HomeMy WebLinkAboutSTORYBOOK THIRD FILING - FDP - FDP130051 - SUBMITTAL DOCUMENTS - ROUND 1 - RECOMMENDATION/REPORT (3)PRELIMINARY SUBSURFACE EXPLORATION REPORT STORYBOOK – 2ND FILING FORT COLLINS, COLORADO EEC PROJECT NO. 1022131 PRELIMINARY SUBSURFACE EXPLORATION REPORT STORYBOOK – 2nd FILING FORT COLLINS, COLORADO EEC PROJECT NO. 1022131 August 8, 2002 INTRODUCTION The preliminary subsurface exploration for the proposed 2nd Filing of the Storybook residential development to be constructed north of Mountain Vista Drive and east of Little John Lane in Fort Collins, Colorado has been completed. Thirteen (13) soil borings extending to depths of approximately 15 feet below present site grades were advanced in the proposed development area to obtain information on existing subsurface conditions. Individual boring logs and a diagram indicating the approximate boring locations are included with this report. We understand the 2nd Filing of the Storybook development will consist of approximately 80 single-family residential lots. Foundation loads for the proposed structures are expected to be light with continuous wall loads less than 3 kips per lineal foot and column loads less than 35 kips. Floor loads are expected to be less than 100 psf. Paved streets and drive areas will be constructed as a part of the development. The purpose of this report is to describe the subsurface conditions encountered in the borings, analyze and evaluate the test data and provide preliminary geotechnical recommendations concerning design and construction of foundations and support of floor slabs and pavements. EXPLORATION AND TESTING PROCEDURES The boring locations were selected and established in the field by Earth Engineering Consultants, Inc. (EEC) personnel. The field locations were established by estimating angles and pacing distances from identifiable site references. The locations of the borings should be considered accurate only to the degree implied by the methods used to make the field measurements. Earth Engineering Consultants, Inc. EEC Project No. 1022131 August 8, 2002 Page 2 The borings were performed using a truck mounted CME-45 drill rig equipped with a hydraulic head employed in drilling and sampling operations. The boreholes were advanced using 4-inch nominal diameter continuous flight augers. Samples of the subsurface materials encountered were obtained using split-barrel and California barrel sampling procedures in general accordance with ASTM Specification D-1586. In the split-barrel and California barrel sampling procedures, standard sampling spoons are driven into the ground by means of a 140-pound hammer falling a distance of 30 inches. The number of blows required to advance the samplers is recorded and is used to estimate the in-situ relative density of cohesionless soils and, to a lesser degree of accuracy, the consistency of cohesive soils and hardness of weathered bedrock. In the California barrel sampling procedure, relatively undisturbed samples are obtained in removable brass liners. All samples obtained in the field were sealed and returned to the laboratory for further examination, classification and testing. Moisture content tests were performed on each of the recovered samples. In addition, selected samples were tested for fine content and plasticity by washed sieve analysis and Atterberg limits tests. Swell/consolidation tests were completed on selected samples to evaluate the subgrade material’s tendency to change volume with variation in moisture content. Results of the outlined tests are indicated on the attached boring logs and summary sheets. As a part of the testing program, all samples were examined in the laboratory by an engineer and classified in accordance with the attached General Notes and the Unified Soil Classification System, based on the soil’s texture and plasticity. The estimated group symbol for the Unified Soil Classification System is shown on the boring logs and a brief description of that classification system is included with this report. Earth Engineering Consultants, Inc. EEC Project No. 1022131 August 8, 2002 Page 3 SITE AND SUBSURFACE CONDITIONS The proposed development is located north of Mountain Vista Drive and east of Little John Lane in Fort Collins, Colorado. Currently, the project site is undeveloped and is situated immediately east of the first filing of the Storybook