Loading...
HomeMy WebLinkAboutREDTAIL PONDS PERMANENT SUPPORTIVE HOUSING (AFFORDABLE HOUSING) - FDP - FDP130048 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFINAL DRAINAGE REPORT FOR FORT COLLINS HOUSING AUTHORITY PERMANENT SUPPORTIVE HOUSING DEVELOPMENT AT FOSSIL BLVD/CONEJOS DRIVE RED TAIL SUBDIVISION FORT COLLINS, COLORADO FOR FORT COLLINS HOUSING AUTHORITY 1715 W. MOUNTAIN AVENUE FORT COLLINS, COLORADO 80521 NOVEMBER 21, 2013 FCHA Permanent Supportive Housing Drainage Report Page 1 of 14 TABLE OF CONTENTS SECTION 1 – ENGINEER’S CERTIFICATION BLOCK ........................................................................ 3 SECTION 2 – GENERAL LOCATION AND DESCRIPTION ................................................................. 4 SITE LOCATION .................................................................................................................... 4 DESCRIPTION OF PROPERTY .................................................................................................. 4 BENCHMARK INFORMATION .................................................................................................. 5 SECTION 3 – STORM DRAINAGE CRITERIA .................................................................................. 6 HYDROLOGIC CRITERIA ........................................................................................................ 6 HYDRAULIC CRITERIA ........................................................................................................... 6 SECTION 4 – DRAINAGE BASINS AND HISTORIC RUNOFF .............................................................. 7 HISTORIC BASINS ................................................................................................................. 7 PROPOSED DEVELOPED BASINS ............................................................................................ 7 PROPOSED DETENTION/WATER QUALITY POND ...................................................................... 9 REQUEST FOR VARIANCE TO REDUCE DETENTION REQUIREMENTS ............................................ 10 HISTORIC/DEVELOPED BASIN COMPARISON ........................................................................ 10 SECTION 5 – STORM WATER MODELING .................................................................................. 11 SECTION 6 – STORMWATER POLLUTION PREVENTION ................................................................. 12 TEMPORARY EROSION CONTROL ........................................................................................ 12 PERMANENT EROSION CONTROL......................................................................................... 12 SECTION 7 – CONCLUSIONS ................................................................................................... 13 SECTION 8 – REFERENCES ....................................................................................................... 14 LIST OF TABLES TABLE 1. HISTORIC FLOWS- 2 AND 100 YEAR. (BASED ON RATIONAL METHOD) ............................. 7 TABLE 2. DEVELOPED FLOWS- 2 AND 100 YEAR. (BASED ON RATIONAL METHOD) ......................... 9 FCHA Permanent Supportive Housing Drainage Report Page 2 of 14 APPENDIX Appendix A – Hydrologic Computations 1. Site Vicinity Map 2. Soil Map - Natural Resources Conservation Services (NRCS) 3. City of Fort Collins 100 year Flood Map 4. Figure 1- Existing Drainage Map 5. Rational Worksheets (Existing Flows) 6. Figure 2 - Developed Drainage Map 7. Rational Worksheets (Developed Flows) 8. Detention Volume Calculations 9. Orifice and Inlet Calculations Appendix B – Hydraulic Computations 1. UD-SEWER Report Appendix C – Referenced Information 1. Drainage and Erosion Control Report for Redtail Appendix D – Utility Site Plans 1. Erosion Control Plan (CE1.0) 2. SWMP and Erosion Control Details (CE1.1) 3. Grading and Drainage Plan (C1.0 to C1.3) 4. Storm Drain Plan (C1.4) 5. Drainage Details (CD1.0, CD1.2) FCHA Permanent Supportive Housing Drainage Report Page 3 of 14 SECTION 1 – ENGINEER’S CERTIFICATION BLOCK I hereby certify that this Final Drainage Report for Fort Collins Housing Authority Permanent Supportive Housing in Red Tail Subdivision was prepared by me (or under my direct supervision) for the Owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. Signature: ________________________________________________ Jason T. Claeys, PE Registered Professional Engineer State of Colorado No. 42122 FCHA Permanent Supportive Housing Drainage Report Page 4 of 14 SECTION 2 – GENERAL LOCATION AND DESCRIPTION SITE LOCATION The Fort Collins Housing Authority Permanent Supportive Housing is located in the Red Tail Subdivision at the intersection of Fossil Boulevard and Conejos Drive in the City of Fort Collins, Colorado. Refer to Appendix A for the site vicinity map. DESCRIPTION OF PROPERTY The site is owned by Fort Collins Housing Authority, and is made up of three separate Tracts. Tract AA open space with 0.120 acres, Lot 1 with 2.820 acres and Lot 2 with 0.145 acres, for a combined total of 3.085 acres. For comparison purposes the drainage basins for the site used the old lot lines prior to adjustment with a total area of 2.93 acres. The site is currently undeveloped open land with approximately two-thirds of the site being used to stockpile earthwork and riprap where it has been accessed from Conejos Road and Fossil Boulevard. The site generally slopes from northwest to southeast with slopes from 2% to 25%. The soils within the site consist of Kim loam and Nunn clay loam which have been classified based on the Natural Resources Conservation Services (NRCS) and attached in Appendix A. Majority of the site is classified as Kim loams having a Type B hydrologic soil group with a moderate inflation rate. The remaining site is Tassel sandy loam with a Type D hydrologic soil group. For the purposes of this site analysis the entire site was assumed to have a Type C hydrologic soil group. There are no irrigation canals passing through the site. A Geotechnical Engineering Study was performed for the site and measured ground water at depths of 14' and 20.5' below existing grade. The property is not located within the 100 year floodplain as shown on the City of Fort Collins Flood Map attached in Appendix A. The Federal Emergency Management Agency (FEMA) had no printed flood maps available since the site is not located within a mapped floodplain area. (FEMA panel # 08069C100F) The main purpose of this study it to analyze the existing and developed drainage patterns in order to convey stormwater through the property to the historic drainage way southwest of the site. A new parking lot to the west of the site and new building will be analyzed for stormwater conveyance and water quality. The proposed scope of work will include new stormwater piping and site grading to accommodate onsite stormwater detention, parking lot and roof drainage. A new storm pipe for the pond outlet will be installed southwest to the historic Pond B that eventually conveys stormwater to Fossil Creek to the south. FCHA Permanent Supportive Housing Drainage Report Page 5 of 14 BENCHMARK INFORMATION Topographic and survey information was provided by King Surveyors, Inc. Horizontal datum is Colorado State Plate Coordinates NAD 83(2007) Datum and vertical datum is referenced from Fort Collins Benchmark Y401, Record Elevation = 4,968.75, NGVD 1929 (unadjusted). FCHA Permanent Supportive Housing Drainage Report Page 6 of 14 SECTION 3 – STORM DRAINAGE CRITERIA This report was prepared to meet or exceed the City of Fort Collins stormwater criteria. The City of Fort Collin’s Storm Drainage Design Criteria and Construction Manual (with all current 1997 Revisions and 2012 Amendments) (CoFC-SDDCCM) and the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. HYDROLOGIC CRITERIA The rational method was performed to calculate the peak historic runoff rates for each basin. The City of Fort Collins runoff coefficients were used for the analysis. Weighted percent impervious was calculated for each basin using Table RO-3 in the Urban Storm Drainage Criteria Manual. The weighted runoff coefficients were calculated for each basin using Tables 3-2 and 3-3 in the City of Fort Collins – Storm Drainage Design Criteria and Construction Standards (CoFC– SDDCCS). The time of concentration was calculated using the equations given within section 2.4.1 of the USDCM equation RO-3. The intensity was calculated using the corresponding storm rainfall depth and USDCM Equation RA-3. To account for the City of Fort Collins’ IDF Curve, Coefficient 3 of the UDFCD’s intensity formula was adjusted to 0.7867. The City of Fort Collins area has 2-yr 1-hr rainfall depth of 0.82 inches, a 10-yr 1 hr rainfall depth of 1.40 inches and a 100-yr 1 hr rainfall depth of 2.86 inches. These depths do account for the 1997 adjusted