
Exhibit: A-4
See Exhibit A-3 for description of field
procedures.
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
abbreviations.
SULFATES (%)
ELEVATION (Ft.)
PERCENT FINES
WATER
CONTENT (%)
FIELD TEST
RESULTS
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
Surface Elev.: 98.6 (Ft.)
DEPTH (Ft.)
5
10
15
20
25
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
A greater
onal safety h
values and
her efficiency
etration per
The effect o
ysis of the su
ndard penetr
terials, but o
e blow coun
considerab
rly where the
water measu
days after d
were backfill
nt of the bac
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
Descriptio
rings were b
gs were loc
vation was
n Exhibit A-2
drilled with a
During the
r. Disturbed
plit-spoon s
ples were ob
er similar to t
e ground wi
r of blows re
poon sample
dard penetr
ring logs at
N-values.
PT hammer
efficiency is
hammer ope
soil properti
y affects the
hammer blo
of the automa
ubsurface inf
ration test pr
only provide
nt in these s
ble care sho
e size of the
urements we
drilling. Afte
ed with auge
ckfill and/or p
t
College ■ For
ct No. 201350
able
on
based upon
cated in the
surveyed a
2 using an e
a CME-55 t
e drilling ope
d samples w
sampler and
btained from
the standard
th a 140-po
equired to ad
ers, final 12
ration resist
the respecti
was used to
typically ac
erated with a
es are base
standard pe
ow over wh
atic hammer
formation for
rovides a re
es an indica
soils may b
ould be exer
e gravel parti
ere obtained
r subseque
er cuttings a
patch may o
rt Collins, Colo
039
the propose
field by mea
at each bor
engineer’s lev
truck-mounte
erations, litho
were obtaine
d a 3-inch
auger cuttin
d penetration
ound hamme
dvance the r
2 inches are
ance value
ve sample d
o advance th
hieved with
a cathead an
ed on the low
enetration re
at would be
r's efficiency
r this report.
asonable in
ation of the
e affected b
rcised in inte
icle exceeds
d in the bor
nt groundwa
and sand (if n
occur and sh
orado
ed developm
asuring from
ring location
vel.
ed rotary d
ologic logs o
ed at selecte
outside dia
ngs. Penetra
n test (SPT)
er free-fallin
ring-barrel s
e recorded)
(N-value).
depths. Ring
he samplers
the automa
nd rope. Pu
wer efficienc
esistance blo
e obtained u
has been co
dication of t
relative stif
by the mois
erpreting th
s the inside d
ings at the
ater measu
needed) and
hould be repa
ment shown
m existing si
n referencin
rill rig with
of the boring
ed intervals
ameter ring
ation resista
). This test c
ng through a
sampler 12 in
or the inte
The blow c
g-barrel sam
s in the borin
atic hammer
ublished corr
cy cathead a
ow count va
using the ca
onsidered in
the in-place
ffness of co
sture conten
e N-values
diameter of t
time of site
rements we
d patched (if
aired as soo
Exhib
on the prov
te features.
g the temp
4-inch diam
gs were reco
utilizing a 2
g-barrel sam
ance values
consists of d
a distance o
nches (18 in
rval indicate
count values
mple blow co
ngs performe
compared t
relations betw
and rope me
lue by incre
athead and
the interpret
density of s
ohesive mate
nt of the soi
in gravelly
the sampler
e exploration
ere obtained
f needed). S
on as possib
bit A-3
vided
The
porary
meter,
orded
2-inch
mpler.
were
riving
of 30
nches
ed, is
s are
ounts
ed on
to the
tween
ethod.
asing
rope
tation
sandy
erials
il. In
soils,
.
n and
d, the
Some
ble.
rracon Projec
rceful ■ Relia
L COMME
retained to
ing interpret
pecifications
ring grading
of the projec
commendati
rformed at t
port does no
modifying effe
become evid
ely notified
es for this p
logical (e.g.
nts, hazardo
ntamination
n prepared f
nd has been
es. No warr
upport, and
n the nature
sions and re
n reviews th
t
College ■ For
ct No. 201350
able
ENTS
review the
tation and im
s. Terracon a
, excavation
ct.
ions present
he indicated
ot reflect var
ects of cons
dent until du
so that furth
project does
, mold, fung
ous material
or pollution,
for the exclu
n prepared i
ranties, eithe
dewatering
e, design, or
commendat
he changes a
rt Collins, Colo
039
final design
mplementatio
also should
n, foundatio
ted in this re
d locations a
riations that
struction or w
uring or afte
her evaluatio
not include
i, bacteria) a
s or conditio
, other studie
usive use of
n accordanc
er express o
requirement
location of t
tions contain
and either ve
orado
n plans and
on of our geo
be retained
on construct
eport are ba
and from ot
may occur
weather. Th
er constructio
on and sup
e either spec
assessment
ons. If the o
es should be
f our client f
ce with gene
or implied, a
ts are the re
the project a
ned in this re
erifies or mo
specificatio
otechnical re
d to provide
tion and oth
ased upon th
her informat
between bo
he nature an
on. If variat
plemental re
cifically or by
of the site o
owner is con
e undertaken
for specific a
erally accep
are intended
esponsibility
as described
eport shall n
odifies the co
ns so comm
ecommenda
observation
her earth-re
he data obta
tion discuss
orings, acros
nd extent of
tions appea
ecommenda
y implication
or identificati
cerned abou
n.
application t
pted geotech
d or made.
of others. I
in this repo
not be consid
onclusions o
16
ments
ations
n and
elated
ained
sed in
ss the
such
ar, we
ations
n any
ion or
ut the
to the
hnical
Site
In the
rt are
dered
of this
Pavements
s in pavem
ding paveme
e soils there
with raised co
ign for the
nd discharg
ed to the s
preventing la
nt structure.
