Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BRINKMAN HEADQUARTERS - PDP/FDP - FDP130050 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONS
PROJECT LOCATION 141 S. Broadway, Suite 202 Denver, Colorado 80209 303 640 3173 open studio | architecture OSA PROJECT NO. COPYRIGHT architect: VICINITY MAP NTS 2013 open studio | architecture contractor: 3003 E. Harmony Rd #300 Fort Collins, CO 80528 (970)267-0954 structural engineer: mechanical / plumbing engineers: Brinkman Construction 19 Old Town Square, # 238 Fort Collins, CO 80524 (970)568-3355 Blake Larsen Larsen Structural Design electrical engineer: owner: 3003 E. Harmony Rd #300 Fort Collins, CO 80528 (970)267-0954 Brinkman Partners landscape architect: 141 College Ave, #104 Fort Collins, CO 80524 (970)484-8855 Paul Mills Russell+Mills Studios 5587 W. 19th Street Greeley, CO 80634 (970)576-3260 Alicia Thorpe AE Associates 9249 S. Broadway #200 Highlands Ranch, CO 80129 (303)287-8091 Chuck Polson Adonai Professional Services 2013-009 Harmony Technology Park PDP SUBMITTAL DEC. 10, 2013 Brinkman HQ Brinkman HQ PDP SUBMITTAL DEC. 10, 2013 LEVEL 1 PLAN 100'-0" ROOF 128'-0" LEVEL 2 PLAN 114'-0" F E D C B A 2'-0" 14'-0" 14'-0" 30'-0" 6'-0" 2'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 8'-0" 160'-0" 4 1 7 11 6 6 7 2 4 5 5 8 T.O. MECH SCREEN 136'-0" TYP. TYP. 13 14 16 15 15 36'-0" 17 TYP. LEVEL 1 PLAN 100'-0" ROOF 128'-0" LEVEL 2 PLAN 114'-0" 4 3 2 1 85'-0" 14'-0" 14'-0" 2'-0" 30'-0" 6'-0" 1 6 5 7 11 11 5 1 7 12 2 4 3 LEVEL 1 PLAN 100'-0" ROOF 128'-0" LEVEL 2 PLAN 114'-0" 1 2 3 4 2'-0" 14'-0" 14'-0" 30'-0" 6'-0" 6'-0" 40'-0" 40'-0" 40'-0" 3'-0" 129'-0" 14 1 4 2 7 3 5 6 5 8 T.O. MECH SCREEN 136'-0" TYP. 13 15 11 15 16 19 18 17 TYP. 36'-0" LEVEL 1 PLAN 100'-0" ROOF 128'-0" LEVEL 2 PLAN 114'-0" A B C D E F 8'-0" 30'-0" 30'-0" 28'-0" 2'-0" 10'-0" 20'-0" 30'-0" 2'-0" 96'-0" 64'-0" 2'-0" 14'-0" 14'-0" 30'-0" 6'-0" 5 4 2 11 12 7 2 9 9 5 1 8 10 6 4 T.O. MECH SCREEN 136'-0" 13 TYP. TYP. TYP. TYP. TYP. 15 16 14 15 19 36'-0" 2 17 TYP. LEVEL 1 PLAN 100'-0" ROOF 128'-0" LEVEL 2 PLAN 114'-0" 5 2 4 2'-0" 14'-0" 14'-0" 30'-0" TYP. TYP. 1'-0" 3'-10" LEVEL 1 PLAN 100'-0" ROOF 128'-0" LEVEL 2 PLAN 114'-0" 14'-0" 14'-0" 2'-0" 30'-0" 1 141 S. Broadway, Suite 202 Denver, Colorado 80209 303 640 3173 open studio | architecture scale: drawn by: checked by: OSA project no.: FOR PLANNING PURPOSES ONLY THIS DOCUMENT MAY BE OBSOLETE AT ANY TIME AND SHOULD IN NO WAY BE CONSIDERED BINDING OR VALID FOR ANY TYPE OF CONSTRUCITON. copyright: 2013 open studio | architecture architect: project: sheet title: date: 1 2 3 4 5 6 Rev. Iss. Description Date 1/8" = 1'-0" 12/10/2013 3:00:58 PM A9.02 EXTERIOR ELEVATIONS Brinkman HQ BV