Loading...
HomeMy WebLinkAboutRIDGEWOOD HILLS RESIDENCES, 4TH FILING - FDP - FDP130052 - SUBMITTAL DOCUMENTS - ROUND 1 - LANDSCAPE PLAN (6)INSTALL USING STRAIGHT LINES AND SMOOTH CURVES.. STAKE STEEL HEADER USING PINS OF TWO FEET O.C. PROVIDE DRAINAGE SLITS OR HOLES AT SUFFICIENT INTERVALS TO ALLOW EXCESS WATER TO DRAIN AWAY. LAY IN G S O D 1. AFTER SOIL PREPARATION, ROLL THE AREA TO AN EVENLY COMPACTED, FIRM SOIL BED. 2. REPLACE HARD AND SOFT AREAS. 3. SCARIFY SURFACE TO A DEPTH OF 3/8 INCH. 4. KEEP SOIL BED MOIST DURING LYING OF SOD. 5. LAY SOD SMOOTHLY; EDGE TO EDGE, AND WITH STAGGERED JOINTS. BUTT EDGES TIGHTLY. 6. WATER SOD LIGHTLY AS LAYING PROGRESSES TO PREVENT DRYING OF SOD. 7. ROLL SOD DIAGONALLY WITH A LIGHT ROLLER, LEVELING IRREGULARITIES AND SEALING JOINTS. 8. IN ORDER TO FACILITATE DRAINAGE, PLACE SOD FLUSH WITH PAVEMENT ON THE UPHILL SIDE OF PAVEMENT. ON THE DOWNHILL SIDE OF PAVEMENT, PLACE SOD SLIGHTLY BELOW PAVEMENT SURFACE. 9. HOLD SOD BACK FROM TREE TRUNKS AS SHOWN IN DETAILS. SEE D IN G 1. TIME OF SEEDING: UNLESS OTHERWISE APPROVED, ALL TURF SEEDING SHALL BE COMPLETED BETWEEN APRIL 15 AND MAY 31, OR BETWEEN SEPTEMBER 1 AND OCTOBER 15. 2. DRILL SEEDING: DRILL SEED USING A DRILL IMPLEMENT EQUIPPED WITH THE FOLLOWING PREFERABLE FEATURES; DEPTH BANDS - TO ALLOW SEEDING AT THE PROPER DEPTH SEED BOX AGITATOR - TO PROMOTE SEED MIXING SEED BOX BAFFLES - TO AID IN EVEN SEED DISTRIBUTION AMONG ROWS SEED-METERING DEVICE - TO PROMOTE EVEN SEED DISTRIBUTION WITHIN ROWS FURROW OPENERS - TO PERMIT PROPER SEED PLACEMENT FROM SEED SPOUTS, AND DRAG CHAINS - TO AID IN SEED COVERAGE 3. THE DRILL WILL BE ADJUSTED TO PLANT SEED TO THE PROPER DEPTH. THE DEPTH OF SEEDING WILL BE APPROXIMATELY 0.25 TO 0.50 INCH. DRILL ROW SPACING WILL BE SET AT APPROXIMATELY 6 TO 8 INCHES. THE DRILL WILL THEN BE TOWED ACROSS THE SEEDBED TO COMPLETE THE PLANTING OPERATION. DRILL SEEDING WILL TAKE PLACE IMMEDIATELY FOLLOWING THE COMPLETION OF FINAL SEED BED PREPARATION TECHNIQUES. 4. BROADCAST SEEDING: BROADCAST SEEDING SHALL ONLY OCCUR IN AREAS INACCESSIBLE TO A DRILL SEEDER. BROADCAST SEED ONLY AFTER ALL TREES AND SHRUBS HAVE BEEN PLANTED IN THESE AREAS. BROADCAST SEEDING WILL BE ACCOMPLISHED USING HAND-OPERATION "CYCLONE-TYPE" SEEDERS OR ROTARY BROADCAST EQUIPMENT ATTACHED TO CONSTRUCTION OR RE-VEGETATION MACHINERY. ALL MACHINERY WILL BE EQUIPPED WITH METERING DEVICES. BROADCASTING BY HAND WILL BE ACCEPTABLE ON SMALL, ISOLATED SITES. WHEN BROADCAST SEEDING, PASSES WILL BE MADE OVER EACH SITE TO BE SEEDED IN A MANNER TO ENSURE AN EVEN DISTRIBUTION OF SEED. WHEN USING HOPPER TYPE EQUIPMENT, SEED SHOULD BE FREQUENTLY MIXED WITHIN THE HOPPER TO DISCOURAGE SEED SETTLING AND UNEVEN PLANTING DISTRIBUTION OF SPECIES. 