HomeMy WebLinkAboutBRINKMAN HEADQUARTERS - PDP/FDP - FDP130050 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONS (3)PROJECT
LOCATION
141 S. Broadway, Suite 202
Denver, Colorado 80209
303 640 3173
open studio | architecture
OSA PROJECT NO.
COPYRIGHT
architect:
VICINITY MAP NTS
2013 open studio | architecture
contractor:
3003 E. Harmony Rd #300
Fort Collins, CO 80528
(970)267-0954
structural engineer:
mechanical / plumbing engineers:
Brinkman Construction
19 Old Town Square, #
238
Fort Collins, CO 80524
(970)568-3355
Blake Larsen
Larsen Structural Design
electrical engineer:
owner:
3003 E. Harmony Rd #300
Fort Collins, CO 80528
(970)267-0954
Brinkman Partners
landscape architect:
141 College Ave, #104
Fort Collins, CO 80524
(970)484-8855
Paul Mills
Russell+Mills Studios
5587 W. 19th Street
Greeley, CO 80634
(970)576-3260
Alicia Thorpe
AE Associates
9249 S. Broadway #200
Highlands Ranch, CO
80129
(303)287-8091
Chuck Polson
Adonai Professional
Services
2013-009
Harmony Technology Park
PDP SUBMITTAL
DEC. 10, 2013
Brinkman HQ
Brinkman HQ
PDP SUBMITTAL
DEC. 10, 2013
141 S. Broadway, Suite 202
Denver, Colorado 80209
303 640 3173
open studio | architecture
scale:
drawn by:
checked by:
OSA project no.:
FOR PLANNING
PURPOSES ONLY
THIS DOCUMENT MAY BE
OBSOLETE AT ANY TIME AND
SHOULD IN NO WAY BE
CONSIDERED BINDING OR
VALID FOR ANY TYPE OF
CONSTRUCITON.
copyright: 2013 open studio | architecture
architect:
project:
sheet title:
date:
1
2
3
4
5
6
Rev. Iss. Description Date
1/8" = 1'-0"
12/10/2013 4:31:27 PM
A9.01c
EXTERIOR ELEVATIONS
Brinkman HQ
BV
JT
2013-009
PDP SUBMITTAL
Harmony Technology Park
DEC. 10, 2013
Brinkman HQ
LEVEL 1 PLAN
100'-0"
ROOF
128'-0"
LEVEL 2 PLAN
114'-0"
F E D C B A
141 S. Broadway, Suite 202
Denver, Colorado 80209
303 640 3173
Brad VanArsdale
open studio | architecture
architect:
project:
Brinkman HQ - OPT 1
Harmony Technology Park
Brinkman HQ -
OPT 1
KEYNOTES - BUILDING ELEVATIONS
1/8" = 1'-0"
141 S. Broadway, Suite 202
Denver, Colorado 80209
303 640 3173
open studio | architecture
scale:
drawn by:
checked by:
OSA project no.:
FOR PLANNING
PURPOSES ONLY
THIS DOCUMENT MAY BE
OBSOLETE AT ANY TIME AND
SHOULD IN NO WAY BE
CONSIDERED BINDING OR
VALID FOR ANY TYPE OF
CONSTRUCITON.
copyright: 2013 open studio | architecture
architect:
project:
sheet title:
date:
1
2
3
4
5
6
Rev. Iss. Description Date
1/8" = 1'-0"
12/10/2013 4:31:27 PM
A9.02c
EXTERIOR ELEVATIONS
Brinkman HQ
BV
JT
2013-009
PDP SUBMITTAL
Harmony Technology Park
DEC. 10, 2013
Brinkman HQ
LEVEL 1 PLAN
100'-0"
ROOF
128'-0"
LEVEL 2 PLAN
114'-0"
1 2 3 4
LEVEL 1 PLAN
100'-0"
ROOF
128'-0"
LEVEL 2 PLAN
114'-0"
A B C D E F
141 S. Broadway, Suite 202
Denver, Colorado 80209
303 640 3173
Brad VanArsdale
open studio | architecture
scale:
drawn by:
checked by:
OSA project no.:
FOR PLANNING
PURPOSES ONLY
THIS DOCUMENT MAY BE
OBSOLETE AT ANY TIME AND
SHOULD IN NO WAY BE
CONSIDERED BINDING OR
VALID FOR ANY TYPE OF
CONSTRUCITON.
copyright: 2013 open studio | architecture
architect:
project:
sheet title:
date:
1
2
3
4
5
6
Rev. Iss. Description Date
1/8" = 1'-0"
9 PM
ELEVATIONS
Brinkman HQ - OPT 1
BV
2013-009
[project status here]
Harmony Technology Park
2013-11-01
Brinkman HQ -
OPT 1
DESIGN DEVELOPMENT 7/11/2013
0' 8' 16' 24'
0' 8' 16' 24'
KEYNOTES - BUILDING ELEVATIONS
1/8" = 1'-0"
1
South Elevation
1/8" = 1'-0"
2
West Elevation
LEVEL 1 PLAN
100'-0"
ROOF
128'-0"
LEVEL 2 PLAN
114'-0"
1 2 3 4
LEVEL 1 PLAN
100'-0"
ROOF
128'-0"
LEVEL 2 PLAN
114'-0"
A B C D E F
141 S. Broadway, Suite 202
Denver, Colorado 80209
303 640 3173
Brad VanArsdale
open studio | architecture
drawn by:
checked by:
OSA project no.:
FOR PLANNING
PURPOSES ONLY
THIS DOCUMENT MAY BE
OBSOLETE AT ANY TIME AND
SHOULD IN NO WAY BE
CONSIDERED BINDING OR
VALID FOR ANY TYPE OF
CONSTRUCITON.
copyright: 2013 open studio | architecture
architect:
project:
date:
1
2
3
4
5
6
Rev. Iss. Description Date
Brinkman HQ - OPT 1
BV
2013-009
[project status here]
Harmony Technology Park
2013-11-01
Brinkman HQ -
OPT 1
DESIGN DEVELOPMENT 7/11/2013
0' 8' 16' 24'
KEYNOTES - BUILDING ELEVATIONS
1/8" = 1'-0"
1
South Elevation
BRINKMAN HQ//SOUTH ELEVATION
SCALE: 1’-0”=1/8”
BRINKMAN HQ//WEST ELEVATION
SCALE: 1’-0”=1/8”
2
East Elevation
LEVEL 1 PLAN
100'-0"
ROOF
128'-0"
LEVEL 2 PLAN
114'-0"
4 3 2 1
LEVEL 1 PLAN
100'-0"
scale:
drawn by:
checked by:
OSA project no.:
FOR PLANNING
PURPOSES ONLY
THIS DOCUMENT MAY BE
OBSOLETE AT ANY TIME AND
SHOULD IN NO WAY BE
CONSIDERED BINDING OR
VALID FOR ANY TYPE OF
CONSTRUCITON.
copyright: 2013 open studio | architecture
sheet title:
date:
1
2
3
4
5
6
Rev. Iss. Description Date
1/8" = 1'-0"
11/8/2013 2:49:40 PM
A9.02
ELEVATIONS
BV
2013-009
[project status here]
2013-11-01
Brinkman HQ
OPT 1
DESIGN DEVELOPMENT 7/11/2013
1/8" = 1'-0"
1
North Elevation
1/8" = 1'-0"
2
East Elevation
BRINKMAN HQ//NORTH ELEVATION
SCALE: 1’-0”=1/8”
BRINKMAN HQ//EAST ELEVATION
SCALE: 1’-0”=1/8”