development. The site slopes to the southeast with a maximum difference in ground surface elevation across the site estimated to be on the order of approximately 5 feet. An EEC field engineer was on-site during drilling to direct the drilling activities and evaluate the subsurface materials encountered. Field descriptions of the materials encountered were based on visual and tactual observation of disturbed samples and auger cuttings. The boring logs included with this report may contain modifications to the field logs based on results of laboratory testing and engineering evaluation. Based on results of field and laboratory evaluation, subsurface conditions can be generalized as follows. Approximately 3 to 6 inches of topsoil and vegetation were encountered at the surface at the boring locations. The topsoil and vegetation was underlain by brown sandy lean clay. The sandy lean clay soils were relatively dry at the time of drilling and exhibited a low to moderate potential for volume change with variation with moisture content at current moisture/density conditions. The lean clay soils contained varying amounts of calcareous deposits and extended to depths of approximately 15½ feet below present site grades. The borings were terminated at depths of approximately 15½ feet below present site grades in the lean clay soils. The stratification boundaries indicated on the boring logs represent the approximate location of changes in soil types; in-situ, the transition of materials may be gradual and indistinct. Earth Engineering Consultants, Inc. EEC Project No. 1022131 August 8, 2002 Page 4 GROUNDWATER OBSERVATIONS Observations were made while drilling and after completion of the borings to detect the presence and level of groundwater. No groundwater was observed in the completed test borings at the time of drilling. Perched and/or trapped water may be encountered in more permeable zones in the subgrade soils at times throughout the year. Fluctuations in ground water levels and in the location and amount of perched water may occur over time depending on variations in hydrologic conditions, irrigation activities on surrounding properties, and other conditions not apparent at the time of this report. ANALYSIS AND RECOMMENDATIONS Site Development At the time of drilling, the near surface cohesive soils were relatively dry and as such, were subject to low to moderate swelling with increase in moisture content. Those materials would be expected to increase in volume with increasing moisture contents subsequent to construction resulting in heaving of the overlying improvements. In order to reduce the potential for post-construction movement of the site improvements, we recommend a zone of material immediately beneath the proposed structures, pavements and flatwork be removed, moisture conditioned and replaced prior to placement of the improvements. Based on previous experience with similar soils, we expect an over-excavation depth of approximately 3 feet below foundation bearing levels would be required. Compacted fill placed beneath building foundations should extend beyond the edges of the foundation in all directions at least 1 foot laterally for each 1 vertical foot of overexcavation. Not all near surface soils at the site exhibited swell potentials high enough to justify overexcavation. We expect structures in those areas could be supported on conventional foundation footings bearing in the in-situ site soils. The subgrades for each residence should be closely evaluated immediately prior to construction to establish the necessity and recommended depth of overexcavation. Earth Engineering Consultants, Inc. EEC Project No. 1022131 August 8, 2002 Page 5 All existing vegetation, topsoil and deleterious material should be completely removed from foundation, interior/exterior slab-on-grade and pavement areas. After stripping and completing all cuts and prior to placement of any fill, foundations, slabs-on-grade or pavements, we recommend the exposed surface materials be scarified, adjusted in moisture content and compacted. The scarified materials should be compacted to be within the range of 94 to 98% of the material’s maximum dry density, at a moisture content of –1% to +3% of optimum moisture, as determined in accordance with ASTM Specification D-698, the standard Proctor procedure. Scarification may not be necessary in foundation