5. BROADCAST SEEDING WILL TAKE PLACE IMMEDIATELY FOLLOWING THE COMPLETION OF FINAL SEEDBED PREPARATION TECHNIQUES. BROADCAST SEEDING SHOULD NOT BE CONDUCTED WHEN WIND VELOCITIES WOULD PROHIBIT EVEN SEED DISTRIBUTION. THE BROADCAST SEEDING RATE WILL BE TWICE THE RATE OF DRILL SEEDING. M U LCH IN G MULCH FOLLOWING ALL SOIL PREPARATION AND PLANTING. 1. SHRUB BEDS: MULCH SHRUB BEDS (DECIDUOUS, CONIFEROUS SHRUBS & GRASSES) WITH A 3-INCH LAYER OF WASHED RIVER GRAVEL MULCH WHERE 5 GALLON SHRUB MATERIAL IS USED. MULCH ALL ONE GALLON PERENNIAL AND GROUND COVER PLANTING AREAS WITH A 3" LAYER OF WOOD MULCH. 2. TREE PLANTING RINGS IN IRRIGATED TURF AREAS: MULCH ALL SOIL PLANTING RINGS OF DECIDUOUS AND CONIFEROUS TREES WITH A 3" LAYER OF WOOD BARK MULCH. AND BOTTOM. 15. SEEDED TURF: ALL TURF SEEDING SHALL BE COMPLETED BETWEEN APRIL 15 AND MAY 31, OR BETWEEN SEPTEMBER 1 AND OCTOBER 15. SEEDED TURF AREAS SHALL BE SEEDED WITH THE FOLLOWING BLEND: 60% ELDORADO, SILVERADO AND MONARCH TURF TYPE TALL FESCUE 30% MANCHAR SMOOTH BROME 10% BLUEGRASS MIX 9DROUGHT TOLERANT BELANDS. DRY LAND SEED AREAS SHALL BE SEEDED WITH THE LOW GROW NATIVE MIX BY PAWNEE BUTTES: 10% ARIZONA FESCUE 40% SANDBERG/CANBY BLUEGRASS 10% ROCKY MOUNTAIN/IDAHO FESCUE 40% BIG BLUEGRASS OR APPROVED EQUIVALENT. 16. TREES, SHRUBS, AND GROUND COVERS: PLANT MATERIALS SHALL BE A FIRST-CLASS REPRESENTATIVE OF ITS SPECIES; HEALTHY, WELL BRANCHED AND WELL PROPORTIONED IN RESPECT TO HEIGHT AN WIDTH RELATIONSHIPS; FREE FROM DISEASE, INJURY, INSECTS, AND WEED ROOTS; AND CONFORMING TO THE REQUIREMENTS OF THE COLORADO NURSERY ACT. (SEE LANDSCAPE CONTRACTORS OF COLORADO STANDARD SPECIFICATIONS FOR APPROPRIATE SECTIONS OF THE NURSERY ACT). ALL PLANTS SHALL BE NURSERY STOCK FROM GROWERS LOCATED IN USDA HARDINESS ZONES 1, 2, 3 OR 4.BOTANIC AND COMMON NAMES: PLANT NAMES GIVEN IN THE PLANT LIST ARE IN CONFORMANCE WITH STANDARD HORTICULTURAL PRACTICE IN THIS AREA. PLANTS ARE TO BE DELIVERED TO THE SITE WITH TAGS BEARING THE BOTANIC NAME AS INDICATED BY THE PLANT LIST. IN TS LAL TA IO N CLEARING. PRIOR TO ANY SOIL PREPARATION, EXISTING VEGETATION TO REMAIN AND WHICH MIGHT INTERFERE WIT THE SPECIFIED SOIL PREPARATION SHALL BE MOWED, GRUBBED, RAKED, AND THE DEBRIS REMOVED FROM THE SITE. PRIOR TO OR DURING GRADING OR TILLAGE OPERATION, THE GROUND SURFACE SHALL BE CLEARED OF MATERIALS THAT MIGHT HINDER FINAL OPERATIONS. PREPARE ALL AREAS TO BE PLANTED AS