rainfall depths. HYDRAULIC CRITERIA The storm drainage system has been designed to convey the minor and major storm events through the combination of inlets and storm sewer pipes. UD SEWER model was used to analyze the pipe capacities and hydraulic grade line for the new storm system. All supporting calculations and exhibits are located in the Appendix. FCHA Permanent Supportive Housing Drainage Report Page 7 of 14 SECTION 4 – DRAINAGE BASINS AND HISTORIC RUNOFF HISTORIC BASINS The site has been divided into four separate basins. Sub-Basins H1 and H2, shown on the attached Drainage Figure 1 in Appendix A, sheet flow to the north and northwest. Basin H1 represents drainage that sheet flows to the existing Conejos Road that is conveyed to the existing Pond B. Basin H2 sheet flows directly southwest off the site to the existing Pond B. Basin H3 sheet flow along steep slopes ( > 7%) to the east and towards South College Avenue. Basin H4 sheet flow along steep slopes ( > 7%) to the east and towards Frontage Road. All four basins eventually convey stormwater to Fossil Creek south of the site. Rational method calculations with peak flows for the individual sub-basins are attached in Appendix A and listed below in Table 1. Table 1. Historic Flows- 2 and 100 year. (Based on Rational Method) Drainage Basin Design Point % Impervious Area (ac) Q-2 (cfs) Q-100 (cfs) 2-yr CFS/AC H1 1 13.1% 0.19 0.16 0.65 0.84 H2 2 2.0% 0.19 0.12 0.52 0.63 H3 3 2.0% 0.91 0.59 2.56 0.64 H4 4 2.0% 1.65 0.88 3.84 0.54 TOTAL SITE 2.93 1.75 7.57 0.60 For each basin the total runoff in Cubic Feet per Second per Acre (CFS/AC) was calculated to determine an equivalent runoff per acre for the entire site. It was determined that the site has an average runoff per acres of 0.60CFS/AC. This value will be used to determine the allowed 2-yr release rate for the onsite detention pond. PROPOSED DEVELOPED BASINS FCHA proposes to construct a building with associated parking, driveway and roadway improvements, walks, retaining walls and other features throughout the site. The overall imperviousness of the site will increase from 2.7% to 33.5%. FCHA proposes to access the site from the same existing location in Conejos Road and Fossil Boulevard. The majority of the site has been graded to drain towards the south to the propsoed FCHA Permanent Supportive Housing Drainage Report Page 8 of 14 onside detention/water quality pond. The remaining to the east will continue to drain to South College Avenue and Frontage Road. See Figure 2 in Appendix A for the proposed drainage Sub- Basins and grading plan. The site has been divided into six separate basins. Sub-Basin OS-1 to will continue to drain west undetained to Conejos Road as historical, eventually being conveyed to the existing Pond B. This basin consists of a paved drive entrance, sidewalks and lawn area. The overall runoff from this basin will decrease by 0.34cfs in comparison to existing basin H-1 Sub-Basin OS-2 will continue to drain southwest as historical, eventually being conveyed offsite undetained to the existing Pond B. This basin will remain mostly undisturbed and replanted with lawn. The overall runoff from this basin will decrease by 0.24cfs in comparison to existing basin H-2. Sub-Basin A1 consists of the parking lot, sidewalks and lawn area where the majority of the stromwater will sheet flow to three separate permeable paver systems and be conveyed through the pavers, into the stone drainage base course and into an underdrain. The permeable pavers will provided water quality and provide some detention volume required for the site. The underdrain with in the permeable pavers will be piped to a central inlet within the middle of the parking lot that conveys stormwater to the detention/water quality pond. Additionally, a small section of roof area at the entrance will be piped to the underrain within the parking median. In the event of the permeable paver systems becoming clogged, stormwater will be conveyed to a curb cut that will drain to the center parking median with an underain and inlet. The inlet within the media will be set slightly above the existing grade to promote infiltration into the surrounding soil and underdrain system. If the inlet becomes clogged, stormwater will pond within the parking area and eventually spill west to the proposed detention/water quality pond. Sub-basin A2 consist of the building roof area, patio, lawn and the detention/water quality pond. The stromwater from the roof will be piped and conveyed to a bio-swale along the south properly line. The bio-swale will have a perforated underdrain pipe encased in washed stone to help promote infiltration and to provide water quality. The patio and lawn area will sheet flow to an inlet located near the bocce ball court that will also convey stormwater to the bio-swale. The bio- swale will convey stormwater from basin A-2 to the detention/water quality pond. Sub-basin A3 consist of sidewalks and steep lawn/landscaping with retaining walls. Stormwater will sheet flow undetained to the southeast corner of the site as historically and eventually be conveyed offsite to frontage road. The overall runoff from this basin will decrease by 3.08cfs in comparison to existing basin H-4. Sub-basin A4 consist of sidewalks and steep lawn/landscaping with retaining walls. Stormwater will sheet flow undetained to the eastern properly line as historically and eventually be conveyed offsite to South College Avenue. The overall runoff from this basin will decrease by 0.35cfs in comparison to existing basin H-3. See Table 2 below for a summary of developed runoff flows. FCHA Permanent Supportive Housing Drainage Report Page 9 of 14 Table 2. Developed Flows- 2, and 100 year. (Based on Rational Method) Drainage Basin Design Point % Impervious Area (ac) Q-2 (cfs) Q-100 (cfs) OS-1 OS-1 0.43 0.05 0.08 0.31 OS-2 OS-2 0.00 0.07 0.06 0.28 A1 1 0.63 0.73 1.40 5.30 A2 2 0.36 1.17 1.33 5.16 A3 3 0.05 0.22 0.18 0.76 A4 4 0.09 0.70 0.53 2.21 PROPOSED DETENTION/WATER QUALITY POND Under the original Drainage and Erosion Control Report for Redtail Subdivision by North Star Design, Inc. (dated November 29 th , 2005), the proposed site falls within Sub-Basins 17, 18, 19, 20, 21, 22, 23 and 24 of the Redtail Drainage Plan, Sheet 15. Excerpts of the report and drainage mapping are attached in appendix C for reference. Under this previously proposed design, Tract I near the southwest corner of the site was designated for the area’s Water Quality Capture Volume needs. No stormwater detention was proposed at that time. Since the previous approval of the original 2005 Redtail drainage report, the City has observed the need for stormwater detention from properties along the South College Avenue corridor in the vicinity of the site. The City has therefore required FCHA provide detention for the developed area of the site. The previously approved design for the site consisted of single family residential development with nearly 79% imperviousness over 2.86 acres, and a peak 100-year storm runoff rate of 28.5 CFS. The current proposed FCHA development has substantially lower imperviousness at 33.5% and a peak undetained 100-year storm runoff rate of 12.37 CFS. The proposed detention/water quality pond has been designed to capture stormwater runoff from basins A1 and A2. The pond has been designed to detain for the 100yr storm rainfall event with a controlled release of 1.13cfs to match the historic 2-yr release rate. The historic 2-yr release rate has been determined based on a comparison of developed area draining to the detention/water quality pond with the average historic 2-yr runoff per acre of 0.60CFS/AC. The total area for developed base A2 and A2 is 1.90 Ac with a maximum historic releaser rate of 0.60CFS/Ac which is equal to 1.13cfs for basin A1 and A2. The controlled release will be achieved by installing a steel plate over the outlet pipe with a 4-1/8" circular orifice cut out of the steel plate. See attached orifice calculations in Appendix A. Utilizing the detention volume calculation spreadsheet provided by UDFCD (version 2.33 Modified FAA Method) the total detention required for basin A1 and A2 is 0.223 AC-FT of detention storage when released at the historic 2-year runoff rate of 1.13 CFS. The proposed detention pond can accommodate approximately 0.218 AC-FT of storage by use of vertical retaining walls. Additional detention storage, approximately 0.037 AC-FT, can be provided in the median of the parking area and underneath the permeable pavers. The total detention provided approximately 0.255 AC-FT. FCHA Permanent Supportive Housing Drainage Report Page 10 of 14 Water Quality Capture Volume (WQCV) requirement for the developed basin A1 and A2 was calculated to be 0.04 AC-FT based on UDFCD Best Management Practice calculation spreadsheet. The