areas, close observation of the exposed soils should be completed to evaluate the swell potential for each building. Fill materials required to develop the site grades should consist of approved, low-volume change materials free from organic matter and debris. Based on the materials observed in the test borings, it is our opinion the near surface lean clay soils could be used as fill in the building and pavement areas. Care should be taken to thoroughly moisture-condition the on- site cohesive soils prior to their use as fill. The fill materials should be placed in loose lifts not to exceed 9 inches thick and adjusted in moisture content and compacted as outlined for the scarified soils. After preparation of the subgrades, care should be taken to avoid disturbing the in-place materials and to maintain the moisture content of those soils. Any materials loosened or disturbed by the construction activities or materials which become dry and desiccated or wet and softened should be removed and replaced or reworked in place prior to placement of the overlying floor slabs or pavements or construction of the footing foundations. Footing Foundations Earth Engineering Consultants, Inc. EEC Project No. 1022131 August 8, 2002 Page 6 Based on our field observations of the site and the soils encountered in the test borings and the results of laboratory testing, it is our opinion the proposed structures could be supported on conventional footing foundations bearing on the in-situ site soils or on newly placed and compacted fill placed as outlined above. However, due to the variability of the soils across the site we recommend that the foundation design for each structure be evaluated on an individual basis. For design of footing foundations bearing on acceptable newly placed and compacted fill soils as outlined above or on the in-situ soils, net allowable total load soil bearing pressures in the range of 1,000 to 2,000 psf appear usable. The net bearing pressure refers to the pressure at foundation bearing level in excess of the minimum surrounding overburden pressure. Total load should include full dead and live loads. Exterior foundations and foundations in unheated areas should be located at least 30 inches below adjacent exterior grade to provide frost protection. We recommend formed continuous footings have a minimum width of 12 inches and isolated column foundations have a minimum width of 24 inches. Trenched foundations or grade beam foundations could be used in cohesive materials; however, the choice of fill soils may affect the suitability of these types of foundations. If used, we recommend trenched foundations have a minimum width of 12 inches and formed grade beam foundations have a minimum width of 8 inches. No unusual problems are anticipated in completing the excavations required for construction of the footing foundations. Care should be taken during construction to thoroughly evaluate the foundation bearing materials. Any materials which are loosened or disturbed by the construction activities or materials which become dry and desiccated or wet and softened should be removed and replaced or reworked in place prior to construction of the footing foundations. We estimate the long-term settlement of footing foundations designed and constructed as outlined above would be less than 1 inch. Interior Floor Slabs Earth Engineering Consultants, Inc. EEC Project No. 1022131 August 8, 2002 Page 7 The natural near surface clay soils would be subject to moisture-induced swelling resulting in the heaving of slabs-on-grade should those slabs be placed directly on the lean clay soils at current moisture/density conditions. We expect approximately 3 feet of the native lean clay soils within interior floor slab areas will need to be removed and replaced with approved, non-expansive fill or moisture-conditioned native lean clay soils. The depth of overexcavation for slabs-on-grade can best be evaluated at the time of excavation. Subgrades and/or fill for floor slab construction would generally be prepared and placed as outlined in the site development section of this report. Care should be taken after preparation and development of the floor slab subgrades to prevent disturbance of the in-place materials. Care will also be needed to maintain the moisture levels in the subgrades prior to floor slab construction. Materials, which are loosened or