FOLLOWS: RIP ALL AREAS TO BE PLANTED, SEEDED AND/OR SODDED TO A MINIMUM OF 8 INCHES IN TWO DIRECTIONS USING AN AGRICULTURAL RIPPER WITH TINES SPACED AT NO GREATER THAN 18 INCHES. AREAS ADJACENT TO WALKS, STRUCTURES CURBS, ETC, WHERE THE USE OF LARGE MECHANICAL EQUIPMENT IS DIFFICULT, SHALL BE WORKED WITH SMALLER EQUIPMENT OR BY HAND. SOIL PREPARATION: SPREAD 3 CY/1000 SF OF COMPOST AND SUFFICIENT FERTILIZER TO MEET REQUIREMENTS OF SOIL ANALYSIS OVER ALL AREAS TO BE SEEDED, SODDED, AND/OR PLANTED W/TREES, SHRUB BED AND GROUND COVER. INCORPORATE COMPOST BY DISKING OR ROTOTILLING INTO THE TOP 4 TO 6 INCHES OF SOIL. OBTAIN A UNIFORM MIXTURE WITH NO POCKETS OF SOIL OR AMENDMENTS REMAINING. TR EE A ND S HRU B LP AN I T N G : 1. SUBSTITUTIONS. ANY PLAN SUBSTITUTIONS ARE TO BE APPROVED BY LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 2. ESTABLISHED LOCATION: STAKE TREES AND FLAG OR SET OUR ALL SHRUBS IN LOCATIONS SHOWN ON THE PLANS PRIOR TO INSTALLATION FOR REVIEW BY OWNER. THE FOLLOWING ARE MINIMUM DISTANCES THAT PLANT MATERIALS CAN BE PLACED FROM ADJACENT WALLS, FENCES OR PAVED AREAS: LARGE SHRUBS: 4 FEET MEDIUM SHRUBS: 2-1/2 FEET PERENNIALS, GRASSES AND GROUND COVERS: 18 INCHES 3. PLANTING PITS: DIG PLANTING PITS A MINIMUM OF 2 TIMES AS WIDE AS DIAMETER OF ROOT BALL OR CONTAINER, AND A DEPTH SUFFICIENT TO ALLOW TOP OF ROOT BALL AT TRUNK TO SIT A MINIMUM OF 3" ABOVE SURROUNDING GRADE FOR SHRUBS. INCORPORATE COMPOST BY DISKING OR ROTOTILLING INTO THE TOP 4 TO 6 INCHES OF SOIL. OBTAIN A UNIFORM MIXTURE WITH NO POCKETS OF SOIL OR AMENDMENTS REMAINING. BACKFILL PIT WITH EXCAVATED SOIL SET TOP OF ROOTBALL 4" ABOVE LOWEST ADJACENT GRADE. REMOVE TOP 2/3 OF WOOD MULCH (4" DEPTH). 6" DEPTH AMENDED SOIL WIRE BASKET AND BURLAP. 1. GUY ALL CONIFER TREES AND ALL DECIDUOUS TREES LARGER THAN 21 2" CAL. AS SHOWN. 2. IN SODDED AREAS, CUT SOD IN 36" CIRCLE AND MULCH. FOR CONIFERS CUT SOD AT DRIP LINE OF TREE AND MULCH. 3. GUY EVERGREEN TREES IN 3 PLACES AT 45 DEGREE ANGLE SLIGHTLY TAUT ONLY TO ALLOW SOME MOVEMENT. USE NYLONG STRAPS (NOT HOSES) WITH METAL GROMMETS. EVERGREEN TREES M TA ER IA LS : 1. WEED BARRIER: WEED BARRIER MAY BE TYPAR 3341 OR APPROVED EQUAL. PLACE WEED BARRIER BENEATH COBBLE MULCH AREAS. 2. COBBLE MULCH: 4-8" DIA. NOMINAL SIZE WASHED RIVER COBBLE. SUBMIT SAMPLE. 3. BARK MULCH: SHREDDED CEDAR BARK MULCH; BARK POLE PEELINGS FROM CEDAR TREES ONLY. MULCH SHALL BE DARK BROWN IN COLOR AND FINELY SHREDDED. MULCH SHALL BE FREE FROM NOXIOUS WEED SEED AND FOREIGN MATERIAL HARMFUL TO PLANT LIFE. CHIPPER CHIPS, PINE POLE PEELINGS OR OTHER ANGULAR BARK CHIPS ARE NOT ACCEPTABLE. SUBMIT SAMPLES. 