Loading...
HomeMy WebLinkAboutBRINKMAN HEADQUARTERS - PDP/FDP - FDP130050 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONS (3)PROJECT LOCATION 141 S. Broadway, Suite 202 Denver, Colorado 80209 303 640 3173 open studio | architecture OSA PROJECT NO. COPYRIGHT architect: VICINITY MAP NTS 2013 open studio | architecture contractor: 3003 E. Harmony Rd #300 Fort Collins, CO 80528 (970)267-0954 structural engineer: mechanical / plumbing engineers: Brinkman Construction 19 Old Town Square, # 238 Fort Collins, CO 80524 (970)568-3355 Blake Larsen Larsen Structural Design electrical engineer: owner: 3003 E. Harmony Rd #300 Fort Collins, CO 80528 (970)267-0954 Brinkman Partners landscape architect: 141 College Ave, #104 Fort Collins, CO 80524 (970)484-8855 Paul Mills Russell+Mills Studios 5587 W. 19th Street Greeley, CO 80634 (970)576-3260 Alicia Thorpe AE Associates 9249 S. Broadway #200 Highlands Ranch, CO 80129 (303)287-8091 Chuck Polson Adonai Professional Services 2013-009 Harmony Technology Park PDP SUBMITTAL DEC. 10, 2013 Brinkman HQ Brinkman HQ PDP SUBMITTAL DEC. 10, 2013 141 S. Broadway, Suite 202 Denver, Colorado 80209 303 640 3173 open studio | architecture scale: drawn by: checked by: OSA project no.: FOR PLANNING PURPOSES ONLY THIS DOCUMENT MAY BE OBSOLETE AT ANY TIME AND SHOULD IN NO WAY BE CONSIDERED BINDING OR VALID FOR ANY TYPE OF CONSTRUCITON. copyright: 2013 open studio | architecture architect: project: sheet title: date: 1 2 3 4 5 6 Rev. Iss. Description Date 1/8" = 1'-0" 12/10/2013 4:31:27 PM A9.01c EXTERIOR ELEVATIONS Brinkman HQ BV JT 2013-009 PDP SUBMITTAL Harmony Technology Park DEC. 10, 2013 Brinkman HQ LEVEL 1 PLAN 100'-0" ROOF 128'-0" LEVEL 2 PLAN 114'-0" F E D C B A 141 S. Broadway, Suite 202 Denver, Colorado 80209 303 640 3173 Brad VanArsdale open studio | architecture architect: project: Brinkman HQ - OPT 1 Harmony Technology Park Brinkman HQ - OPT 1 KEYNOTES - BUILDING ELEVATIONS 1/8" = 1'-0" 141 S. Broadway, Suite 202 Denver, Colorado 80209 303 640 3173 open studio | architecture scale: drawn by: checked by: OSA project no.: FOR PLANNING PURPOSES ONLY THIS DOCUMENT MAY BE OBSOLETE AT ANY TIME AND SHOULD IN NO WAY BE CONSIDERED BINDING OR VALID FOR ANY TYPE OF CONSTRUCITON. copyright: 2013 open studio | architecture architect: project: sheet title: date: 1 2 3 4 5 6 Rev. Iss. Description Date 1/8" = 1'-0" 12/10/2013 4:31:27 PM A9.02c EXTERIOR ELEVATIONS Brinkman HQ BV JT 2013-009 PDP SUBMITTAL Harmony Technology Park DEC. 10, 2013 Brinkman HQ LEVEL 1 PLAN 100'-0" ROOF 128'-0" LEVEL 2 PLAN 114'-0" 1 2 3 4 LEVEL 1 PLAN 100'-0" ROOF 128'-0" LEVEL 2 PLAN 114'-0" A B C D E F 141 S. Broadway, Suite 202 Denver, Colorado 80209 303 640 3173 Brad VanArsdale open studio | architecture scale: drawn by: checked by: OSA project no.: FOR PLANNING PURPOSES ONLY THIS DOCUMENT MAY BE OBSOLETE AT ANY TIME AND SHOULD IN NO WAY BE CONSIDERED BINDING OR VALID FOR ANY TYPE OF CONSTRUCITON. copyright: 2013 open studio | architecture architect: project: sheet title: date: 1 2 3 4 5 6 Rev. Iss. Description Date 1/8" = 1'-0" 9 PM ELEVATIONS Brinkman HQ - OPT 1 BV 2013-009 [project status here] Harmony Technology Park 2013-11-01 Brinkman HQ - OPT 1 DESIGN DEVELOPMENT 7/11/2013 0' 8' 16' 24' 0' 8' 16' 24' KEYNOTES - BUILDING ELEVATIONS 1/8" = 1'-0" 1 South Elevation 1/8" = 1'-0" 2 West Elevation LEVEL 1 PLAN 100'-0" ROOF 128'-0" LEVEL 2 PLAN 114'-0" 1 2 3 4 LEVEL 1 PLAN 100'-0" ROOF 128'-0" LEVEL 2 PLAN 114'-0" A B C D E F 141 S. Broadway, Suite 202 Denver, Colorado 80209 303 640 3173 Brad VanArsdale open studio | architecture drawn by: checked by: OSA project no.: FOR PLANNING PURPOSES ONLY THIS DOCUMENT MAY BE OBSOLETE AT ANY TIME AND SHOULD IN NO WAY BE CONSIDERED BINDING OR VALID FOR ANY TYPE OF CONSTRUCITON. copyright: 2013 open studio | architecture architect: project: date: 1 2 3 4 5 6 Rev. Iss. Description Date Brinkman HQ - OPT 1 BV 2013-009 [project status here] Harmony Technology Park 2013-11-01 Brinkman HQ - OPT 1 DESIGN DEVELOPMENT 7/11/2013 0' 8' 16' 24' KEYNOTES - BUILDING ELEVATIONS 1/8" = 1'-0" 1 South Elevation BRINKMAN HQ//SOUTH ELEVATION SCALE: 1’-0”=1/8” BRINKMAN HQ//WEST ELEVATION SCALE: 1’-0”=1/8” 2 East Elevation LEVEL 1 PLAN 100'-0" ROOF 128'-0" LEVEL 2 PLAN 114'-0" 4 3 2 1 LEVEL 1 PLAN 100'-0" scale: drawn by: checked by: OSA project no.: FOR PLANNING PURPOSES ONLY THIS DOCUMENT MAY BE OBSOLETE AT ANY TIME AND SHOULD IN NO WAY BE CONSIDERED BINDING OR VALID FOR ANY TYPE OF CONSTRUCITON. copyright: 2013 open studio | architecture sheet title: date: 1 2 3 4 5 6 Rev. Iss. Description Date 1/8" = 1'-0" 11/8/2013 2:49:40 PM A9.02 ELEVATIONS BV 2013-009 [project status here] 2013-11-01 Brinkman HQ OPT 1 DESIGN DEVELOPMENT 7/11/2013 1/8" = 1'-0" 1 North Elevation 1/8" = 1'-0" 2 East Elevation BRINKMAN HQ//NORTH ELEVATION SCALE: 1’-0”=1/8” BRINKMAN HQ//EAST ELEVATION SCALE: 1’-0”=1/8”