cipate the ex
w pavement
g the subgra
ese areas. R
nts in these a
Pavements
ative mainte
ment progra
ance consist
bal maintena
when implem
n investment
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
ese requirem
lifts not exc
eight as dete
nce is affec
vil engineer
ents:
uld slope a m
nd the pavem
;
riate edge dr
drainage sur
nt and seal c
ped areas i
and
ed, low perm
– Constru
ment, such
ents. Wate
eby degradin
oncrete curb
pavements
ge excess w
torm water
ateral migrat
xisting landsc
ts. We rec
ade, placing
Recommend
areas are pr
– Mainten
enance sho
am in orde
ts of both lo
ance (e.g. s
menting a pla
t for paveme
t
College ■ For
ct No. 201350
able
ments is also
ceeding 6 in
ermined by A
cted by its
should con
minimum of 2
ment surface
rainage and
rrounding ar
cracks imme
in, or adjac
meability bac
uction Con
as landscap
er collects i
ng support
bs, irrigated
with these
water from th
collection s
tion of water
cape islands
commend c
fill (if neces
dations for s
resented in t
nance
ould be pla
er to enha
calized main
surface seali
anned pavem
ents.
rt Collins, Colo
039
o an accepta
nches and c
ASTM D698
surrounding
nsider the fo
2 percent aw
e have a min
pavement u
reas anticipa
diately;
ent to pave
ckfill against
sideration
pe islands,
in the islan
of the pave
foliage, and
conditions s
he islands.
system or o
r such as a
s within the p
completely r
ssary), and c
subgrade pr
the 4.2 Earth
anned and
ance future
ntenance (e
ing). Preve
ment mainten
orado
able alternat
compacted t
8.
gs. In addi
ollowing reco
way from the
nimum 2 per
nder drain s
ated for frequ
ements to re
t the exterior
s
are source
nds and mig
ement. This
low permea
should inclu
Examples
other suitab
cutoff wall in
parking lot w
removing ex
constructing
reparation a
hwork sectio
provided
pavement
.g. crack an
entative mai
nance progr
tive. Aggreg
to at least 9
ition to prov
ommendatio
e pavements
rcent slope to
ystems;
uent wetting;
educe moist
r side of curb
es for wate
grates into
s is especia
ability near-s
ude features
of features
ble outlet a
nstalled to a
will be remov
xisting lands
new concre
nd fill place
on of this re
for an ong
performanc
nd joint seali
ntenance is
ram and pro
gate base co
95 percent o
viding preve
ons in the de
;
o promote p
ture migratio
b and gutter
er infiltration
the surroun
ally applicab
surface soils
s to restrict
are edge d
and imperme
a depth below
ved and rep
scape mate
ete pavemen
ement below
port.
going pave
ce. Preve
ng and patc
s usually the
vides the hig
15
ourse
of the
entive
esign
proper
on to
.
n into
nding
le for
s. The
or to
drains
eable
w the
laced
erials,
nts to
w new
ement
entive
ching)
e first
ghest
Entrained ai
Concrete
e should be d
time the wa
.
inal and tra
on/contractio
pon the fina
and doweled
te base co
tions for qu
rtation (CDO
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
– Subgrad
s, the site gr
aced and co
isolated aro
disturbed d
As a result
rrective actio
ment constru
be thoroug
ing garage
perly compa
– Thickne
pavements
pavements.
ment, we re
pavements.
nd new repai
ents are us
n with the fol
erties
ve strength
nt type
r content (%
aggregate
deposited by
ater is added
ansverse join
on and isola
l pavement
d where nec
urse should
uality and g
OT) Class 5
t
College ■ For
ct No. 201350
able
de Prepara
rading is acc
mpacted in
ound new c
ue to utility
t, the pavem
on will be re
ction for sig
hly evaluate
foundation e
acted to the
ess Recom
are necessa
. To enhanc
ecommend p
It may be p
ir pavements
sed, portlan
lowing minim
)
y truck mixe
d to the mix
nts should b
tion per AC
geometry.
cessary for lo
d consist of
radation. U
or 6 specific
rt Collins, Colo
039
ation
complished r
a uniform m
construction
y excavation
ment subgra
quired. The
ns of disturb
ed by Terrac
elements. A
recommend
mendation
ary, we reco
ce performa
placing at le
prudent to in
s to strengthe
nd cement c
mum propert
AST
rs or agitato
x. Other spe
be provided
I 325. The
Joints shou
oad transfer
f a blend o
Use of mate
cations is re
orado
relatively ea
manner. Ho
areas. As
ns, construc
ade may no
subgrade s
bance or ins
con prior to
All pavemen
dations in thi
ns
ommend mat
nce of pave
east 6 inche
nclude epox
en the joints
concrete sh
rties:
V
4,0
Type I o
5
TM C33 and
ors and place
ecifications o
d as needed
location an
uld be seale
r.
of sand and
erials meeti
ecommended
rly in the con
owever, pave
s constructio
ction traffic,
ot be suitab
should be ca
stability. We
placement
nt areas sho
is report imm
tching pavem
ment repairs
es of aggreg
xy anchored
s.
hould be pr
Value
000 psi
or II cement
5 to 8
CDOT Sectio
ed a maximu
outlined by C
d in concret
nd extent of
d to preven
d gravel wh
ng Colorado
d for base c
nstruction ph
ement repai
on proceeds
, desiccatio
ble for pave
arefully evalu
e recommen
of new con
ould be moi
mediately pr
ment thickne
s and reduce
gate base co
dowels betw
roduced from
on 703
um of 90 min
CDOT shou
te pavement
joints shou
t entry of fo
hich meets
o Departme
ourse. Rec
14
hase.