4. HEADERS: STEEL HEADER: RYERSON ESTATE STEEL HEADER 1/8" X 4" WITH 1" X 24" SIZE STRAP STEEL STAKES OR EQUAL. SUBMIT SAMPLE. 5. TREE STAKES: 8-FOOT LONG, 2-INCH DIAMETER PRESSURE TREATED LODGE POLE PINE STAKES (OR METAL "T" POSTS AS ALLOWED BY LANDSCAPE ARCHITECT. APPROVAL REQUIRED PRIOR TO INSTALLATION.) 6. GUY ANCHORS: 24-INCH LONG METAL "T" POSTS. 7. GUYING AND STAKING WIRE: GALVANIZED IRON OR STEEL 12-GUAGE WIRE. 8. WEBBING: 2-INCH NYLON WEBBING OR RUBBERIZED CLOTH. 9. TREE WRAP: 4-INCH MINIMUM WIDTH COMMERCIAL TREE WRAP. 10. SAFETY CAPS: INDUSTRY STANDARD (FOR METAL "T" POST ONLY) 11. COMPOST: A TOTALLY ORGANIC PRODUCT THAT HAS BEEN AEROBICALLY AND NATURALLY PROCESSED WITHOUT THE ADDITION OF COARSE WOOD CHIPS, IN SUCH A MANNER AS TO MAINTAIN A CONSISTENT TEMPERATURE OF 140 DEGREES FAHRENHEIT OR GREATER FOR A PERIOD OF TIME SUFFICIENT TO CREATE THE FOLLOWING CHARACTERISTICS MEASURED BY DRY WEIGHT: MAXIMUM ALLOWABLE ORGANIC MATTER: 60% ORGANIC MATTER TO NITROGEN RATIO: 25:1 TO 30:1; PH: 7 TO 8 PHSALTS: 2.0 TO 3.0 MMHOS; LESS THAN 25% INORGANIC MATTER; LESS THEN 1% SOIL, DIRT OR SAND; MAXIMUM PARTICLE SIZE OF INCH DIAMETER. ERADICATION OF ALL HARMFUL WEED SEEDS, PATHOGENS AND BACTERIA; A NON-OFFENSIVE EARTHLY SMELL. 12. FERTILIZER: FERTILIZER FOR TURF SHALL BE COMMERCIAL TYPE, OF UNIFORM COMPOSITION, FREE FLOWING, AND CONFORMING TO APPLICABLE STATE AND FEDERAL LAWS. SUBMIT MANUFACTURER'S GUARANTEED ANALYSIS. FORMULATED FERTILIZER ANALYSIS SHALL BE SUBMITTED TO OWNER'S REPRESENTATIVE FOR REVIEW AND SHALL BE BASED UPON RECOMMENDATIONS MADE BY SOIL LAB. CONTRACTOR SHALL SUBMIT SOIL SAMPLE TO SOIL LAB FOR ANALYSIS AND FERTILIZER RECOMMENDATIONS. IF SOIL TYPES ARE SIMILAR IN STRUCTURE, THE CONTRACTOR MAY USE A CONSISTENT FORMULATED FERTILIZER FOR THE ENTIRE SITE AREA. HOWEVER, IF SOIL STRUCTURES ARE VASTLY DIFFERENT, A FORMULATED FERTILIZER FOR EACH SPECIFIC SITE AREA WILL BE REQUIRED. FERTILIZER FOR TREE AND SHRUB, BACKFILL MIX, AND GROUND COVER AREAS SHALL BE OSMOCOTE SIERRABLEN, 9 MONTH SLOW-RELEASE FERTILIZER. 13. BLUEGRASS SOD: BLUEGRASS SOD SHALL CONTAIN THE FOLLOWING SEED MIX: 60% ELDORADO, SILVERADO AND MONARCH TURF TYPE FTALL FESCUE, 30% MANCHAR SMOOTHE BROME, 10% BLUEGRASS MIX (DROUGHT TOLERANT BLENDS). SOD SHALL BE A MINIMUM OF ¾ INCH THICK, HARVESTED IN ROLLS FERTILIZED TWO TO THREE WEEKS BEFORE CUTTING, AND SHALL BE CUT NOT MORE THAN ONE DAY PRIOR TO PLANTING. SOD SHALL BE ONE YEAR OLD, MINIMUM, GROWN UNDER INTENSIVE CARE AND CULTIVATION TO PRODUCE A THICK, EVEN STAND OF