disturbed by construction activities or materials that become wet and softened or dry and desiccated, should be removed and replaced or reworked prior to placement of the overlying floor slabs. Below Grade Areas We recommend a perimeter drain system be installed around all below grade areas to reduce the potential for hydrostatic loads on the below grade walls and to help prevent accumulation of infiltration water in below grade areas. In general, a perimeter drain system should consist of perforated metal or plastic pipe placed at the foundation bearing level around the exterior perimeter of the structure. The drainpipe should be surrounded by a minimum of 6 inches of appropriately sized granular filter material. A filter fabric to help reduce the potential infiltration of fines should surround the drain system. The drain-line should be sloped to provide positive gravity drainage of water to a sump area or gravity out fall so that reverse flow cannot occur back into the system. Caution should be taken during backfill operations so that damage and/or disturbance to the drain system does not occur. Foundation Walls Earth Engineering Consultants, Inc. EEC Project No. 1022131 August 8, 2002 Page 8 Backfill placed adjacent to the below grade walls should consist of approved, low-volume change soils that are free from organic matter and debris. The on-site lean clay soils could be used as fill in this area. If free draining granular soils are used as backfill adjacent to the below grade areas, we recommend the top 2 feet of material be an essentially cohesive material to reduce surface infiltration in the backfill. The backfill soils should be placed in loose lifts not to exceed 9 inches thick, and compacted to be within the range of 94% to 98% of the material's maximum dry density and moisture conditioned to be within the range –1% to +3% of optimum moisture, as determined in accordance with ASTM D-698, the standard Proctor procedure. Care should be taken in placing and compacting the wall backfill to avoid placing undue lateral stress on the below grade walls. We recommend compaction using light mechanical or hand compaction equipment. For design of below grade walls where appropriate steps have been taken to eliminate hydrostatic loads, we recommend using an equivalent fluid pressure of 40 pcf. The recommended design equivalent fluid pressure is based on an active stress distribution case where slight rotation is expected in the below grade walls. The rotation commonly estimated for active stress distribution results in deflection of the wall of approximately 0.5% times the height of the wall. That deflection may result in stress cracks on the interior of the basement walls, particularly near the center of spans between corners or other restrained points. The recommended equivalent fluid pressure does not include an allowance for hydrostatic loads nor does it include a factor of safety. Surcharge loads placed adjacent to below grade walls or point loads placed in the wall backfill may add to the lateral pressures of below grade walls. Surface Drainage Positive surface drainage should be developed away from the structures to reduce potential infiltration of surface water into the foundation wall bearing soils and/or backfill, which could result in increased earth pressures exerted against the foundation wall and possibly differential foundation and floor slab movement. The ground surface surrounding each Earth Engineering Consultants, Inc. EEC Project No. 1022131 August 8, 2002 Page 9 structure should slope away in all directions at a minimum of 1 inch per foot for at least 10 feet. Care should be taken in planning of landscaping adjacent to the residence to avoid features which would pond water adjacent to the foundation walls. Exterior Slab and Pavement Subgrades The natural clay soils could support the exterior slabs-on-grade and site pavements; however, due to the expansive potential of the natural lean clay soils, some movement of flatwork and pavements could occur and should be expected. As a minimum, we recommend exterior slab and pavement subgrades be scarified, moisture conditioned and recompacted as outlined in the site development section. To further reduce the potential for post-construction movement, overexcavation and backfilling could be completed. Based on City of Fort Collins standards, we expect some