Loading...
HomeMy WebLinkAboutSPRING CREEK FARMS NORTH FOURTH FILING - PDP130014 - AGENDA -Spring Creek Farms Fourth Filing Modification of Standards Request Requested Modifications of Standards for: 4.27(D)(2) Secondary Uses in E zone 4.27(D)(5) Density/Intensity in E zone 4.27(B)(3)(a)(1) Single-family detached dwellings located on lots containing no more than six thousand (6,000) square feet. Standards 4.27(D)(2) Secondary Uses in E zone Secondary Uses. All secondary uses shall be integrated both in function and appearance into a larger employment district development plan that emphasizes primary uses. A secondary use shall be subject to administrative review or Planning and Zoning Board review as required for such use in Section 4.27(B). The following permitted uses shall be considered secondary uses in this zone district and together shall occupy no more than twenty-five (25) percent of the total gross area of the development plan. 4.27(D)(5) Density/Intensity in E zone Density/Intensity. All residential development in the E Employment District shall have an overall minimum average density of seven (7) dwelling units per net acre of residential land. 4.27(B)(3)(a)(1) Single-family detached dwellings located on lots containing no more than six thousand (6,000) square feet. The following uses are permitted in the E District, subject to review by the Planning and Zoning Board: (a) Residential Uses: 1. Single-family detached dwellings located on lots containing no more than six thousand (6,000) square feet. Discussion These three modification requests are centered on the desire to extend the single family detached residential development proposed on the LMN portion of the Spring Creek Farms North ODP (parcel A1) into a portion of the E employment zone district (parcel C on the ODP). The E zone district on the Spring Creek Farms ODP is a narrow zoning district sandwiched between the LMN and MMN portions of Spring Creek Farms North and I industrial zoning to the north. Per the ODP, the gross area of this E zone district is 6.2 acres. The portion of this that is under consideration is a 2.18 acre piece (shaded in gray on the graphic below) that is directly north of Parcel A1, and is separated from the rest of the Parcel C by the extension of Joseph Allen Drive to the North. Spring Creek Farms North Forth Filing Modification of Standards 1 Existing ODP with the Subject Site Highlighted By the extension of Joseph Allen Drive, the E zone area has been divided into two parcels, making it virtually impossible to get a single employer use onto the site. The extension of Joseph Allen Drive was requested and paid for by the CIty of Fort Colins to satisfy conditions for the project to the north of Spring Creek Farms. As such, the landowner has been forced to market the sites independently. The site under consideration is removed from the visibility of Timberline Drive making it even less desirable for primary uses, and is further constrained by the existing irrigation easement along the southern portion of the site. This creates a useable area of about 1.85 acres for a primary use. While this is certainly large enough for an office building, due to its location and lack of visibility, finding a user for an office building is unlikely. The site also isn’t big enough for an industrial user, which could just as easily find a larger site just to the north of this site. Due to this, and with the desire to create a cohesive community, and with a builder identified for the LMN portion of Spring Creek Farms North, it is desirable to simply extend that project into the subject site as is shown in the Spring Creek Farms North Forth Filing PDP Spring Creek Farms North Forth Filing Modification of Standards 2 Subject Parcel with Existing Conditions 4.27(D)(2) Secondary Uses in E zone The first part of the modification request is to increase the allowable secondary uses to 35% of the overall E zone district. With the overall E zone area on the ODP of 6.2 acres, we are allowed to have 25% of that area, or 1.5 acres be secondary uses. However, the total area in consideration is 2.18 acres net, or 35% of the total E zone district. To stay in compliance with the standards, we would be able to place residential uses on 1.5 acres of the subject parcel, with the rest, 0.68 acres staying as a primary use, which would actually be even smaller taking into account the actual useable area of the parcel. This is unfeasible for both uses. JUSTIFICATION The increase in secondary uses for the parcel in question makes the proposed project feasible from a use standpoint, does not substantially detract from the intent of the E zone district, and is equal too or better than what would be required under the Land Use Code. 4.27(D)(5) Density/Intensity in E zone The second part is to decrease the required density in the E zone from 7 units per acre to 3.21 units per acre. With the relatively small size of this parcel, it is desirable to simply continue the single family use and lotting pattern of the LMN site. While we would like to have more density in this area, the location of the existing underground irrigation ditch also impacts the layout for the single family units. As proposed, we have 7 lots on the subject property for 3.21 units per acre. If the irrigation ditch did not exist, we could easily gain an additional 3 lots. At 7 units per acre, the required density on this site would be 16 units. We have prepared an alternate plan showing how 16 units would look on the proposed site. For this, we assumed single family attached units, placing as many units as possible fronting on adjacent Spring Creek Farms North Forth Filing Modification of Standards 3 public ROW. This in itself would likely require some level of modifications of standards. While this concept may be feasible, it would require a different builder to come in to build these, and this type of unit is still difficult to finance for the smaller builder in the current lending environment. JUSTIFICATION If both the LMN and E parcels are taken into consideration, the decrease in density becomes nominal and inconsequential. As shown in the table below, if both parcels were to be developed at the minimum densities, then a total of 55 units would be required. However, since we are proposing on developing the LMN portion at a higher density than required, overall we are providing a total of 76 units, This is 21 more units than the minimum density would require. ! Parcel! Min Density ! Min Units! Density Shown! Units ! LMN! 3! 39! 5.29! 69 ! E! 7! 16! 3.2! 7 ! Total! ! 55! ! 76 As can be seen, the reduction in density in the E zone becomes nominal and inconsequential if the project is looked at as a whole. Therefor, the proposed use would be equal to or better than what would be required under the Land Use Code. Preferred Plan Spring Creek Farms North Forth Filing Modification of Standards 4 Alternate Plan 4.27(B)(3)(a)(1) Single-family detached dwellings located on lots containing no more than six thousand (6,000) square feet. The final part of the modification request is to allow one lot (Lot 2 Block 2) to be slightly larger than 6,000 square feet. This is due to the configuration of the site rather than any specific desire to have the lot be larger than allowed. It is also desirable to continue the lot mix in the LMN parcel with a variety of lot widths to accommodate different products. Lot 2, Block 2: The typical lot size for this type C lot is 60 feet wide by 100 feet deep, for a 6,000 square foot lot. However, as is true in many locations, the public street is not 100% parallel with the rear lot line, therefore this particular lot is about 103 feet deep, for a lot area of 6,255 square feet. The average lot size for the seven lots is 5,874 square feet. JUSTIFICATION The increase in lot area for the one lot is fairly minor, and would not be noticeable by the general public, therefor the proposed modification would be equal to or better than what would be required by code. Spring Creek Farms North Forth Filing Modification of Standards 5 Spring Creek Farms Fourth Filing Modification of Standards Request Requested Modifications of Standards for: 3.2.3(C) Solar Oriented Residential Lots Standards 3.2.3(C) Solar Oriented Residential Lots At least sixty-five (65) percent of the lots less than fifteen thousand (15,000) square feet in area in single- and two-family residential developments must conform to the definition of a "solar-oriented lot" in order to preserve the potential for solar energy usage. Discussion This particular parcel of land that is the proposed Spring Creek Farms Fourth Filing is unique in that it is relatively narrow (360+’ feet east to west) and long (1940+- feet north to south). With this shape,there is limited ability for lot and street placement within the parcel to create a functional and economical development, taking into consideration all the dynamics of development, including, but not limited to solar orientation, utilities, drainage patterns, and the existing park (Spring Creek Farms Third Filing). While various layout options were considered, the current site plan was