GRASS. FLAGGING 2X ROOT BALL DIA. SCARIFY SIDES 6" DEPTH AMENDED SOIL 6" DEPTH AMENDED SOIL. NO SPECIAL EXISTING SUBGRADE BACKFILL MIX. PLACE SHRUBS A MINIMUM OF 18" FROM PLANTING BED EDGE (STEEL HEADER, CURBS, WALKS, WALLS, ETC.) FOR 1 GALLON SHRUBS, 3' MINIMUM FOR 5 GALLON DECIDUOUS SHRUBS, 4' FOR CONIFER SHRUB. FOR 5 GALLON AND LARGER PLANT MATERIAL CONSTRUCT A 2" HIGH WATERING RING AROUND SHRUB AT EDGE OF PLANTING PIT. FOR 1 GALLON MATERIAL, CONSTRUCT A 2" X 18" DIA. WATER RING AND MULCH WITH WOOD BARK INSIDE OF THE WATER RING. NO WEEDBARRIER FABRIC HAND SPADED EDGE SHRUB BED FINISHED GRADE 4" DEPTH RESTORE THE FINE GRADE OF ALL AREAS TO BE PLANTED, SEEDED AND/OR SODDED WITH FLOAT DRAG TO REMOVE IRREGULARITIES RESULTING FROM TILLING OPERATIONS. FLOAT DRAG TWO DIRECTIONS. REMOVE ANY ADDITIONAL STONES OVER 1-1/2 INCHES THAT HAVE COME TO THE SURFACE. UPON COMPLETION OF FINISH GRADING OPERATIONS, THE CONTRACTOR MUST PROVIDE A FINISH LANDSCAPE GRADE THAT SHALL CONFORM TO THE GRADES AND ELEVATIONS SHOWN ON THE ENGINEERING DRAWINGS. CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE IN ALL LANDSCAPE AREAS. SHRUBS. ROUGHEN SIDES OF THE PIT TO REMOVE ANY COMPACTING OR GLAZING. LOOSEN SOIL AT BOTTOM OF PIT TO A MINIMUM DEPTH OF SIX INCHES. MIX LOOSENED SOIL WITH SPECIFIED BACKFILL. 4. BACKFILL MATERIAL: TREE AND SHRUB PLANTING PITS SHALL BE BACKFILLED WITH THE FOLLOWING MIX: 75% TOPSOIL BY VOLUME (SOIL EXCAVATED FROM PLANTING PITS). 25% COMPOST BY VOLUME. THE SPECIFIED BACKFILL MATERIALS SHALL BE PRE-MIXED USING INDUSTRY ACCEPTED TECHNIQUE IN ORDER TO OBTAIN A UNIFORM, EVENLY BLENDED CONSISTENCY, FREE FROM POCKETS OF UNBLENDED MATERIAL AND CLODS OR STONES GREATER THAN TWO INCHES IN DIAMETER. BACKFILL MIX SHALL BE DELIVERED TO EACH PLANTING PIT AFTER MIXING HAS OCCURRED. LP AN I T N G : 1. REMOVE STOCK FROM CONTAINER. DO NOT BREAK THE ROOT BALL. A SPADE SHALL NOT BE USED. SCARIFY SIDES AND BOTTOM OF ROOT BALL. 2. PLACE BACKFILL MIX INTO PLANTING PIT TO A DEPTH SUCH THAT THE PLANT, WHEN PLANTED, WILL BE THREE INCHES ABOVE FINISH GRADE FOR DECIDUOUS TREES, FOUR TO SIX INCHES FOR CONIFEROUS TREES, AND TWO INCHES ABOVE FINISH GRADE FOR ALL SHRUBS. 3. UNTIE AND REMOVE BURLAP FROM TOP THIRD OF ROOT BALL ON BALLED AND BURLAPPED MATERIAL. REMOVE WIRE BASKETS FROM TOP AND MINIMUM OF 2/3 OF ALL SIDE OF ROOT BALL. 4. BACKFILL ONE-HALF OF PIT WITH BACKFILL MIXTURE AND WATER IN THOROUGHLY BEFORE PLACING ANY MORE BACKFILL. DO NOT WORK WET SOIL. 5. BACKFILL THE REST OF THE PLANTING PIT WITH BACKFILL MIXTURE AND TAMP TO COMPACT. WATER IN THOROUGHLY. DO NOT WORK WET SOIL APPLY SLOW RELEASE FERTILIZER, PER MANUFACTURER'S DIRECTION OF SIZE OF PLANT MATERIAL, BY SPREADING EVENLY OVER THE TOP OF THE ENTIRE PLANTING PIT. 6. STAKE OR GUY ALL TREES IN A TRUE VERTICAL POSITION. WRAP DECIDUOUS TREES BOTTOM TO TOP. STAPLE OR TACK IN PLACE AT TOP. WRAP APPROXIMATELY NOVEMBER 15 AND REMOVE APPROXIMATELY MAY 15. 