overexcavation would be required in pavement areas. Care should be taken after preparation and development of the exterior slab and pavement subgrades to prevent disturbance of the in-place materials. Care will also be needed to maintain the moisture levels in the subgrades prior to floor slab and pavement construction. Materials that are loosened or disturbed by construction activities or materials that become wet and softened or dry and desiccated, should be removed and replaced or reworked prior to placement of the overlying floor slabs. Earth Engineering Consultants, Inc. EEC Project No. 1022131 August 8, 2002 Page 10 Pavements Pavements for the development are expected to be residential local streets carrying low volumes of light vehicles with occasional heavy truck traffic. In accordance with City of Fort Collins standards, the exploration for the streets cannot be completed until water and sewer lines have been completed in the right-of-way and subgrades cut to approximate final grade. The minimum section acceptable for City of Fort Collins streets is 3½ inches of hot bituminous pavement over 6 inches of aggregate base. Some areas of expansive soils were observed near the surface at the boring locations. We expect some swell mitigation techniques such as overexcavation may be necessary in some areas. In addition, if low-swell subgrades are developed through overexcavation, moisture conditioning and backfilling, slight pumping of the subgrades may be observed. Fly ash stabilization may be necessary if excessive pumping is observed in pavement areas. We would be pleased to develop more specific pavement recommendations based on projected traffic volumes by others. Heavier pavement sections would be needed in areas of higher or heavier traffic loads. The hot bituminous pavement should be consistent with City of Fort Collins requirements for S or SX materials. The aggregate base should be consistent with city requirements for Class 5 or Class 6 base. GENERAL COMMENTS The analysis and preliminary recommendations presented in this report are based upon the data obtained from the soil borings performed at the indicated locations and from any other information discussed in this report. This report does not reflect any variations which may occur between borings or across the site. The nature and extent of such variations may not become evident until construction. If variations appear evident, it will be necessary to re- evaluate the recommendations of this report. Earth Engineering Consultants, Inc. EEC Project No. 1022131 August 8, 2002 Page 11 It is recommended that the geotechnical engineer be retained to review the plans and specifications so that comments can be made regarding the interpretation and implementation of our geotechnical recommendations in the design and specifications. It is further recommended that the geotechnical engineer be retained for testing and observations during earthwork and foundation construction phases to help determine that the design requirements are fulfilled. This report has been prepared for the exclusive use of Nebarado Construction for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranty, express or implied, is made. In the event that any changes in the nature, design or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless the changes are reviewed and the conclusions of this report modified or verified in writing by the geotechnical engineer. STORYBOOK FILING II FORT COLLINS, COLORADO PROJECT NO: 1022131 DATE: JULY 2002 LOG OF BORING B-1 RIG TYPE: CME 45 SHEET 1 OF 1 WATER DEPTH FOREMAN: JJB START DATE 7/18/2002 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 7/18/2002 AFTER DRILLING N/A SPT HAMMER: Manual SURFACE ELEV N/A 24 HOUR N/A D N QU MC DD A-LIMITS -200 SWELL SOIL DESCRIPTION TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF 0-6" Topsoil and Vegetation _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ stiff 3 with calcareous deposits _ _ 4 _ _ CS 5 16 *9000+ 11.3 116.6 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SS 10 12 *9000+ 14.2 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 10 *9000+ 14.5 _ _ BOTTOM OF BORING 15.5' 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 STORYBOOK FILING II FORT COLLINS, COLORADO PROJECT NO: 1022131 DATE: JULY 2002 LOG OF BORING B-2 RIG TYPE: CME 45 SHEET 1 OF 1 WATER DEPTH FOREMAN: JJB START DATE 7/18/2002 