Loading...
HomeMy WebLinkAboutRIDGEWOOD HILLS RESIDENCES, 4TH FILING - FDP - FDP130052 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANS (54)1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION NORTH 0 15' 30' 60' SCALE: 1"= 30'-0" 120' GRADING NOTES 1. ALL EASEMENTS ARE PROPOSED AND WILL BE DEDICATED BY THE PLAT. EASEMENTS ARE LABELED ON THE UTILITY PLAN. 2. THE DRIVES WITHIN THE SITE WILL BE PRIVATELY OWNED AND MAINTAINED. THERE WILL BE NO PUBLIC MAINTENANCE OF THE DRIVES. 3. LIMITS OF STREET CUT SHOWN ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS SHALL BE IN ACCORDANCE WITH THE CITY STREET REPAIR STANDARDS. 4. NO OFF SITE GRADING IS PROPOSED WITH THIS DEVELOPMENT. 5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. THIS DRAWING, AS AN INSTRUMENT OF SERVICE, IS AND SHALL REMAIN THE PROPERTY OF TFG DESIGN, LLC. AND SHALL NOT BE REPRODUCED, PUBLISHED OR USED IN ANY WAY WITHOUT THE PERMISSION OF THE LANDSCAPE ARCHITECT. 1269 N Cleveland Ave, Loveland CO 80537 (970) 669.3737 design@tfgdesign.com www.tfgdesign.com ATTN: SHEET OF SHEET NUMBER: SHEET TITLE: REVISIONS: PROJECT INFORMATION: OWNER: DRAWN BY: FILE LOCATION: C:\Users\Jason\Dropbox\Ridgewood Hills\DWGS\C3.0_Grading.dwg PLOT DATE: 11/19/2013 7:34 AM PROJECT NUMBER: DATE: PHASE: M. TIMM DEVELOPMENT BILL TIMM 233 CARILLO STREET SANTA BARBARA, CA 93101 (805) 963-0358 RIDGEWOOD HILLS - FOURTH FILING AVONDALE RD & TRIANGLE FORT COLLINS, COLORADO 111-122FC DEC 04,2013 FP MM.DD.YY X MM.DD.YY X MM.DD.YY X MM.DD.YY X 36 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL PERMEABLE PAVEMENT CONSTRUCTION NOTES (PAVERS) 1. EXCAVATION OF SUBGRADE SHALL NOT COMMENCE UNTIL AFTER THE PRE-CONSTRUCTION MEETING. 2. SUBGRADE SHALL BE EXCAVATED USING LOW GROUND PRESSURE (LGP) TRACK EQUIPMENT TO MINIMIZE OVER COMPACTION OF THE SUBGRADE - FOR PARTIAL AND FULL INFILTRATION SECTIONS ONLY. 3. GRADING AND COMPACTION EQUIPMENT USED IN THE AREA OF THE PERMEABLE PAVEMENT SHOULD BE APPROVED BY THE ENGINEER PRIOR TO USE. 4. LOOSE MATERIALS SHALL NOT BE STORED ON THE PERMEABLE PAVEMENT AREA. 5. THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS, AND DIRT FROM ANY SOURCE FROM ENTERING THE PERMEABLE PAVEMENT SYSTEM. 6. PLACEMENT OF THE WEARING COURSES SHALL BE PERFORMED AFTER FINE GRADING AND LANDSCAPING IN ADJACENT AREAS IS COMPLETE. IF THE WEARING COURSE BECOMES CLOGGED DUE TO CONSTRUCTION ACTIVITIES, CLEAN THE SURFACE WITH A VACUUM MACHINE TO RESTORE THE INFILTRATION RATE AFTER CONSTRUCTION IS COMPLETE. GRADING PLANS - SOUTH 8