JT 2013-009 PDP SUBMITTAL Harmony Technology Park DEC. 10, 2013 Brinkman HQ 1/8" = 1'-0" 2 SOUTH ELEVATION 1/8" = 1'-0" 1 WEST ELEVATION KEYNOTES - BUILDING ELEVATIONS 1 1. METAL WALL PANEL OR COMPOSITE PANEL "A" 2 2. METAL WALL PANEL OR COMPOSITE PANEL "B" 3 3. METAL WALL PANEL OR COMPOSITE PANEL "C" 4 4. BREAK METAL, FINISH TO MATCH WALL PANEL "A" 5 5. STOREFRONT A: KAWNEER TRIFAB 451T WITH 1" INSULATED GLASS 6 6. STOREFRONT B: KAWNEER TRIFAB 451T WITH 1" INSULATED GLASS 7 7. 4 x 4 x 12 BRICK VENEER 8 8. 6" T-SHAPED MULLION CAP 9 9. CURTAIN WALL SYSTEM w/ 1" INSULATED GLASS 10 10. 1" INSULATED SPANDREL GLASS 11 11. METAL WALL PANEL OR COMPOSITE PANEL "D" 12 12. 12" DIAMETER, TWO PIECE PRE-FINISHED COLUMN COVER 13 13. THROUGH WALL LAMB’S TONGUE SCUPPER 14 14. MECHANICAL SCREEN WALL 15 15. PROVIDE SOLID BRICK AT CAP 16 16. PREFINISHED METAL COPING TO MATCH METAL PANELS BELOW 17 17. CONTROL JOINT 18 18. HM DOOR 19 19. BREAK METAL, TO MATCH WALL PANEL "C" 20 20. OVERHEAD COILING DOOR 0' 8' 16' 24' 0' 8' 16' 24' 1/8" = 1'-0" 3 NORTH CANOPY ELEVATION 1/8" = 1'-0" 4 SOUTH CANOPY ELEVATION 2'-0" 40'-0" 40'-0" 2'-0" 5'-0" 39'-0" T.O. MECH SCREEN 136'-0" TYP. 14 16 16 15 19 36'-0" 20 141 S. Broadway, Suite 202 Denver, Colorado 80209 303 640 3173 open studio | architecture scale: drawn by: checked by: OSA project no.: FOR PLANNING PURPOSES ONLY THIS DOCUMENT MAY BE OBSOLETE AT ANY TIME AND SHOULD IN NO WAY BE CONSIDERED BINDING OR VALID FOR ANY TYPE OF CONSTRUCITON. copyright: 2013 open studio | architecture architect: project: sheet title: date: 1 2 3 4 5 6 Rev. Iss. Description Date 1/8" = 1'-0" 12/10/2013 3:00:57 PM A9.01 EXTERIOR ELEVATIONS Brinkman HQ BV JT 2013-009 PDP SUBMITTAL Harmony Technology Park DEC. 10, 2013 Brinkman HQ 1/8" = 1'-0" 1 EAST ELEVATION 1/8" = 1'-0" 2 NORTH ELEVATION 0' 8' 16' 24' 0' 8' 16' 24' KEYNOTES - BUILDING ELEVATIONS 1 1. METAL WALL PANEL OR COMPOSITE PANEL "A" 2 2. METAL WALL PANEL OR COMPOSITE PANEL "B" 3 3. METAL WALL PANEL OR COMPOSITE PANEL "C" 4 4. BREAK METAL, FINISH TO MATCH WALL PANEL "A" 5 5. STOREFRONT A: KAWNEER TRIFAB 451T WITH 1" INSULATED GLASS 6 6. STOREFRONT B: KAWNEER TRIFAB 451T WITH 1" INSULATED GLASS 7 7. 4 x 4 x 12 BRICK VENEER 8 8. 6" T-SHAPED MULLION CAP 9 9. CURTAIN WALL SYSTEM w/ 1" INSULATED GLASS 10 10. 1" INSULATED SPANDREL GLASS 11 11. METAL WALL PANEL OR COMPOSITE PANEL "D" 12 12. 12" DIAMETER, TWO PIECE PRE-FINISHED COLUMN COVER 13 13. THROUGH WALL LAMB’S TONGUE SCUPPER 14 14. MECHANICAL SCREEN WALL 15 15. PROVIDE SOLID BRICK AT CAP 16 16. PREFINISHED METAL COPING TO MATCH METAL PANELS BELOW 17 17. CONTROL JOINT 18 18. HM DOOR 19 19. BREAK METAL, TO MATCH WALL PANEL "C" 20 20. OVERHEAD COILING DOOR