Loading...
HomeMy WebLinkAboutREDTAIL PONDS PERMANENT SUPPORTIVE HOUSING (AFFORDABLE HOUSING) - FDP - FDP130048 - SUBMITTAL DOCUMENTS - ROUND 1 -Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview September 27, 2013 Chadrick Martinez Fort Collins Housing Authority 1715 W. Mountain Ave. Fort Collins, CO 80521 RESPONSE COMMENTS - CONSULTANT TEAM; OCTOBER 21, 2013 RE: Redtail Ponds Permanent Supportive Housing (Affordable Housing), PDP130030, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-224-6126 or jholland@fcgov.com. Comment Summary: Department: Current Planning Contact: Jason Holland, 970-224-6126, jholland@fcgov.com Topic: General Comment Number: 1 Comment Originated: 09/25/2013 In terms of building color, the project is in proximity to natural habitat and also must comply with the multi-family design standards. Staff's recommendation to satisfy these standards is to utilize a color palette that is warmer and more natural, in order to harmonize within the natural setting and the existing office buildings to the south. A contrast of traditional materials/colors with the contemporary building would be appropriate. [SC]: Colors modified per recommendation. Comment Number: 2 Comment Originated: 09/25/2013 Building Materials: Please submit an exhibit showing an accurate depiction of all proposed material colors and textures. This can be done with high resolution photographs of materials and color samples as well as photographs of the materials on existing buildings. Include color and material information for the HVAC units shown on the building elevations. The individual HVAC units need to blend in and be as inconspicuous as possible. Recent approved Banner Health plans are a good format example. Please incorporate color elevations directly in to the 24x36 drawings instead of separate 11 x 17 pages. [SC]: Presentation provided per request. Comment Number: 3 Comment Originated: 09/25/2013 Staff recommends that more masonry material be used on the building facade and that the masonry be more evenly distributed around the building, both to further articulate the massing and to further improve the residential character of the building. An additional material such as a stained siding might also add a warmer appearance to the building; the Baker Townhomes at 4th and Cherokee would be an example. This could be used to enhance the traditional/contemporary contrast. [SC]: Masonry added to East/College Ave. Elevation. RE: Elevations. Comment Number: 4 Comment Originated: 09/27/2013 West elevation: The projected design elements used to break up the main wall plane on this elevation are repeated uniformly to the extent that the overall elevation could benefit from additional elements to substantially break up this uniformity. In addition to substantial elements, the west elevation would benefit from more material variation such as the addition of plank siding used on the east elevation. Also, please also add a dashed line to the elevations showing where main wall plane corners intersect. A plan key map would also be helpful adjacent to each elevation. [SC]: Key plan provided in drawings. Uniformity of elevation addressed. RE: Elevations. Comment Number: 5 Comment Originated: 09/27/2013 Landscape and site plans: Please provide a detail for the site fence and retaining wall showing design, material, and color. We recommend moving the fencing north off of the top of the 3' retaining wall, so that the wall and fence are a more layered affect. Fence has been moved from top of wall. See Sheet LS53 for fence detail. Comment Number: 6 Comment Originated: 09/27/2013 Provide significant additional evergreen tree and shrub material along the south property boundary in a naturalized, layered pattern to enhance screening, transition and softer / filtered views toward the southern facing building elevations. Project has added three evergreen trees, in addition to the planned 47 shrubs and trees capable of screening year round. Included in this number are the Gambel Oaks which retain their leaves through winter. Comment Number: 7 Comment Originated: 09/27/2013 The MAF tree symbol on the plans -- can you please clarify, this is not on the plant list. MAF refers to Mahonia fremontii, common name Desert Holly Comment Number: 8 Comment Originated: 09/27/2013 Landscape and site plans: please incorporate the overall site plan into the set as a cover page, and make the more detailed site and landscape plans more readable by eliminating the existing topo and improving the line hierarchy. Label the locations of walls on the plans and add a +/- wall height for general