rs for
s, the
n, or
ement
uated
d the
ncrete
isture
rior to
esses
e risk
ourse
ween
m an
nutes
uld be
ts for
ld be
oreign
strict
ent of
ycled
ill likely be
that the othe
hould the su
excessive m
over waterin
roken utility
rt be followe
Pavements
ction of the p
ting portland
pe islands a
nt reconstruc
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
s should be
1R-37 8.3.1
extent of cra
trench back
mmendation
hould not be
2-inch void s
e floor slab.
n partition w
suspended
vapor retar
h wood, tile
r when the
arrant the us
to ACI 302 f
tarder.
and constr
1R are recom
ems - Cons
-on-grade us
reduced an
er recomme
ubsurface so
movement c
ng of landsc
lines. The
ed.
proposed pa
d cement c
are abandon
ction in these
t
College ■ For
ct No. 201350
able
e saw-cut in
2 (tooled co
acking.
kfill placed b
ns presented
e constructed
space should
Special fra
walls to avo
ceilings.
rder should b
e, carpet o
slab will s
se of a vapo
for procedur
uction cons
mmended.
struction C
sing the reco
nd tend to b
ndations in t
oils become
causing unev
caping, poo
refore, it is
arking garag
concrete pav
ned will also
e areas are
rt Collins, Colo
039
n slabs in a
ontrol joints
beneath slab
d in the 4.2
d on frozen s
d be constru
ming details
oid potential
be considere
or other mo
upport equi
or retarder,
res and caut
iderations, a
Considerati
ommendatio
be more uni
this report a
wetted to s
ven floor sla
or drainage,
imperative
e will requir
vements. N
o be require
presented in
orado
accordance
are not rec
bs should be
Earthwork s
subgrade.
ucted below
s should be
distortion.
ed beneath
oisture sens
ipment sens
the slab de
tions regard
as outlined i
ions
ons discusse
iform. The
are followed.
significant d
abs and sev
improperly
that the rec
re demolition
New pavem
ed. Recom
n the followin
with ACI D
commended)
e compacted
section of th
non-bearing
provided at
Partition w
concrete sla
sitive or im
sitive to mo
esigner and
ing the use
in the ACI D
ed in previou
estimates d
Additional
depths, whic
vere cracking
y functioning
commendatio
n and remov
ments placed
mmendations
ng sections
Design Manu
) to control
d in accordan
his report.
g partition w
doorjambs a
walls should
abs that will
mpervious fl
oisture. Wh
slab contrac
and placem
Design Manu
us sections o
discussed a
movement c
ch could res
g. This cou
g drain syst
ons present
val of a porti
d where ex
s for repairs
of this repor
13
ual,
the
nce
walls
and
be
l be
loor
hen
ctor
ment
ual,
of this
above
could
sult in
uld be
tems,
ted in
ion of
xisting
s and
rt.
Floor Syste
en bearing
should the
nt of about
l floor shou
e prepared a
ctural desig
e reaction of
ed existing s
1 foot of non
al floor slab d
Positive sepa
oundations, c
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
phant's trunk
minimized, is
onsideratio
ode Used
nal Building Co
dance with the
ational Buildin
t for seismic s
t soil profile d
of about 29.4 f
ns exist belo
eper depths co
rnatively, a ge
eismic site cl
ems
necessary)
ding. Subgra
t 8 inches, m
ade soils sh
em - Design
on properly
subgrade
1 inch is pos
uld be used.
as described
n of concre
f 100 pound
soils at the s
-expansive,
design and c
arations and
columns, or
t
College ■ For
ct No. 201350
able
k dischargin
s recommend
ons
ode (IBC) 1
e 2012 Interna
ng Code (IBC
site classifica
determination
feet and this s
ow the maxim
ould be perfo
eophysical ex
ass. Howeve
may be util
ade soils be
moisture con
ould be mai
n Recomm
prepared so
soils underg
ssible. If the
. If conven
d in the 4.2 E
ete slabs-on
ds per cubic
site. A mod
imported gr
construction
d/or isolation
utility lines t
rt Collins, Colo
039
ng near the
ded.
ational Buildin
C) requires a
tion. The cur
n. The boring
seismic site c
mum depth o
rmed to confir
xploration cou
er, we believe
lized for the
eneath interio
nditioned and
ntained unti
mendations
oils, movem
go an incre
e owner can
ntional slab-o
Earthwork s
n-grade subj
c inch (pci) m
ulus of 200
ranular fill.
n recommend
n joints shou
to allow inde
orado
e bottom o
Site
ng Code, Tab
site soil prof
rrent scope re
gs completed
class definition
of the subsu
rm the condit
uld be utilized
e a higher se
e interior flo
or and exter
d compacted
l slab constr
s
ment of the s
ease in moi
nnot accept
on-grade is
section of th
jected to po
may be used
pci may be
dations are
uld be provid
ependent mo
of the hole
Classificatio
C 2
ble 1613.5.2.
file determina
equested doe
d for this proje
n considers th
urface explora
ions below th
in order to a
eismic site cla
oor system f
rior slabs sh
d. The mois
ruction.
slab-on-grad
isture conte
the risk of s
utilized, the
is report.
oint loading
d for floors
used for floo
as follows:
ded betwee
ovement.
where con
on
ation extendi
es not include
ect extended
hat similar soil
ation. Addit
e current dep
attempt to just
ass for this si
for the prop
hould be sca
sture conten
de floor syste
ent. We esti
slab moveme
e subgrade
s, a modulu
supported o
ors supporte
n slabs and
12
ncrete
ng a
e the
to a
l and
ional
pth of
tify a
ite is
posed
arified
nt and
em is
imate
ent, a
soils
us of
on re-
ed on
d all
should be w
to prevent
crete should
Pier concrete
ommend the
strata. This s
surfaces mu
bserve the b
concrete pl
he concrete
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
he horizonta
Parameters
shear streng
ternal frictio
rade reaction
of LPILE analy
e.
