CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
LEGEND
(1.) THE EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO
ANY CONSTRUCTION ON THIS SITE.
(2.) THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED
PLANS.
(3.) ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND
DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION
CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE
AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL
REPORT.
(4.) AT ALL TIMES DURING CONSTRUCTION, THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND
CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO
MINIMIZE WIND BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND
MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN.
(5.) PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL
OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR
IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.
(6.) ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS,
STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG
LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL BMPS ARE
INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS-OF-WAY SHALL REMAIN EXPOSED BY
LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR
PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS
OTHERWISE APPROVED BY THE CITY/COUNTY.
(7.) IN ORDER TO MINIMIZE EROSION POTENTIAL, ALL TEMPORARY (STRUCTURAL) EROSION CONTROL
MEASURES SHALL:
(A.) BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) WEEKS AND AFTER EACH SIGNIFICANT STORM
EVENT AND REPAIRED OR RECONSTRUCTED AS NECESSARY IN ORDER TO ENSURE THE CONTINUED
PERFORMANCE OF THEIR INTENDED FUNCTION.
(B.) REMAIN IN PLACE UNTIL SUCH TIME AS ALL THE SURROUNDING DISTURBED AREAS ARE SUFFICIENTLY
STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR.
(C.) BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY THE
EROSION CONTROL INSPECTOR.
(8.) WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE
RESPONSIBLE FOR THE CLEAN UP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM ALL DRAINAGE
INFRASTRUCTURE AND OTHER PUBLIC FACILITIES.
(9.) THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY
DEPOSITED ON EXISTING STREETS, SIDEWALKS, OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE
STREETS AND WALKWAYS ARE CLEANED AT THE END OF EACH WORKING DAY.
(10.) ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED
AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY WATERS
OF THE UNITED STATES.
(11.) NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE
PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT
FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (30) DAYS SHALL BE SEEDED AND MULCHED.
(12.) THE STORMWATER VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM SEWER
LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE
OVER TO THE CITY/COUNTY OR HOMEOWNERS ASSOCIATION (HOA).
(13.) CITY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (CDPS) REQUIREMENTS MAKE IT
UNLAWFUL TO DISCHARGE OR ALLOW THE DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER
FROM CONSTRUCTION SITES. POLLUTANTS INCLUDE, BUT ARE NOT LIMITED TO DISCARDED BUILDING
MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, OIL AND GAS PRODUCTS, LITTER, AND SANITARY
WASTE. THE DEVELOPER SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE
THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND
ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
(14.) A DESIGNATED AREA SHALL BE PROVIDED ON SITE FOR CONCRETE TRUCK CHUTE WASHOUT. THE AREA
SHALL BE CONSTRUCTED SO AS TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST FIFTY (50)
FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION. UPON COMPLETION OF CONSTRUCTION
ACTIVITIES THE CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND PROPERLY DISPOSED OF PRIOR
TO THE AREA BEING RESTORED.
(15.) TO ENSURE THAT SEDIMENT DOES NOT MOVE OFF OF INDIVIDUAL LOTS ONE OR MORE OF THE
FOLLOWING SEDIMENT/EROSION CONTROL BMPS SHALL BE INSTALLED AND MAINTAINED UNTIL THE LOTS
ARE SUFFICIENTLY STABILIZED, AS DETERMINED BY THE EROSION CONTROL INSPECTOR.
(A.) ALONG LOT PERIMETER.
(B.) OTHER LOCATIONS, IF NEEDED.
(16.) CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS
SHOWN ON THESE PLANS. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED
NECESSARY, AS DIRECTED BY THE CITY/COUNTY.
NOTES:
1) REFER TO DRAINAGE PLAN FOR
FLOODPLAIN INFORMATION
2) PROVIDE STAPLED EROSION CONTROL
FABRIC AT ALL CONCENTRATED FLOW
POINTS AT CHANNEL SIDE SLOPE TO
STABILIZE AS NECESSARY IN
CONJUNCTION WITH RESEEDING.
Mobilization Fdn. Excav'n Site Grading Vertical Const. Flatwork Inst. Landscaping
Demobilization
Best Management Practices (BMP's)
Structural "Installation"
Silt Fence
Vehicle Tracking Pad
Inlet Protection (Any existing inlets
downstream of site)
Sediment Trap / Filter (in Detention Basin)
Contour Furrows (Ripping / Disking)
Flow Barriers / Wattle Dikes
Riprap Armoring
*All BMP's are to be removed once
construction is complete
Vegetative
Temporary Seeding / Planting
Any time the site will sit
dormant longer than 30 days.
Mulching / Sealant
Any time the site will sit
dormant longer than 30 days.
Sod Installation
Permanent Seeding / Planting
Rolled Products (Netting / Blankets / Mats)
Any time the site will sit
dormant longer than 30 days.
THIS DRAWING, AS AN INSTRUMENT OF SERVICE, IS AND SHALL REMAIN THE PROPERTY OF TFG DESIGN, LLC. AND SHALL NOT BE REPRODUCED, PUBLISHED OR USED IN ANY WAY WITHOUT THE PERMISSION OF THE
LANDSCAPE ARCHITECT.
1269 N Cleveland Ave, Loveland CO 80537
(970) 669.3737
design@tfgdesign.com www.tfgdesign.com
ATTN:
SHEET OF
SHEET NUMBER:
SHEET TITLE:
REVISIONS:
PROJECT INFORMATION:
OWNER:
DRAWN BY:
FILE LOCATION: C:\Users\Jason\Dropbox\Ridgewood Hills\DWGS\C5.0_Erosion Control Plan.dwg
PLOT DATE: 11/19/2013 7:34 AM
PROJECT NUMBER:
DATE:
PHASE:
M. TIMM DEVELOPMENT
BILL TIMM
233 CARILLO STREET
SANTA BARBARA, CA 93101
(805) 963-0358
RIDGEWOOD HILLS - FOURTH FILING
AVONDALE RD & TRIANGLE
FORT COLLINS, COLORADO
111-122FC
DEC 04,2013
FP
MM.DD.YY X
MM.DD.YY X
MM.DD.YY X
MM.DD.YY X
36
EROSION CONTROL PLAN
4