GRADING NOTES
1. ALL EASEMENTS ARE PROPOSED AND WILL
BE DEDICATED BY THE PLAT. EASEMENTS
ARE LABELED ON THE UTILITY PLAN.
2. THE DRIVES WITHIN THE SITE WILL BE
PRIVATELY OWNED AND MAINTAINED.
THERE WILL BE NO PUBLIC MAINTENANCE
OF THE DRIVES.
3. LIMITS OF STREET CUT SHOWN ARE
APPROXIMATE. FINAL LIMITS ARE TO BE
DETERMINED IN THE FIELD BY THE CITY
ENGINEERING INSPECTOR. ALL REPAIRS
SHALL BE IN ACCORDANCE WITH THE CITY
STREET REPAIR STANDARDS.
4. NO OFF SITE GRADING IS PROPOSED WITH
THIS DEVELOPMENT.
5. SEE LANDSCAPE PLAN FOR REVEGETATION
METHODS AND DETAILS.
THIS DRAWING, AS AN INSTRUMENT OF SERVICE, IS AND SHALL REMAIN THE PROPERTY OF TFG DESIGN, LLC. AND SHALL NOT BE REPRODUCED, PUBLISHED OR USED IN ANY WAY WITHOUT THE PERMISSION OF THE
LANDSCAPE ARCHITECT.
1269 N Cleveland Ave, Loveland CO 80537
(970) 669.3737
design@tfgdesign.com www.tfgdesign.com
ATTN:
SHEET OF
SHEET NUMBER:
SHEET TITLE:
REVISIONS:
PROJECT INFORMATION:
OWNER:
DRAWN BY:
FILE LOCATION: C:\Users\Jason\Dropbox\Ridgewood Hills\DWGS\C3.0_Grading.dwg
PLOT DATE: 11/19/2013 7:34 AM
PROJECT NUMBER:
DATE:
PHASE:
M. TIMM DEVELOPMENT
BILL TIMM
233 CARILLO STREET
SANTA BARBARA, CA 93101
(805) 963-0358
RIDGEWOOD HILLS - FOURTH FILING
AVONDALE RD & TRIANGLE
FORT COLLINS, COLORADO
111-122FC
DEC 04,2013
FP
MM.DD.YY X
MM.DD.YY X
MM.DD.YY X
MM.DD.YY X
36
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
PERMEABLE PAVEMENT CONSTRUCTION NOTES
(PAVERS)
1. EXCAVATION OF SUBGRADE SHALL NOT
COMMENCE UNTIL AFTER THE
PRE-CONSTRUCTION MEETING.
2. SUBGRADE SHALL BE EXCAVATED USING
LOW GROUND PRESSURE (LGP) TRACK
EQUIPMENT TO MINIMIZE OVER COMPACTION
OF THE SUBGRADE - FOR PARTIAL AND FULL
INFILTRATION SECTIONS ONLY.
3. GRADING AND COMPACTION EQUIPMENT
USED IN THE AREA OF THE PERMEABLE
PAVEMENT SHOULD BE APPROVED BY THE
ENGINEER PRIOR TO USE.
4. LOOSE MATERIALS SHALL NOT BE STORED ON
THE PERMEABLE PAVEMENT AREA.
5. THE CONTRACTOR SHALL, AT ALL TIMES
DURING AND AFTER SYSTEM INSTALLATION,
PREVENT SEDIMENT, DEBRIS, AND DIRT FROM
ANY SOURCE FROM ENTERING THE
PERMEABLE PAVEMENT SYSTEM.
6. PLACEMENT OF THE WEARING COURSES
SHALL BE PERFORMED AFTER FINE GRADING
AND LANDSCAPING IN ADJACENT AREAS IS
COMPLETE. IF THE WEARING COURSE
BECOMES CLOGGED DUE TO CONSTRUCTION
ACTIVITIES, CLEAN THE SURFACE WITH A
VACUUM MACHINE TO RESTORE THE
INFILTRATION RATE AFTER CONSTRUCTION IS
COMPLETE.