s Bottome
pth should b
owever, spe
caving soils
drill the piers
be removed
mediately a
onditions, a
er, or an ele
n will be m
concrete qu
withdrawn in
infiltration o
d have a rela
e with slump
sides of ea
should be a
ust be clean
bearing surfa
lacement in
e on the side
t
College ■ For
ct No. 201350
able
al direction u
gth (psf)
on, (degree
n, k (pci)*
ysis, assume a
ed in Bedro
be possible
ecialized drill
s and groun
s prior to con
d from each
fter complet
tremie shou
ephant's trun
minimized, i
antities may
n a slow co
f water or ca
atively high f
p in the rang
ach pier sh
ccomplished
ned prior to
ace and sha
piers will o
es of the ho
rt Collins, Colo
039
using LPILE,
S
wi
es)
50
20
a groundwate
ock - Cons
with conven
ing equipme
dwater indic
ncrete place
pier hole pri
tion of drillin
uld be used
nk discharg
s recomme
y exceed cal
ontinuous m
aving soils o
fluidity when
e of 5 to 7 in
ould be me
d by a rough
concrete pla
ft configurat
only be acce
ole or reinfo
orado
, piers may b
Clay
Stiff clay
thout free
water
120
700
N/A
00 - static
00 - cyclic
0.007
r depth of abo
truction C
ntional single
ent may be re
cate that tem
ement.
ior to concre
ng and clean
for concret
ing near the
ended. Due
culated geo
manner main
or the creati
n placed in c
nches is reco
echanically r
hening tooth
acement. A
tion.
eptable if pr
rcing steel.
be designed
Sand and
Gravel
Sand
(submerged)
125
N/A
35
60
N/A
out 7 feet belo
onsiderati
e-flight powe
equired for v
mporary ste
ete placeme
ning. If pier
te placemen
e bottom of
to potentia
metric volum
ntaining a s
ion of voids
cased pier ho
ommended.
roughened i
h placed on
A representa
rovisions ar
The use o
d for the follo
Sandsto
Bedroc
)
Sand
130
N/A
40
125
N/A
ow existing
ons
er augers o
very hard bed
eel casing w
nt. Pier con
r concrete ca
nt. The use
f the hole w
al sloughing
mes.
ufficient hea
in pier conc
oles or throu
n the sands
the auger.
ative of Terr
re taken to a
of a bottom-d
11
owing
one
ck
n the
drock
will be
ncrete
annot
of a
where
g and
ad of
crete.
ugh a
stone
Shaft
racon
avoid
dump
m pier diame
m bedrock e
um allowable
ble skin fricti
ickness (ben
Drilled piers sh
ould be con
meters. A m
rs should be
of individua
y reduction is
nalyses are n
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
yle landscap
n to paveme
e of splash
s discharge
ab Design a
ade, exterior
ely experien
could be red
oisture incre
moisture-dens
ns which allo
g structural e
rol joints on r
ns
nstructing the
ck. Design
structural ele
s Bottome
D
h
eter
embedment 1
e end-bearing
ion (for porti
neath grade b
hould be emb
sidered to w
minimum pra
e maintained
al piers mu
s a function
necessary, c
t
College ■ For
ct No. 201350
able
ped irrigation
nts or be ex
blocks or do
by solid pip
and Constr
r architectur
ce some mo
duced by:
eases in the
sity during p
ow vertical
elements; an
relatively clo
e proposed
recommen
ements are p
ed in Bedro
Description
g pressure
ion of pier em
beams, betw
edded into ha
work in grou
actical horiz
d, and adjac
st be reduc
of pier spac
capacity redu
rt Collins, Colo
039
n should not
xtended awa
ownspout ex
pe to storm
ruction
al features,
ovement due
backfill;
placement of
movement b
nd
ose centers.
parking gar
dations for
presented in
ock - Desig
mbedded int
ween piers)
ard or very ha
up action if t
ontal clear s
cent piers sh
ced when c
ing and the
uction factor
orado
t be used ne
ay from the
xtensions.
sewers or t
and utilities
e to the vol
f the backfill;
between the
rage on a d
foundations
the followin
gn Recomm
o bedrock)
ard bedrock m
the horizonta
spacing bet
hould bear
considering
number of p
rs can be pro
ear the build
structures a
A preferred
to a detentio
s founded on
ume change
;
e exterior fe
rilled pier fo
s for the p
ng paragraph
mendation
materials.
al spacing is
tween piers
at the same
the effects
piers within a
ovided for th
ding. Roof d
a minimum
d alternative
on pond or
n, or in back
e of the mat
eatures
oundation sy
proposed pa
hs.
s
Value
22 feet
18 inches
6 feet
35,000 psf
2,500 psf
4 inches
s less than
of at least
e elevation.
of group a
a group. If g
he analyses.
10
drains
of 10
is to
other
kfill or
terial.
ystem
arking
three
three
The
ction.
group
.
tion. Lands
ermitted to p
tion) can re
As a result,
on if positive
nd/or subgra
ground (if a
the perimete
rea drains m
uilding. Back
ll constructio
roposed par
ding be pe
d.
and pavem
should be
allowances
rk, particula
e, care shou
n of surface
located adj
nd spray hea
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
pavement ar
ackfill.
a common s
he parking ga
ches that co
h plug” that e
hould consis
ent. The clay
ance with re
mended that
f trench back
d Drainage
adjusted to
pavements
nfiltration of
scape irrigati
pond near or
esult in sign
any estimat
e drainage i
de.
any) should
er of the pro
may be requi
kfill against
on debris to
king garage
rformed to
ments will b
used for pa
in final grad
rly if such m
ld be taken
water.