determined to be the best solution to meet all the various criteria. This site plan has one north south street (Adobe Drive) towards the west side, with three east - west streets for connectivity to Joseph Allen Drive. With this, lots were oriented to these east - west streets to provide as many solar oriented lots as possible. In addition, the lots on the Southern cul-de-sac of Adobe Drive were also oriented as much as possible to meet the solar orientation standards. Justification In Spring Creek Farms Fourth Filing, there are a total of 25 lots total that meet the intent of the solar orientation standard, or 33% of the 76 total lots. It is our interpretation that the granting of the Modifications would not be detrimental to the public good and by satisfying Criteria 3 of 2.8.2(H)(3) which reads: By reason of exceptional physical conditions or other extraordinary and exceptional situations, unique to such property, including, but not limited to, physical conditions such as exceptional narrowness, shallowness or topography, or physical conditions which hinder the owner's ability to install a solar energy system, the strict application of the standard sought to be modified would result in unusual and exceptional practical difficulties, or exceptional or undue hardship upon the owner of such property, provided that such difficulties or hardship are not caused by the act or omission of the applicant. Due to the unique property shape, being relative thin and long, it is not practical to meet the strict interpretation of the solar orientation standards. We have included as many solar oriented lots as Spring Creek Farms North Forth Filing Modification of Standards Solar 1 reasonably practical with the property shape, with 33% of the lots meeting the solar orientation requirement. Below is a graphic of the site plan, with the lots that meet the solar orientation requirement shaded in grey. Spring Creek Farms North Forth Filing Modification of Standards 2 NEIGHBORHOOD INFORMATION MEETING SUMMARY PROJECT: Spring Creek Farms North, Fourth Filing DATE: February 11, 2013 LOCATION: 221 Timberline Road (City of Fort Collins Police Services Building) PROJECT PLANNER: Jason Holland Following an introduction to the City’s development review process by the project planner, the applicant began by giving some details of the proposed project: The project would include lots for approximately 76 single family detached homes. The project site is located in both the Low Density Mixed-Use Neighborhood Zone District and the Employment Zone District located generally behind (west) of the Police Services Building, although the project site does not extend all the way south to Drake Road. Total project size is approximately 15.2 acres. Access into the development is proposed from Joseph Allen Drive, Charles Brockman Drive and Nancy Gray Avenue. This project is separate from the recently approved multi-family apartment homes to the east across Joseph Allen Drive (Spring Creek Farms North Filing Two). During an informal group discussion and question and answer session, several main themes and questions were expressed:  Traffic: There were concerns that along with the newly approved multi-family development, these developments would add to traffic in the area, including the Drake & Timberline intersection, but especially at the Drake Road and Joseph Allen Drive intersection. During rush hour, many neighbors from the developments to the north and south of Drake Road must wait long periods of time to turn left onto Drake Road. This is a dangerous and busy portion of Drake Road with the nearby train tracks, Power Trail crossing light and the short distance to the Drake and Timberline intersection. When a train goes by it is impossible to get out.  Open Space: Questions were asked about what would happen to the open space to the west of the railroad tracks -- it isn’t unusual to see wildlife in this area and it provides a nice buffer. The applicant explained the open space is not part of this development and there are no known plans for that space at the moment. There is also a park proposed from the Spring Creek Farms Third Filing for an area along Joseph Allen Drive that this new development wraps around.  Railroad Pedestrian Crossing: Questions were asked if it was possible to insert a crossing over or under the railroad tracks on the west side of this new development. The applicant informed the meeting it would be both extremely expensive to add a connection (either an overpass or underpass) and difficult to negotiate those rights with the railroad owners.  Density / Housing Size: Several questions were asked regarding the overall density of the homes and what style, price ranges and sizes are envisioned. The density of the proposed development is similar in nature to the existing neighborhoods to the south and west and within the density standards required by the Land Use Code for these two zone districts. The applicant responded that the homes would also be similar to or slightly larger in size than nearby existing homes to the south and west. City staff explained the requirements related to garage door being recessed behind the front face of the homes. ADJACENT SELF STORAGE BUILDINGS G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE 4* 3* 2* 1* 5* 6* 7* 8* 2* 1* BLOCK 4 3* 49' 3* 2* 1* 20 19 18 17 16 15 14 4 5 7 8 9 10 6 11* 12* 13* BLOCK 3 BLOCK 2 1 2 3 4 5 6 7 8 9 20' IRRIGATION & UTIL. EASEMENT 63' 42' R R B2 B1 B1 D B1 B2 B1 D C C B1 B1 B1 B1 C C C C C B1 C C B1 C C D C B1 B2 C B2 B1 B2 B2 C C D C* SPRING CREEK FARMS NORTH FIRST MMN ZONING E ZONE NOT A PART C B1 3* 2* 1* 20 19 18 17 16 15 14 4 5 7 8 9 10 6 11* 12* 13* BLOCK 3 PROPERTY LINE U.& D.ITY EASEMENT FLOWLINE, CURB & GUTTER PROPOSED WALK MATCHLINE NEW 6' WOOD FENCE LOT LINE RIGHT OF WAY LINE LIMITS OF DISTURBANCE CENTERLINE BUILDING ENVELOPE HANDICAP RAMP HANDICAP PARKING R LOTS MEETING SOLAR REQ. B1 C B2 C B1 B2 B1 B1 B1 C B1 C B2 B2 B1 C B1 D C D C B1 B1 B1 B1 B1 B1 A A A A A A A A LMN Spring Creek Farms North THIRD B1 B2 4* 3* 2* 1* 5* 6* 7* 8* 2* 1* BLOCK 4 3* B1 12 13 14 15 16 ADJACENT SELF STORAGE BUILDINGS 3* 2* 1* 20 19 18 17 16 15 14 4 5 7 8 9 10 6 11* 12* 13* BLOCK 3 BLOCK 2 1 2 3 4 5 6 7 8 9 10 11 12 13 1* 2* 3 4 1 2 3 E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G PROPERTY LINE SHADE TREES ORNAMENTAL TREES DECIDUOUS SHRUBS ORNAMENTAL GRASSES BLUEGRASS SOD EVERGREEN SHRUBS U.& D.ITY EASEMENT FLOWLINE, CURB & GUTTER PROPOSED WALK LOT LINE RIGHT OF WAY LINE LIMITS OF DISTURBANCE DRYLAND SEED MIX EVERGREEN TREES 4* 3* 2* 1* 5* 6* 7* 8* 2* 1* BLOCK 4 3* 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30* 31* 32* 33* 34 35 36 37* 38* E E E E E E E E E E E E E E E E E E E E E E E E E E E G G G G G G G G G G G G G G G G G DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES TABLE OF CONTENTS I. INTRODUCTION........................................................................................................ 1 II. EXISTING CONDITIONS .......................................................................................... 2 Land Use......................................................................................................................... 2 Streets............................................................................................................................. 2 Existing Traffic................................................................................................................. 6 Existing Operation........................................................................................................... 6 Pederstrian Facilities..................................................................................................... 10 Bicycle Facilities............................................................................................................ 10 Transit Facilities ............................................................................................................ 10 III. PROPOSED DEVELOPMENT............................................................................... 11 Trip Generation ............................................................................................................. 11 Trip Distribution ............................................................................................................. 11 Background Traffic Projections ..................................................................................... 14 Trip Assignment ............................................................................................................ 14 Signal Warrants............................................................................................................. 14 Operation Analysis ........................................................................................................ 14 Geometry ...................................................................................................................... 20 Pedestrian Level of Service........................................................................................... 