reference. WILL COMPLY Department: Engineering Development Review Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com Topic: General Comment Number: 20 Comment Originated: 09/25/2013 09/25/2013: Additional information is needed on the project to be able to calculate the TDR Fee's for the project. I need to know the amount of non residential space in the building (office space, meeting space...). Common/programming space square footage = 4,436 sf Contact: Tyler Siegmund, 970-221-6501, tsiegmund@fcgov.com Topic: Construction Drawings Comment Number: 8 Comment Originated: 09/25/2013 09/25/2013: An additional utility easement is needed where the water main and fire hydrant extends onto the property. Currently they are in ROW but with vacation of the ROW an easement will be needed. RESPONSE COMMENTS - JVA; OCTOBER 18, 2013 A utility easement has been added for the watermain outside of ROW. Comment Number: 9 Comment Originated: 09/25/2013 09/25/2013: Please provide radii for the drive approach returns RESPONSE COMMENTS - JVA; OCTOBER 18,2013 A detailing grading and layout plan has been created for the drive approach. Radii have been added. Comment Number: 10 Comment Originated: 09/25/2013 09/25/2013: The variance request for the Fossil Blvd/Conejos intersection has been accepted and a letter of acceptance will follow. Profile plan of the vertical alignment is needed and will be reviewed at final plan. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Right, left and center profiles have been added for the intersection. Comment Number: 11 Comment Originated: 09/25/2013 09/25/2013: Please incorporate Construction Notes appendix E-1 and E-2 from the Larimer County Urban Area Street Standards to the General Notes on sheet C0.1 of the utility plans RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Constructions notes have been added. Comment Number: 12 Comment Originated: 09/25/2013 09/25/2013: Please show the new right of way along Conejos Rd- see redlines RESPONSE COMMENTS - JVA; OCTOBER 18,2013 ROW has been shown on all plans. Comment Number: 13 Comment Originated: 09/25/2013 09/25/2013: Please label the 15ft utility easement along College Ave on sheet C2 RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Easement has been labeled. Comment Number: 14 Comment Originated: 09/25/2013 09/25/2013: Please add the standard asphalt repair note to sheets C0.2, CE1.0 in the Utility Plans: Limits of street cut are approximate. Final limits are to be determined in the field by the City of Fort Collins Engineering Inspector. All repairs to be in accordance with city street repair standards. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Note has been added. Comment Number: 15 Comment Originated: 09/25/2013 09/25/2013: Please provide a detail for the retaining wall construction. Label the retaining wall along College Ave on sheet C2 RESPONSE COMMENTS - JVA; OCTOBER 18,2013. See landscape plans for retaining wall detail. Retaining wall labels have been added. Comment Number: 16 Comment Originated: 09/25/2013 09/25/2013: Please note that the existing right-of-way on sheet C0.2 is to be vacated RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Note have been added. Comment Number: 17 Comment Originated: 09/25/2013 09/25/2013: Sheet C2.0 references an existing light and power vault but is not shown on the plan. Add existing vault location. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 The existing electric transformer has been added. Topic: General Comment Number: 1 Comment Originated: 09/25/2013 09/25/2013: The South College Corridor Plan identifies 144ft of right-of-way needed along College Ave adjacent to this project. This development is responsible for ½ of the required right-of-way, or a total of 72ft. 70.5ft currently exist so an additional 1.5ft of right-of-way is needed along College Ave RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Additional ROW has been added. Comment Number: 2 Comment Originated: 09/25/2013 09/25/2013: The site plan and the utility plan set are conflicting on the width of the existing sidewalk along College Ave. The Utility plans show an existing 7ft sidewalk and this project constructing an 8ft sidewalk for the remaining property frontage. The South College Corridor Plan identifies 8ft sidewalk widths along College Ave. Further evaluation will be needed to determine if the existing 7ft wide sidewalk along approximately 40ft of the property frontage will need to be removed and replaced with an 8ft sidewalk. Please revise the site plan to show the existing 7ft sidewalk and the new 8ft wide sidewalk to be installed with this project. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 The existing sidewalk at the southeast corner of the site is concrete and transitions to asphalt to the north. The intention is to maintain the existing 7' wide concrete sidewalk for approximately 40' along the property line and replace the entire section of asphalt walk. The existing 7' wide concrete walk appears to be in good shape. Comment Number: 3 Comment Originated: 09/25/2013 09/25/2013: A CDOT construction permit will be needed for the sanitary sewer service connection in College Ave. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 JVA will coordinate with CDOT for a construction permit. Topic: Plat Comment Number: 4 Comment Originated: 09/25/2013 09/25/2013: Please show the proposed vacation of Fossil Blvd right-of-way on the new plat. A note will need to be added that references all easements on the original Redtail Subdivision plat are vacated. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 5 Comment Originated: 09/25/2013 09/25/2013: Please reference the easement agreement recordation number for Tract I detention pond on the plat. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Tract I is no longer required and will not be included with the property. Comment Number: 6 Comment Originated: 09/25/2013 09/25/2013: Add the following note to the plat: There shall be no private conditions, covenants or restrictions that prohibit or limit the installation of resource conserving equipment or landscaping that are allowed by Sections 12-120 – 12-122 of the City Code. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 7 Comment Originated: 09/25/2013 09/25/2013: Add the development name in the legal description on sheet 1 of the plat. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Topic: Site Plan Comment Number: 18 Comment Originated: 09/25/2013 09/25/2013: Please add the following note to the site plan: Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. [SC]: Notes provided. Comment Number: 19 Comment Originated: 09/25/2013 09/25/2013: Please label the retaining wall along College Ave. [SC]: Label provided. Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General Comment Number: 3 Comment Originated: 09/24/2013 09/24/2013: Please add the Natural Habitat Buffer Zone to the site, landscape and utility plans. I am struggling to read the landscape plans, is there a way to simplify some of the linework and details? WILL COMPLY RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Natural Habitat Buffer Zone has been labeled. Topic: Landscape Plans Comment Number: 2 Comment Originated: 09/24/2013 09/24/2013: Per the ECS, additional shrubs and native trees need to be added to the landscaping plan in order to achieve compliance with Section 3.4.1(E)(1)(g) of the Land Use Code. The referenced code states “The project shall be designed to enhance the natural ecological characteristics of the site. If existing landscaping within the buffer zone is determined by the decision maker to be incompatible with the purposes of the buffer zone, then the applicant shall undertake restoration and mitigation measures such as regrading and/or the replanting of native vegetation.” The project boundary/property line only encroaches into the buffer where the projects’ site access connects to the City right-of-way at the northwest portion of the site. The ECS discussion within the buffer area is actually an out parcel and not a part of this project. Topic: Reports - Soils, Subdrain Comment Number: 1 Comment Originated: 09/24/2013 09/24/2013: The ECS needs to be updated to include the following information: - Wildlife use of the area and not just the immediate site - Any patterns of non-native vegetation on the site as described in Section 3.4.1(D)(1)(e). ECS HAS BEEN UPDATED AND RE-SUBMITTED. Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com Topic: Landscape Plan Comment Number: 1 Comment Originated: 09/25/2013 09/25/2013: Schedule an on-site meeting with the City Forester to obtain information needed to develop an existing tree inventory, protection and mitigation plan. WILL COMPLY Comment Number: 2 Comment Originated: 09/25/2013 09/25/2013: Add tree protection specifications found in LUC 3.2.1 G. WILL COMPLY Comment Number: 3 Comment Originated: 09/25/2013 09/25/2013: Species Changes: Planting Ash is not recommended because of future impact from Emerald Ash Borer moving into Colorado. REMOVED FROM LIST Sugarberry has not proven reliably hardy in the Fort Collins area. REMOVED FROM LIST Comment Number: 4 Comment Originated: 09/25/2013 09/25/2013: In the plant