Loading...
HomeMy WebLinkAboutLAGRANGE @ RIGDEN FARM - MAJOR AMENDMENT - MJA130005 - REPORTS - DRAINAGE REPORT1 City of Fort Collins Engineering Review 281 North College Fort Collins, Colorado 80522 July 3, 2013 RE: Drainage Memorandum Lagrange at Rigden Farm Fort Collins, Colorado Project Number: 374-008 Dear Staff: Northern Engineering Services is pleased to submit this Drainage Memorandum in conjunction with the PDP for Lagrange at Rigden Farm for your consideration. The footprints of the buildings within Lagrange have been modified next to the existing pond and per the Cities request a grading plan is being submitted. The grading was revised to address the new footprint. The resulting grading changes have had no major effect on the flow volume to the ultimate drainage destination (the inlet for basin 104b, the inlet for Basins 111a- 111f or the pond for basin 105a-105b). Please see the drainage and erosion control plan for reference. There will be no revisions to the storm infrastructure or the existing pond with this development. We feel that the current proposed grading and drainage plan is in compliance with the concepts shown in the approved Final Drainage and Erosion Control Study for Rigden Farm Second Filing. If you have any questions, please feel free to contact me at your earliest convenience. Sincerely, NORTHERN ENGINEERING SERVICES, INC. James Prelog, P.E.