20 Bicycle Level of Service ................................................................................................ 24 Transit Level of Service................................................................................................. 24 IV. CONCLUSIONS .................................................................................................... 25 DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES LIST OF TABLES 1. Current Peak Hour Operation.................................................................................... 9 2. Trip Generation ....................................................................................................... 11 3. Short Range (2018) Background Peak Hour Operation .......................................... 18 4. Short Range (2018) Total Peak Hour Operation ..................................................... 21 LIST OF FIGURES 1. Site Location ............................................................................................................. 3 2. Existing Geometry..................................................................................................... 4 3. Recent Peak Hour Traffic .......................................................................................... 7 4. Adjusted/Balance Recent Peak Hour Traffic ............................................................. 8 5. Site Plan.................................................................................................................. 12 6. Trip Distribution ....................................................................................................... 13 7. Short Range (2018) Background Peak Hour Traffic................................................ 15 8. Site Generated Peak Hour Traffic ........................................................................... 16 9. Short Range (2018) Total Peak Hour Traffic ........................................................... 17 10. Short Range (2018) Geometry ................................................................................ 23 APPENDICES A. Base Assumptions Form B. Peak Hour Traffic Counts C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins Motor Vehicle LOS Standards (Intersections) D. Short Range (2018) Background Peak Hour Operation E. Short Range (2018) Total Peak Hour Operation F. Pedestrian/Bicycle Level of Service Worksheets DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 1 I. INTRODUCTION This transportation impact study (TIS) addresses the capacity, geometric, and control requirements for the proposed Spring Creek Farms North residential development. The proposed Spring Creek Farms North is located north of Drake Road between Joseph Allen Drive and the Union Pacific Railroad tracks in Fort Collins, Colorado. During the course of the analysis, numerous contacts were made with the owner/developer (SC Residential, LLC), the project engineering consultant (Aspen Engineering), the project planning consultant (Vignette Studios), Fort Collins Traffic Engineering, and Fort Collins Transportation Planning. The Transportation Impact Study Base Assumptions form and related documents are provided in Appendix A. This study generally conforms to the format set forth in the Fort Collins TIS Guidelines in the “Larimer County Urban Area Street Standards” (LCUASS). A scoping discussion was held with the Fort Collins Traffic Engineering staff. Due to the trip generation, this is a intermediate transportation impact study. The study involved the following steps: - Collect physical, traffic, and development data; - Perform trip generation, trip distribution, and trip assignment; - Determine peak hour traffic volumes; - Conduct capacity and operational level of service analyses on key intersections; - Analyze signal warrants; - Conduct level of service evaluation of pedestrian, bicycle, and transit modes of transportation DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 2 II. EXISTING CONDITIONS The location of the Spring Creek Farms North is shown in Figure 1. It is important that a thorough understanding of the existing conditions be presented. Land Use Land uses in the area are primarily commercial, residential, or open. There are residential uses to the west, east, and south of the site. There are commercial uses to the southeast (Rigden Farm Commercial) and northeast (Timberline Commercial) of the site. The Fort Collins Police Services Building is east of the site. The Fort Collins Police Services Building was part of the original Spring Creek Farms North. The Spring Creek Farm apartments bordered by Drake Road, Charles Brockman Drive, Timberline Road, and Joseph Allen Drive is currently being constructed. The Spring Creek Farms North site is currently vacant. The center of Fort Collins lies to the west of the proposed Spring Creek Farms North site. Streets The primary streets near the Spring Creek Farms North site are Timberline Road, Drake Road, Nancy Gray Avenue, Joseph Allen Drive, and Charles Brockman Drive. Figure 2 shows a schematic of the existing geometry at the key intersections. Timberline Road is east of the proposed Spring Creek Farms North site. It is a north-south street classified as a six-lane arterial on the Fort Collins Master Street Plan. Currently, Timberline Road has a four-lane cross section. At the Timberline/Drake intersection, Timberline Road has dual northbound and southbound left-turn lanes, two through lanes in each direction, and northbound and southbound right-turn lanes. At the Timberline/Nancy Gray intersection, Timberline Road has a northbound and southbound left-turn lane, two through lanes in each direction, and a northbound and southbound right-turn lane. At the Timberline/Charles Brockman-Katadin intersection, Timberline Road has a northbound and southbound left-turn lane, two through lanes in each direction, and a northbound right-turn lane. The Timberline/Drake and Timberline/Nancy Gray intersections have signal control. The Timberline/Charles Brockman-Katadin intersection is stop sign controlled on Charles Brockman Drive- Katadin Drive. The posted speed limit on this segment of Timberline Road is 45 mph. Drake Road is south of (adjacent to) the proposed Spring Creek Farms North site. It is an east-west street classified as a four-lane arterial, west of Timberline Road and a two-lane arterial, east of Timberline Road on the Fort Collins Master Street Plan. Currently, Drake Road has a four-lane cross section. At the Timberline/Drake intersection, Drake Road has dual eastbound left-turn lanes, a westbound left-turn lane, two through lanes in each direction, and an eastbound right-turn lane. The right-turn Drake Charles Brockman Prospect Timberline Nancy Gray Joseph Allen Sagebrush SCALE: 1"=1000' SITE LOCATION Figure 1 DELICH ASSOCIATES Spring Creek Farms North TIS, May 2013 Page 3 EXISTING GEOMETRY Figure 2 DELICH ASSOCIATES Spring Creek Farms North TIS, May 2013 Page 4 Drake Road Charles Brockman Katadin Drive Drive Sagebrush Drive Nancy Gray Avenue Timberline Road - Denotes Lane Required Geometry DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 5 volume on the westbound approach at the Timberline/Drake intersection indicates the need for a right-turn lane. At the Drake/Sagebrush intersection, Drake Road has a westbound left-turn lane and two through lanes in each direction. The Drake/Sagebrush intersection is stop sign controlled on Sagebrush Drive. The posted speed limit on this segment of Drake Road is 40 mph. Nancy Gray Avenue is north of the proposed Spring Creek Farms North site. It is an east-west street classified as a local street on the west side of Timberline Road on the Fort Collins Master Street Plan. Currently, Nancy Gray Avenue has a two-lane cross section. At the Timberline/Nancy Gray intersection, Nancy Gray Avenue has an eastbound and westbound left-turn lane and a combined through/right-turn lane in each direction. At the Nancy Gray/Joseph Allen intersection, Nancy Gray Avenue has all movements combined into a single lane. The Nancy Gray/Joseph Allen intersection is stop sign controlled on Joseph Allen Drive. There is no posted speed limit on this segment of Nancy Gray Avenue. Charles Brockman Drive is east of the Spring Creek Farms North site. Katadin Drive is within the Sidehill Development. They are east-west streets classified as local streets on the Fort Collins Master Street Plan. Currently, Charles Brockman Drive and Katadin Drive have two-lane cross sections. The Timberline/Charles Brockman-Katadin intersection is a ¾ intersection (right-in/right-out/left-in). At the Timberline/Charles Brockman-Katadin intersection, Charles Brockman Drive has an eastbound right-turn lane and Katadin Drive has a westbound right-turn lane. At the Charles Brockman/Joseph Allen intersection, Charles Brockman Drive has all movements combined into a single lane. The Charles Brockman/Joseph Allen intersection is stop sign controlled on Joseph Allen Drive. There is no posted speed limit on this segment of Charles Brockman Drive-Katadin Drive Road. Sagebrush Drive is south of the proposed Spring Creek Farms North site. It is a north-south street classified