schedule list percentages of each tree used and check that they are within the minimum species Diversity standard. LUC 3.2.1 D 3. WILL COMPLY Comment Number: 5 Comment Originated: 09/25/2013 09/25/2013: Due to the utility line separation for the Sewer line some trees along College are placed in back of the walk. Review with the utility if a small ornamental tree such as Autumn Brilliance Serviceberry, which was used in the parkway between the sidewalks to the south of this project, can be used on this project. If the parkway has a steep grade that could be limiting. WILL COMPLY Comment Number: 6 Comment Originated: 09/25/2013 09/25/2013: The west most shade tree to the south on the entry to the parking lot does not appear to be labeled. TREE LABELED QM, Quercus macrocarpa, common name Bur Oak Comment Number: 7 Comment Originated: 09/25/2013 09/25/2013: Add Standard landscape notes that address plant, quality, mulch selection and placement, irrigation etc. In addition to those add these landscape notes. Include a note that incorporates the separation standards in LUC 3.2.1 K. • The soil in all landscape areas, including parkways and medians, shall be thoroughly loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly incorporated into the soil of all landscape areas to a depth of at least six (6) inches by tilling, discing or other suitable method, at a rate of at least three (3) cubic yards of soil amendment per one thousand (1,000) square feet of landscape area. • A permit must be obtained from the City forester before any trees or shrubs as noted on this plan are planted, pruned or removed on the public right-of-way. This includes zones between the sidewalk and curb, medians and other city property. This permit shall approve the location and species to be planted. Failure to obtain this permit may result in replacing or relocating trees and a hold on certificate of occupancy. • The developer shall contact the City Forester to inspect all street tree plantings at the completion of each phase of the development. All trees need to have been installed as shown on the landscape plan. Approval of street tree planting is required before final approval of each phase. Failure to obtain approval by the City Forester for street trees in a phase shall result in a hold on certificate of occupancy for future phases of the development. WILL COMPLY Comment Number: 8 Comment Originated: 09/25/2013 09/25/2013: Sizes of trees and shrubs should meet LUC size standards. Review with the City Planner. ALL PLANT MATERIALS MEET OR EXCEED LUC SIZE STANDARDS FOR AFFORDABLE HOUSING. Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com Topic: General Comment Number: 1 Comment Originated: 09/23/2013 09/23/2013: The locations of the electric utility facilities will need to be coordinated with Light & Power Engineering at (970)221-6700. The electric transformer (not shown on the utility plan) will need to be located within 10 feet of an all-weather surface that is accessible to a utility line truck. Also, the utility plan shows the electric line too close to the water lines. The minimum lateral separation between water and electric is 10 feet. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Water line has been shifted to proved 10' minimum separation. Comment Number: 2 Comment Originated: 09/23/2013 09/23/2013: The developer will need to provide a completed Commercial Service Information (C-1) form and a 1-line electric diagram to Light & Power Engineering. This form is available on WWW.FCGOV.COM, or can be provided on request from Light & Power Engineering. NOTED. Comment Number: 3 Comment Originated: 09/23/2013 09/23/2013: Electric development charges will apply. Light & Power Engineering can assist in estimating these charges. City Code requires that individual apartments must have individual electric meters for each unit. It also provides for the Utilities Director to grant an exception to this requirement, which was granted on August 2, 2013. NOTED. Comment Number: 4 Comment Originated: 09/23/2013 09/23/2013: It appears likely that a fire booster pump will be necessary. This pump must be metered along with the main building meter. NOTED, REVIEWING WITH PFA AND ENGINEERING. Comment Number: 5 Comment Originated: 09/23/2013 09/23/2013: After plans are final and approved, please send an AutoCad (version 2008) drawing of the utility site plan to Terry Cox at TCOX@FCGOV.COM. NOTED. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 09/26/2013 09/26/2013: PFA continues to work off-line with the project team to resolve minor questions and concerns. NOTED. Comment Number: 2 Comment Originated: 09/26/2013 09/26/2013: As both stairwells will serve a roof access and areas of refuge, please be sure that both stairwells are appropriately signed on the exterior for firefighter identification and use. [SC]: SC to comply. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 09/17/2013 09/17/2013: The site disturbs more than 10,000 sq-ft, therefore Erosion and Sediment Control Materials need to be submitted for FDP. The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. (Requirements added to the packet of Materials from Stormwater) Current Erosion Control Materials Submitted does not meet requirements. Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning this section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com RESPONSE COMMENTS - JVA; OCTOBER 18,2013 The drainage and erosion control is still under design. The final drainage and erosion control report will be provided shortly. Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General Comment Number: 2 Comment Originated: 09/24/2013 09/24/2013: Per previous meetings and discussions, the development needs to meet the detention, water quality, and LID requirements. These requirements need to be met while still meeting the detention pond design and landscape standards. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 The drainage and LID requirements are still under design. Water quality variance is being requested to be included with the detention volume and will be further explained in the drainage report which will be provided shortly. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Building Elevations Comment Number: 1 Comment Originated: 09/24/2013 09/24/2013: No comments. Topic: Construction Drawings Comment Number: 2 Comment Originated: 09/24/2013 09/24/2013: Please change the sub-title on sheet C0.00 to match the Subdivision Plat. See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 3 Comment Originated: 09/24/2013 09/24/2013: Please change the numbering of sheet C0.00 to C0.0, to be consistent with the rest of the plan set. See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 4 Comment Originated: 09/24/2013 09/24/2013: There are line over text issues on sheets C0.2, C1.0, CD1.2, CE1.0, CE1.1, C2.0, C3.0, CD1.0 & Figure 2. See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted Comment Number: 5 Comment Originated: 09/24/2013 09/24/2013: There are text over text issues on sheets C1.0. See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Topic: Landscape Plans Comment Number: 6 Comment Originated: 09/24/2013 09/24/2013: There are line over text issues on sheets LP11 & LP12. See redlines. WILL COMPLY Comment Number: 7 Comment Originated: 09/24/2013 09/24/2013: The title on sheet LP11 does not match the index on sheet 1 of the Site Plans. See redlines. WILL COMPLY Topic: Lighting Plan Comment Number: 8 Comment Originated: 09/24/2013 09/24/2013: No comments. Topic: Plat Comment Number: 9 Comment Originated: 09/24/2013 09/24/2013: Please correct the typos in the Statement Of Ownership And Subdivision. See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 10 Comment Originated: 09/24/2013 09/24/2013: Please add the Plat name to the Statement Of Ownership And Subdivision. See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 11 Comment Originated: 09/24/2013 09/24/2013: Are there any Lienholders? If you are uncertain whether there are, please add a signature block as a placeholder. There are no Lienholders Comment Number: 12 Comment Originated: 09/24/2013 09/24/2013: Please add the note: Unless shown otherwise, all easements depicted on the Retail Subdivision are hereby vacated with this plat. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 13 Comment Originated: 09/24/2013 09/24/2013: Please provide the current acceptable monument records for the aliquot corners shown. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 14 Comment Originated: 09/24/2013 09/24/2013: Please label all properties surrounding this Plat. See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 15 Comment Originated: 09/25/2013 09/25/2013: Please label the right of way widths and how they were dedicated. See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 16 Comment Originated: 09/25/2013 09/25/2013: Please add a note addressing the offsite sight distance easement(per Retail Subdivision) at the northwest corner of the property, to be vacated by separate document IF this sight distance easement is no longer needed and IF it was ever dedicated to begin with. See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 17 Comment Originated: 