jacent to str
ads should
t
College ■ For
ct No. 201350
able
reas to redu
source of wa
arage should
ould migrate
extends at le
st of clay co
fill should be
ecommendat
t a represen
kfill within bu
e
o provide ef
s during con
f water into
ion adjacent
r adjacent to
nificantly hig
tions of pote
s not obtain
be sloped a
oposed buil
red to facilita
footings and
reduce the
e and prior to
document
be subject to
ving and fla
des should t
movement wo
that joints
ructure (if a
be located a
rt Collins, Colo
039
uce the infilt
ater infiltratio
d be effectiv
below the b
east 5 feet o
ompacted at
e placed to c
tions in this r
ntative of Te
uilding and p
ffective drai
nstruction an
foundation
t to foundati
the perimet
gher soil mo
ential movem
ed and main
at a minimum
ding, where
ate drainage
d exterior w
possibility o
o project co
positive dra
o post-cons
atwork to pre
take into co
ould be critic
are properly
ny) should
a minimum
orado
ration and c
on and migr
vely sealed t
building. We
out from the
t a water co
completely s
report.
erracon prov
avement are
nage away
nd maintaine
excavations
ions should
ter of the str
ovements th
ment descri
ntained, and
m of 10 perc
e possible.
e in unpaved
walls should
of moisture in
ompletion, w
ainage, as d
struction mo
event areas
onsideration
cal. Where
y sealed an
preferably b
of 5 feet aw
conveyance
ration. All uti
to restrict wa
e recommen
face of the
ontent at or
surround the
vide full-time
eas.
from the p
ed througho
s must be p
be minimize
ructure (eithe
han those d
bed in this
d water is al
cent grade fo
The use of
d areas arou
be properly
nfiltration. A
we recomme
described a
ovement. M
s where wat
post-constru
paving or fl
nd maintaine
be self-cont
way from the
of surface w
ility trenches
ater intrusion
d constructin
building ext
above the
utility line an
observation
proposed pa
out the life o
prevented d
ed or elimin
er during or
discussed in
report cann
lowed to infi
or at least 10
f swales, ch
und the perim
y compacted
After constru
end verificati
above, has
Maximum gr
ter can pond
uction move
latwork abut
ed to preven
ained. Spr
e building lin
9
water
s that
n and
ng an
terior.
soil’s
nd be
n and
arking
of the
during
nated.
post-
n this
ot be
iltrate
0 feet
hases
meter
d and
uction
on of
been
rades
d. In
ement
ts the
nt the
inkler
ne(s).
ing of these m
Utility Trenc
h excavatio
backfill plac
rground pipi
s, so minor d
ation walls s
y trenches b
d with relativ
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
operties
d Limit
c Limit
sive Potentia
ample compa
STM D698 at
bmerged.
n Requirem
uld be plac
produce reco
em
on requireme
ohesive soil (
ohesionless s
engineered fi
s of the in-pla
et, the area r
moisture and
ture levels sh
thout the fill m
ned clay ma
could result
materials coul
ch Backfill
ns should b
cement and c
ng within or
deviations in
hould be ov
be properly
ely clean gra
t
College ■ For
ct No. 201350
able
al (%)
cted to appro
optimum moi
ments
ced and co
ommended
9
p
4
eq
ents
95
by
(clay) -1
soil
-3
ll be tested f
ace density te
represented b
d compaction
hould be main
material pump
aterials should
in an increa
d result in un
be made w
compaction.
r near the p
alignment d
versized to a
backfilled w
anular mater
rt Collins, Colo
039
oximately 95 p
sture content
mpacted in
moisture co
inches or les
ropelled com
to 6 inches in
quipment (i.e
5 percent of t
y ASTM D698
1 to +3 % of th
3 to +3 % of th
for moisture c
ests indicate
by the test sh
requirements
ntained low e
ping when pro
d not be allo
ase in the m
desirable mo
with sufficien
roposed stru
do not result
accommodate
with relatively
rial, they sho
orado
V
30
15
Non-ex
percent of the
t. The sample
horizontal
ntents and d
Desc
ss in loose thi
paction equip
n loose thickn
. jumping jack
the maximum
8
he optimum m
he optimum m
content and c
the specified
ould be rewo
s are achieve
enough to allo
oofrolled.
owed to dry o
material’s exp
ovement.
t working s
uctures shou
in breakage
e differentia
y clean mate
ould be capp
Value
(max.)
(max.)
xpansive1
e maximum dr
e is confined
lifts, using
densities thro
cription
ckness when
pment is used
ness when ha
k or plate com
m dry unit weig
moisture cont
moisture cont
compaction d
moisture or
orked and rete
ed.
ow for satisfa
out. A loss o
pansive poten
space to pe
uld be desig
or distress.
l movements
erials. If ut
ped with at l
ry unit weight
under a 100
equipment
oughout the
n heavy, self-
d
and-guided
mpactor) is us
ght as determ
tent
tent
during placem
compaction l
ested as requ
actory compac
of moisture w
ntial. Subseq
ermit constru
gned with fle
Utility knoc
s. It is impe
tility trenche
east 18 inch
8
t as
psf
t and
e lift.
sed
mined
ment.
imits
uired
ction
within
quent
uction
exible
kouts
rative
s are
hes of
4
3
No. 4
No. 200
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
Preparation
the demolit
inches of
compacted
M D698 befo
ose, or other
new repair
-excavating
the excavatio
ade to the d
ations prese
subgrade ma
stable cond
y, over-exca
rushed grave
stable workin
ce subgrade
s and Plac
pproved gra
soil removed
d technician
re-used as f
soils will re
uired) shoul
dation
4”
3”
Sieve
0 Sieve
t
College ■ For
ct No. 201350
able
n
tion and rem
the expose
to at least
re any new f
rwise unsuit
pavements
the unsuitab
on has been
desired grad
ented in subs
ay be affect
itions develo
avation of w
el and/or ro
ng surface i
e pumping.