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 7/18/2002 AFTER DRILLING N/A SPT HAMMER: Manual SURFACE ELEV N/A 24 HOUR N/A D N QU MC DD A-LIMITS -200 SWELL SOIL DESCRIPTION TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF 0-6" Topsoil and Vegetation _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 light brown _ _ stiff CS 3 20 *9000+ 8.8 111.6 30 17 57.9 3500 psf 3.0% with calcareous deposits _ _ 4 _ _ SS 5 17 *9000+ 8.2 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SS 10 13 *9000+ 12.0 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 21 *9000+ 11.0 _ _ BOTTOM OF BORING 15.5' 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 STORYBOOK FILING II FORT COLLINS, COLORADO PROJECT NO: 1022131 DATE: JULY 2002 LOG OF BORING B-3 RIG TYPE: CME 45 SHEET 1 OF 1 WATER DEPTH FOREMAN: JJB START DATE 7/18/2002 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 7/18/2002 AFTER DRILLING N/A SPT HAMMER: Manual SURFACE ELEV N/A 24 HOUR N/A D N QU MC DD A-LIMITS -200 SWELL SOIL DESCRIPTION TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF 0-6" Topsoil and Vegetation _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 dark brown _ _ stiff 3 _ _ 4 _ _ SS 5 12 *9000+ 12.0 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ CS 10 14 *9000+ 13.6 116.2 32 19 116.2 2500 psf 1.8% _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 12 *9000+ 14.0 _ _ BOTTOM OF BORING 15.5' 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 STORYBOOK FILING II FORT COLLINS, COLORADO PROJECT NO: 1022131 DATE: JULY 2002 LOG OF BORING B-4 RIG TYPE: CME 45 SHEET 1 OF 1 WATER DEPTH FOREMAN: JJB START DATE 7/18/2002 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 7/18/2002 AFTER DRILLING N/A SPT HAMMER: Manual SURFACE ELEV N/A 24 HOUR N/A D N QU MC DD A-LIMITS -200 SWELL SOIL DESCRIPTION TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF 0-6" Topsoil and Vegetation _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ stiff 3 _ _ 4 _ _ CS 5 13 *9000+ 12.3 115.6 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SS 10 11 *9000+ 12.3 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 8 *9000+ 15.6 _ _ BOTTOM OF BORING 15.5' 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 STORYBOOK FILING II FORT COLLINS, COLORADO PROJECT NO: 1022131 DATE: JULY 2002 LOG OF BORING B-5 RIG TYPE: CME 45 SHEET 1 OF 1 WATER DEPTH FOREMAN: JJB START DATE 7/18/2002 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 7/18/2002 AFTER DRILLING N/A SPT HAMMER: Manual SURFACE ELEV N/A 24 HOUR N/A D N QU MC DD A-LIMITS -200 SWELL SOIL DESCRIPTION TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF 0-6" Topsoil and Vegetation _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ stiff CS 3 22 *9000+ 8.2 110.0 31 17 61.1 1600 psf 1.6% _ _ 4 _ _ SS 5 18 *9000+ 9.2 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SS 10 12 *9000+ 13.6 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 11 *9000+ 14.9 _ _ BOTTOM OF BORING 15.5' 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 STORYBOOK FILING II FORT COLLINS, COLORADO PROJECT NO: 1022131 DATE: JULY 2002 LOG OF BORING B-6 RIG TYPE: CME 45 SHEET 1 OF 1 WATER DEPTH FOREMAN: JJB START DATE 7/18/2002 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 7/18/2002 AFTER DRILLING N/A SPT HAMMER: Manual SURFACE ELEV N/A 24 HOUR N/A D N QU MC DD A-LIMITS -200 SWELL SOIL DESCRIPTION TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF 0-6" Topsoil and Vegetation _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ stiff 3 _ _ 4 _ _ SS 5 11 *9000+ 10.0 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ CS 10 15 *9000+ 12.9 114.4 34 18 64.3 1600 psf 1.2% _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 14 *9000+ 15.6 _ _ BOTTOM OF BORING 15.5' 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 STORYBOOK FILING II FORT COLLINS, COLORADO PROJECT NO: 1022131 DATE: JULY 2002 LOG OF BORING B-7 RIG TYPE: CME 45 SHEET 1 OF 1 WATER DEPTH FOREMAN: JJB START DATE 7/18/2002 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 7/18/2002 AFTER DRILLING N/A SPT HAMMER: Manual SURFACE ELEV N/A 24 HOUR N/A D N QU MC DD A-LIMITS -200 SWELL SOIL DESCRIPTION TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF 0-6" Topsoil and Vegetation _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 light brown _ _ stiff 3 with calcareous deposits _ _ 4 _ _ CS 5 17 *9000+ 10.7 109.9 