Loading...
HomeMy WebLinkAboutPLUM & SHIELDS GREEK HOUSING - PDP/FDP - FDP130053 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPage 1 of 2 D:\Projects\970-001\Drainage\Reports\Drainage Report\970-001_Drainage-Letter.docx Drainage Letter Report Date: December 20, 2013 Project: Plum & Shields Greek Housing Project No. 970-001 Project Development Plan/Final Plan Fort Collins, Colorado Attn: Mr. Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Dear Wes: This letter serves to address the stormwater impacts of the Plum & Shields Greek Housing project. The existing building is situated towards the northern portion of the site. The site currently consists of rooftop, concrete walks, asphalt parking areas, some turf, trees, and other vegetation. It presently functions similar to a ‘B’ lot, with historic drainage being split towards Plum Street to the north and towards Shields Street to the east. The total impervious area of the existing site is approximately 12,325 square-feet. The existing percent impervious for the entire site is 65.1%. The existing total runoff from the site is 2.6 cfs in the 100-yr event. The proposed redevelopment will leave the existing building footprint unchanged, while expanding the parking area south of the building. Portions of existing paving will be modified, and a paver area will be added near the southern exit from the site. While very minor grading changes will occur, existing drainage patterns will be maintained. The total impervious area of the proposed redevelopment is roughly 13,141 square-feet. This is a slight increase from the existing condition. The proposed percent impervious for the entire site also increases slightly to 67.7%. However, due to the addition of pavers and the removal of some concrete paving along the north side of the building, total runoff from the site remains unchanged at 2.6 cfs in the 100-yr event. The site is located in the Old Town Drainage Basin. On-site detention is not required so long as there is no increase in runoff. Since the redevelopment does not propose an increase in runoff, detention storage is not required. Calculations using the rational method to determine the existing and proposed runoff are attached to this letter, as is a drainage exhibit. There are no regulatory floodplains associated with the project. Page 2 of 2 D:\Projects\970-001\Drainage\Reports\Drainage Report\970-001_Drainage-Letter.docx Although stormwater quantity detention is not required, stormwater quality mitigation will be addressed by both temporary and permanent Best Management Practices (BMPs). During construction, the Contractor will follow the appropriate and applicable City of Fort Collins standards for erosion and sediment control. Since the approximately 10,140 sf area of disturbance for the project is less than one acre, a comprehensive Stormwater Management Plan will not be prepared for this project. Post construction water quality and erosion control will be achieved by a fully established and stabilized site. All areas disturbed during construction will receive permanent hardscape, landscape, or building structure. There are no existing stormwater BMP’s currently on-site. In order to bring the site into compliance with the Low Impact Development Standards adopted by the city, water quality mitigation and permeable pavers will be provided on-site. Water quality treatment will occur through a variety of methods. The first method is the use of a raised bio-retention area along the south side of the existing building that intercepts runoff from rooftop downspouts. This planter bed will have an engineered section designed to remove particulates and contaminants from the runoff. While most minor events are expected to infiltrate into the ground, a subdrain is provided to drain the rain garden should it become overburdened. The underdrain will outfall into a permeable paver sub-base, providing additional treatment of the runoff from the roof. In addition to treating the roof runoff, the paver area will intercept all surface runoff from the existing asphalt parking area south of the trash enclosure, which allows minor rain events to infiltrate into the soil rather than leaving the site. The final method that is being utilized on the north side of the building is to discharge roof drains into landscaped areas. The combination of these two features will treat all water originating in the southern portion of the site, which is roughly 57% of the entire project site, which exceeds the requirement to treat a minimum of 50% of the project site with some form of LID water quality treatment. Also, of the 1,018 sf of new paving proposed with this project, 337sf will be permeable pavers. This means 33% of the new paving will be permeable, meeting the requirement that at least 25% of all new paving be permeable. To