cement
anular and low
d from this s
n who is qua
fill below pav
equire rewor
d meet the f
rt Collins, Colo
039
moval of lan
ed ground
95 percen
fill or pavem
table materia
s, the propo
ble soils and
n compacted
de. Enginee
sequent sec
ted by preci
op, workabi
wet zones a
ock can be
s attained.
w plasticity c
site that is fr
alified in soi
vement repa
rking to adj
following ma
Perce
orado
ndscape ma
surface sho
nt of the m
ment is place
als are enco
osed subgra
d backfilling
d, engineere
ered fill shou
ctions of this
ipitation, rep
lity may be
nd replacem
tracked or
Lightweight
cohesive imp
ree of organi
il material id
airs and foun
just the mo
aterial prope
ent finer by w
1
70
50
1
aterials from
ould be sc
aximum dry
ed.
ountered at t
ade elevatio
with compa
ed fill can be
uld be place
report.
petitive cons
improved b
ment with gr
“crowded” i
t excavation
ported mater
ic or objectio
dentification
ndation back
oisture cont
erty requirem
weight (ASTM
100
0-100
0-100
5-50
m existing in
carified, moi
y unit weigh
the bottom o
ons may be
acted engine
e placed to
ed in accord
struction traf
by scarifying
ranular mate
nto the uns
n equipment
rials may be
onable mate
and compa
kfill. It shou
ent to mee
ments:
M C136)
7
nterior
isture
ht as
of the
e re-
eered
bring
dance
ffic or
g and
erials
stable
t may
used
erials,
action
uld be
et the
and the exc
ng upon dep
ater may be
may be utilize
grade soil co
oils determin
an the OSHA
responsible
stability of b
n the interes
on and trenc
ety measure
from the cre
d against the
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
sting portlan
ements shou
All materials
e removed fr
be given to
th the on-sit
blended at a
n, it is antic
onventional e
vated can va
als encounte
milar conditio
s are encoun
ne any excav
f undergroun
uring the sit
expected un
cavation thor
pth of excav
e encountere
ed to control
onditions sho
ned at that t
A maximum
e for designin
both the exc
st of safety f
h safety stan
, it is recomm
est of the slo
e elements.
t
College ■ For
ct No. 201350
able
nd cement co
uld include c
s derived fr
rom the site.
re-using the
te soils. Con
a ratio of 30 p
ipated that
earthmoving
ary significa
ered in wide
ons exist thro
ntered at the
vation modif
nd facilities s
te reconnais
derground f
roughly clean
vation and s
ed in excava
water within
ould be evalu
time by the
values may
ng and cons
cavation side
following loc
ndards.
mended that
ope equal to
rt Collins, Colo
039
oncrete park
complete rem
rom the dem
e concrete p
ncrete mater
percent conc
excavations
equipment.
ntly across t
ely-spaced e
oughout the
e time of con
fications nece
such as sep
ssance, such
facilities are
ned prior to b
seasonal con
tions on the
excavations
uated during
contractors’
have to be u
structing stab
es and botto
cal, and fede
t all vehicles
the slope he
orado
king lot in ar
moval of all
molition of e
rovided the
rials should
crete to 70 p
s for the pro
the site as th
exploratory t
proposed ar
nstruction, th
essary to ma
ptic tanks, va
h features c
e encountere
backfill place
nditions, sur
e site. It is a
s.
g the excava
’ Competent
used. The in
ble, tempora
om. All exca
eral regulatio
s and soil pil
eight. The e
reas planned
concrete wit
existing con
materials ar
be processe
ercent of on
oposed con
heir classific
test borings.
rea of excav
e actual con
aintain safe c
aults, basem
could be en
ed, such fea
ement and/o
rface water
anticipated th
ation process
t Person. S
ndividual con
ry excavatio
avations sho
ons, includin
es be kept a
exposed slop
d for new pa
thin the prop
crete parkin
re processed
ed to a max
-site soils.
nstruction ca
cations are b
. The contr
vation. If diff
nditions shou
conditions.
ments, and ut
countered d
atures shou
r constructio
infiltration a
hat pumping
s and the sta
Slope inclina
ntractor(s) s
ons as requir
ould be slop
ng current O
a minimum la
pe face shou
6
arking
posed
ng lot
d and
imum
an be
based
ractor
ferent
uld be
tilities
during
ld be
on.
and/or
from
ability
ations
hould
red to
ed or
OSHA
ateral
uld be
ve the reco
e followed to
Earthwork
wing presen
cement of e
d and evalua
observation
ion, subgrad
tion of the p
Site Prepara
placing any f
proposed c
recommend
on of subgra
organic ma
exposed slo
uld be grade
y uniform thic
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
at the site
uring constr
the bottom
ssible and l
Creek rise.
Soils
uring previo
are low swe
als will exhib
s recomme
er, even if th
ments, and
as uneven p
xcessive we
ess is gener
significantly
mmendation
reduce mov
nts recomme
engineered
ated by Ter
of over-ex
de stabiliza
roject.
ation
fill, strip and
construction
d completel
ade, fill place
aterials shou
opes after co
ed to create
ckness of fill
t
College ■ For
ct No. 201350
able
and condit
ruction. Ter
of proposed
ikely that gr
ous studies
elling at the s
bit a higher e
ndations to
hese procedu
flatwork sh
pavement/flo
etting or dry
rally not be f
more expe
ns described
vement.
endations fo
fills on the
racon on a
xcavation o
ation, and o
d remove exi
area. Existi
y removing
ement, and c
uld be waste
mpletion of g
e a relatively
beneath pro
rt Collins, Colo
039
ions observ
rracon recom
d lower level
roundwater l
on this prop
samples in-s
expansive p
o help mitig
ures are foll
hould be ant
oor slabs will
ing of the e
feasible, but
nsive measu
d in section
r site prepar
e project. A
full-time bas
operations,
other geotec
isting vegeta
ing landscap
the landsca
construction
ed from the
grading oper
y level surfa
oposed struct
orado
ved during o
mmends ma
l pavements
levels below
perty indicat
situ moisture
potential if th
gate the eff
lowed, some
ticipated. T
l probably in
expansive cl
t it may be p
ures are us
n 4.2.8 Gra
ration, excav
All earthwork
sis. The eva
testing of
chnical con
ation and an
pe islands a
ape materia
of new pave
site or use
rations. Prio
ace to rece
tures.
