HomeMy WebLinkAboutGEICO OFFICE BUILDING - PDP - PDP130039 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESPage 1
December 23, 2013
Geico Office Building
Statement of Planning Objectives
This proposal is for a new office building to be located at 2024 East Harmony Road.
Currently, there are two lots (2016 and 2024), which will be platted with into one lot with this PDP.
Uses surrounding the property consist of the following:
South: Harmony Village Shopping Center, Zoned HC
West: Harmony Wellness Center, Zoned HC
North: Harmony Half Acres Subdivision, Zoned UE
East: Harmony School Shops, Zoned HC
The proposed building will contain approximately 7,029 sq. ft. of office space and is two
stories in height. Main access to the site will utilize an existing (right-in /right-out only)
entrance off of Harmony Road, which currently serves the Forever Young hair salon. Due to
the amount of traffic and proximity to Timberline Road, there will be a new right-out only curb
cut located approximately 35 feet east of the existing driveway. 27 parking spaces will be
provided for employees and visitors, 11 of which are compact spaces.
The .548-acre site is in the H-C zoning district. The area surrounding the Geico office
building contains a mix of single-family homes, retail, shopping centers, and medical uses.
The site is ideal for this type of use as it provides a high-quality building in an underutilized
vacant infill site in Fort Collins. The proposed project is located within walking and biking
distance to neighborhoods, restaurants, and shopping centers. There is an existing transit
stop on Harmony Road in front of the site.
(i) Statement of appropriate City Plan Principles and Policies achieved by
the proposed plan:
The Geico Office Building meets the following applicable City Plan Principles
and Policies:
Economic Health
Principle EH 4: The City will encourage the redevelopment of strategic
areas within the community as defined in the Community and
Neighborhood Livability and Neighborhood Principles and Policies.
Policy EH 4.1 –Prioritize Targeted Redevelopment Areas
Policy EH 4.2 – Reduce Barriers to Infill Development and
Redevelopment
By building a new office building, Geico will continue to promote and sustain
their local business thereby further enhancing the economic health of Fort
Page 2
Collins. This represents business retention for a business that is successful
in Fort Collins.
Environmental Health
Principle ENV 19: The City will pursue opportunities to protect and
restore the natural function of the community’s urban watersheds and
streams as a key component of minimizing flood risk, reducing urban
runoff pollution, and improving the ecological health of urban streams.
Policy ENV 19.2 – Pursue Low Impact Development
The project is implementing LID by incorporating grass swales and pervious
pavement, which will treat runoff from the new building.
Community and Neighborhood Livability
Principle LIV 38: Employment Districts will be the major employment
centers in the community, and will also include a variety of
complementary uses to meet the needs of employees. By design, they
will be accessible to the City’s multimodal transportation system and
encourage walking, bicycling, car and van pooling, and transit use.
Policy LIV 38.1 – Mix of Uses
Policy LIV 38.3 – Land Use Transitions
Policy LIV 38.5 – Coordinate District Design
Policy LIV 38.7 – Address Parking
Policy LIV 38.8 – Provide Walkways and Bikeways
The proposed office building is a primary use located in a targeted activity
center. The area surrounding the site contains a mix of residential,
institutional, employment, office and retail. The visual impacts of the parking
lot have been reduced by placing the parking to the side of the building and
enhancing with landscaping.
Transportation
Principle T 9: Enhanced Travel Corridors will contain amenities and
designs that specifically promote walking, the use of mass transit, and
bicycling.
Policy T 9.1 – Locating Enhanced Travel Corridors
Principle T10: Using transit will be a safe, affordable, easy, and
convenient mobility option for all ages and abilities.
Policy T 10.1 – Transit Stops
Policy T 10.6 – High Frequency Transit Service
Principle T11: Bicycling will be a safe, easy, and convenient mobility
option for all ages and abilities
Page 3
The location of this building and its proximity to Harmony and Timberline
Roads will promote and support the idea of a predominance of the daily trips
of the employees of this project utilizing alternative modes of transportation
(walking/biking) or public transportation. The on-street bike lanes will help to
encourage safe cycling. Both Harmony and Timberline Roads are
designated as enhanced travel corridors and there is an existing Transfort
stop on Harmony in front of the site.
(ii) Description of proposed open space, wetlands, natural habitats and
features, landscaping, circulation, transition areas, and associated
buffering on site and in the general vicinity of the project.
The site is adjacent to the Dixon Canyon Lateral irrigation ditch. There was
an Ecological Characterization Report prepared and submitted to the City.
We will determine the best way to treat the natural buffer zone during the
review process.
(iii) Statement of proposed ownership and maintenance of public and
private open space areas; applicant's intentions with regard to future
ownership of all or portions of the project development plan.
The project will be owned by Steve Allen LLC. All maintenance for common
areas, landscape, trash removal, stormwater infrastructure, and snow
removal shall be performed by the property owner.
(iv) Estimate of number of employees for business, commercial, and
industrial uses.
The number of employees is estimated to be approximately 10-15.
(v) Description of rationale behind the assumptions and choices made by
the applicant.
Our assumptions are based on the following rationale for the proposed office
use:
Office Building – The motivation behind the new building was to relocate an
existing insurance agency to a new building as well as provide Class A office
space for lease. The site has been an eyesore for a number of years, so the
improvements will create an attractive corner presence at the intersection of
two busy streets.
(vi) The applicant shall submit as evidence of successful completion of the
applicable criteria, the completed documents pursuant to these
regulations for each proposed use. The planning Director may require,
or the applicant may choose to submit, evidence that is beyond what is
required in that section. Any variance from the criteria shall be
described.
At this time the project is not proposing any variance from any City of Fort
Collins criteria. See above for applicable criteria.
(vii) Narrative description of how conflicts between land uses or
disturbances to wetlands, natural habitats and features and or wildlife
are being avoided to the maximum extent feasible or are mitigated.
Page 4
The site is adjacent to the Dixon Canyon Lateral irrigation ditch. There was
an Ecological Characterization Report prepared and submitted to the City.
We will determine the best way to treat the natural buffer zone during the
review process.
(viii) Written narrative addressing each concern/issue raised at the
neighborhood meeting(s), if a meeting has been held.
There was no neighborhood meeting.
(ix) Name of the project as well as any previous name the project may have
had during Conceptual Review.
The project is called Geico Office Building. The project was referred to as
2024 Harmony Road – Insurance Office at Conceptual Review.