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SS 10 13 *9000+ 10.9 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ CS 15 13 *9000+ 13.9 113.4 BOTTOM OF BORING 15.0' _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 STORYBOOK FILING II FORT COLLINS, COLORADO PROJECT NO: 1022131 DATE: JULY 2002 LOG OF BORING B-8 RIG TYPE: CME 45 SHEET 1 OF 1 WATER DEPTH FOREMAN: JJB START DATE 7/18/2002 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 7/18/2002 AFTER DRILLING N/A SPT HAMMER: Manual SURFACE ELEV N/A 24 HOUR N/A D N QU MC DD A-LIMITS -200 SWELL SOIL DESCRIPTION TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF 0-6" Topsoil and Vegetation _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 olive brown _ _ stiff CS 3 26 *9000+ 8.8 113.8 with calcareous deposits _ _ 4 _ _ brown color change with depth SS 5 18 *9000+ 9.7 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SS 10 16 *9000+ 11.4 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 16 *9000+ 14.3 _ _ BOTTOM OF BORING 15.5' 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 STORYBOOK FILING II FORT COLLINS, COLORADO PROJECT NO: 1022131 DATE: JULY 2002 LOG OF BORING B-9 RIG TYPE: CME 45 SHEET 1 OF 1 WATER DEPTH FOREMAN: JJB START DATE 7/18/2002 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 7/18/2002 AFTER DRILLING N/A SPT HAMMER: Manual SURFACE ELEV N/A 24 HOUR N/A D N QU MC DD A-LIMITS -200 SWELL SOIL DESCRIPTION TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF 0-6" Topsoil and Vegetation _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ stiff 3 with calcareous deposits _ _ 4 _ _ CS 5 17 *9000+ 9.8 112.8 34 20 65.8 4000 psf 3.3% _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SS 10 18 *9000+ 10.4 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 8 *9000+ 14.8 _ _ BOTTOM OF BORING 15.5' 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 STORYBOOK FILING II FORT COLLINS, COLORADO PROJECT NO: 1022131 DATE: JULY 2002 LOG OF BORING B-10 RIG TYPE: CME 45 SHEET 1 OF 1 WATER DEPTH FOREMAN: JJB START DATE 7/18/2002 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 7/18/2002 AFTER DRILLING N/A SPT HAMMER: Manual SURFACE ELEV N/A 24 HOUR N/A D N QU MC DD A-LIMITS -200 SWELL SOIL DESCRIPTION TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF 0-6" Topsoil and Vegetation _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 olive brown _ _ stiff CS 3 23 *9000+ 8.2 106.7 32 18 61.9 1800 psf 2.4% _ _ 4 _ _ brown color change with depth SS 5 22 *9000+ 9.8 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ CS 10 16 *9000+ 12.7 114.3 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 11 *9000+ 14.9 _ _ BOTTOM OF BORING 15.5' 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 STORYBOOK FILING II FORT COLLINS, COLORADO PROJECT NO: 1022131 DATE: JULY 2002 LOG OF BORING B-11 RIG TYPE: CME 45 SHEET 1 OF 1 WATER DEPTH FOREMAN: JJB START DATE 7/18/2002 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 7/18/2002 AFTER DRILLING N/A SPT HAMMER: Manual SURFACE ELEV N/A 24 HOUR N/A D N QU MC DD A-LIMITS -200 SWELL SOIL DESCRIPTION TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF 0-6" Topsoil and Vegetation _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ stiff 3 with calcareous deposits _ _ 4 _ _ SS 5 16 *9000+ 10.1 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SS 10 12 *9000+ 10.5 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ CS 15 19 *9000+ 14.6 112.5 BOTTOM OF BORING 15.0' _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 STORYBOOK FILING II FORT COLLINS, COLORADO PROJECT NO: 1022131 DATE: JULY 2002 LOG OF BORING B-12 RIG TYPE: CME 45 SHEET 1 OF 1 WATER DEPTH FOREMAN: JJB START DATE 7/18/2002 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 7/18/2002 AFTER DRILLING N/A SPT HAMMER: Manual SURFACE ELEV N/A 24 HOUR N/A D N QU MC DD A-LIMITS -200 SWELL SOIL DESCRIPTION TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF 0-6" Topsoil and Vegetation _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ stiff 3 _ _ 4 _ _ SS 5 9 *4000 7.2 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ CS 10 16 *9000+ 9.4 114.0 30 17 59.1 2200 psf 1.8% _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 14 *9000+ 13.7 _ _ BOTTOM OF BORING 15.5' 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 STORYBOOK FILING II FORT COLLINS, COLORADO PROJECT NO: 1022131 DATE: JULY 2002 