as a local street on the Fort Collins Master Street Plan. Sagebrush Drive only has a south leg at the Drake/Sagebrush intersection. Currently, Sagebrush Drive has a two-lane cross section. At the Drake/Sagebrush intersection, Sagebrush Drive has all movements combined into a single lane. There is no posted speed limit on this segment of Sagebrush Drive. Joseph Allen Drive is west of (adjacent to) the proposed Spring Creek Farms North site. It is a north-south street classified as a local street on the Fort Collins Master Street Plan. Joseph Allen Drive has a two-lane cross section. At the Nancy Gray/Joseph Allen intersection, Joseph Allen Drive has all movements combined into a single lane. At the Charles Brockman/Joseph Allen intersection, Joseph Allen Drive has all movements combined into a single lane. There is no posted speed limit on this segment of Joseph Allen Drive. South of Charles Brockman Drive, Joseph Allen Drive will access Drake Road across from Sagebrush Drive. It will be built with the Spring Creek Farm development that is currently under construction. DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 6 It was determined that the Nancy Gray/Joseph Allen and Charles Brockman/Joseph Allen intersections would operate acceptably and that they did not need to be analyzed. Existing Traffic Recent peak hour traffic volumes at the key intersections are shown in Figure 3. The counts at the Timberline/Drake intersection were obtained in April 2013 by the City of Fort Collins. The counts at the Timberline/Nancy Gray intersection were obtained in February 2013 by the City of Fort Collins. The counts at the Timberline/Charles Brockman-Katadin and Drake/Sagebrush intersections were obtained in January 2012. These are greater than one year old. However, since there was significant construction traffic at these intersections, these counts were used with adjustments related to the through traffic. Raw traffic count data is provided in Appendix B. Since the traffic counts were done on different days, the intersection volumes were balanced using the Timberline/Drake and Timberline/Nancy Gray intersection to determine the through volumes on Timberline Road and Drake Road. Figure 4 shows the adjusted/balanced recent peak hour traffic volumes. Existing Operation The Timberline/Drake, Timberline/Nancy Gray, Timberline/Charles Brockman- Katadin, and Drake/Sagebrush intersections were evaluated and the peak hour operation is displayed in Table 1. Calculation forms are provided in Appendix C. The Timberline/Drake, Timberline/Nancy Gray, Timberline/Charles Brockman-Katadin, and Drake/Sagebrush intersections are currently operating acceptably with existing control and geometry in the morning and afternoon peak hours, except for the westbound approach at the Timberline/Drake intersection in the morning peak hour. An adjustment to the City’s current signal timing splits results in acceptable operation. No other adjustments were made. This operation is shown in parentheses in Table 1. The intersections were evaluated using techniques provided in the 2000 Highway Capacity Manual. A description of level of service for signalized and unsignalized intersections from the 2000 Highway Capacity Manual and a table showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are also provided in Appendix C. At the Drake/Sagebrush intersection, the calculated delay for the northbound approach was commensurate with level of service E in the morning peak hour and F in the afternoon peak hour. The Spring Creek Farms North site is in an area termed “mixed use districts.” In areas termed “mixed use districts,” acceptable operation at signalized intersections during the peak hours is defined as level of service E or better. At unsignalized intersections, acceptable operation is considered to be at level of service F for any approach leg for an arterial/local intersection. In such areas, it is expected that there would be substantial delays to the minor street movements at unsignalized intersections during the peak hours. This is considered to be normal and acceptable in urban areas. RECENT PEAK HOUR TRAFFIC Figure 3 DELICH ASSOCIATES Spring Creek Farms North TIS, May 2013 Page 7 350/437 1234/934 18/24 237/291 701/1067 180/354 308/211 338/440 215/290 304/201 308/339 29/33 45/11 1742/1273 7/9 12/10 1001/1685 18/20 11/29 31/14 Drake Road 8/6 1753/1271 12/10 6/5 1022/1689 19/41 18/40 0/0 2/13 15/18 1/0 7/13 Charles Brockman Katadin Drive Drive Sagebrush Drive Nancy Gray Avenue Timberline Road AM/PM 849/931 17/21 893/1054 2/13 26/28 12/10 ADJUST/BALANCED RECENT PEAK HOUR TRAFFIC Figure 4 DELICH ASSOCIATES Spring Creek Farms North TIS, May 2013 Page 8 350/437 1207/923 18/24 226/291 668/1068 171/354 301/208 338/440 215/290 297/199 308/339 29/33 45/11 1783/1290 7/9 12/10 1054/1684 18/20 11/29 31/14 Drake Road 8/6 1794/1288 12/10 6/5 1075/1688 19/41 18/40 0/0 2/13 15/18 1/0 7/13 Charles Brockman Katadin Drive Drive Sagebrush Drive Nancy Gray Avenue Timberline Road AM/PM 842/928 17/21 882/1054 2/13 26/28 12/10 DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 9 TABLE 1 Current Peak Hour Operation Intersection Movement Level of Service AM PM EB LT D D EB T/RT D D EB APPROACH D D WB LT D D WB T/RT D D WB APPROACH D D NB LT A A NB T A A NB RT A A NB APPROACH A A SB LT A A SB T A A SB RT A A SB APPROACH A A Timberline/Nancy Gray (signal) OVERALL A A EB RT B B WB RT B A NB LT B C Timberline/Charles Brockman- Katadin (stop sign) SB LT C B EB LT D (E) E EB T C (C) D EB RT C (C) D EB APPROACH D (D) D WB LT D (C) D WB T/RT F (E) E WB APPROACH F (E) E NB LT D (D) D NB T D (D) C NB RT B (B) C NB APPROACH D (D) D SB LT D (D) D SB T C (C) D SB RT E (E) C SB APPROACH D (D) D Timberline/Drake (signal) OVERALL E (D) D Drake/Sagebrush WB LT B A (stop sign) NB LT/RT E F DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 10 Pedestrian Facilities There are sidewalks along Timberline Road, Charles Brockman Drive-Katadin Drive, Nancy Gray Avenue, and Joseph Allen Drive within the pedestrian influence area. There are sidewalks along Drake Road, except on the north side from Timberline Road to the Union Pacific Railroad within the pedestrian influence area. The Power Trail is just west of the Union Pacific Railroad. Bicycle Facilities There are bicycle lanes along Timberline Road, Drake Road, and Nancy Gray Avenue, east of Timberline Road, within the study area. The Power Trail is just west of the Union Pacific Railroad. Transit Facilities Currently, this area of Fort Collins is served by Transfort Route 17. It operates along Timberline Road. DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 11 III. PROPOSED DEVELOPMENT The Spring Creek Farms North is a residential development with 76 single family dwelling units, located in the northwest quadrant of the Drake/Sagebrush-Joseph Allen intersection in Fort Collins. Figure 5 shows a site plan of the Spring Creek Farms North. The short range analysis (Year 2018) includes development of the Spring Creek Farms North and an appropriate increase in background traffic due to normal growth and other potential developments in the area. The site plan shows that the Spring Creek Farms North will use Nancy Gray Avenue and Charles Brockman Drive to access Timberline Road. The Spring Creek Farms North will also have access to Drake Road with the continuation of Joseph Allen Drive to the Drake/Sagebrush intersection. Trip Generation Trip generation is important in considering the impact of a development such as this upon the existing and proposed street system. A compilation of trip generation information contain in Trip Generation, 9th Edition, ITE was used to estimate the trips that would be generated by the proposed/expected uses at the Spring Creek Farms North site. A trip is defined as a one-way vehicle movement from origin to destination. Table 2 shows the expected trip generation on a daily and peak hour basis. The trip generation of the Spring Creek Farms North development resulted in 816 daily trip ends, 63 morning peak hour trip ends, and 82 afternoon peak hour trip ends. TABLE 2 Trip Generation Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out 210 Single Family 76 D.U. EQ 816 EQ 16 EQ 47 EQ 52 EQ 30 Trip Distribution Trip distribution for the Spring Creek Farms North was based on existing/future travel patterns, land uses in the area, consideration of trip attractions/productions in the area, and engineering judgment. Figure 6 shows the trip distribution for the short range (2018) analysis future. The trip distribution was agreed to by City of Fort Collins staff in the scoping discussions. SITE PLAN Figure 5 DELICH ASSOCIATES Spring Creek Farms North TIS, May 2013 Page 12 TRIP DISTRIBUTION Figure 6 DELICH ASSOCIATES Spring Creek Farms North TIS, May 2013 Page 13 Timberline Road Drake Road Charles Brockman Katadin Drive Drive Sagebrush Drive Nancy Gray Avenue SITE 35% NOM 20% 20% 25% DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 14 Background Traffic Projections Figure 7 shows the short range (2018) background traffic projections. Background traffic projections for the short range future horizon were