09/25/2013 09/25/2013: Please show an additional tie distance for the 20' emergency access easement. See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 18 Comment Originated: 09/25/2013 09/25/2013: Please add the square footage and use to all Lots & Tracts. See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 19 Comment Originated: 09/25/2013 09/25/2013: Please make all bearings to read the same direction. See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 20 Comment Originated: 09/25/2013 09/25/2013: Please label the Point Of Beginning. See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 21 Comment Originated: 09/25/2013 09/25/2013: Please show and label all dimensions between the monuments shown. See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Comment Number: 22 Comment Originated: 09/25/2013 09/25/2013: Do calculated positions need to be shown along the east line of Section 2? See redlines. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Topic: Site Plan Comment Number: 23 Comment Originated: 09/25/2013 09/25/2013: Please change the legal description to match the Subdivision Plat. See redlines. [SC]: Revised. Comment Number: 24 Comment Originated: 09/25/2013 09/25/2013: Please move all of the "date" text over to the date line on sheet 1. See redlines. [SC]: Revised. Comment Number: 25 Comment Originated: 09/25/2013 09/25/2013: Please correct the typos in the titles in the index on sheet 1. See redlines. [SC]: Revised. Comment Number: 26 Comment Originated: 09/25/2013 09/25/2013: There are 2 sheets in the Lighting Plans. Please add sheet E1.2 to the index on sheet 1. See redlines. [SC]: Revised. Comment Number: 27 Comment Originated: 09/25/2013 09/25/2013: There are line over text issues on sheets LS11 & LS12. See redlines. WILL COMPLY Comment Number: 28 Comment Originated: 09/25/2013 09/25/2013: There are text over text issues on sheet LS11. See redlines. WILL COMPLY Department: Traffic Operation Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 09/24/2013 09/24/2013: Please include an R1-1 (Stop) with street name sign above and a W4-4P warning sign (Cross Traffic Does Not Stop) below. RESPONSE COMMENTS - JVA; OCTOBER 18,2013 Comment noted. Topic: Traffic Impact Study Comment Number: 2 Comment Originated: 09/24/2013 09/24/2013: TIS is accepted. Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson@fcgov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 10/08/2013 10/08/2013: Russian Sage (Perovskia Atriplicifolia) is no longer on the Fort Collins Plant List- Please find a suitable replacement. PLANT WAS NOT USED AND HAS BEEN REMOVED FROM LIST Department: Zoning Contact: Peter Barnes, 970-416-2355, pbarnes@fcgov.com Topic: Building Elevations Comment Number: 1 Comment Originated: 09/17/2013 09/17/2013: Label the height of the building from grade to the tallest point of the building. [SC]: Dimension provided. Comment Number: 2 Comment Originated: 09/17/2013 09/17/2013: Add a note to either the buidling elevation drawings or to the site plan indicating that vents, flues, meters, conduit, PTAC units, mechanical equipment, etc., will be painted to match the building or will be screened from view. [SC]: SC to comply. Topic: General Comment Number: 8 Comment Originated: 09/17/2013 09/17/2013: Provide a detail drawing of the fence and the bike chalet. [SC]: See building materials. Topic: Landscape Plans Comment Number: 7 Comment Originated: 09/17/2013 09/17/2013: Add a note to the 'Landscape Notes', stating something to the effect that all landscape improvements are required to be completed prior to the issuance of a certificate of occupancy, or financially guaranteed by a bond, letter of credit or escrow in the amount of 125% of the cost of a written estimate from the landscape contractor in the event the landscaping isn't completed. WILL COMPLY Topic: Site Plan Comment Number: 3 Comment Originated: 09/17/2013 09/17/2013: Show the distance from the bike chalet to the south lot line. [SC]: Dimension provided. Comment Number: 4 Comment Originated: 09/17/2013 09/17/2013: Show the parking stall and drive aisle dimensions. [SC]: Dimension provided. Comment Number: 5 Comment Originated: 09/17/2013 09/17/2013: the site plan legend calls out a bike rack (BR) and light poles (LP), but I couldn't find them on the plan. Please show the locations. [SC]: Labels provided. Comment Number: 6 Comment Originated: 09/17/2013 09/17/2013: The conceptual review comment letter states that trash and recycling are stored within the building. Please add a note to the "General Notes" explaining that. [SC]: Notes provided. END OF COMMENTS