permeable pavers are able to account for approximately 522 CF or 0.01 AC-FT based on the UDFCD BMP permeable pavement system Spreadsheet. The detention/water quality pond has been designed to treat for 0.03 AC-FT released over a 40-hr period. REQUEST FOR VARIANCE TO REDUCE DETENTION REQUIREMENTS As demonstrated in the previous section, it will be difficult to provide large storm event detention storage in addition to the current site layout on a steeply sloped property. On behalf of Fort Collins Housing Authority, JVA Inc. is requesting variance from the City of Fort Collins for WQCV and stormwater detention requirements to allow the WQCV to be included within the 100-year storage volume rather than in addition to it. This represents a 1,633 cubic feet (0.04AC- FT) reduction in required detention volume. In addition to the water quality outlet structure within the pond, the site will have permeable pavers and bioswales to meet the City of Fort Collins Low Impact Development (LID) and parking lot requirements. HISTORIC/DEVELOPED BASIN COMPARISON A majority of the site historically drains east to frontage road and South College Ave. The developed drainage basins will alter the existing drainage patterns by providing onsite detention and untimely reducing runoff to the east as stated above. The total developed flow to the west from basin OS-1, OS-2, A1, and A2 is approximately 1.68 cfs for the 100 year storm event based on the controlled release from the detention pond. The historic flow to the west is approximately 1.17 cfs for the 100 year storm event resulting in a net increase of 0.51 cfs which is considered negligible. The small increase in runoff to the west to existing Pond B will have limited to no significant impact to the downstream conveyance to Fossil Creek. Overall, the developed 100 year runoff that ultimately reaches Fossil Creek south of the site will be reduced from 7.57 cfs to 4.56 cfs, a net decrease of 3.01cfs. During the review of the original Redtail stormwater report it was noted that the pond berm along the east edge of existing Pond C was not constructed per the original design plans. It is recommended that the berm be completed by the Redtail owner per the original design plans. Per the original design report for Redtail, the stormwater conveyance system through pond B and C are capable of handing 250cfs from the west side of the tracts, therefore the small increase in developed runoff from the site is considered negligible. FCHA Permanent Supportive Housing Drainage Report Page 11 of 14 SECTION 5 – STORM WATER MODELING The storm drain piping has been modeled using UD-SEWER to determine pipe size and Hydraulic Grade Line profiles (HGL). The storm drain and underdrain located in the parking lot has been modeled and the results have been attached in appendix B. The pipe has been designed to handle the 100-yr flow. If this system becomes clogged stormwater will pond within the median and parking areas and spill over the drive to the detention/water quality pond. The pond outlet has been modeled to handle the 2-year historic release rate of 1.13cfs. If the pond outlet becomes clogged an emergency spill way has been designed to handle the 100 year developed runoff. FCHA Permanent Supportive Housing Drainage Report Page 12 of 14 SECTION 6 – STORMWATER POLLUTION PREVENTION TEMPORARY EROSION CONTROL A temporary erosion control plan is to be implemented for the site during construction. Temporary erosion control measures include, but not limited to, slope and swale protection provided by the use of erosion control wattles/sediment control logs, inlet protection, etc. All temporary erosion control measures are to be removed after they are deemed unnecessary. Refer to the Erosion Control Report for the FCHA Permanent Supportive Housing Dated November 21, 2013 for additional detail information. PERMANENT EROSION CONTROL Permanent erosion control measures include, but not limited to, the constructed detention pond, riprap pads placed for culvert outlet protection, seeding and mulch placed to enable and established vegetative growth, etc. Long-term maintenance of these erosion control measures shall be the responsibility of the owner of the property. A general erosion control plan has been provided in Appendix D FCHA Permanent Supportive Housing Drainage Report Page 13 of 14 SECTION 7 – CONCLUSIONS This Final Drainage Report for FCHA Permanent Supportive Housing has been prepared to comply with the stormwater criteria set by the City of Fort Collins. The proposed drainage systems presented in this report are designed to convey the proposed peak stormwater runoff through the site to the proposed detention/water quality pond. Through calculations and review of the proposed storm drain system, there appears to be adequate capacity to convey the proposed flows. This report also proposes best management practices for erosion control, permanent landscaping, riprap, and on-site construction facilities. It can therefore be concluded that development of the detention pond complies with all of the stormwater jurisdictional criteria and will not adversely affect the existing streets, storm drain system and/or detention/water quality facilities. FCHA Permanent Supportive Housing Drainage Report Page 14 of 14 SECTION 8 – REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage and Flood Control District, June 2001, Revised April 2008. 2. Storm Drainage Criteria Manual and Construction Standards, City of Fort Collins Storm Water Utility, City of Fort Collins, Colorado, Updated January, 1997 with 2012 amendments. 3. “Hydrologic Group Rating for Larimer County Area, Colorado”, USDA-Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov. [12/6/2012] 4. Drainage and Erosion Control Report for Redtail, prepared by North Star Design, Inc., Dated November 29, 2005 5. Urban Drainage (UD-SEWER), Urban Drainage and Flood Control District, Version 1.4.0.20 dated 2009. APPENDIX A – HYDROLOGIC COMPUTATIONS 1. Site Vicinity Map 2. Soil Map - Natural Resources Conservation Services (NRCS) 3. City of Fort Collins 100 year Flood Map 4. Figure 1- Existing Drainage Map 5. Rational Worksheets (Existing Flows) 6. Figure 2 - Developed Drainage Map 7. Rational Worksheets (Developed Flows) 8. Detention Volume Calculations 9. Orifice and Inlet Calculations PERMANENT SUPPORTIVE HOUSING DEVELOPMENT FORT COLLINS, COLORADO VICINITY MAP NOT TO SCALE Hydrologic Soil Group—Larimer County Area, Colorado (Fort Collins Housing Authority) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/18/2013 Page 1 of 4 4484980 4485000 4485020 4485040 4485060 4485080 4485100 4485120 4485140 4484980 4485000 4485020 4485040 4485060 4485080 4485100 4485120 4485140 493220 493240 493260 493280 493300 493320 493340 493360 493380 493400 493420 493440 493460 493480 493220 493240 493260 493280 493300 493320 493340 493360 493380 493400 493420 493440 493460 493480 40° 31' 1'' N 105° 4' 48'' W 40° 31' 1'' N 105° 4' 37'' W 40° 30' 55'' N 105° 4' 48'' W 40° 30' 55'' N 105° 4' 37'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 50 100 200 300 Feet 0 15 30 60 90 Meters Map Scale: 1:1,200 if printed on A landscape (11" x 8.5") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 53 Kim loam, 1 to 3 percent slopes B 0.0 0.1% 54 Kim loam, 3 to 5 percent slopes B 2.9 40.7% 63 Longmont clay, 0 to 3 percent slopes C 0.2 3.3% 74 Nunn clay loam, 1 to 3 percent slopes C 1.3 18.2% 90 Renohill clay loam, 3 to 9 percent slopes C 0.3 3.8% 106 Tassel sandy loam, 3 to 25 percent slopes D 2.5 33.8% Totals for Area of Interest 7.2 100.0% Hydrologic Soil Group—Larimer County Area, Colorado Fort Collins Housing Authority Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/18/2013 Page 3 of 4 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Fort Collins Housing Authority Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/18/2013 Page 4 of 4 Fort Collins Housing Authority City of Fort Collins Flood Map This map is a user generated static output from the City of Fort Collins FCMaps Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. 