obtained by reviewing the North Front Range Regional Transportation Plan and various traffic studies prepared for this area of Fort Collins. The other traffic studies in this area are Timberline Commercial, Spring Creek Farm, and Bucking Horse (Filings 1 and 2). Based upon these sources, it was determined that traffic volumes on Timberline Road and Drake Road, would increase by approximately 2.0% per year in the short range future. It was assumed that Spring Creek Farms, Bucking Horse Filing One and Filing Two, and half of Timberline Commercial would be developed in the short range future. This traffic was added to the short range (2018) background traffic volumes. The background traffic growth was agreed to by City of Fort Collins staff in the scoping discussions. Trip Assignment Trip assignment is how the generated and distributed trips are expected to be loaded on the street system. The assigned trips are the resultant of the trip distribution process. Figure 8 shows the site generated peak hour traffic assignment. Figure 9 shows the short range (2018) total (site plus background) peak hour traffic assignment. Signal Warrants As a matter of policy, traffic signals are not installed at any location unless warrants are met according to the Manual on Uniform Traffic Control Devices. The Timberline/Drake and Timberline/Nancy Gray intersections are currently signalized. The Timberline/Charles Brockman-Katadin and Drake/Sagebrush-Joseph Allen intersections will not have traffic signals in the future. Operation Analysis Operation analyses were performed at the Timberline/Drake, Timberline/Nancy Gray, Timberline/Charles Brockman-Katadin, and Drake/Sagebrush-Joseph Allen intersections. The Timberline/Drake intersection was analyzed with the required westbound right-turn lane in the short range (2018) future. The operations analyses were conducted for the short range future, reflecting the year 2018 condition. Using the traffic volumes shown in Figure 7, the Timberline/Drake, Timberline/Nancy Gray, Timberline/Charles Brockman-Katadin, and Drake/Sagebrush- Joseph Allen intersections operate in the short range (2018) background traffic future as indicated in Table 3. Calculation forms for these analyses are provided in Appendix D. The key intersections will operate acceptably with the existing control and required SHORT RANGE (2018) BACKGROUND PEAK HOUR TRAFFIC Figure 7 DELICH ASSOCIATES Spring Creek Farms North TIS, May 2013 Page 15 393/509 1381/1090 26/36 293/379 808/1247 225/423 389/293 381/495 242/322 353/250 351/398 42/45 47/21 2095/1581 11/31 14/18 1281/2028 20/46 11/29 37/20 Drake Road 31/24 2115/1548 14/29 6/5 1242/1988 52/109 80/95 1/5 17/28 45/28 3/4 90/76 Charles Brockman Katadin Drive Drive Sagebrush Drive Nancy Gray Avenue Joseph Allen Drive 26/28 NOM 12/10 31/17 NOM 15/6 9/34 985/1094 17/21 13/50 1022/1223 2/13 Timberline SITE GENERATED PEAK HOUR TRAFFIC Figure 8 DELICH ASSOCIATES Spring Creek Farms North TIS, May 2013 Page 16 3/8 0/3 8/5 8/5 2/1 1/1 1/1 0/2 3/8 0/3 2/3 3/9 6/4 10/6 Drake Road 0/2 2/1 3/9 3/9 15/9 NOM 6/4 Charles Brockman Katadin Drive Drive Sagebrush Drive Nancy Gray Avenue Joseph Allen Drive 12/8 NOM 4/3 4/13 6/16 Timberline Road AM/PM SHORT RANGE (2018) TOTAL PEAK HOUR TRAFFIC Figure 9 DELICH ASSOCIATES Spring Creek Farms North TIS, May 2013 Page 17 396/517 1381/1093 26/36 293/379 816/1252 233/428 391/294 382/496 243/323 353/252 354/406 42/45 47/24 2097/1584 11/31 17/27 1287/2032 20/46 21/35 37/20 Drake Road 31/26 2117/1549 14/29 9/14 1245/1997 52/109 95/104 1/5 23/32 45/28 3/4 90/76 Charles Brockman Katadin Drive Drive Sagebrush Drive Nancy Gray Avenue Joseph Allen Drive 26/28 NOM 12/10 43/25 NOM 19/9 13/47 985/1094 17/21 19/66 1022/1223 2/13 Timberline DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 18 TABLE 3 Short Range (2018) Background Peak Hour Operation Intersection Movement Level of Service AM PM EB LT E E EB T/RT D D EB APPROACH D E WB LT E D WB T/RT D D WB APPROACH D D NB LT A D NB T B A NB RT A A NB APPROACH B A SB LT C B SB T A B SB RT A A SB APPROACH A B Timberline/Nancy Gray (signal) OVERALL B B EB RT B C WB RT B A NB LT B C Timberline/Charles Brockman- Katadin (stop sign) SB LT D C Continued on next page DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 19 Continued from previous page TABLE 3 Short Range (2018) Background Peak Hour Operation Intersection Movement Level of Service AM PM EB LT E E EB T D D EB RT C D EB APPROACH D D WB LT D D WB T E E WB RT E D WB APPROACH E D NB LT D E NB T E D NB RT B C NB APPROACH E D SB LT D D SB T C E SB RT D B SB APPROACH D D Timberline/Drake (signal) OVERALL D D EB LT B B WB LT B B NB LT F F NB T/RT B B NB APPROACH F F SB LT F F SB T/RT B B Drake/Sagebrush-Joseph Allen (stop sign) [with minor street left-turn lanes] SB APPROACH E F DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 20 geometry. At the Drake/Sagebrush-Joseph Allen intersection the calculated delay for the northbound and southbound approaches was commensurate with level of service E/F in the morning and afternoon peak hours. This is considered to be normal and acceptable during the peak hours at stop sign controlled intersections along arterial streets. Using the traffic volumes shown in Figure 9, the Timberline/Drake, Timberline/Nancy Gray, Timberline/Charles Brockman-Katadin, and Drake/Sagebrush- Joseph Allen intersections operate in the short range (2018) total traffic future as indicated in Table 4. Calculation forms for these analyses are provided in Appendix F. The key intersections will operate acceptably with existing control and required geometry. At the Drake/Sagebrush-Joseph Allen intersection the calculated delay for the northbound and southbound approaches was commensurate with level of service E/F in the morning and afternoon peak hours. This is considered to be normal and acceptable during the peak hours at stop sign controlled intersections along arterial streets. Geometry Figure 10 shows a schematic of the required short range (2018) geometry. This is the existing geometry at the Timberline/Nancy Gray, and Timberline/Charles Brockman- Katadin intersections. At the Timberline/Drake intersection a westbound right-turn lane is required per LCUASS Figure 8-4 with the current traffic. At the Drake/Sagebrush- Joseph Allen intersection it is recommended that the Sagebrush Drive-Joseph Allen Drive legs have a northbound and southbound left-turn lane and a northbound and southbound through/right-turn lane. A westbound right-turn lane is also required at this intersection. The lanes at the Drake/Sagebrush-Joseph Allen intersection are currently being constructed. Pedestrian Level of Service Appendix H shows a map of the area that is within 1320 feet of the Spring Creek Farms North development. There will be six pedestrian destinations within 1320 feet of the Spring Creek Farms North development. These are: 1) the residential area to the east of the site (Sidehill), 2) the Fort Collins Police Services Building within the site, 3) the residential area to the west of the site, 4) the commercial area (Timberline Commercial to the north of the site, 5) the commercial area (Rigden Farms) to the southeast of the site, and 6) the residential area to the south of the site. This site is in an area type termed “transit corridor.” Acceptable pedestrian level of service will be achieved for all pedestrian destinations. The Pedestrian LOS Worksheet is provided in Appendix H. The minimum level of service for “transit corridor” is B, except for Visual Interest & Amenities which is C. DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 21 TABLE 4 Short Range (2018) Total Peak Hour Operation Intersection Movement Level of Service AM PM EB LT E E EB T/RT D D EB APPROACH E E WB LT E D WB T/RT D D WB APPROACH D D NB LT A D NB T B A NB RT A A NB APPROACH B A SB LT C B SB T A B SB RT A A SB APPROACH A B Timberline/Nancy Gray (signal) OVERALL B B EB RT B C WB RT B A NB LT B C Timberline/Charles Brockman- Katadin (stop sign) SB LT D C Continued on next page DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 22 Continued from previous page TABLE 4 Short Range (2018) Total Peak Hour Operation Intersection Movement Level of Service AM PM EB LT E E EB T D D EB RT C D EB APPROACH D D WB LT D D WB T E E WB RT E D WB APPROACH E D NB LT D E NB T E D NB RT B C NB APPROACH E D SB LT D D SB T D E SB RT D B SB APPROACH D D Timberline/Drake (signal) OVERALL D D EB LT B B WB LT B B NB LT F F NB T/RT B B NB APPROACH F F SB LT F F SB T/RT B B Drake/Sagebrush-Joseph Allen (stop sign) [with minor street left-turn lanes] SB APPROACH E F SHORT RANGE (2018) GEOMETRY Figure 10 DELICH ASSOCIATES Spring Creek Farms North TIS, May 2013 Page 23 Drake Road Charles Brockman Katadin Drive Drive Sagebrush Drive Nancy Gray Avenue Timberline Road - Denotes Lane DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 24 Bicycle Level of Service Appendix H shows a map of the area that is within 1320 feet of the Spring Creek Farms North development. There will be two bicycle destinations within 1320 feet of the Spring Creek Farms North development. These are: 1) the commercial area (Timberline Commercial) to