Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
FRONT RANGE COMMUNITY COLLEGE, INTEGRATED TECHNOLOGY BUILDING - SPAR - SPA130006 - SUBMITTAL DOCUMENTS - ROUND 1 - ARCHITECTURAL DETAILS
CG CG CG MOTOR CYCLE MOTOR CYCLE X X E CEL 2 3 4 5 6 7 8 9 10 A B C D E 1 AUTOMOTIVE CLASS ROOMS CLEAN ENERGY TECHNOLOGY WELDING STAFF OFFICES MAIN ENTRY ROLLING GATE FOR DELIVERIES AND ACCESS TO YARD AUTO. CONEX STORAGE WELDING RECYCLE PICK-UP (TWICE PER YEAR) WELDING MATERIAL STORAGE WELDING EXHAUST SYSTEM 11 8'-0" MASONRY SCREEN WALL AUTO AND WELDING YARD W. HARMONY RD. S. SHIELDS ST. CLARENDON HILLS DR. STARFLOWER DR. LANGDALE DR. STARFLOWER DR. EXTENTS OF WORK PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS © OZ ARCHITECTURE SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: 3003 LARIMER STREET DENVER, CO 80205 PHONE 303.861.5704 www.ozarch.com 10/29/2013 12:31:14 PM C:\Revit Local Files\812011-FRCC_ITB_A13\812011-FRCC_ITB_A13_rgreek.rvt As indicated TECHNOLOGY BLDG. 4616 SOUTH SHIELDS ST. FORT COLLINS, CO 80526 812011.00 Author Checker 10/29/13 CITY SPAR SUBMITTAL FLOOR PLAN A1.0 TECHNOLOGY BLDG. Approver 1 INTEGRATED 1/16" = 1'-0" TECH. LEVEL ONE FLOOR PLAN 2 CAMPUS 1" = 200'-0" CONTEXT MAP