6,281 City of Fort Collins - GIS 0.2 1: WGS_1984_Web_Mercator_Auxiliary_Sphere 0 0.10 0.2 Miles Notes Legend FEMA Floodplain FEMA High Risk - Floodway FEMA High Risk - 100 Year FEMA Moderate Risk - 100 / 500 Year City Floodplains City High Risk - Floodway City High Risk - 100 Year City Moderate Risk - 100 Year Natural Areas City Limits PROJECT LOCATION JVA Incorporated Job Name: FCHA-PSH I% C2 C100 25 Old Town Square Job Number: 1980c Streets Paved 100% 0.95 1.00 Fort Collins, CO 80524 Date: 11/20/13 Concrete Drives/Walks 90% 0.95 1.00 Ph: 970.225.9099 By: DH Roof 90% 0.95 1.00 Fax: 970.225.6923 Gravel 40% 0.50 0.63 Playground 10% 0.20 0.25 FCHA-PSH Historic Lawn - Flat (<2%) 2% 0.20 0.25 Historic Runoff Coefficient & Time of Concentration Calculations Historic Lawn - Medium (2-7%) 2% 0.25 0.31 Location: Fort Collins Historic Lawn - Steep > 7% 2% 0.35 0.44 Minor Design Storm: 2 Major Design Storm: 100 Soil Type: C/D Basin Design Data I (%) = 100% 90% 90% 40% 10% 2% 2% 2% I (%) tc Comp tc Final Basin Name Design Point Apaved streets (sf) Adrives/co nc (sf) Aroof (sf) Agravel (sf) Aplygnd (sf) Alawn- FLAT (sf) Alawn- MED (sf) Alawn- STEEP (sf) ATotal (sf) ATotal (ac) Imp (%) C2 C5 C10 C100 Upper most Length (ft) Slope (%) ti (min) Length (ft) Slope (%) Type of Land Surface Cv JVA Incorporated Job Name: FCHA-PSH I% C2 C100 25 Old Town Square Job Number: 1980c Streets, Parking, Drives 100% 0.95 1.00 Fort Collins, CO 80524 Date: 11/20/13 Concrete/Asphalt Drives 90% 0.95 1.00 Ph: 970.225.9099 By: DH Roof 90% 0.95 1.00 Fax: 970.225.6923 Permeable Pavers 40% 0.50 0.63 FCHA-PSH Lawn - Flat (<2%) 0% 0.20 0.25 Composite Runoff Coefficient Calculations Lawn - Medium (2-7%) 0% 0.25 0.31 Location: Fort Collins Lawn - Steep > 7% 0% 0.35 0.44 Minor Design Storm: 2 Major Design Storm: 100 Soil Type: C/D I (%) = 100% 90% 90% 40% 0% 0% 0% I (%) Basin Name Design Point Apaved streets (sf) Adrives/c onc (sf) Aroof (sf) Apavers (sf) Alawn- FLAT (sf) Alawn- MED (sf) Alawn- STEEP (sf) ATotal (sf) ATotal (ac) Imp (%) C2 C100 OS-1 OS-1 885 1,165 2,050 0.05 43.2% 0.61 0.68 OS-2 OS-2 3,218 3,218 0.07 0.0% 0.35 0.44 A1 1 19,505 729 4,518 6,859 31,611 0.73 63.3% 0.72 0.78 A2 2 2,742 16,691 2,565 28,828 50,826 1.17 36.4% 0.53 0.59 A3 3 311 528 3,160 5,472 9,471 0.22 5.2% 0.34 0.42 A4 4 3,186 0 14,036 13,381 30,603 0.70 9.4% 0.37 0.44 A1+A2 5 22,247 17,420 7,083 6,859 28,828 0 82,437 1.89 46.7% 0.60 0.66 A3+A4 6 3,497 0 528 0 17,196 18,853 40,074 0.92 8.4% 0.36 0.44 Runoff Coeff's Basin Design Data A3+A4 6 3,497 0 528 0 17,196 18,853 40,074 0.92 8.4% 0.36 0.44 A1-A4 7 0 25,744 17,420 7,611 6,859 46,024 18,853 122,511 2.81 34.2% 0.52 0.59 OS1+OS2 8 885 0 0 0 0 0 4,383 5,268 0.12 16.8% 0.45 0.53 TOTAL SITE 885 25,744 17,420 7,611 6,859 46,024 23,236 127,779 2.93 33.5% 0.52 0.59 1980c - Rational Calculations.xlsx Developed C Page 2 of 5 JVA Incorporated Job Name: FCHA-PSH 25 Old Town Square Job Number: 1980c Fort Collins, CO 80524 Date: 11/20/13 Ph: 970.225.9099 By: DH Fax: 970.225.6923 FCHA-PSH Time of Concentration Calculations Location: Fort Collins Minor Design Storm: 2 Major Design Storm: 100 Soil Type: C/D Sub-Basin Data tc Comp tc Final Basin Name Design Point ATotal (ac) C5 Upper most Length (ft) Slope (%) ti (min) Length (ft) Slope (%) Type of Land Surface Cv Velocity (fps) tt (min) Time of Conc ti + tt = tc Total Length (ft) tc =(L/180)+ 10 (min) Min tc OS-1 OS-1 0.05 0.61 35 2.0% 4.2 5 2.0% Paved areas & shallow paved swales 20 2.8 0.0 4.3 40 10.2 5.0 OS-2 OS-2 0.07 0.35 65 3.0% 7.7 5 2.0% Paved areas & shallow paved swales 20 2.8 0.0 7.7 70 10.4 7.7 A1 1 0.73 0.72 54 2.0% 4.0 210 1.0% Paved areas & shallow paved swales JVA Incorporated Job Name: FCHA-PSH 25 Old Town Square Job Number: 1980c Fort Collins, CO 80524 Date: 11/20/13 Ph: 970.225.9099 By: DH Fax: 970.225.6923 FCHA-PSH Developed Storm Runoff Calculations Design Storm : 2 Year Point Hour Rainfall (P1) : 0.82 I = (28.5 P1) / ((10 + TC)^0.786651) Basin Name Design Point Area (ac) Runoff Coeff tc (min) C*A (ac) I (in/hr) Q (cfs) Total tc (min) ΣC*A (ac) I (in/hr) Q (cfs) Inlet Type Q intercepted Q carryover Pipe Size (in) or equivalent Pipe Material Slope (%) Pipe Flow (cfs) Max Pipe Capacity (cfs) Length (ft) Velocity (fps) tt (min) Total Time (min) Notes OS-1 OS-1 0.05 0.61 5.00 0.03 2.78 0.08 OS-2 OS-2 0.07 0.35 7.70 0.03 2.44 0.06 Basins OS-1 and OS-2 Routed 7.70 0.05 2.44 0.13 A1 1 0.73 0.72 5.80 0.52 2.67 1.40 A2 2 1.17 0.53 10.90 0.62 2.14 1.33 A3 3 0.22 0.34 8.60 0.07 2.35 0.18 A4 4 0.70 0.37 12.00 0.26 2.06 0.53 Basins A1 and A2 Routed 10.90 1.14 2.14 2.45 Basins A3 and A4 Routed 12.00 0.33 2.06 0.68 12.00 1.53 2.06 3.15 3.1 Pipe/Swale Travel Time Entire Site Direct Runoff Total Runoff Inlets Pipe 1980c - Rational Calculations.xlsx Q Minor Page 5 of 5 JVA Incorporated Job Name: FCHA-PSH 25 Old Town Square Job Number: 1980c Fort Collins, CO 80524 Date: 11/20/13 Ph: 970.225.9099 By: DH Fax: 970.225.6923 FCHA-PSH Developed Storm Runoff Calculations Design Storm : 100 Year Point Hour Rainfall (P1) : 2.86 I = (28.5 P1) / ((10 + TC)^0.786651) Basin Name Design Point Area (ac) Runoff Coeff tc (min) C*A (ac) I (in/hr) Q (cfs) Total tc (min) ΣC*A (ac) I (in/hr) Q (cfs) Inlet Type Q intercepted Q carryover Pipe Size (in) or equivalent Pipe Material Slope (%) Pipe Flow (cfs) Max Pipe Capacity (cfs) Length (ft) Velocity (fps) tt (min) Total Time (min) Notes OS-1 OS-1 0.05 0.68 5.00 0.03 9.70 0.31 OS-2 OS-2 0.07 0.44 7.70 0.03 8.52 0.28 0.5 'Basins OS-1 and OS-2 Routed 7.70 0.06 8.52 0.55 A1 1 0.73 0.78 5.80 0.57 9.31 5.30 15 in PVC 0.5% 5.3 6.4 280 10.0 0.47 0.47 A2 2 1.17 0.59 10.90 0.69 7.47 5.16 15 in PVC 1.6% 0.0 11.4 160 10.0 0.27 0.27 A3 3 0.22 0.42 8.60 0.09 8.19 0.76 15 in PVC 2.0% 0.0 12.8 5 10.0 0.01 0.01 A4 4 0.70 0.44 12.00 0.31 7.18 2.21 'Basins A1 and A2 Routed 10.90 1.26 7.47 9.41 Basins A3 and A4 Routed 12.00 0.40 7.18 2.88 12.00 1.72 7.18 12.37 12.4 Pipe/Swale Travel Time Entire Site Direct Runoff Total Runoff Inlets Pipe 1980c - Rational Calculations.xlsx Q100 Page 4 of 5 Project: Basin ID: Design Information (Input): Design Information (Input): Catchment Drainage Imperviousness Ia = 46.70 percent Catchment Drainage Imperviousness I a = 46.70 percent Catchment Drainage Area A = 1.900 acres Catchment Drainage Area A = 1.900 acres Predevelopment NRCS Soil Group Type = C A, B, C, or D Predevelopment NRCS Soil Group Type = C A, B, C, or D Return Period for Detention Control T = 2 years (2, 5, 10, 25, 50, or 100) Return Period for Detention Control T = 100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Tc = 10 minutes Time of Concentration of Watershed Tc = 10 minutes Allowable Unit Release Rate q = 0.60 cfs/acre Allowable Unit Release Rate q = 0.60 cfs/acre One-hour Precipitation P1 = 0.82 inches One-hour Precipitation P 1 = 2.86 inches Design Rainfall IDF Formula i = C1* P 1/(C2 +Tc)^C 3 Design Rainfall IDF Formula i = C1 * P1/(C 2+Tc )^C3 Coefficient One C1 = 28.50 Coefficient One C 1 = 28.50 Coefficient Two C2 = 10 Coefficient Two C 2 = 10 Coefficient Three C3 = 0.78665 Coefficient Three C 3 = 0.78665 Determination of Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = 0.32 Runoff Coefficient C = 0.60 Inflow Peak Runoff Qp-in = 1.36 cfs Inflow Peak Runoff Qp-in = 8.87 cfs Allowable Peak Outflow Rate Qp-out = 1.13 cfs Allowable Peak Outflow Rate Qp-out = 1.13 cfs Mod. FAA Minor Storage Volume = 175 cubic feet Mod. FAA Major Storage Volume = 10,136 cubic feet Mod. FAA Minor Storage Volume = 0.004 acre-ft Mod. FAA Major Storage Volume = 0.233 acre-ft 5 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes) Rainfall Rainfall Inflow Adjustment Average Outflow Storage Rainfall Rainfall Inflow Adjustment Average Outflow Storage Duration Intensity Volume Factor Outflow Volume Volume Duration Intensity Volume Factor Outflow Volume Volume minutes inches / hr acre-feet "m" cfs acre-feet acre-feet minutes inches / hr acre-feet "m" cfs acre-feet acre-feet (input) (output) (output) (output) (output) (output) (output) (input) (output) (output) (output) (output) (output) (output) 0 0.00 0.000 0.00 0.00 0.000 0.000 0 0.00 0.000 0.00 0.00 0.000 0.000 5 2.78 0.012 1.00 1.13 0.008 0.004 5 9.68 0.076 1.00 1.13 0.008 0.068 10 2.21 0.019 0.99 1.12 0.015 0.003 10 7.72 0.121 0.99 1.12 0.015 0.106 15 1.86 0.023 0.83 0.93 0.019 0.004 15 6.48 0.153 0.83 0.93 0.019 0.133 20 1.61 0.027 0.75 0.84 0.023 0.004 20 5.61 0.176 0.75 0.84 0.023 0.153 25 1.43 0.030 0.70 0.79 0.027 0.003 25 4.97 0.195 0.70 0.79 0.027 0.168 30 1.28 0.032 0.66 0.75 0.031 0.001 30 4.48 0.211 0.66 0.75 0.031 0.180 35 1.17 0.034 0.64 0.72 0.035 -0.001 35 4.08 0.224 0.64 0.72 0.035 0.189 40 1.08 0.036 0.62 0.70 0.039 -0.003 40 3.76 0.236 0.62 0.70 0.039 0.197 45 1.00 0.038 0.61 0.69 0.043 -0.005 45 3.48 0.246 0.61 0.69 0.043 0.204 50 0.93 0.039 0.60 0.68 0.047 -0.007 50 3.25 0.255 0.60 0.68 0.047 0.209 55 0.88 0.040 0.59 0.67 0.050 -0.010 55 3.06 0.264 0.59 0.67 0.050 0.213 60 0.83 0.042 0.58 0.66 0.054 -0.013 60 2.88 0.272 0.58 0.66 0.054 0.217 65 0.78 0.043 0.58 0.65 0.058 -0.016 65 2.73 0.279 0.58 0.65 0.058 0.220 70 0.74 0.044 0.57 0.64 0.062 -0.019 70 2.60 0.285 0.57 0.64 0.062 0.223 75 0.71 0.045 0.57 0.64 0.066 -0.021 75 2.47 0.291 0.57 0.64 0.066 0.225 80 0.68 0.045 0.56 0.63 0.070 -0.024 80 2.37 0.297 0.56 0.63 0.070 0.227 85 0.65 0.046 0.56 0.63 0.074 -0.028 85 2.27 0.303 0.56 0.63 0.074 0.229 90 0.62 0.047 0.55 0.63 0.078 -0.031 90 2.18 0.308 0.55 0.63 0.078 0.230 95 0.60 0.048 0.55 0.62 0.082 -0.034 95 2.10 0.313 0.55 0.62 0.082 0.231 100 0.58 0.049 0.55 0.62 0.085 -0.037 100 2.02 0.317 0.55 0.62 0.085 0.232 105 0.56 0.049 0.55 0.62 0.089 -0.040 105 1.95 0.322 0.55 0.62 0.089 0.232 110 0.54 0.050 0.54 0.62 0.093 -0.043 110 1.89 0.326 0.54 0.62 0.093 0.233 115 0.52 0.050 0.54 0.61 0.097 -0.047 115 1.83 0.330 0.54 0.61 0.097 0.233 Project: Basin ID: Design Information (Input): #1 Horiz. #2 Horiz. #1 Vert. #2 Vert. Circular Opening: Diameter in Inches Dia. = 4.06 15.00 inches OR Rectangular Opening: Width in Feet W = 3.00 3.00 ft. Length (Height for Vertical) L or H = 3.00 3.00 ft. Percentage of Open Area After Trash Rack Reduction % open = 75 75 % Orifice Coefficient Co = 0.65 0.65 Weir Coefficient Cw = 2.80 2.80 Orifice Elevation (Bottom for Vertical) Eo = 4985.56 4985.56 ft. Calculation of Collection Capacity: Net Opening Area (after Trash Rack Reduction) Ao = 6.75 6.75 0.00 0.00 sq. ft. OPTIONAL: User-Overide Net Opening Area Ao = sq. ft. Perimeter as Weir Length Lw = 10.50 10.50 ft. OPTIONAL: User-Overide Weir Length Lw = ft. Top Elevation of Vertical Orifice Opening, Top = 0.34 1.25 ft. Center Elevation of Vertical Orifice Opening, Cen = 0.17 0.63 ft. Horizontal Orifices Vertical Orifices Labels Water WQCV #1 Horiz. #1 Horiz. #2 Horiz. #2 Horiz. #1 Vert. #2 Vert. Total Target Volumes for WQCV, Minor, Surface Plate/Riser Weir Orifice Weir Orifice Collection Collection Collection for WQCV, Minor, & Major Storage Elevation Flow Flow Flow Flow Flow Capacity Capacity Capacity & Major Storage W.S. Elevations ft cfs cfs cfs cfs cfs cfs cfs cfs Volumes (input) (linked) (User-linked) (output) (output) (output) (output) (output) (output) (output) (link for goal seek) Bottom of pond 4987.76 0.00 95.94 52.22 95.94 52.22 0.00 0.00 104.45 4988.00 0.00 112.06 55.00 112.06 55.00 0.00 0.00 110.00 4989.00 0.00 187.58 65.30 187.58 65.30 0.00 0.00 130.61 4990.00 0.00 275.06 74.19 275.06 74.19 0.00 0.00 148.38 4991.00 0.00 373.03 82.12 373.03 82.12 0.00 0.00 164.25 Spillway 4991.50 0.00 425.62 85.81 425.62 85.81 0.00 0.00 171.63 4992.00 0.00 480.48 89.35 480.48 89.35 0.00 0.00 178.71 Top of Berm 4993.00 0.01 596.63 96.04 596.63 96.04 0.00 0.00 192.08 0.01 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.01 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.01 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.01 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.01 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.01 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.01 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.02 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.02 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.02 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.02 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.02 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.02 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.02 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.02 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.02 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.02 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.02 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.02 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A FCHA - Permanent Supportive Housing Pond Summary Design Engineer: Design Firm: Project Number: Date: Pond Summary Table 0.04 4989.58 9.41 4 2/16 1.13 0.037 0.218 0.255 0.233 0.022 4991.33 9.41 9.00 1.5 4991.50 4993.00 Excess 100-yr Detention Volume (acre-ft) D. Harner JVA, Inc Proposal November 20, 2013 100-yr Detention Volume pond (acre-ft) 100-yr Water Surface Elev. (ft) Detention Pond Summary Table Water Quality Capture Volume-Pond (acre-ft) WQCV Water Surface Elev. Required (ft) 100-yr Pond Max Inflow (cfs) (routed) 100-yr Site Release Rate (cfs) Outlet Orifice Size (in) 100-yr Detention Volume pavers (acre-ft) Total 100-yr Detention Volume Provided (acre-ft) Total 100-yr Detention Volume Required (acre-ft) Spillway Summary Table Top of Berm Elev. (ft) 100-yr Pond Max Inflow (cfs) (routed) Length (ft) Spillway Depth, including 1 ft freeboard (ft) Spillway Crest Elev. (ft) 1980c WQCV (Current).xls - Pond Summary Page 1 of 6 JVA, Inc. FCHA - Permanent Supportive Housing Water Quality Pond and Outlet Sizing (Per USDCM) Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A 1.9 acres Composite. Imperviousness, I 46.7% WQCV (watershed inches) 0.197 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.038 acre-feet Including 20% for Sedimentation WATER QUALITY OUTLET SIZING (Per USDCM, Volume 3): Design Water Quality Depth, DWQ 1.82 ft Determine K40 K40 = 0.013DWQ 2 + 0.22DWQ - 0.10 0.343 Maximum Area per Row, a a = WQCV / K40 0.109 square inches Number of Rows, nr 5 rows Number of Columns, nc (See Table 6a-1 for Max.) 1 columns Choose Hole Diameter 5/16 inches Use USDCM Volume 3, Figure 5 0.313 inches Urban Storm Drainage Criteria Manual (USDCM) Volume III, Urban Drainage and Flood Control District, June 2001 Circular Perforation Sizing D. Harner JVA, Inc. 2104c November 20, 2013 * * 1 . 2 12 Area WQCV Volume       = Use USDCM Volume 3, Figure 5 0.313 inches Total Area per Row, Ao 0.08 square inches Total Outlet Area, Aot 0.38 square inches Does design work? Yes Minimum Steel Plate Thickness 1/4 inch WQCV.xls - WQCV & Outlet Structure Page 2 of 6 JVA, Inc. FCHA - Permanent Supportive Housing Critical Pond Elevations Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 Stage Storage Volume (pond volume calculated using the prismoidal formula): CONTOUR (FT) AREA (FT2) AREA (ACRE) VOLUME (ACRE- FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4987.76 0.000 0.000 0.00 0.000 4988.0 81.00 0.002 0.000 0.24 0.000 4989.0 1,005.00 0.023 0.010 1.24 0.011 4990.0 3,253.00 0.075 0.046 2.24 0.057 4991.0 5,206.00 0.120 0.096 3.24 0.153 4991.5 6,121.00 0.141 0.065 3.74 0.218 Spillway 4992.0 7,503.00 0.172 0.078 4.24 0.296 4993.0 9,865.00 0.226 0.199 5.24 0.495 Top of berm 0.038 ac-ft 4989.58 ft 1.82 ft D. Harner JVA, Inc. 2104c Interpolates to an Elev. of Required Water Quality Capture Volume = November 20, 2013 Water Quality Volume Pond Detph ( ) 3 AAAADepth 1 2 1 2 V + + = 1980c WQCV (Current).xls - Pond Stage Storage #1 Page 3 of 6 JVA, Inc. 1.82 ft 0.233 ac-ft 0.037 ac-ft 0.196 ac-ft 4991.33 ft 3.57 ft Water Quality Volume Pond Detph Total Required Detention Volume Required 100-yr Detention Volume (including WQCV) = Volume provided w/in Pavers Total Pond Volume Required Detention Volume Pond Detph 4987.00 4988.00 4989.00 4990.00 4991.00 4992.00 4993.00 4994.00 0.0 0.1 0.2 0.3 0.4 0.5 0.6 FCHA - Permanent Supportive Housing Emergency Overflow Spillway Calculations Design Engineer: Design Firm: Project Number: Date: Broad-Crested Weir Equation-Trapezoidal Shape where: Q = Discharge (cfs) C = Weir Coeffecient L = Weir Length (ft) H = Average Weir Head (ft) H:V =Side Slope Calculations Knowns: 4.00 0.50 ft 2.6 4991.50 ft 9.41 cfs *Total Onsite Runnoff 8.24 ft 9 ft 1.50 ft Side Slopes (H:V) Desired Spillway Head Weir Coefficient Spillway Elevation D. Harner JVA, Inc. 2104c November 20, 2013 100-yr Pond Inflow Calculated Spillway Length Use Spillway Length Spillway Depth 2 5 2 3 H V H QCLH C       = + Topft of Berm Elevation 4993.0 (including 1' freeboard) 4991.40 4991.60 4991.80 4992.00 4992.20 4992.40 4992.60 4992.80 4993.00 0.00 20.00 40.00 60.00 80.00 ELEVATION (ft) FCHA - Permanent Supportive Housing Emergency Overflow Spillway Calculations Design Engineer: Design Firm: Project Number: Date: D. Harner JVA, Inc. 2104c November 20, 2013 Ponding Depth (ft) Spillway Head (ft) QTotal (CFS) 4991.50 0.00 0.00 4991.60 0.10 0.77 4991.70 0.20 2.28 4991.80 0.30 4.36 4991.90 0.40 6.97 4992.00 0.50 10.11 4992.10 0.60 13.78 4992.20 0.70 17.97 4992.30 0.80 22.70 4992.40 0.90 27.97 4992.50 1.00 33.80 4992.60 1.10 40.19 4992.70 1.20 47.17 4992.80 1.30 54.72 4992.90 1.40 62.88 4993.00 1.50 71.65 WQCV.xls - Spillway Page 5 of 6 JVA, Inc. FCHA - Permanent Supportive Housing Circular Orifice Plate Sizing Design Engineer: Design Firm: Project Number: Date: Orifice Equation where: C = Orifice Discharge Coefficient A o = Orifice Area (ft 2 ) g = Gravity (32.2 ft/s 2 ) ∆h = Difference in Elevation Head (ft) D o = Orifice Diameter (in) Calculations 100-yr Orifice Sizing 100-yr Orifice Rating Table Knowns: 100-yr Release Rate 1.13 cfs 100-yr WSEL 4991.33 ft 4987.76 0.68 0.000 4988.00 0.72 0.000 Pond Outlet Invert 4985.56 ft 4989.00 0.86 0.011 4990.00 0.99 0.057 Discharge Coefficient 0.65 4991.00 1.10 0.153 4991.50 1.15 0.218 Tailwater Elevation 4984.68 ft 4992.00 1.20 0.296 4993.00 1.29 0.495 Orifice Diameter 4 2/16 in Pond Volume (ac-ft) D. Harner JVA, Inc. 2104c November 20, 2013 Elevation (ft) Discharge (cfs) C g h Q QCA o g h A o ∆ = ∆ ⇒ = 2 2 π o o A D = 576 1980c WQCV (Current).xls - Outlet Orifice Plate Sizing Page 6 of 6 JVA, Inc. Orifice Area 0.092 ft 2 Centroid Elevation 4985.73 ft Actual Release Rate 1.13 cfs C g h Q QCA o g h A o ∆ Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Type of Permeable Pavement Section A) What type of section of permeable pavement is used? (Based on the land use and activities, proximity to adjacent structures and soil characteristics.) B) What type of wearing course? 