the north of the site and 2) the commercial area (Rigden Farms) to the southeast of the site. The Bicycle LOS Worksheet is provided in Appendix H. The minimum level of service for this site is C. This site is connected to Timberline Road and Drake Road. Therefore, it is concluded that level of service C can be achieved. The Power Trail is just west of the Union Pacific Railroad. Transit Level of Service This area of Fort Collins is served by Transfort Route 17. This route has transit stops just north of the Timberline/Drake intersection, just south of the Timberline/Charles Brockman-Katadin intersection, and just north of the Timberline/Nancy Gray intersection, which are near this site. DELICH Spring Creek Farms North TIS, May 2013 ASSOCIATES Page 25 IV. CONCLUSIONS This study assessed the impacts of the Spring Creek Farms North on the street system in the vicinity of the proposed development in the short range (2018) future. As a result of this analysis, the following is concluded: - The development of the Spring Creek Farms North is feasible from a traffic engineering standpoint. At full development, the Spring Creek Farms North will generate approximately 816 daily trip ends, 63 morning peak hour trip ends, and 82 afternoon peak hour trip ends. - The Timberline/Drake and Timberline/Nancy Gray intersections are currently signalized. The Timberline/Charles Brockman-Katadin and Drake/Sagebrush- Joseph Allen intersections will not have traffic signals in the future. - In the short range (2018) future, given development of the Spring Creek Farms North and an increase in background traffic, the Timberline/Drake, Timberline/Nancy Gray, Timberline/Charles Brockman-Katadin, and Drake/Sagebrush-Joseph Allen intersections will operate acceptably with the existing geometry and control. - The short range (2018) geometry is shown in Figure 10. At the Timberline/Drake intersection a westbound right-turn lane is required with the current traffic. At the Drake/Sagebrush-Joseph Allen intersection it is recommended that the Sagebrush Drive-Joseph Allen Drive legs have a northbound and southbound left-turn lane and a northbound and southbound through/right-turn lane. A westbound right-turn lane is also required at this intersection. - Acceptable level of service is achieved for pedestrian, bicycle, and transit modes based upon the measures in the multi-modal transportation guidelines and future improvements to the street system in the area. Road AM/PM Road AM/PM G G G G G G G G G G G G G G G G G G G G G G G G TRACT C TRACT D PRIVATE DRIVE RETAINING WALLS (TYP) REFERENCE CIVIL PLANS FOR HEIGHT AND DETAILS (4) CASP (1) QURO (1) QURO (3) GLTS (3) TICG (2) GLTS (2) PYCA (2) QURO (2) QURO (2) GLTS (4) QUMA (3) TICG (1) CEOC (2) ULFR (2) GLTS (1) GYDE (2) QUMA (2) GYDE (2) GYDE (1) QUMA (2) ULFR (1) GYDE 6' U.& D. EASEMENT (TYP) (2) PRAM (2) PIPU (1) POAC (3) POAC (3) PRAM (2) CRCI DRAINAGE EASEMENT (1) CEOC (2) POAC (1) PINI (2) PIFL (3) MARA (2) PIPU (7) CHNA (5) CHNA (6) PRVM (5) JUCH (6) JUCH 8' U.& D. EASEMENT (TYP) 8' U.& D. EASEMENT (TYP) REAR YARD FENCES AT PRIVATE DRIVE (TYP) TO BE LOCATED 8' BACK OF CURB 9' UTIL. EASEMENT 9' UTIL. EASEMENT 6' U.& D. EASEMENT (TYP) JOSEPH ALLEN DRIVE ADOBE DRIVE (LOCAL 53' ROW) SPRING FARM DRIVE (LOCAL 53' ROW) CHARLES BROCKMAN DR. (LOCAL 53' ROW) 6' U.& D. & DRAINAGE EASEMENT BLOCK 5 BLOCK 3 DRIVEWAY LOCATION (TYP) (6) PRVM 2.08' WALL 2.64' WALL 3.47' WALL 4.19' WALL 5.55' WALL 3.38' WALL END OF WALL .5' WALL 2.51' WALL (1) PYCA (1) PYCA DECIDUOUS TREE PLANTING NOTES 1. DO NOT CUT OR DAMAGE LEADER. PRUNE DAMAGED OR DEAD WOOD IMMEDIATELY PRIOR TO PLANTING. NEVER LEAVE "V" CROTCHES OR DOUBLE LEADER UNLESS TYPICAL OF SPECIES. 2. CUT TWINE AND BURLAP FROM AROUND TRUNK, PULL BACK. REMOVE ALL BURLAP AND WIRE BASKETS BEFORE PLACING IN TREE PIT. 3. ANY BROKEN OR CRUMBLING ROOT BALL WILL BE REJECTED. REMOVING THE WIRE WILL NOT BE AN EXCUSE FROM DAMAGED ROOT BALLS. 4. STAKE TREE LEAVING ENOUGH SLACK SO TREE CAN SWAY IN WIND. 5. USE 2 STAKES FOR TREES 2 1/2" CAL. AND SMALLER. USE 3 STAKES FOR TREES LAGER THAN 2 1/2" CAL. REMOVE ALL STAKES 1 YEAR AFTER PLANTING. 6. FOR WINTERIZATION WRAP ENTIRE SURFACE OF TRUNK TO SECOND BRANCH WITH TREE WRAPPING. SECURE AT 2' INTERVALS WITH VINYL ELECTRICAL TAPE. (REMOVE IN SUMMER.) NOT TO SCALE DECIDUOUS TREE PLANTING 2 X BALL DIA. INSTALL TOP OF ROOTBALL 2" ABOVE SURROUNDING FINISH GRADE FOR TREES PLANTED IN TURF, CREATE TREE RING 1' PAST PLANTING HOLE, 4' MIN DIA, PLACE 3 INCHES OF NON-DYED SHREDDED CEDAR MULCH IN TREE RING. FOR TREES PLANTED IN SHRUB BEDS, MULCH WITH SHRUB BED MULCH. FINISH GRADE PLACE DISH 2" ABOVE GRADE 1 1 2" WIDE HEAVY NYLON STRAP WITH EYELETS. 12 GAUGE GALVANIZED WIRE. (DOUBLE STANDARD) LODGEPOLE TREE STAKES ADJUST TREE STAKES SO TOP IS LEVEL WITH OR BELOW FIRST BRANCHES. SPECIFIED BACKFILL MIX. ROUGHENED SIDE SLOPES OF PIT EXISTING SOIL NOT TO SCALE CONIFEROUS TREE PLANTING WITH STAKES CONIFEROUS TREE PLANTING NOTES 1. DO NOT CUT OR DAMAGE LEADER. PRUNE DAMAGED OR DEAD WOOD IMMEDIATELY PRIOR TO PLANTING. 2. CUT TWINE AND BURLAP FROM AROUND TRUNK, PULL BACK. REMOVE ALL BURLAP AND WIRE BASKETS BEFORE PLACING IN TREE PIT. 3. ANY BROKEN OR CRUMBLING ROOT BALL WILL BE REJECTED. REMOVING THE WIRE WILL NOT BE AN EXCUSE FROM DAMAGED ROOT BALLS. 4. STAKE TREE LEAVING ENOUGH SLACK SO TREE CAN DANCE. 5. USE 2 STAKES FOR TREES 8' AND SMALLER. USE 3 OR MORE STAKES FOR TREES LARGER THAN 8' . 6. REMOVE ALL STAKES 1 YEAR AFTER PLANTING. 2 X BALL DIA. INSTALL TOP OF ROOTBALL 2" ABOVE SURROUNDING FINISH GRADE FOR TREES PLANTED IN TURF, CREATE TREE RING 1' PAST PLANTING HOLE, PLACE 3 INCHES OF SHREDDED CEDAR MULCH IN TREE RING. FOR TREES PLANTED IN SHRUB BEDS, MULCH WITH SHRUB BED MULCH. FINISH GRADE PLACE DISH 2" ABOVE GRADE 1 1 2" WIDE HEAVY NYLON STRAP WITH EYELETS. 12 GAUGE GALVANIZED WIRE. (DOUBLE STANDARD) LODGEPOLE TREE STAKES SPECIFIED BACKFILL MIX. ROUGHENED SIDE SLOPES OF PIT EXISTING SOIL SHRUB PLANTING NOT TO SCALE SHRUB PLANTING NOTES: 1. ANY BROKEN OR CRUMBLING ROOT BALL WILL BE REJECTED. 2. PRUNE ALL DAMAGED OR DEADWOOD IMMEDIATELY PRIOR TO PLANTING. 2 X BALL DIA. INSTALL TOP OF ROOTBALL 2" ABOVE SURROUNDING FINISH GRADE FINISH GRADE PLACE DISH 2" ABOVE GRADE SPECIFIED BACKFILL MIX. ROUGHENED SIDE SLOPES OF PIT EXISTING SOIL SPECIFIED MULCH 3-4" OVER FILTER FABRIC NORTH Planning Landscape Architecture Graphics SHEET TITLE: SHEET NO: OF PO Box 1889 Fort Collins, Colorado 80522-1889 970.472.9125 T 866.902.4163 F www.vignettestudios.com ACAD FILE: DRAWN: CHECKED: JOB NO: REVISIONS DATE ISSUE DATE: CLIENT SCALE 1"=50' 0 25 50 FORT COLLINS, COLORADO PROJECT DEVELOPMENT PLAN Filing No. 4 Spring Creek Farms North LANDSCAPE PLAN 5 5 COMMENTS COMMENTS 13502 13502PDP1 TCH TCH 10/9/13 11/26/13 April 10, 2013 100 Landscape Legend UNION PACIFIC RAILROAD POWER BIKE TRAIL MATCHLINE SHEET 4 Spring Creek Farms North SECOND FILNG MMN ZONE TRACT A (2) QURO (2) GYDE (3) TICG (1) PYCA (3) CASP (1) QURO (2) QURO (2) GLTS (2) QUMA (2) CEOC (1) ULFR (2) TICG (2) CEOC (2) TICG (2) TICG (1) ULFR (3) CASP (2) GLTS (1) ULFR (2) GLTS (1) GYDE (3) QUMA (1) GYDE (3) CRCI (2) MARA (1) CASP (2) QUMA (3) PIFL (2) PIPU IRRIGATION & UTIL. EASEMENT 20' IRRIGATION & 9' UTIL.. EASEMENT UTIL. EASEMENT 20' (2) PINI 6' U.& D. EASEMENT EACH SIDE (TYP) DRIVEWAY LOCATION (TYP) 9' UTIL.. EASEMENT 6' U.&D. EASEMENT (TYP) 9' UTIL. EASEMENT (TYP) 6' U.& D.. EASEMENT TRACT B BLOCK 6 NANCY GRAY AVENUE JOSEPH ALLEN DRIVE CHARLES BROCKMAN DR. (LOCAL 53' ROW) ADOBE DRIVE (LOCAL 53' ROW) NANCY GRAY AVE (LOCAL 53' ROW) BLOCK 1 .61 WALL END OF WALL 2.09' WALL 1.2' WALL 1.04' WALL .86' WALL 1.15' WALL 1.19' WALL 1.2' WALL 1.56' WALL (2) PYCA BUFFERYARD 'B' 362 FT. (2) CRCI (2) CRCI (1) CEOC PROPERTY LINE SHADE TREES ORNAMENTAL TREES DECIDUOUS SHRUBS ORNAMENTAL GRASSES BLUEGRASS SOD EVERGREEN SHRUBS U.& D.ITY EASEMENT FLOWLINE, CURB & GUTTER PROPOSED WALK LOT LINE RIGHT OF WAY LINE LIMITS OF DISTURBANCE DRYLAND SEED MIX EVERGREEN TREES * LOTS MEETING SOLAR REQ. NORTH Planning Landscape Architecture Graphics SHEET TITLE: SHEET NO: OF PO Box 1889 Fort Collins, Colorado 80522-1889 970.472.9125 T 866.902.4163 F www.vignettestudios.com ACAD FILE: DRAWN: CHECKED: JOB NO: REVISIONS DATE ISSUE DATE: CLIENT SCALE 1"=50' 0 25 50 FORT COLLINS, COLORADO PROJECT DEVELOPMENT PLAN Filing No. 4 Spring Creek Farms North LANDSCAPE PLAN 4 5 COMMENTS COMMENTS 13502 13502PDP1 TCH TCH 10/9/13 11/26/13 April 10, 2013 100 Planting Notes 1. ALL PLANT MATERIALS SHALL BE IN ACCORDANCE WITH ANA SPECIFICATIONS FOR NUMBER ONE GRADE. 2. ALL TURF AREAS TO BE IRRIGATED WITH AN AUTOMATIC POP-UP SPRINKLER SYSTEM. ALL SHRUB BEDS TO BE IRRIGATED WITH AUTOMATIC DRIP IRRIGATION SYSTEM, OR ACCEPTABLE ALTERNATIVE. THE IRRIGATION SYSTEM IS TO BE ADJUSTED TO MEET THE NEEDS OF THE INDIVIDUAL PLANT MATERIAL. 3. ALL TREES TO BE BALLED & BURLAPPED, ROOT CONTROL BAG, OR CONTAINERIZED. 4. ALL SHRUB BEDS TO RECEIVE WOOD OR ROCK MULCH TO A DEPTH OF 3" OVER LANDSCAPE FILTER FABRIC. 5. ALL SHRUB BEDS TO BE EDGED WITH STEEL EDGER OR EQUIVALENT. 6. KEEP ALL TREES 10' CLEAR FROM WATER AND SANITARY SEWER MAINS, AND 4' CLEAR FROM GAS LINES. KEEP SHRUBS 4' CLEAR FROM WATER AND SANITARY SEWER MAINS. LOCATE ALL U.