summarize, the proposed grading concept very closely matches existing elevations and drainage patterns. On-site detention is proven to be unnecessary. Stormwater quality has been provided, and meets the city requirements for Low Impact Development. Therefore, it is my professional opinion that the Plum & Shields Greek Housing satisfies all applicable stormwater criteria. Please do not hesitate to contact me if you have questions or require additional information. Sincerely, Andrew Reese Nicholas W. Haws, PE Project Engineer Project Manager enc. CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Shields & Plum Greek Housing Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Reese Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.50 . 40 Roofs …….…….………………..……………….…………………………………………….0..95 90 Concrete Pavers…………………………...………………..…………………………………………….0.40 . 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. N 7,785 0.18 0.02 0.05 0.03 0.00 0.00 0.08 0.60 0.60 0.75 52.1 S 10,186 0.23 0.11 0.02 0.05 0.00 0.00 0.05 0.77 0.77 0.97 75.0 Total 17,971 0.41 0.14 0.07 0.07 0.00 0.00 0.13 0.70 0.70 0.87 65.1 EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 Overland Flow, Time of Concentration: Project: Shields & Plum Greek Housing Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) EXISTING TIME OF CONCENTRATION COMPUTATIONS A. Reese December 20, 2013 3 1 1 . 87 1 . 1 * S Ti C Cf L  Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Rational Method Equation: Project: Shields & Plum Greek Housing Calculations By: Date: From Section 3.2.1 of the CFCSDDC EXISTING RUNOFF COMPUTATIONS A. Reese December 20, 2013 Q C f C i A From Section 3.2.1 of the CFCSDDC Rainfall Intensity: N N 0.18 5.0 5.0 5.0 0.60 0.60 0.75 2.85 4.87 9.95 0.3 0.5 1.3 S S 0.23 5.2 5.2 5.1 0.77 0.77 0.97 2.85 4.87 9.95 0.5 0.9 2.3 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Existing.xlsx\Direct-Runoff DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q10 (cfs) Q100 (cfs) N N 0.18 0.60 0.60 0.75 5.0 5.0 5.0 0.3 0.5 1.3 S S 0.23 0.77 0.77 0.97 5.2 5.2 5.1 0.5 0.9 2.3 EXISTING RUNOFF SUMMARY TABLE D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Existing.xlsx\Summary Table CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Shields & Plum Greek Housing Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Reese Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.50 . 40 Roofs …….…….………………..……………….…………………………………………….0..95 90 Concrete Pavers…………………………...………………..…………………………………………….0.40 . 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. N 7,785 0.18 0.02 0.05 0.03 0.00 0.00 0.08 0.59 0.59 0.73 50.5 S 10,186 0.23 0.12 0.03 0.05 0.00 0.01 0.03 0.83 0.83 1.00 80.9 Total 17,971 0.41 0.14 0.08 0.07 0.00 0.01 0.11 0.72 0.72 0.90 67.7 DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 Overland Flow, Time of Concentration: Project: Shields & Plum Greek Housing Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) DEVELOPED TIME OF CONCENTRATION COMPUTATIONS A. Reese December 20, 2013 3 1 1 . 87 1 . 1 * S Ti C Cf L  Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Rational Method Equation: Project: Shields & Plum Greek Housing Calculations By: Date: From Section 3.2.1 of the CFCSDDC DEVELOPED RUNOFF COMPUTATIONS A. Reese December 20, 2013 Q C f C i A From Section 3.2.1 of the CFCSDDC Rainfall Intensity: N N 0.18 5.0 5.0 5.0 0.59 0.59 0.73 2.85 4.87 9.95 0.3 0.5 1.3 S S 0.23 5.2 5.2 5.1 0.83 0.83 1.00 2.85 4.87 9.95 0.6 0.9 2.3 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Proposed.xlsx\Direct-Runoff DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q10 (cfs) Q100 (cfs) N N 0.18 0.59 0.59 0.73 5.0 5.0 5.0 0.3 0.5 1.3 S S 0.23 0.83 0.83 1.00 5.2 5.2 5.1 0.6 0.9 2.3 DEVELOPED RUNOFF SUMMARY TABLE D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Proposed.xlsx\Summary Table Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) N N No 0.95 0.95 1.00 45 2.8 1.3 1.3 0.9 194 0.6 1.55 2.1 0 0.0 0.00 N/A 5.0 5.0 5.0 S S No 0.15 0.15 0.19 5 1.0 3.8 3.8 3.7 184 1.2 2.17 1.4 0 0.0 0.00 N/A 5.2 5.2 5.1 Gutter Flow Swale Flow Design Point Basin Overland Flow Time of Concentration (Equation RO-4) D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Proposed.xlsx\Tc-2-yr_&_100-yr December 20, 2013 D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Proposed.xlsx\C-Values Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) N N No 0.95 0.95 1.00 45 2.8 1.3 1.3 0.9 194 0.6 1.55 2.1 0 0.0 0.00 N/A 5.0 5.0 5.0 S S No 0.15 0.15 0.19 5 1.0 3.8 3.8 3.7 184 1.2 2.17 1.4 0 0.0 0.00 N/A 5.2 5.2 5.1 Gutter Flow Swale Flow Design Point Basin Overland Flow Time of Concentration (Equation RO-4) D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Existing.xlsx\Tc-2-yr_&_100-yr December 20, 2013 D:\Projects\970-001\Drainage\Hydrology\970-001_Rational-Calcs_Existing.xlsx\C-Values