our testing
aintaining a
s and measu
w this site m
tes the nativ
e content. H
e clays unde
fects of soi
e movemen
The severity
ncrease if an
lays. Elimin
possible to fu
ed during co
ading and D
vation, subg
k on the pr
aluation of e
engineered
ditions exp
ny other dele
are located w
als from the
ements to fill
d to re-vege
or to the plac
ive fill, and
and observ
separation
ured groundw
may rise as w
ve clay soils
However, it i
ergo a signif
il shrinkage
t and cracki
y of cracking
ny modificati
nating the ri
urther reduc
onstruction.
Drainage of
grade prepar
roject shoul
earthwork sh
d fills, subg
osed during
eterious mat
within the pa
e islands pri
in these are
etate landsc
cement of fills
to provide
5
vation
of at
water
water
s and
s our
ficant
e and
ing in
g and
ion of
isk of
ce the
It is
f this
ration
ld be
hould
grade
g the
terials
arking
ior to
eas.
caped
s, the
for a
garage and o
Existing Fil
ously noted
t the site. T
struction of
garage site.
the percent c
tprint of the
ew improvem
compacted
s or paveme
of the exist
on tests or p
Shallow Gro
ously stated
xisting site g
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
represent g
e of other tim
ying seasona
uctuations o
unt of rainfa
herefore, gro
e may be hi
water level
ns for the pr
ndwater leve
ch a plan wo
undwater lev
ENDATIO
cal Conside
ce conditions
on from a
ction recom
cal condition
other site im
l
, existing fill
erracon perf
the existing
We have re
compaction a
proposed pa
ments will be
with compa
nts. We rec
ting parking
proofrolling.
oundwater
d, groundwa
grades which
t
College ■ For
ct No. 201350
able
groundwater
mes or at ot
al and weath
occur due to
ll, runoff an
oundwater le
igher or lowe
fluctuations
roject.
els can best
ould include
vels over a su
ONS FOR
erations
s encounter
geotechnica
mmendations
ns that coul
mprovements
l was encou
formed field
portland ce
eviewed the
and moisture
arking garag
e located in la
ratively less
commend tho
lot prior to
r
ater was me
h is consiste
rt Collins, Colo
039
conditions
ther location
her condition
o seasonal v
d other fact
evels during
er than the l
should be c
be determin
installation o
ufficient perio
R DESIGN
ed in the bo
al point of v
s described
d impact de
s.
untered to d
density com
ement concr
results of th
e content wer
e extends ou
andscaped a
s compactive
oroughly eva
construction
easured at d
ent with grou
orado
at the time
ns. Groundw
ns, and other
variations in
tors not evid
construction
levels indica
considered
ned by imple
of groundwat
od of time.
N AND CO
orings, the s
view provid
in this rep
esign and c
depths up to
mpaction tes
rete parking
he field dens
re within the
utside the fo
areas. Fill pla
e effort than
aluating fill m
n of new im
depths rangi
undwater co
of the field
water levels
r factors.
n the water
dent at the
n or at othe
ated on the
when devel
ementation o
ter piezomet
ONSTRUC
site appears
ded certain
port are foll
construction
o about 4 fe
sting during
lot occupyi
sity compact
specified lim
ootprint of the
aced in land
n fills placed
materials in a
mprovements
ing from ab
onditions enc
exploration
can be expe
levels prese
time the bo
r times in th
boring logs.
oping the de
of a groundw
ters, and pe
CTION
s suitable fo
precautions
owed. We
of the prop
eet in the bo
site develop
ing the prop
tion testing w
mits.
e existing pa
scaped area
d below stru
areas outsid
s by field de
out 6½ to 8
countered d
4
, and
ected
ent in
orings
he life
The
esign
water
riodic
or the
s and
have
posed
orings
pment
posed
which
arking
as are
ctural
de the
ensity
8 feet
during
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
n of changes
the results o
ws:
ription
mulch
ng of lean clay
nts of sand
clay
nd gravel
edrock
Testing
from this p
moisture con
h of approxi
y testing we
5 and plastic
uble sulfate
project con
fate exposu
r 4. Laborat
er
observed w
ition, delayed
holes are not
Depth t
while
t
College ■ For
ct No. 201350
able
s in soil type
of the boring
Appro
Bottom
About 3-
No
y About 1 to
About
exis
About
exis
To the
exploratio
roject site
ntents. A sa
imately 630
re non-plast
city indices r
testing indic
ncrete on a
re in accord
tory test res
while drilling
d water leve
ted on the at
to groundwat
e drilling, ft.
9
10
9
rt Collins, Colo
039
es; in-situ, t
gs, subsurfa
oximate Dept
m of Stratum
inches thick in
s. 1 and 3 onl
o 4 feet below
site grades.
5 to 14 feet b
sting site grade
17 to 19 feet b
sting site grade
maximum de
on of about 29
suggests th
ample of the
pounds per
tic or exhibit
ranging from
cate that AS
nd below g
ance with th
ults are pres
and after c
ls were also
ttached borin
ter Depth
1 day a
orado
the transition
ace condition
th to
(feet) Co
n Boring
ly.
w existing
below
es.
below
es.
epth of
9.4 feet.
he site soils
sandy lean
r square foo
ted low to hi
m 17 to 30.