& D.ITIES PRIOR TO PLANTING. LOCATE ALL UNDERGROUND U.& D.ITIES PRIOR TO PLANTING. 7. TREE U.& D.ITY SEPARATIONS SHALL NOT BE USED AS A MEANS OF AVOIDING REQUIRED STREET TREES. 8. THE SOIL IN ALL LANDSCAPE AREAS, INCLUDING PARKWAYS AND MEDIANS, SHALL BE THOROUGHLY LOOSENED TO A DEPTH OF NOT LESS THAN (8) EIGHT INCHES AND SOIL AMENDMENT SHALL BE THOROUGHLY INCORPORATED INTO THE SOIL OF ALL LANDSCAPE AREAS TO A DEPTH OF AT LEAST SIX (6) INCHES BY TILLING, DISCING OR OTHER SUITABLE METHOD, AT A RATE OF AT LEAST THREE (3) CUBIC YARDS OF SOIL AMENDMENT PER ONE THOUSAND (1,000) SQUARE FEET OF LANDSCAPE AREA. 9. TO THE MAXIMUM EXTENT FEASIBLE, TOPSOIL THAT IS REMOVED DURING CONSTRICTION ACTIVITY SHALL BE CONSERVED FOR LATER USE ON AREAS REQUIRING REVEGETATION AND LANDSCAPING. 10. MINOR CHANGES IN SPECIES AND PLANT LOCATIONS MAY BE MADE DURING CONSTRUCTION, AS REQUIRED BY SITE CONDITIONS, OR PLANT AVAILABILITY. OVERALL QUANTITY, QUALITY, AND DESIGN CONCEPT TO BE CONSISTENT WITH APPROVED PLANS. IN THE EVENT OF CONFLICT WITH THE QUANTITIES INCLUDED IN THE PLANT LIST, SPECIES AND QUANTITIES ILLUSTRATED SHALL BE PROVIDED. ALL CHANGES OF SPECIES AND LOCATION WITH THE NATURAL FEATURE BUFFER ZONE SHALL REQUIRE APPROVAL BY THE CITY'S ENVIRONMENTAL PLANNER, CURRENT PLANNING DEPARTMENT PRIOR TO INSTALLATION. 11. ALL LANDSCAPING PROPOSED WITH INSTALLATION, MUST BE INSTALLED OR SECURED WITH AN IRREVOCABLE LETTER OF CREDIT, PERFORMANCE BOND, OR ESCROW ACCOUNT FOR 125% OF THE VALUATION OF THE MATERIALS AND INSTALLATION PRIOR TO ISSUANCE OF A FINAL CERTIFICATE OF OCCUPANCY. 12. DEVELOPER SHALL ENSURE THAT THE LANDSCAPE PLAN IS COORDINATED WITH THE PLANS DONE BY OTHER CONSULTANTS SO THE PROPOSED GRADING, STORM DRAINAGE, OR OTHER CONSTRUCTION, DOES NOT CONFLICT, NOR PRECLUDE INSTALLATION AND MAINTENANCE OF LANDSCAPE ELEMENTS ON THIS PLAN. 13. THE LANDSCAPE IRRIGATION SYSTEM NEEDS TO BE REVIEWED AND APPROVED BY THE CITY OF FORT COLLINS PRIOR TO THE ISSUANCE OF A BUILDING PERMIT. 14. COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN ADJACENT ROW, MEDIANS, AND TRAFFIC CIRCLES ARE TO BE MAINTAINED BY A HOME OWNERS ASSOCIATION. 15. A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR SHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED ON THE PUBLIC RIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS, AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVED THE LOCATION AND SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT MAY RESULT IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY. 16. THE DEVELOPER SHALL CONTACT THE CITY FORESTER TO INSPECT ALL STREET TREE PLANTINGS AT THE COMPLETION OF THE DEVELOPMENT. ALL TREES NEED TO HAVE BEEN INSTALLED AS SHOWN ON THE LANDSCAPE PLAN. APPROVAL OF STREET TREE PLANTING IS REQUIRED BEFORE FINAL APPROVAL OF EACH PHASE. FAILURE TO OBTAIN APPROVAL BY THE CITY FORESTER FOR STREET TREES IN A PHASE SHALL RESULT IN A HOLD ON CERTIFICATE OF OCCUPANCY FOR FUTURE PHASES OF THE DEVELOPMENT. 17. TREES SHALL BE PLANTED A MINIMUM OF 8 FEET FROM DRIVEWAY EDGES PER 3.2.1(D)(2)(a). 18. STREET TREES SHALL BE SUPPLIED AND PLANTED BY THE DEVELOPER USING A QUALIFIED LANDSCAPE CONTRACTOR. 19. STREET TREES SHALL BE INSTALLED BY RESIDENTIAL LOTS BY THE DEVELOPER AT TIME OF CO, UNLESS TIME OF YEAR LIMITS TREE PLANTING, IN WHICH CASE RESIDENTIAL STREET TREES SHALL BE PLANTED WITHIN 6 MONTHS OF CO. 20. THE DEVELOPER SHALL REPLACE DEAD OR DYING STREET TREES AFTER PLANTING UNTIL FINAL INSPECTION AND MAINTENANCE ACCEPTANCE BY THE CITY OF FORT COLLINS FORESTRY DIVISION. ALL STREET TREES MUST BE ESTABLISHED, OF AN APPROVED SPECIES AND OF ACCEPTABLE CONDITION PRIOR TO ACCEPTANCE. 21. STREET TREE LOCATIONS AND NUMBERS MAY BE ADJUSTED TO ACCOMMODATE DRIVEWAY LOCATIONS, UTILITY SEPARATIONS BETWEEN TREES, STREET SIGNS, AND STREET LIGHTS. 22. STREET TREES TO BE CENTERED IN THE MIDDLE OF THE LOT TO THE EXTENT FEASIBLE. QUAINTEST SHOWN ON PLANS MUST E INSTALLED UNLESS A REDUCTION OCCURS TO MEET SEPARATION STANDARDS. Spring Creek Farms North POLICE FACILITY MMN ZONE Proposed Planting List Code Scientific Name Common Name Qty. Size Water Use % Diversity DECIDUOUS TREES CASP Catalpa speciosa Western Catalpa 12 2" cal Low 7% CEOC Celtis occidentalis Western Hackberry 11 2" cal Low 6% CRCI Crataegus crus-galli 'Inermis' Thornless Cockspur Hawthorne 9 1.5" cal Low 5% GLTR Gleditsia tri. inermis 'Skyline' Skyline Honeylocust 20 2" cal Low 12% GYDE Gymnocladus dioicus 'Espresso' Esspresso Coffeetree 12 2" cal Low 7% MARA Malus 'Radiant' Radiant Crabapple 9 1.5" cal Low 5% QUMA Quercus macrocarpa Gall Resistant Burr Oak 14 2" cal Low 8% QURO Quercus Robur 'Boulevard' Boulevard English Oak 15 2" cal Mod 8% POAC Populus x acuminata Lanceleaf Cottonwood 6 2" cal Mod 3% PRAM Prunus americana American Plum 5 15 gal Mod 3% PYCA Pyrus calleryana 'Chanticleer' Chanticleer Pear 10 1.5" cal Mod 6% TICG Tilia cordata 'Greenspire' Greenspire Linden 15 2" cal Mod 9% ULFR Ulmus 'Accolade' Accolade Elm 10 2" cal Low 6% 148 EVERGREEN TREES PIFL Pinus flexilis Limber Pine 6 6' B&B Low 3% PINI Pinus nigra Austrian Pine 10 6' B&B Low 6% PIPU Picea pungens Colorado Blue Spruce 11 6' B&B Mod 6% 27 SHRUBS CHNA Chrysothamnus naseosus Rabbitbrush 25 5 gal Low PHMO Physocarpus monogynus Mountain Ninebark 3 5 gal Low PRVM Prunus vir. melanocarpa Native Chokecherry 16 5 gal Low JUCH Juniperus chinensis 'Holbert' Holbert Juniper 11 5 gal Low Landscape Hydrozone Breakdown Landscape Legend Item Area (sf) Hydrozone Water Use Turf Grass 33,958 sq ft Mod 10 gal/sf 339,580 gal Dryland Grass 36,390 sq ft Very Low 0 gal Low Water Shrub Beds 10,030 sq ft Low 3 gal/sf 30,090 gal Mod Water Shrub Beds 0 sq ft Mod 10 gal/sf 0 gal Low Water Perennial Beds 0 sq ft Low 3 gal/sf 0 gal Mod Water Perennial Beds 0 sq ft Mod 10 gal/sf 0 gal TOTAL 80,370 sq. ft. 369,670 gal 4.6 gal/sf Dryland Seed MIx Common Name Scientific Name Lb of PLS/AC Blue Grama Bouteloua gracilis 1.5 Bottlebrush Squirreltail Sitanion hystrix 6 Buffalo Grass (primed w/KNO3 Buchloe dactyloides 7 Greecrypn Needle Grass Stipa viridula 4 Prairie June Grass Koeleria cristata 2 Sand Dropseed Sporobulus cryptandrus 0.3 Sideoats Grama Bouteloua curtipendula 3.4 Western Wheatgrass Agropyron smithii 6 TOTAL 30.2 LBS/PLS Spring Creek Farms North PARCEL A E ZONE MATCHLINE SHEET 5 UNION PACIFIC RAILROAD POWER BIKE TRAIL BUFFERYARD TYPE LENGTH WIDTH MULTIPLIER CANOPY TREES REQUIRED / PROVIDED ORN. TREES REQUIRED / PROVIDED EVER. TREES REQUIRED / PROVIDED SHRUBS REQUIRED / PROVIDED B 362' 15'+30' EXISTING 45' TOTAL .5 8 / 5 8 / 8 6 / 11 45 / TBD W/ FINAL Landscape Bufferyard 17 18 19 20 21 22 23 24 25 26 27 28 29 30* 31* 32* 33* 34 35 36 37* 38* DRIVEWAY LOCATION (TYP) 7 PARKING SPACES 9' 18' 28' TRACT C 6' U.& D. EASEMENT (TYP) 9' UTIL. EASEMENT 9' UTIL. EASEMENT 9' UTIL. EASEMENT 9' UTIL. EASEMENT 53' 30' 20' TRACT D PRIVATE DRIVE 53' 30' 53' 30' 8' U.& D. EASEMENT (TYP) 8' U.& D. EASEMENT (TYP) PED. RAMPS (TYP) PED. RAMPS (TYP) 6' U.& D. & DRAINAGE EASEMENT MMN SPRING CREEK FARMS NORTH SECOND REAR YARD FENCES AT PRIVATE DRIVE (TYP) TO BE LOCATED 8' BACK OF CURB 53' 30' 53' 30' 6' U.& D. EASEMENT (TYP) JOSEPH ALLEN DRIVE ADOBE DRIVE (LOCAL 53' ROW) SPRING FARM DRIVE (LOCAL 53' ROW) CHARLES BROCKMAN DR. (LOCAL 53' ROW) LMN ZONE DISTRICT LMN NOT A PART BLOCK 5 BLOCK 3 END OF WALL .5' WALL 2.51' WALL 3.38' WALL 5.55' WALL 4.19' WALL 3.47' WALL 2.64' WALL 2.08' WALL 8'-0" O.C. (TYP.) FRONT BACK 1x4 PICKETS (TYP) 2X4 RAIL (TYP) 6X6 POST, 8' O.C. (TYP) 2X6 CAP RAIL (TYP) 3'-0" 6'-0" 2X6 CAP RAIL 1X4 PICKET FLUSH WITH BACK OF POST 2X4 RAILS ON BACK SIDE OF FENCE (TYP) 2X4 RAIL FINISH GRADE HOLD TOP OF FOOTING 4" BELOW FINISH GRADE TO ACCOMODATE BOTTOM COURSE OF WALL 10" DIA. CONCRETE FOOTING (TYP ALL POSTS) THIS SIDE FACES OPEN SPACE 6x6 POST (TYP) 3" 1" CHAMFER TYP. PROPERTY LINE SET FACE OF POSTS 10" BEHIND PROPERTY LINE ON LOT SIDE SET FIRST COURSE OF WALL 6" BACK OF PROPERTY LINE ON LOT SIDE SPECIFIED MODULAR WALL SYSTEM, INSTALL PER MANUFACTURER OR STRUCTURAL ENGINEER SPECIFICATIONS 2" MAXIMUM GAP TO FINAL GRADE KEYSTONE MODULAR WALL SYSTEM STRAIGHT FACE LIGHT TAN COLOR 6'-0" HEIGHT VARIES, 6" MIN, 5.5' MAX. AVERAGE HEIGHT ABOUT 3' FINISH GRADE AT OPEN SPACE OPEN SPACE SIDE LOT SIDE 6'-0" 8'-0" O.C. (TYP.) FRONT BACK 6" 3'-0" 6'-0" 1x4 PICKETS (TYP) 2X4 RAIL (TYP) 2X6 CAP RAIL (TYP) 2" MAXIMUM GAP TO FINAL GRADE 4x4 POST, 8' O.C. (TYP) 2X6 CAP RAIL 1X4 PICKET FLUSH WITH BACK OF POST 2X4 RAILS ON BACK SIDE OF FENCE (TYP) 2X4 RAIL FINISH GRADE HOLD TOP OF FOOTING 3" BELOW FINISH GRADE 10" DIA. CONCRETE FOOTING (TYP ALL POSTS) THIS SIDE FACES STREET/O.S. 4x4 POST (TYP) NOTE: CAP, FASCIA, RAILS ETC. SHALL BE PARALLEL FENCE TO STEP WITH THE GRADE. NORTH Planning Landscape Architecture Graphics SHEET TITLE: SHEET NO: OF PO Box 1889 Fort Collins, Colorado 80522-1889 970.472.9125 T 866.902.4163 F www.vignettestudios.com ACAD FILE: DRAWN: CHECKED: JOB NO: REVISIONS DATE ISSUE DATE: CLIENT SCALE 1"=50' 0 25 50 FORT COLLINS, COLORADO PROJECT DEVELOPMENT PLAN Filing No. 4 Spring Creek Farms North North SITE PLAN 3 5 COMMENTS COMMENTS 13502 13502 PDP1 TCH TCH 10/9/13 11/26/13 April 10, 2013 100 Site Plan Legend LOT TYPE SUMMARY (A) ALLEY LOAD HOMES 47' X 100' 8 10% (B1) SINGLE FAMILY 50' X 100' 28 37% (B2) SINGLE FAMILY 52' X 100' 10 13% (C) SINGLE FAMILY 60' X 100' 24 32% (D) SINGLE FAMILY 70' X 100' 6 8% TOTAL UNITS 76 MATCHLINE SHEET 2 UNION PACIFIC RAILROAD POWER BIKE TRAIL 6' FENCE AND WALL DETAIL AT WEST PROPERTY LINE SCALE 1/2"= 1'-0" 6' FENCE DETAIL (TYP) SCALE 1/2"= 1'-0" BLOCK 2 1 2 3 4 5 6 7 8 9 10 11 12 13 1* 2* 3 4 1 2 3 DRIVEWAY LOCATION (TYP) 9' UTIL. EASEMENT 9' UTIL. EASEMENT 9' UTIL. EASEMENT 9' UTIL. EASEMENT 53' 30' 53' 30' TRACT A 50' 53' 30' 20' IRRIGATION & UTIL. EASEMENT 6' U.