2. Required Storage Volume A) Effective Imperviousness of Area Tributary to Permeable Pavement, Ia Ia = 63.3 % B) Tributary Area's Imperviousness Ratio (I = Ia / 100) i = 0.633 C) Tributary Watershed Area ATotal = 31,611 sq ft (including area of permeable pavement system) D) Area of Permeable Pavement System APPS = 4,518 sq ft (Minimum recommended permeable pavement area = 7600 sq ft) E) Impervious Tributary Ratio RT = 3.8 IMPERVIOUS TRIBUTARY RATIO EXCEEDS 2.0 (Contributing Imperviuos Area / Permeable Pavement Ratio) F) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 522 cu ft (WQCV = (0.8 * (0.91 * i3 - 1.19 * i2 + 0.78 * i) / 12) * Area) G) Is flood control volume being added? Provide overflow to carry runoff directly into the reservoir layer to ensure use of flood control volume regardless FCHA Permanent Supportive Housing Fort Collins, CO Design Procedure Form: Permeable Pavement Systems (PPS) D. Harner JVAInc. November 20, 2013 Choose One No Infiltration Partial Infiltration Section Full Infiltration Section Choose One YES NO Choose One PICP Concrete Grid Pavement Pervious Concrete Porous Gravel of flood control volume regardless H) Total Volume Needed VTotal = 10,136 cu ft of infiltration rates. 3. Depth of Reservoir A) Minimum Depth of Reservoir Dmin = 16.0 inches (Minimum recommended depth is 6 inches) B) Is the slope of the reservoir/subgrade interface equal to 0%? C) Porosity (Porous Gravel Pavement < 0.3, Others < 0.40) P = 0.40 D) Slope of the Base Course/Subgrade Interface S = 0.010 ft / ft E) Length Between Lateral Flow Barriers (max = 57.78 ft.) L = 70.0 ft LENGTH TOO LONG F) Volume Provided Based on Depth of Base Course V = 1,626 cu ft VOLUME PROVIDED < Flat or Stepped: V = P * ((Dmin-1)/12) * Area TOTAL VOLUME NEEDED Sloped: V = P * [(Dmin - (Dmin - 6*SL-1)) / 12] * Area Volume assumes uniform slope & lateral flow barrier spacing. Calculate the volume of each cell individually when this varies. Choose One YES- Flat or Stepped Installation NO- Sloped Installation APPENDIX B – HYDRAULIC COMPUTATIONS 1. UD-SEWER Report INLET AT PARKING MEDIAN WEST PARKING MEDIAN PLAN VIEW 8" PERF UD 12" STORM DRAIN TO DETENTION POND 0.00 17.40 34.80 52.20 69.60 87.00 104.40 121.80 139.20 156.60 174.00 4988.05 4988.85 4989.65 4990.45 4991.25 4992.05 4992.85 4993.65 4994.45 4995.25 HGL EGL WEST PARKING MEDIAN STORM PIPE PROFILE OUTLET TO DETENTION POND INLET IN PARKING MEDIAN Program: UDSEWER Math Model Interface 2.0.3.10 Run Date: 11/20/2013 2:41:04 PM UDSewer Results Summary Project Title: FCHA Redtail West Storm System Project Description: Default system System Input Summary Rainfall Parameters Rainfall Return Period: 100 Rainfall Calculation Method: Formula One Hour Depth (in): 2.86 Rainfall Constant "A": 28.5 Rainfall Constant "B": 10 Rainfall Constant "C": 0.786 Rational Method Constraints Minimum Urban Runoff Coeff.: 0.20 Maximum Rural Overland Len. (ft): 500 Maximum Urban Overland Len. (ft): 300 Used UDFCD Tc. Maximum: No Sizer Constraints Minimum Sewer Size (in): 18.00 Maximum Depth to Rise Ratio: 0.90 Maximum Flow Velocity (fps): 18.0 Minimum Flow Velocity (fps): 2.0 Backwater Calculations: Tailwater Elevation (ft): 4991.50 Manhole Input Summary: Given Flow Sub Basin Information Element Name Ground Elevation (ft) Total Known Flow (cfs) Local Contribution (cfs) Drainage Area (Ac.) Runoff Coefficient 5yr Coefficient Overland Length (ft) Overland Slope (%) Gutter Length (ft) MH 1 SWR 1 - 1 4994.60 5.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MH 2 SWR 2 - 1 4996.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Manhole Output Summary: Local Contribution Total Design Flow Element Name Overland Time (min) Gutter Time (min) Basin Tc (min) Intensity (in/hr) Local Contrib (cfs) Coeff. Area Intensity (in/hr) Manhole Tc (min) Peak Flow (cfs) Comment OUTFALL 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.30 Surface Water Present (Upstream) MH 1 SWR 1 - 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.30 Surface Water Present (Downstream) MH 2 SWR 2 - 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Sewer Input Summary: Elevation Loss Coefficients Given Dimensions Element Name Sewer Length (ft) Downstream Invert (ft) Slope (%) Upstream Invert (cfs) MH 1 SWR 1 - 1 5.30 CIRCULAR 12.00 in 12.00 in 18.00 in 18.00 in 12.00 in 12.00 in 0.79 Height is too small. Width is too small. Existing height is smaller than the suggested height. Existing width is smaller than the suggested width. MH 2 SWR 2 - 1 1.00 CIRCULAR 8.00 in 8.00 in 18.00 in 18.00 in 8.00 in 8.00 in 0.35 Height is too small. Width is too small. Existing height is smaller than the suggested height. Existing width is smaller than the suggested width. Calculated diameter was determined by sewer hydraulic capacity rounded up to the nearest commercially available size. Sewer sizes should not decrease downstream. All hydraulics where calculated using the 'Used' parameters. Grade Line Summary: Tailwater Elevation (ft): 4991.50 Invert Elev. Downstream Manhole Losses HGL EGL Element Name Downstream (ft) Upstream (ft) Bend Loss (ft) Lateral Loss (ft) Downstream (ft) Upstream (ft) Downstream (ft) Friction Loss (ft) Upstream (ft) MH 1 SWR 1 - 1 4988.77 4991.72 0.00 0.00 4991.50 4993.02 4992.21 1.52 4993.73 MH 2 SWR 2 - 1 4991.92 4992.97 0.17 0.00 4993.77 4994.48 4993.89 0.72 4994.61 Bend and Lateral losses only apply when there is an outgoing sewer. The system outfall, sewer #0, is not considered a sewer. Bend loss = Bend K * V_fi ^ 2/(2*g) Lateral loss = V_fo ^ 2/(2*g)- Junction Loss K * V_fi ^ 2/(2*g). Friction loss is always Upstream EGL - Downstream EGL. Excavation Estimate: MH 2 SWR 2 - 1 105.00 1.67 4.00 3.94 5.69 3.15 1.87 6.39 3.50 2.22 55.44 Sewer Too Shallow Total earth volume for sewer trenches = 84 cubic yards. The trench was estimated to have a bottom width equal to the outer pipe diameter plus 36 inches. If the calculated width of the trench bottom is less than the minimum acceptable width, the minimum acceptable width was used. The sewer wall thickness is equal to: (equivalent diameter in inches/12)+1 inches The sewer bedding thickness is equal to: Four inches for pipes less than 33 inches. Six inches for pipes less than 60 inches. Eight inches for all larger sizes. UDSEWER Math Model Interface Results: FCHA Redtail West Storm S... file:///V:/1980c Fort Collins Housing Authority/Calculations/Storm Wate... 4 of 4 11/20/2013 2:43 PM POND OUTLET STRUCTURE PIPE OUTFALL TO EXISTING POND B DETENTION POND OUTLET PIPING 0.00 14.10 28.20 42.30 56.40 70.50 84.60 98.70 112.80 126.90 4983.47 4984.47 4985.47 4986.47 4987.47 4988.47 4989.47 4990.47 4991.47 4992.47 HGL EGL POND OUTLET STORM PROFILE POND OUTLET STRUCTURE PIPE OUTLET TO EXISTING POND B Program: UDSEWER Math Model Interface 2.0.3.10 Run Date: 11/22/2013 9:26:20 AM UDSewer Results Summary Project Title: FCHA Redtail West Storm System Project Description: Default system System Input Summary Rainfall Parameters Rainfall Return Period: 100 Rainfall Calculation Method: Formula One Hour Depth (in): 2.86 Rainfall Constant "A": 28.5 Rainfall Constant "B": 10 Rainfall Constant "C": 0.786 Rational Method Constraints Minimum Urban Runoff Coeff.: 0.20 Maximum Rural Overland Len. (ft): 500 Maximum Urban Overland Len. (ft): 300 Used UDFCD Tc. Maximum: No Sizer Constraints Minimum Sewer Size (in): 15.00 Maximum Depth to Rise Ratio: 0.90 Maximum Flow Velocity (fps): 18.0 Minimum Flow Velocity (fps): 2.0 Backwater Calculations: Tailwater Elevation (ft): 4984.35 Manhole Input Summary: Given Flow Sub Basin Information Element Name Ground Elevation (ft) Total Known Flow (cfs) Local Contribution (cfs) Drainage Area (Ac.) Runoff Coefficient 5yr Coefficient Overland Length (ft) Overland Slope (%) Gutter Length (ft) MH 1 SWR 1 - 1 4993.11 1.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MH 2 SWR 2 - 1 4993.00 1.