STM Type I
grade. Fou
he provision
sented in Ap
completion fo
obtained in
ng logs, and
to groundwa
after drilling,
8.1
6.5
7.8
n between m
ns on the pr
onsistency/D
Very s
Loose to m
Hard to
s are low s
clay exhibite
ot (psf). Sam
igh plasticity
or II portlan
ndation con
s of the AC
ppendix B.
or the prese
the borings.
are summar
ater
, ft.
Rela
ground
materials ma
roject site ca
Density/Hardn
--
--
soft to stiff
medium dense
o very hard
swelling to
ed an uncon
mples of site
y with liquid
d cement sh
ncrete shoul
I Design Ma
ence and lev
The water l
rized below:
ative elevatio
dwater 1 day
drilling, ft.
90.5
89.1
89.6
3
ay be
an be
ness
e
non-
nfined
soils
limits
hould
ld be
anual,
vel of
levels
on of
y after
College ■ For
ct No. 201350
able
MATION
Refer to the
We underst
over the ex
the existin
reasonable
parking gar
We anticipa
precast con
Columns: 5
Walls: 2 to
Considering
where reas
project. W
feet will be
No below-g
scription
The propos
The Summ
developmen
Colorado.
The studen
couple of y
concrete an
The propos
concrete pa
and interior
The site is r
CONDITI
rofile
d at each bo
Stratificati
rt Collins, Colo
039
e Boring Loca
tand a new p
xisting concre
ng concrete
and will se
rage will be tw
ate the parkin
ncrete.
500 kips (prov
4 klf (assume
g the existin
onable, mino
We anticipate
necessary to
grade areas a
sed parking ga
mit at Colleg
nt located at
nt housing de
years and in
nd asphalt sur
sed parking g
avement with
r landscape is
relatively flat.
IONS
oring locatio
on boundar
orado
Descripti
ation Plan (Ex
parking garage
ete pavement
pavements
erve as the l
wo or three st
ng garage wil
vided)
ed)
ng concrete p
or grading will
cuts and fills
construct ne
re planned.
Descripti
arage site is l
ge (a.k.a. T
1721 Choice
evelopment w
ncludes seve
rfaced drive l
arage site is
curb and gu
slands.
n are indica
ries on the
ion
xhibit A-2 in A
e is planned
ts. Conceptu
will be p
lower level p
tories.
ll be construc
pavements w
be necessar
s on the orde
ew foundation
on
located on the
The Common
e Center Driv
was construct
eral multi-sto
anes and par
covered with
tter surround
ated on the
e boring log
Appendix A)
to be constru
ual plans ind
preserved w
pavements.
cted of reinfor
will be prese
ry to complete
er of about 2
elements.
e southern en
n/Choice Ce
ve in Fort Co
ted over the
ry buildings
rking areas.
h portland cem
ding the perim
individual b
gs represen
2
ucted
icate
where
The
rced,
erved
e the
to 3
nd of
nter)
llins,
past
with
ment
meter
boring
nt the
rilled pier fo
We understan
unction as th
emoval of ex
roposed par
ortland ceme
There are exi
andscape m
ompacted en
The 2012 Inte
ite is C.
Close monito
chieving the
etained to mo
mmary shou
e recognize
ering Report
e Summit on C
rracon Projec
rceful ■ Relia
UMMARY
tigation has
nstructed at
s Exhibits A-
o depths of
s the recomm
r informationa
ation obtaine
. However,
d:
as encounte
feet below e
g site develo
ccupying the
sity compact
within the sp
end construc
omed in bed
undations ar
nd the portla
e lower leve
xisting pavem
rking garage
ent concrete
isting landsc
aterials from
ngineered fill
ernational Bu
oring of the
e design su
onitor this po
ld be used
d that detai
t
College ■ For
ct No. 201350
able
been perform
1721 Choic
-4 through A-
approximat
mendations
al purposes
ed from our s
the following
ered in the b
existing site g
pment and c
proposed p
tion testing w
pecified limits
cting the pro
drock. Geo
re presented
and cement
l pavement f
ments is nec
e, we recomm
matching th
cape islands
m the island
l and new co
uilding Code,
e constructio
ubgrade sup
ortion of the
in conjunct
ls were not
rt Collins, Colo
039
med for the p
e Center Dr
-6 and desig
tely 30 feet
for the propo
and will be u
subsurface e
g geotechnic
borings perfo
grades. Terr
construction
parking garag
which indica
s.
oposed park
technical re
d in the repo
concrete pa
for the parkin
cessary to c
mend replac
e thickness o
within the p
ds and prep
oncrete pave
, Table 1613
on operation
pport. We t
work.
tion with the
included or
orado
proposed pa
rive in Fort C
gnated as Bo
below exist
osed parking
utilized by oth
exploration, t
cal considera
ormed on thi
racon perform
of the existi
ge site. We
ate the perce
king garage
ecommendat
ort
avements fo
ng garage. I
construct the
cing the dem
of existing pa
arking lot. W
paring the s
ments.
3.5.2 IBC sei
ns discusse
therefore re
e entire rep
r fully develo
arking garag
Collins, Colo
oring No. 1 th
ting site grad
g garage. B
hers.
the site can
ations were
s site to dep
med field de
ing portland
have review
ent compact
on a drilled
tions and d
or the existin
n areas whe
e foundation
molished pav
avements.
We recomme
subgrade to
smic site cla
ed herein w
ecommend t
port for desi
oped in this
ge at The Su
orado. Thre
hrough Borin
des. This r
Borings perfo
be develope
identified an
pths ranging
ensity compa
cement con
wed the resu
tion and mo
d pier found
esign criter
ng parking lo
ere demolition
elements fo
vements with
end removin
receive pro
assification fo
will be critic
that Terraco
ign purpose
section, an
i
ummit
ee (3)
g No.
report
ormed
ed for
nd will
from
action
ncrete
ults of
isture
dation
ia for
ot will
n and
or the
h new
ng the
operly
or this
cal in
on be
es. It
d the