&D. EASEMENT (TYP) 6' U.& D. EASEMENT EACH SIDE (TYP) 6' U.& D. EASEMENT PED. RAMPS (TYP) PED. RAMPS (TYP) LMN ZONE DISTRICT 53' 30' TRACT B BLOCK 6 NANCY GRAY AVENUE JOSEPH ALLEN DRIVE CHARLES BROCKMAN DR. (LOCAL 53' ROW) ADOBE DRIVE (LOCAL 53' ROW) NANCY GRAY AVE (LOCAL 53' ROW) E ZONE DISTRICT BLOCK 1 2.08' WALL 1.56' WALL 1.2' WALL 1.19' WALL 1.15' WALL .86' WALL 1.04' WALL 1.2' WALL .61 WALL END OF WALL 2.09' WALL PROPERTY LINE U.& D.ITY EASEMENT FLOWLINE, CURB & GUTTER PROPOSED WALK MATCHLINE NEW 6' WOOD FENCE LOT LINE RIGHT OF WAY LINE LIMITS OF DISTURBANCE CENTERLINE BUILDING ENVELOPE HANDICAP RAMP HANDICAP PARKING R NORTH Planning Landscape Architecture Graphics SHEET TITLE: SHEET NO: OF PO Box 1889 Fort Collins, Colorado 80522-1889 970.472.9125 T 866.902.4163 F www.vignettestudios.com ACAD FILE: DRAWN: CHECKED: JOB NO: REVISIONS DATE ISSUE DATE: CLIENT SCALE 1"=50' 0 25 50 FORT COLLINS, COLORADO PROJECT DEVELOPMENT PLAN Filing No. 4 Spring Creek Farms North North SITE PLAN 2 5 COMMENTS COMMENTS 13502 13502 PDP1 TCH TCH 10/9/13 11/26/13 April 10, 2013 100 Site Plan Legend LOT TYPE SUMMARY (A) ALLEY LOAD HOMES 47' X 100' 8 10% (B1) SINGLE FAMILY 50' X 100' 28 37% (B2) SINGLE FAMILY 52' X 100' 10 13% (C) SINGLE FAMILY 60' X 100' 24 32% (D) SINGLE FAMILY 70' X 100' 6 8% TOTAL UNITS 76 MATCHLINE SHEET 3 UNION PACIFIC RAILROAD POWER BIKE TRAIL 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30* 31* 32* 33* 34 35 36 37* 38* 1* 2* 3 4 1 2 3 TRACT C TRACT D PRIVATE DRIVE TRACT A TRACT B BLOCK 6 BLOCK 1 BLOCK 5 BLOCK 3 SITE LOCATION TIMBERLINE ROAD PROSPECT STREET COUNTY ROAD 9 I - ZONING E - ZONING MMN - ZONING 1 MILE RADIUS DRAKE ROAD LEMAY AVE MMN - ZONING MMN - ZONING POL - ZONING I - ZONING RL - ZONING NC - ZONING LMN - ZONING MMN - ZONING UNION PACIFIC RAILROAD E - ZONING LMN - ZONING NORTH Planning Landscape Architecture Graphics SHEET TITLE: SHEET NO: OF PO Box 1889 Fort Collins, Colorado 80522-1889 970.472.9125 T 866.902.4163 F www.vignettestudios.com ACAD FILE: DRAWN: CHECKED: JOB NO: REVISIONS DATE ISSUE DATE: CLIENT SCALE 1"=100' 0 50 100 FORT COLLINS, COLORADO PROJECT DEVELOPMENT PLANS Filing No. 4 Spring Creek Farms North North COVER SHEET 1 5 COMMENTS COMMENTS 13502 13502 PDP1 TCH TCH 10/9/13 11/26/13 April 10, 2013 CONTEXT DIAGRAM 200 SCALE 1" = 120' SHEET INDEX 1. COVER SHEET 2. SITE PLAN 3. SITE PLAN 4. LANDSCAPE PLAN 5. LANDSCAPE PLAN NORTH VICINITY MAP SCALE 1"=2000' APPROXIMATE A tract of land located in the Southeast One-quarter of Section 19, Township 7 North, Range 68 West of the Sixth Principal Meridian being more particularly described as follows: &RPPHQFLQJDWWKH6RXWKHDVWFRUQHURI6HFWLRQ7KHQFH1ƒ :IHHWWRWKH6RXWKZHVW FRUQHURI2XWORW$6SULQJ&UHHN)DUPV1RUWK1RUWK7KHQFH1ƒ :IHHWDORQJWKH:HVWOLQHRI VDLG2XWORW$WRWKH32,172)%(*,11,1*7KHQFH1ƒ :IHHWFRQWLQXLQJDORQJVDLG:HVW OLQHWRWKH1RUWKZHVWFRUQHURIVDLG2XWORW$7KHQFH1ƒ (IHHWDORQJDSRUWLRQRIWKH1RUWK line of said Outlot A to the West line of the Public Right-of-way recorded at Reception No. 20060031327; 7KHQFH6ƒ (IHHWDORQJVDLG:HVWOLQH7KHQFHDORQJWKH:HVWHUO\5LJKWRIZD\OLQHVRI-RVHSK Allen Drive as shown on the plat of Spring Creek Farms North North and Spring Creek Farms North North )LOLQJ1RWKHIROORZLQJ1LQH  FRXUVHV6ƒ :IHHWIHHWDORQJWKHDUFRIDFXUYH FRQFDYHWRWKH1RUWKZHVWVDLGFXUYHKDYLQJDUDGLXVRIIHHWDGHOWDDQJOHRIƒ DQGZKRVHORQJ FKRUGEHDUV6ƒ :IHHW6ƒ (IHHWIHHWDORQJWKHDUFRIDFXUYH FRQFDYHWRWKH6RXWKZHVWVDLGFXUYHKDYLQJDUDGLXVRIIHHWDGHOWDDQJOHRIƒ DQGZKRVHORQJ FKRUGEHDUV6ƒ (IHHW6ƒ (IHHWIHHWDORQJWKHDUFRIDFXUYH FRQFDYHWRWKH1RUWKZHVWVDLGFXUYHKDYLQJDUDGLXVRIIHHWDGHOWDDQJOHRIƒ DQGZKRVHORQJ FKRUGEHDUV6ƒ :IHHW6ƒ (IHHWIHHWDORQJWKHDUFRIDFXUYH FRQFDYHWRWKH6RXWKZHVWVDLGFXUYHKDYLQJDUDGLXVRIIHHWDGHOWDDQJOHRIƒ DQGZKRVHORQJ FKRUGEHDUV6ƒ (IHHWDQG6ƒ (IHHWWRWKH1RUWKHDVWFRUQHURI7UDFW$ 6SULQJ&UHHN)DUPV1RUWK1RUWK)LOLQJ1R7KHQFH1ƒ :IHHWDORQJWKH1RUWKOLQHRIVDLG 7UDFW$7KHQFH6ƒ (IHHWDORQJWKH:HVWOLQHRIVDLG7UDFW$7KHQFH1ƒ ( IHHWDORQJWKH6RXWKOLQHRIVDLG7UDFW$WRWKH6RXWKHDVWFRUQHURIVDLG7UDFW$7KHQFH6ƒ ( IHHWDORQJWKH:HVWOLQHRI-RVHSK$OOHQ'ULYH7KHQFH6ƒ :IHHWWRWKH32,172) BEGINNING. Property Description 1. SEE SUBDIVISION PLAT AND U.& D.ITY PLANS FOR DESIGN OF ALL EASEMENTS, LOT AREAS AND DIMENSIONS, AND DESIGN OF STREETS AND WALKS. 2. PUBLIC STREETS WILL MEET OR EXCEED CITY OF FORT COLLINS DESIGN CRITERIA. 3. COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN ADJACENT ROW, MEDIANS, AND TRAFFIC CIRCLES ARE TO BE MAINTAINED BY A HOMEOWNERS ASSOCIATION. 4. SIGNS TO COMPLY WITH CITY SIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED. 5. WITH FINAL DEVELOPMENT PLANS, DEVELOPER SHALL ENSURE THAT THE LANDSCAPE PLAN IS COORDINATED WITH THE PLANS DONE BY OTHER CONSULTANTS SO THAT THE PROPOSED GRADING, STORM DRAINAGE, OR OTHER CONSTRUCTION DOES NOT CONFLICT WITH, NOR PRECLUDE INSTALLATION AND MAINTENANCE OF LANDSCAPE ELEMENTS ON THIS PLAN. 6. LIGHTING WITHIN THE PROJECT SHALL COMPLY WITH CITY OF FORT COLLINS LIGHT AND POWER UTILITY REQUIREMENTS AND SECTION 3.2.4 OF THE LAND USE CODE. 7. TO MEET THE REQUIREMENTS OF 3.5.2 (B) OF THE LAND USE CODE, A MINIMUM OF 3 HOUSING MODELS FOR THE SINGLE FAMILY HOMES SHALL BE REQUIRED. THESE HOUSING MODELS SHALL MEET OR EXCEED THE STANDARDS AS OUTLINED IN 3.5.2(B)(2) OF THE LAND USE CODE. 8. ALL SINGLE FAMILY DETACHED HOMES SHALL MEET THE GARAGE DOOR STANDARDS AS OUTLINED IN 3.5.2(E) OF THE LAND USE CODE WHERE FACING PUBLIC STREETS. 9. PRIVATE CONDITIONS, COVENANTS, AND RESTRICTIONS (CC&R'S), OR ANY OTHER PRIVATE RESTRICTIVE COVENANT IMPOSED ON LANDOWNERS WITHIN THE DEVELOPMENT, MAY NOT BE CREATED OR ENFORCED WHICH HAS THE EFFECT OF PROHIBITING OR LIMITING THE INSTALLATION OF XERISCAPE LANDSCAPING, SOLAR/PHOTO-VOLTAIC COLLECTORS (IF MOUNTED FLUSH UPON ANY ESTABLISHED ROOF LINE), CLOTHES LINES (IF LOCATED IN BACK YARDS), ODOR-CONTROLLED COMPOST BINS, OR WHICH HAS THE EFFECT OF REQUIRING THAT A PORTION OF ANY INDIVIDUAL LOT BE PLANTED IN TURF GRASS. 10. THE SOIL IN ALL LANDSCAPE AREAS, INCLUDING PARKWAYS AND MEDIANS, SHALL BE THOROUGHLY LOOSENED TO A DEPTH OF NOT LESS THAN EIGHT INCHES AND SOIL AMENDMENT SHALL BE THOROUGHLY INCORPORATED INTO THE SOIL OF ALL LANDSCAPE AREAS TO A DEPTH OF AT LEAST 6 INCHES BY TILLING, DISKING OR OTHER SUITABLE METHOD, AT A RATE OF AT LEAST 3 CUBIC YARDS OF SOIL AMENDMENT PER 1,000 SQUARE FEET OF LANDSCAPE AREA. 11. A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR SHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED ON THE PUBLIC RIGTH-OF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT MAY RESULT IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY. 12. THE DEVELOPER SHALL CONTACT THE CITY FORESTER TO INSPECT ALL STREET TREE PLANTINGS AT THE COMPLETION OF DEVELOPMENT. ALL TREES NEED TO HAVE BEEN INSTALLED AS SHOWN ON THE LANDSCAPE PLAN. APPROVAL OF STREET TREE PLANTING IS REQUIRED BEFORE FINAL APPROVAL OF EACH PHASE. FAILURE TO OBTAIN APPROVAL BY THE CITY FORESTER FOR STREET TREES IN A PHASE SHALL RESULT IN A HOLD ON CERTIFICATE OF OCCUPANCY FOR FUTURE PHASES OF THE DEVELOPMENT. General Notes: OWNER'S CERTIFICATION THE UNDERSIGNED DOES/DO HEREBY CERTIFY THAT I/WE ARE THE LAWFUL OWNERS OF REAL PROPERTY DESCRIBED ON THIS SITE PLAN AND DO HEREBY CERTIFY THAT I/WE ACCEPT THE CONDITIONS AND RESTRICTIONS SET FORTH ON SAID SITE PLAN. NOTARY CERTIFICATE STATE OF COLORADO ss.) COUNTY OF ) SUBSCRIBED and sworn to before this day of 20 by. WITNESS my hand and official seal. My commission expires: Notary Public OWNER DATE DIRECTOR OF PLANNING APPROVED BY THE DIRECTOR OF PLANNING OF THE CITY OF FORT COLLINS, COLORADO, THIS DAY OF A.D. 20 DIRECTOR OF PLANNING Signatures Landuse Breakdown LMN E Total GROSS AREA 13.05 AC 2.18 AC 15.23 AC DWELLING UNITS 69 UNITS 7 UNITS 76 UNITS GROSS DENSITY 5.29 DU/AC 3.21 DU/AC 4.99 DU/AC NET DENSITY 5.29 DU/AC 3.21 DU/AC 4.99 DU/AC SOLAR ORIENTATION 23 2 25 32.9% COVERAGE STREET ROW 123,147 SF 18,616 SF 141,763 SF 21.37 % PRIVATE DRIVES 4,185 SF 4,185 SF 0.63 % LOTS 411,293 SF 41,118 SF 452,411 SF 68.19 % OPEN SPACE 29,832 SF 35,227 SF 65,059 SF 9.81 % TOTAL 568,457 SF 94,961 SF 663,418 SF 100 % Building Setbacks PER LAND USE CODE FOR LMN DISTRICT Other ZONING LMN & E MAXIMUM BUILDING HEIGHT 3 STORIES FORT COLLINS POLICE FACILITY MMN ZONE VACANT E ZONE PARKWOOD EAST RL ZONE UNION PACIFIC RAILROAD SPRING CREEK FARMS NORTH SECOND FILING MMN ZONE OUTLOT A SPRING CREEK FARMS NORTH NOT A PART LMN ZONE POWER BIKE TRAIL EAST DRAKE ROAD CHARLES BROCKMAN DRIVE NANCY GRAY AVENUE JOSEPH ALLEN DRIVE TIMBERLINE ROAD SITE LMN ZONE E ZONE SPRING CREEK FARMS NORTH THIRD FILING LMN ZONE