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Manhole Output Summary: Local Contribution Total Design Flow Element Name Overland Time (min) Gutter Time (min) Basin Tc (min) Intensity (in/hr) Local Contrib (cfs) Coeff. Area Intensity (in/hr) Manhole Tc (min) Peak Flow (cfs) Comment OUTFALL 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.13 MH 1 SWR 1 - 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.13 MH 2 SWR 2 - 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.13 Sewer Input Summary: Elevation Loss Coefficients Given Dimensions Element Name Sewer Length (ft) Downstream Invert (ft) Slope (%) Upstream Invert (ft) Mannings n Bend Loss Lateral Loss Cross Section Rise MH 1 SWR 1 - 1 1.13 CIRCULAR 12.00 in 12.00 in 15.00 in 15.00 in 12.00 in 12.00 in 0.79 Height is too small. Width is too small. Existing height is smaller than the suggested height. Existing width is smaller than the suggested width. MH 2 SWR 2 - 1 1.13 CIRCULAR 12.00 in 12.00 in 15.00 in 15.00 in 12.00 in 12.00 in 0.79 Height is too small. Width is too small. Existing height is smaller than the suggested height. Existing width is smaller than the suggested width. Calculated diameter was determined by sewer hydraulic capacity rounded up to the nearest commercially available size. Sewer sizes should not decrease downstream. All hydraulics where calculated using the 'Used' parameters. Grade Line Summary: Tailwater Elevation (ft): 4984.35 Invert Elev. Downstream Manhole Losses HGL EGL Element Name Downstream (ft) Upstream (ft) Bend Loss (ft) Lateral Loss (ft) Downstream (ft) Upstream (ft) Downstream (ft) Friction Loss (ft) Upstream (ft) MH 1 SWR 1 - 1 4984.35 4984.81 0.00 0.00 4984.80 4985.31 4984.97 0.47 4985.44 MH 2 SWR 2 - 1 4985.01 4985.23 0.01 0.00 4985.46 4985.73 4985.63 0.23 4985.86 Bend and Lateral losses only apply when there is an outgoing sewer. The system outfall, sewer #0, is not considered a sewer. Bend loss = Bend K * V_fi ^ 2/(2*g) Lateral loss = V_fo ^ 2/(2*g)- Junction Loss K * V_fi ^ 2/(2*g). Friction loss is always Upstream EGL - Downstream EGL. Excavation Estimate: The trench side slope is 1.0 ft/ft Total earth volume for sewer trenches = 299 cubic yards. The trench was estimated to have a bottom width equal to the outer pipe diameter plus 36 inches. If the calculated width of the trench bottom is less than the minimum acceptable width, the minimum acceptable width was used. The sewer wall thickness is equal to: (equivalent diameter in inches/12)+1 inches The sewer bedding thickness is equal to: Four inches for pipes less than 33 inches. Six inches for pipes less than 60 inches. Eight inches for all larger sizes. UDSEWER Math Model Interface Results: FCHA Redtail West Storm S... file:///V:/1980c Fort Collins Housing Authority/Calculations/Storm Wate... 4 of 4 11/22/2013 9:26 AM APPENDIX C – REFERENCED INFORMATION 1. Drainage and Erosion Control Report for Redtail This unofficial copy was downloaded on Jul-18-2013 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA APPENDIX D – UTILITY SITE PLANS 1. Erosion Control Plan (CE1.0) 2. SWMP and Erosion Control Details (CE1.1) 3. Grading and Drainage Plan (C1.0 to C1.3) 4. Storm Drain Plan (C1.4) 5. Drainage Details (CD1.0, CD1.2) LOT 12 5,340 sq.ft. 5033 FOSSIL BLVD TRACT I 1,739 sq. ft. TRACT F 63,458 sq.ft. 1.457 acres CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Date Environmental Planner 678',2&203/(7,9$,1&&23<5,*+7‹ CIVIL: MECHANICAL/PLUMBING: STRUCTURAL: ARCHITECT: STUDIO COMPLETIVA ELECTRICAL: LANDSCAPE ARCHITECT: azur ground JVA KL&A MOUNTAIN AIRE wAyne's ELECTRIC REDTAIL PONDS PSH FORT COLLINS HOUSING AUTHORITY CE1.0 CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Date Environmental Planner 678',2&203/(7,9$,1&&23<5,*+7‹ CIVIL: MECHANICAL/PLUMBING: STRUCTURAL: ARCHITECT: STUDIO COMPLETIVA ELECTRICAL: LANDSCAPE ARCHITECT: azur ground JVA KL&A MOUNTAIN AIRE wAyne's ELECTRIC REDTAIL PONDS PSH FORT COLLINS HOUSING AUTHORITY CE1.1 LOT 12 5,340 sq.ft. 5033 FOSSIL BLVD TRACT F 63,458 sq.ft. 1.457 acres CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Date Environmental Planner 678',2&203/(7,9$,1&&23<5,*+7‹ CIVIL: MECHANICAL/PLUMBING: STRUCTURAL: ARCHITECT: STUDIO COMPLETIVA ELECTRICAL: LANDSCAPE ARCHITECT: azur ground JVA KL&A MOUNTAIN AIRE wAyne's ELECTRIC REDTAIL PONDS PSH FORT COLLINS HOUSING AUTHORITY C1.0 TRACT I 1,739 sq. ft. CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Date Environmental Planner 678',2&203/(7,9$,1&&23<5,*+7‹ CIVIL: MECHANICAL/PLUMBING: STRUCTURAL: ARCHITECT: STUDIO COMPLETIVA ELECTRICAL: LANDSCAPE ARCHITECT: azur ground JVA KL&A MOUNTAIN AIRE wAyne's ELECTRIC REDTAIL PONDS PSH FORT COLLINS HOUSING AUTHORITY C1.1 CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Date Environmental Planner 678',2&203/(7,9$,1&&23<5,*+7‹ CIVIL: MECHANICAL/PLUMBING: STRUCTURAL: ARCHITECT: STUDIO COMPLETIVA ELECTRICAL: LANDSCAPE ARCHITECT: azur ground JVA KL&A MOUNTAIN AIRE wAyne's ELECTRIC REDTAIL PONDS PSH FORT COLLINS HOUSING AUTHORITY C1.2 CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Date Environmental Planner 678',2&203/(7,9$,1&&23<5,*+7‹ CIVIL: MECHANICAL/PLUMBING: STRUCTURAL: ARCHITECT: STUDIO COMPLETIVA ELECTRICAL: LANDSCAPE ARCHITECT: azur ground JVA KL&A MOUNTAIN AIRE wAyne's ELECTRIC REDTAIL PONDS PSH FORT COLLINS HOUSING AUTHORITY C1.3 LOT 12 5,340 sq.ft. 5033 FOSSIL BLVD TRACT F 63,458 sq.ft. 1.457 acres CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Date Environmental Planner 678',2&203/(7,9$,1&&23<5,*+7‹ CIVIL: MECHANICAL/PLUMBING: STRUCTURAL: ARCHITECT: STUDIO COMPLETIVA ELECTRICAL: LANDSCAPE ARCHITECT: azur ground JVA KL&A MOUNTAIN AIRE wAyne's ELECTRIC REDTAIL PONDS PSH FORT COLLINS HOUSING AUTHORITY C1.4 CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Date Environmental Planner 678',2&203/(7,9$,1&&23<5,*+7‹ CIVIL: MECHANICAL/PLUMBING: STRUCTURAL: ARCHITECT: STUDIO COMPLETIVA ELECTRICAL: LANDSCAPE ARCHITECT: azur ground JVA KL&A MOUNTAIN AIRE wAyne's ELECTRIC REDTAIL PONDS PSH FORT COLLINS HOUSING AUTHORITY CD1.0 CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Date Environmental Planner 678',2&203/(7,9$,1&&23<5,*+7‹ CIVIL: MECHANICAL/PLUMBING: STRUCTURAL: ARCHITECT: STUDIO COMPLETIVA ELECTRICAL: LANDSCAPE ARCHITECT: azur ground JVA KL&A MOUNTAIN AIRE wAyne's ELECTRIC REDTAIL PONDS PSH FORT COLLINS HOUSING AUTHORITY CD1.1 C C A A B B SECTION C-C SECTION A-A SECTION B-B WELL SCREEN FLOW CONTROL PLATE 6" PLAN 1 GENERAL NOTES SECTION D-D WQ D A A OPP. CLR. ABBREVIATIONS @ # Wp Wo TYP. DIA. O.C. MAX. MIN. LEGEND INV. WQ ELEV. 6" Ls Ws Ws/2 Ws/2 1' Ls 3'-6" 6" 6" 6" VARIES VARIES 6" D 6" 4" Wp Wo Wo 1' Ws Wo 2'-6" 3" CLR. CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Date Environmental Planner 678',2&203/(7,9$,1&&23<5,*+7‹ CIVIL: MECHANICAL/PLUMBING: STRUCTURAL: ARCHITECT: STUDIO COMPLETIVA ELECTRICAL: LANDSCAPE ARCHITECT: azur ground JVA KL&A MOUNTAIN AIRE wAyne's ELECTRIC REDTAIL PONDS PSH FORT COLLINS HOUSING AUTHORITY CD1.2 The minimum trench width is 2.00 ft Downstream Upstream Element Name Length (ft) Wall (in) Bedding (in) Bottom Width (ft) Top Width (ft) Trench Depth (ft) Cover (ft) Top Width (ft) Trench Depth (ft) Cover (ft) Volume (cu. yd) Comment MH 1 SWR 1 - 1 95.00 2.00 4.00 4.33 8.84 4.92 3.25 16.60 8.80 7.13 179.71 MH 2 SWR 2 - 1 46.00 2.00 4.00 4.33 16.20 8.60 6.93 15.54 8.27 6.60 119.01 UDSEWER Math Model Interface Results: FCHA Redtail West Storm S... file:///V:/1980c Fort Collins Housing Authority/Calculations/Storm Wate... 3 of 4 11/22/2013 9:26 AM (ft or in) Span (ft or in) MH 1 SWR 1 - 1 95.00 4984.35 0.5 4984.81 0.013 0.03 0.00 CIRCULAR 12.00 in 12.00 in MH 2 SWR 2 - 1 46.00 4985.01 0.5 4985.23 0.013 0.20 0.00 CIRCULAR 12.00 in 12.00 in Sewer Flow Summary: Full Flow Capacity Critical Flow Normal Flow Element Name Flow (cfs) Velocity (fps) Depth (in) Velocity (fps) Depth (in) Velocity (fps) Froude Number Flow Condition Flow (cfs) Surcharged Length (ft) Comment MH 1 SWR 1 - 1 2.49 3.16 5.37 3.32 5.68 3.09 0.90 Subcritical 1.13 0.00 MH 2 SWR 2 - 1 2.47 3.15 5.37 3.32 5.69 3.08 0.89 Subcritical 1.13 0.00 A Froude number of 0 indicates that pressured flow occurs (adverse slope or undersized pipe). If the sewer is not pressurized, full flow represents the maximum gravity flow in the sewer. If the sewer is pressurized, full flow represents the pressurized flow conditions. Sewer Sizing Summary: Existing Calculated Used Element Name Peak Flow (cfs) Cross Section Rise Span Rise Span Rise Span Area (ft^2) Comment UDSEWER Math Model Interface Results: FCHA Redtail West Storm S... file:///V:/1980c Fort Collins Housing Authority/Calculations/Storm Wate... 2 of 4 11/22/2013 9:26 AM Gutter Velocity (fps) OUTFALL 1 4988.