LOG OF BORING B-13 RIG TYPE: CME 45 SHEET 1 OF 1 WATER DEPTH FOREMAN: JJB START DATE 7/18/2002 WHILE DRILLING None AUGER TYPE: 4" CFA FINISH DATE 7/18/2002 AFTER DRILLING N/A SPT HAMMER: Manual SURFACE ELEV N/A 24 HOUR N/A D N QU MC DD A-LIMITS -200 SWELL SOIL DESCRIPTION TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF 0-6" Topsoil and Vegetation _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ stiff 3 with calcareous deposits _ _ 4 _ _ CS 5 21 *9000+ 9.1 114.3 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SS 10 18 *9000+ 10.5 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 15 *9000+ 12.5 _ _ BOTTOM OF BORING 15.5' 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay Sample Location: B-2, S-1 @ 2-3' Liquid Limit: 30 Plasticity Index: 17 % Passing #200: 57.9% Beginning Moisture: 8.5% Dry Density: 111.6 pcf Ending Moisture: 17.9% Swell Pressure: 3500 psf % Swell @ 500 psf: 3.0% 0 2 4 6 8 10 nt Movement Swell Project: Storybook - 2nd Filing Fort Collins, Colorado Project Number: 1022131 Date: August 2002 -10 -8 -6 -4 -2 0 0.01 0.1 1 10 Percent Move Load (TSF) Water Added Consolidation SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay Sample Location: B-3, S-2 @ 9-10' Liquid Limit: 32 Plasticity Index: 19 % Passing #200: 67.7% Beginning Moisture: 12.9% Dry Density: 116.2 pcf Ending Moisture: 16.7% Swell Pressure: 2500 psf % Swell @ 500 psf: 1.8% 0 2 4 6 8 10 nt Movement Swell Project: Storybook - 2nd Filing Fort Collins, Colorado Project Number: 1022131 Date: August 2002 -10 -8 -6 -4 -2 0 0.01 0.1 1 10 Percent Move Load (TSF) Water Added Consolidation SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay Sample Location: B-5, S-1 @ 2-3' Liquid Limit: 31 Plasticity Index: 17 % Passing #200: 61.1% Beginning Moisture: 8.0% Dry Density: 110.0 pcf Ending Moisture: 21.2% Swell Pressure: 1600 psf % Swell @ 500 psf: 1.6% 0 2 4 6 8 10 nt Movement Swell Project: Storybook - 2nd Filing Fort Collins, Colorado Project Number: 1022131 Date: August 2002 -10 -8 -6 -4 -2 0 0.01 0.1 1 10 Percent Move Load (TSF) Water Added Consolidation SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay Sample Location: B-6, S-2 @ 9-10' Liquid Limit: 34 Plasticity Index: 18 % Passing #200: 64.3% Beginning Moisture: 12.6% Dry Density: 114.4 pcf Ending Moisture: 16.8% Swell Pressure: 1600 psf % Swell @ 500 psf: 1.2% 0 2 4 6 8 10 nt Movement Swell Project: Storybook - 2nd Filing Fort Collins, Colorado Project Number: 1022131 Date: August 2002 -10 -8 -6 -4 -2 0 0.01 0.1 1 10 Percent Move Load (TSF) Water Added Consolidation SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay Sample Location: B-9, S-1 @ 4-5' Liquid Limit: 34 Plasticity Index: 20 % Passing #200: 65.8% Beginning Moisture: 9.6% Dry Density: 112.8 pcf Ending Moisture: 20.2% Swell Pressure: 4000 psf % Swell @ 500 psf: 3.3% 0 2 4 6 8 10 nt Movement Swell Project: Storybook - 2nd Filing Fort Collins, Colorado Project Number: 1022131 Date: August 2002 -10 -8 -6 -4 -2 0 0.01 0.1 1 10 Percent Move Load (TSF) Water Added Consolidation SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay Sample Location: B-10, S-1 @ 2-3' Liquid Limit: 32 Plasticity Index: 18 % Passing #200: 61.9% Beginning Moisture: 8.1% Dry Density: 106.7 pcf Ending Moisture: 20.7% Swell Pressure: 1800 psf % Swell @ 500 psf: 2.4% 0 2 4 6 8 10 nt Movement Swell Project: Storybook - 2nd Filing Fort Collins, Colorado Project Number: 1022131 Date: August 2002 -10 -8 -6 -4 -2 0 0.01 0.1 1 10 Percent Move Load (TSF) Water Added Consolidation SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay Sample Location: B-12, S-2 @ 9-10' Liquid Limit: 30 Plasticity Index: 17 % Passing #200: 59.1% Beginning Moisture: 9.3% Dry Density: 114.0 pcf Ending Moisture: 16.3% Swell Pressure: 2200 psf % Swell @ 500 psf: 1.8% 0 2 4 6 8 10 nt Movement Swell Project: Storybook - 2nd Filing Fort Collins, Colorado Project Number: 1022131 Date: August 2002 -10 -8 -6 -4 -2 0 0.01 0.1 1 10 Percent Move Load (TSF) Water Added Consolidation Earth Engineering Consultants Earth Engineering Consultants Earth Engineering Consultants Earth Engineering Consultants Earth Engineering Consultants Earth Engineering Consultants Earth Engineering Consultants Earth Engineering Consultants Earth Engineering Consultants Earth Engineering Consultants Earth Engineering Consultants Earth Engineering Consultants Earth Engineering Consultants