HomeMy WebLinkAboutGEICO OFFICE BUILDING - PDP - PDP130039 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONSFIRST FLOOR PLAN
100' - 0"
ROOF BEARING
122' - 2 5/8"
SECOND FLOOR PLAN
112' - 0"
SECOND FLOOR
BEARING
110' - 6"
WOOD OR STEEL OVERHANG
SUPPORT - STAIN OR PAINT
METAL OR FIBER CEMENT FASCIA BOARD - BEIGE/GRAY
ASPHALT SHINGLE ROOF - BEIGE/BROWN
FIBER CEMENT REVEAL PANEL - GREEN/BEIGE
SYNTHETIC STONE VENEER - BEIGE/BUFF FIBERGLASS WINDOW - BLACK
BRICK - WARM GRAY TONES
METAL OR FIBER CEMENT SIDING -
BEIGE
SYNTHETIC STONE VENEER - BEIGE/BUFF
FIBER CEMENT REVEAL PANEL - GREEN/GRAY
WOOD OR STEEL OVERHANG
SUPPORT - STAIN OR PAINT
30"- 0" MAX.
3"
12"
3"
12"
FIRST FLOOR PLAN
100' - 0"
ROOF BEARING
122' - 2 5/8"
SECOND FLOOR PLAN
112' - 0"
SECOND FLOOR
BEARING
110' - 6"
ASPHALT SHINGLE ROOF - BEIGE/BROWN
METAL OR FIBER CEMENT FASCIA
BOARD - BEIGE/GRAY
FIBER CEMENT REVEAL PANEL - GREEN/GRAY
SYNTHETIC STONE VENEER - BEIGE/BUFF
BRICK - WARM GRAY TONES
FIBERGLASS WINDOW - BLACK
PRE FABRICATED STEEL STAIR AND
GUARD RAIL - BLACK
SYNTHETIC STONE VENEER -
BEIGE/BUFF
METAL OR FIBER CEMENT SIDING - BEIGE
BRICK - WARM GRAY TONES
WOOD OR STEEL OVERHANG SUPPORT
- STAIN OR PAINT
27' - 11 1/4"
METAL TRASH GATES
- PAINT
PRECAST WALL CAP -
BEIGE/GRAY
BRICK - WARM GRAY TONES
TO MATCH BUILDING
6' - 0"
14' - 10 1/2"
FIRST FLOOR PLAN
100' - 0"
ROOF BEARING
122' - 2 5/8"
SECOND FLOOR PLAN
112' - 0"
SECOND FLOOR
BEARING
110' - 6"
ASPHALT SHINGLE ROOF - BEIGE/BROWN
METAL OR FIBER CEMENT
FASCIA BOARD - BEIGE/GRAY
WOOD OR STEEL OVERHANG SUPPORT -
STAIN OR PAINT
FIBER CEMENT REVEAL PANEL - GREEN/GRAY
SYNTHETIC STONE VENEER -BEIGE/BUFF
BRICK - WARM GRAY TONES BRICK - WARM GRAY TONES
FIBERGLASS WINDOW - BLACK
FIBER CEMENT SIDING - BEIGE
SYNTHETIC STONE VENEER - BEIGE/BUFF
27' - 11 1/4"
SYNTHETIC STONE VENEER -
BEIGE/BUFF
ENTRY COLUMN -
STAIN OR PAINT
FIRST FLOOR PLAN
100' - 0"
ROOF BEARING
122' - 2 5/8"
SECOND FLOOR PLAN
112' - 0"
SECOND FLOOR
BEARING
110' - 6"
SYNTHETIC STONE VENEER - BEIGE/BUFF
PRE FABRICATED STEEL STAIR AND GUARD RAIL - BLACK
BRICK - WARM GRAY TONES
METAL OR FIBER CEMENT SIDING - BEIGE
FIBERGLASS WINDOW - BLACK
WOOD OR STEEL OVERHANG
SUPPORT - STAIN OR PAINT
WOOD OR STEEL OVERHANG
SUPPORT - STAIN OR PAINT
FIBER CEMENT REVEAL PANEL - GREEN/GRAY
SYNTHETIC STONE VENEER -
BEIGE/BUFF
FIBERGLASS WINDOW - BLACK
ASPHALT SHINGLE ROOF - BEIGE/BROWN
ASPHALT SHINGLE ROOF - BEIGE/BROWN
METAL OR FIBER CEMENT FASCIA BOARD -
BEIGE/GRAY
METAL OR FIBER CEMENT FASCIA BOARD -
BEIGE/GRAY
27' - 11 1/4"
ENTRY COLUMNS - STAIN OR PAINT
SYNTHETIC STONE VENEER ENTRY COLUMNS - BEIGE/BUFF
3"
12"
3"
12"
1. ALL MECHANICAL AND ELECTRICAL EQUIPMENT TO BE PAINTED TO
MATCH BUILDING.
2. ALL MECHANICAL AND ELECTRICAL METERS TO BE PAINTED TO
MATCH BUILDING.
GENERAL NOTES:
PROJECT
DATE
DRAWN
712 WHALERS WAY SUITE, B-100
FORT COLLINS, CO 80525
(970) 223-1820
www.aller-lingle-massey.com
PRINTED FILE NAME:
NOT FOR CONSTRUCTION
12/23/2013 3:42:41 PM
C ALLER-LINGLE-MASSEY 2013
0000-Project-SD.rvt
BUILDING ELEVATIONS
1326
KEE
12/23/13
A4.2
2024 E. HARMONY RD.
FORT COLLINS, CO
GEICO OFFICE BUILDING
A4.2 SCALE: 1/4" = 1'-0" RE:
1 A1.1
1 SOUTH ELEVATION
A4.2 SCALE: 1/4" = 1'-0" RE:
1 A1.1
2 WEST ELEVATION
A4.2 SCALE:
3 VIEW FROM SOUTHWEST
A4.2 SCALE: RE:
4 VIEW FROM WEST
BRICK - WARM GRAY TONES
TO MATCH BUILDING
PRECAST WALL CAP -
BEIGE/GRAY
METAL MAN GATE - PAINT
TO MATCH BRICK
10' - 10 1/2"
1. ALL MECHANICAL AND ELECTRICAL EQUIPMENT TO BE PAINTED TO
MATCH BUILDING.
2. ALL MECHANICAL AND ELECTRICAL METERS TO BE PAINTED TO
MATCH BUILDING.
GENERAL NOTES:
PROJECT
DATE
DRAWN
712 WHALERS WAY SUITE, B-100
FORT COLLINS, CO 80525
(970) 223-1820
www.aller-lingle-massey.com
PRINTED FILE NAME:
NOT FOR CONSTRUCTION
12/23/2013 3:40:30 PM
C ALLER-LINGLE-MASSEY 2013
0000-Project-SD.rvt
BUILDING ELEVATIONS
1326
KEE
12/23/13
A4.1
2024 E. HARMONY RD.
FORT COLLINS, CO
GEICO OFFICE BUILDING
A4.1 SCALE: 1/4" = 1'-0" RE:
1 A1.1
1 EAST ELEVATION
A4.1 SCALE: 1/4" = 1'-0" RE:
1 A1.1
2 NORTH ELEVATION
A4.1 SCALE:
3 VIEW FROM SOUTHEAST
A4.1 SCALE: 1/4" = 1'-0" RE:
1 A3.1
4 TRASH ENCLOSURE ELEVATIONS