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 UDSEWER Math Model Interface Results: FCHA Redtail West Storm S... file:///V:/1980c Fort Collins Housing Authority/Calculations/Storm Wate... 1 of 4 11/22/2013 9:26 AM The trench side slope is 1.0 ft/ft The minimum trench width is 2.00 ft Downstream Upstream Element Name Length (ft) Wall (in) Bedding (in) Bottom Width (ft) Top Width (ft) Trench Depth (ft) Cover (ft) Top Width (ft) Trench Depth (ft) Cover (ft) Volume (cu. yd) Comment MH 1 SWR 1 - 1 69.00 2.00 4.00 4.33 0.00 0.50 0.00 5.76 3.38 1.71 28.59 Sewer Too Shallow UDSEWER Math Model Interface Results: FCHA Redtail West Storm S... file:///V:/1980c Fort Collins Housing Authority/Calculations/Storm Wate... 3 of 4 11/20/2013 2:43 PM (ft) Mannings n Bend Loss Lateral Loss Cross Section Rise (ft or in) Span (ft or in) MH 1 SWR 1 - 1 69.00 4988.77 4.3 4991.72 0.013 1.32 0.00 CIRCULAR 12.00 in 12.00 in MH 2 SWR 2 - 1 105.00 4991.92 1.0 4992.97 0.013 1.32 0.00 CIRCULAR 8.00 in 8.00 in Sewer Flow Summary: Full Flow Capacity Critical Flow Normal Flow Element Name Flow (cfs) Velocity (fps) Depth (in) Velocity (fps) Depth (in) Velocity (fps) Froude Number Flow Condition Flow (cfs) Surcharged Length (ft) Comment MH 1 SWR 1 - 1 7.39 9.41 11.17 6.96 7.52 10.23 2.46 Pressurized 5.30 69.00 MH 2 SWR 2 - 1 1.21 3.47 5.69 3.76 5.54 3.88 1.06 Pressurized 1.00 105.00 A Froude number of 0 indicates that pressured flow occurs (adverse slope or undersized pipe). If the sewer is not pressurized, full flow represents the maximum gravity flow in the sewer. If the sewer is pressurized, full flow represents the pressurized flow conditions. Sewer Sizing Summary: Existing Calculated Used Element Name Peak Flow Cross Section Rise Span Rise Span Rise Span Area (ft^2) Comment UDSEWER Math Model Interface Results: FCHA Redtail West Storm S... file:///V:/1980c Fort Collins Housing Authority/Calculations/Storm Wate... 2 of 4 11/20/2013 2:43 PM Gutter Velocity (fps) OUTFALL 1 4988.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 UDSEWER Math Model Interface Results: FCHA Redtail West Storm S... file:///V:/1980c Fort Collins Housing Authority/Calculations/Storm Wate... 1 of 4 11/20/2013 2:43 PM Permeable Pavers UD-BMP_v3.02.xls, PPS 11/20/2013, 8:04 PM WQCV AVAILABLE IN ADDITION TO THE WQCV PROVIDED IN THE POND DETENTION VOLUME UTILIZED IN ADDITION TO VOLUME IN THE DETENTION POND. = ∆ ⇒ = 2 2 π o o A D = 576 1980c WQCV (Current).xls - Outlet Orifice Plate Sizing Page 6 of 6 JVA, Inc. DISCHARGE (cfs) STAGE - DISCHARGE CURVE FOR THE PROPOSED DETENTION POND OVERFLOW SPILLWAY FOR SOUTH POND WQCV.xls - Spillway Page 4 of 6 JVA, Inc. ELEVATION (FT) DETENTION POND VOLUME (AC-FT) DETENTION POND VOLUME VERSUS ELEVATION 1980c WQCV (Current).xls - Pond Stage Storage #1 Page 3 of 6 JVA, Inc. 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A Routing 5: Water flows separately through WQCV plate, #1 horizontal opening, #2 horizontal opening, #1 vertical opening, and #2 vertical opening. The sum of all four will be applied to culvert sheet. STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL) Current Routing Order is #5 W.S. EL. WQ W.S. EL. Minor W.S. EL. Major WQ H1 H2 V1 V2 Routing Order #1 (Standard) V1 W.S. EL. WQ W.S. EL. Design Storm WQ H1 Routing Order #3 (Single Stage) Routing Order #4 V2 V1 H1 WQ W.S. EL. Major W.S. EL. Minor W.S. EL. WQ W.S. EL. Emergency Spillway Emergency Overflow into Pipe- H2 V2 H1 WQ W.S. EL. Major W.S. EL. Minor W.S. EL. WQ V1 Routing Order #2 UD-Detention_v2.33 (2-yr release WEST).xls, Outlet 11/20/2013, 8:13 PM 120 0.51 0.051 0.54 0.61 0.101 -0.050 120 1.77 0.334 0.54 0.61 0.101 0.233 125 0.49 0.052 0.54 0.61 0.105 -0.053 125 1.72 0.337 0.54 0.61 0.105 0.233 130 0.48 0.052 0.54 0.61 0.109 -0.057 130 1.67 0.341 0.54 0.61 0.109 0.232 135 0.47 0.053 0.54 0.61 0.113 -0.060 135 1.63 0.345 0.54 0.61 0.113 0.232 140 0.45 0.053 0.54 0.60 0.117 -0.063 140 1.58 0.348 0.54 0.60 0.117 0.231 145 0.44 0.054 0.53 0.60 0.121 -0.067 145 1.54 0.351 0.53 0.60 0.121 0.231 150 0.43 0.054 0.53 0.60 0.124 -0.070 150 1.50 0.354 0.53 0.60 0.124 0.230 155 0.42 0.055 0.53 0.60 0.128 -0.074 155 1.47 0.357 0.53 0.60 0.128 0.229 160 0.41 0.055 0.53 0.60 0.132 -0.077 160 1.43 0.360 0.53 0.60 0.132 0.228 165 0.40 0.056 0.53 0.60 0.136 -0.081 165 1.40 0.363 0.53 0.60 0.136 0.227 170 0.39 0.056 0.53 0.60 0.140 -0.084 170 1.37 0.366 0.53 0.60 0.140 0.226 175 0.38 0.056 0.53 0.60 0.144 -0.087 175 1.34 0.369 0.53 0.60 0.144 0.225 180 0.38 0.057 0.53 0.60 0.148 -0.091 180 1.31 0.371 0.53 0.60 0.148 0.224 185 0.37 0.057 0.53 0.60 0.152 -0.094 185 1.29 0.374 0.53 0.60 0.152 0.222 190 0.36 0.058 0.53 0.59 0.156 -0.098 190 1.26 0.377 0.53 0.59 0.156 0.221 195 0.35 0.058 0.53 0.59 0.159 -0.101 195 1.24 0.379 0.53 0.59 0.159 0.220 200 0.35 0.058 0.52 0.59 0.163 -0.105 200 1.21 0.381 0.52 0.59 0.163 0.218 205 0.34 0.059 0.52 0.59 0.167 -0.109 205 1.19 0.384 0.52 0.59 0.167 0.217 210 0.34 0.059 0.52 0.59 0.171 -0.112 210 1.17 0.386 0.52 0.59 0.171 0.215 215 0.33 0.059 0.52 0.59 0.175 -0.116 215 1.15 0.388 0.52 0.59 0.175 0.213 220 0.32 0.060 0.52 0.59 0.179 -0.119 220 1.13 0.391 0.52 0.59 0.179 0.212 225 0.32 0.060 0.52 0.59 0.183 -0.123 225 1.11 0.393 0.52 0.59 0.183 0.210 230 0.31 0.060 0.52 0.59 0.187 -0.126 230 1.09 0.395 0.52 0.59 0.187 0.208 235 0.31 0.061 0.52 0.59 0.191 -0.130 235 1.08 0.397 0.52 0.59 0.191 0.206 240 0.30 0.061 0.52 0.59 0.194 -0.133 240 1.06 0.399 0.52 0.59 0.194 0.205 245 0.30 0.061 0.52 0.59 0.198 -0.137 245 1.04 0.401 0.52 0.59 0.198 0.203 250 0.29 0.062 0.52 0.59 0.202 -0.141 250 1.03 0.403 0.52 0.59 0.202 0.201 255 0.29 0.062 0.52 0.59 0.206 -0.144 255 1.01 0.405 0.52 0.59 0.206 0.199 260 0.29 0.062 0.52 0.59 0.210 -0.148 260 1.00 0.407 0.52 0.59 0.210 0.197 265 0.28 0.063 0.52 0.59 0.214 -0.151 265 0.98 0.409 0.52 0.59 0.214 0.195 270 0.28 0.063 0.52 0.59 0.218 -0.155 270 0.97 0.411 0.52 0.59 0.218 0.193 275 0.27 0.063 0.52 0.59 0.222 -0.159 275 0.96 0.412 0.52 0.59 0.222 0.191 280 0.27 0.063 0.52 0.59 0.226 -0.162 280 0.94 0.414 0.52 0.59 0.226 0.189 285 0.27 0.064 0.52 0.58 0.230 -0.166 285 0.93 0.416 0.52 0.58 0.230 0.187 290 0.26 0.064 0.52 0.58 0.233 -0.170 290 0.92 0.418 0.52 0.58 0.233 0.184 295 0.26 0.064 0.52 0.58 0.237 -0.173 295 0.91 0.419 0.52 0.58 0.237 0.182 300 0.26 0.064 0.52 0.58 0.241 -0.177 300 0.89 0.421 0.52 0.58 0.241 0.180 Mod. FAA Minor Storage Volume (cubic ft.) = 175 Mod. FAA Major Storage Volume (cubic ft.) = 10,136 Mod. FAA Minor Storage Volume (acre-ft.) = 0.0040 Mod. FAA Major Storage Volume (acre-ft.) = 0.2327 DETENTION VOLUME BY THE MODIFIED FAA METHOD FCHA - PSH A1 AND A2 ROUTED TO POND Determination of MAJOR Detention Volume Using Modified FAA Method (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.33, Released August 2013 Determination of MINOR Detention Volume Using Modified FAA Method UD-Detention_v2.33 (2-yr release WEST).xls, Modified FAA 11/20/2013, 8:13 PM 20 2.0 1.8 5.8 264 11.5 5.8 A2 2 1.17 0.53 100 2.0% 8.3 330 2.0% Grassed waterway 15 2.1 2.6 10.9 430 12.4 10.9 A3 3 0.22 0.34 74 3.0% 8.3 75 25.0% Short Pasture and lawns 7 3.5 0.4 8.6 149 10.8 8.6 A4 4 0.70 0.37 100 2.0% 10.7 255 6.0% Short Pasture and lawns 7 1.7 2.5 13.2 355 12.0 12.0 Initial Overland Time (ti ) Travel Time (tt ) tt =Length/(Velocity x 60) tc Urbanized Check ON 1980c - Rational Calculations.xlsx Developed Tc Page 3 of 5 Velocity (fps) tt (min) Time of Conc ti + tt = tc Total Length (ft) tc=(L/180)+ 10 (min.) Min tc H1 1 751 0 0 417 0 0 6,900 0 8,068 0.19 13.1% 0.33 0.33 0.33 0.39 50 4.0% 6.3 50 4.0% Nearly bare ground 10 2.0 0.4 6.7 100 10.6 6.7 H2 2 0 0 0 0 0 0 8,270 0 8,270 0.19 2.0% 0.25 0.25 0.25 0.31 45 4.0% 6.6 45 4.0% Nearly bare ground 10 2.0 0.4 7.0 90 10.5 7.0 H3 3 0 0 0 0 0 3,382 3,846 32,494 39,722 0.91 2.0% 0.33 0.33 0.33 0.41 110 2.0% 11.8 490 10.0% Nearly bare ground 10 3.2 2.6 14.4 600 13.3 13.3 H4 4 0 0 0 0 0 11,701 40,517 19,503 71,721 1.65 2.0% 0.27 0.27 0.27 0.34 130 1.5% 15.2 400 10.0% Nearly bare ground 10 3.2 2.1 17.3 530 12.9 12.9 Routed Together H1+H2 1 751 0 0 417 0 0 15,170 0 16,338 0.38 7.5% 0.29 0.29 0.29 0.35 50 4.0% 6.6 50 4.0% Nearly bare ground 10 2.0 0.4 7.0 100 10.6 7.0 H3+H4 4 0 0 0 0 0 15,083 44,363 51,997 111,443 2.56 2.0% 0.29 0.29 0.29 0.36 110 2.0% 12.4 540 10.0% Nearly bare ground 10 3.2 2.8 15.2 650 13.6 13.6 TOTAL SITE 751 0 0 417 0 15,083 59,533 51,997 127,781 2.93 2.7% 0.29 0.29 0.29 0.36 Initial Overland Time (ti) ti=0.395(1.1-C5)L1/2S-1/3 Travel Time (tt) tt=Length/(Velocity x 60) tc Urbanized Check ON Runoff Coeff's I = (28.5 P1) / ((10 + TC) 0.786651) Basin Name Design Point Time of Conc (tc) C2 C5 C10 C100 2 5 10 100 ATotal (sf) ATotal (ac) Q2 Q5 Q10 Q100 2-YR CFS/A C H1 1 6.7 0.33 0.33 0.33 0.39 2.55 3.55 4.36 8.90 8,068 0.19 0.16 0.22 0.26 0.65 0.84 H2 2 7.0 0.25 0.25 0.25 0.31 2.52 3.50 4.30 8.78 8,270 0.19 0.12 0.17 0.20 0.52 0.63 H3 3 13.3 0.33 0.33 0.33 0.41 1.97 2.73 3.35 6.85 39,722 0.91 0.59 0.82 1.00 2.56 0.64 H4 4 12.9 0.27 0.27 0.27 0.34 1.99 2.77 3.40 6.94 71,721 1.65 0.88 1.23 1.51 3.84 0.54 Developed release rate for basin A1 and A2 TOTAL SITE 127,781 2.93 1.75 2.42 2.98 7.57 0.60 1.13 cfs WESTERN Basins H1 & H2 Routed Together H1+H2 1 7.0 0.29 0.29 0.29 0.35 2.52 3.50 4.30 8.78 16,338 0.38 0.27 0.38 0.46 1.16 EASTERN Basins H3 & H4 Routed Together H3+H4 4 13.6 0.29 0.29 0.29 0.36 1.95 2.70 3.32 6.78 111,443 2.56 1.44 2.00 2.46 6.29 Runoff Coeff's Rainfall Intensities (in/hr) Area Flow Rates (cfs) 1980c - Rational Calculations.xlsx Historic Page 1 of 5 Survey Area Data: Version 7, May 1, 2009 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Nov 18, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (Fort Collins Housing Authority) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/18/2013 Page 2 of 4