7. IF TREES ARE PLANTED IN A SPADE DUG HOLE, THEY SHALL BE DEEP WATERED WITH A WATERING NEEDLE ANGLING FROM THE INSIDE OF THE BALL OUT THROUGH THE PERIMETER OF THE SOIL. W EE D BA RR IE R N I TS LAL TA IO N 1. WEED BARRIER SHALL BE PLACED IN ALL SHRUB BED AREAS WHERE 5-GALLON SHRUB MATERIAL IS USED OR WHERE NOTED IN PLAN AND DETAILS. AT ALL EDGES OF CURBS, WALLS, STRUCTURES, PAVEMENTS, AND HEADERS, WEED BARRIER SHALL BE SECURED WITH 11-GAUGE, 6-INCH LONG STAPLES AT 18 INCHES O.C. AT ALL EDGES. 2. NO WEED BARRIER SHALL BE PLACED IN AREAS RECEIVING ONE GALLON AND SMALLER PLANT MATERIAL. 3. NO WEED BARRIER SHALL BE PLACED IN SOIL PLANTING RINGS OF DECIDUOUS AND CONIFEROUS TREES PLANTED IN SODDED OR SEEDED AREAS. TS EE L H EA D ER C O N TS RUC I T O N 1. LAYOUT STEEL HEADER IN LOCATIONS SHOWN ON PLANS AND RECEIVE REVIEW OF OWNER PRIOR TO INSTALLATION. LOCATE BY SCALING OFF OF PLAN. INSTALL PLUMB WITH GRADES MAINTAINING A MINIMUM CONSTANT HEIGHT OF ONE INCH ABOVE ADJACENT TURF AREAS. 30" DIA. MULCH RING IN LAWN AREAS. 4" DEPTH WOOD MULCH AT BASE OF TREE. OF ROOTBALL 3" ABOVE LOWEST ADJACENT GRADE. POSTS VERTICALLY PLUMB. NO RUBBER HOSES. PROTECTIVE RUBBER CAPS ON POSTS. SET TREE ON COMPACTED SUBGRADE WITH TOP REMOVE TOP 3/4 OF WIRE BASKET AND BURLAP. PLANTED IN THE SPRING DO NOT WRAP. WRAP TREES TO FIRST BRANCH IN THE FALL. iF DECIDUOUS TREES (SLIGHTLY TAUT). WITH NYLON STRAPS. SET STAKE TREES USING METAL POSTS WIRED 18" MIN. LAWN SHRUBS TREE AND SHRUB INSTALLATION LANDSCAPE SPECIFICATIONS THIS DRAWING, AS AN INSTRUMENT OF SERVICE, IS AND SHALL REMAIN THE PROPERTY OF TFG DESIGN, LLC. AND SHALL NOT BE REPRODUCED, PUBLISHED OR USED IN ANY WAY WITHOUT THE PERMISSION OF THE LANDSCAPE ARCHITECT. 1269 N Cleveland Ave, Loveland CO 80537 (970) 669.3737 design@tfgdesign.com www.tfgdesign.com ATTN: SHEET OF SHEET NUMBER: SHEET TITLE: REVISIONS: PROJECT INFORMATION: OWNER: DRAWN BY: FILE LOCATION: C:\TFG_David\Working Temp\Ridgewood\Ridgwood Hills - FP.dwg PLOT DATE: 12/13/2013 9:16 AM PROJECT NUMBER: DATE: PHASE: M. Timm Development Bill Timm 233 Carillo Street Santa Barbara, CA 93101 (805) 963-0358 RIDGEWOOD HILLS - FOURTH FILING AVONDALE RD & TRIANGLE DR FORT COLLINS, COLORADO 111-122FC DEC 13, 2013 FP 8