HomeMy WebLinkAboutFOOTHILLS MALL REDEVELOPMENT, PHASE TWO - FDP - FDP130054 - SUBMITTAL DOCUMENTS - ROUND 1 - SITE PLAN (7)A104
CONNECTIVITY
PEDESTRIAN
EXHIBIT
LEGEND
*
ENTERTAINMENT/THEATER ENTRANCE
PEDESTRIAN ROUTE
DESIGNATED SHARED BICYCLE LANES
PATH TO BRT
TRANSPORTATION NODE
*
PATH TO BRT
PROPOSED HARD SURFACE MULTI USE
MAX BRT
TRANSIT HUB
BUS STOP
EXISTING CROSSWALK
*
BIKE RACK LOCATIONS
BUS STOP
BUS STOP
REMINGTON ST.
MATHEWS ST.
J.F.K. PARKWAY
E. MONROE DRIVE
*PROPOSED
PROPOSED
PROPOSED
ROUTE TO BRT AT
SWALLOW RD
ROUTE TO BRT AT
HORSETOOTH RD
PATH TO BRT AT
SWALLOW RD
ROUTE TO BRT AT
HORSETOOTH RD *
PEDESTRIAN
UNDERPASS
DESIGNATED BICYCLE ONLY LANES
E. SWALLOW RD.
STANFORD RD.
S. COLLEGE AVE.
E. MONROE DRIVE
0’
SCALE: 1”=150’
75’ 150’ 300’