Loading...
HomeMy WebLinkAboutLAKEVIEW SUBDIVISION - FDP - FDP130047 - SUBMITTAL DOCUMENTS - ROUND 1 - STORMWATER MANAGEMENT PLANSTORMWATER MANAGEMENT PLAN (SWMP) / EROSION CONTROL REPORT LAKEVIEW SUBDIVISION Fort Collins, Colorado November 21, 2013 Prepared for: Century Communities 8390 E. Crescent Parkway, Suite 650 Greenwood Village, Colorado 80111 Prepared by: 200 South College Avenue, Suite 10 Fort Collins, Colorado 80524 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 665-002  This Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. ADDRESS: 200 S. College Ave. Suite 10 Fort Collins, CO 80524 PHONE: 970.221.4158 FAX: 970.221.4159 WEBSITE: www.northernengineering.com November 21, 2013 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 RE: Stormwater Management Plan/Erosion Control Report Lakeview Subdivision Dear Staff: Northern Engineering Services, Inc. is pleased to submit this Stormwater Management Plan and Erosion Control Report for Carriage House Apartments. This report outlines Best Management Practices (BMPs) to be implemented with the proposed construction in order to minimize potential pollutants in stormwater discharges. We have prepared this report to accompany the Colorado Department of Public Health and Environment (CDPHE) General Permit for Stormwater Discharge Associated with Construction Activities (i.e., Stormwater Discharge Permit or SDP). The General Permit No. for this SDP is ___________________ (COR-XXXXXXXXXX) and the Certification No. for this SDP is ______________ (CORXXXXX). The Permit Certification is effective beginning ___________________ (Month Day, Year), and initial certification expires _______________ (Month Day, Year). A copy of the issuance cover letter can be found in Appendix D of this document. Please note: this Stormwater Management Plan (including the Site Maps) is not a static document - it is a dynamic device that should be kept current and logged as construction takes place. As such, this version was prepared to facilitate initial plan approvals and permitting, but does not necessarily reflect the final version, or the transitions throughout the construction process. As the site develops and changes, the contractor is expected and encouraged to make changes to what is contained herein so that the Stormwater Management Plan (SWMP) works as effectively and efficiently as possible. It shall be the responsibility of the SWMP Administrator and/or the permit holder (or applicant thereof) to ensure the plan is properly maintained and followed. If you should have any questions or comments as you review this report, please feel free to contact us at your convenience. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Ryan O. Banning, P.E. Project Engineer Lakeview Subdivision Stormwater Management Plan/Erosion Control Report TABLE OF CONTENTS Vicinity Map 1.0 General Requirements ............................................................................................... 1 1.1 Objectives .................................................................................................................. 1 1.2 SWMP Availability ...................................................................................................... 1 1.3 Definitions.................................................................................................................. 1 1.4 Additional Permitting ................................................................................................... 1 2.0 Narrative Site Description .......................................................................................... 2 2.1 Existing Site Description .............................................................................................. 2 2.2 Wind and Rainfall Erodibility | Sediment Migration Patterns ............................................ 2 2.3 Nature of Construction Activity ..................................................................................... 2 2.4 Sequence of Major Activities ......................................................................................... 2 2.5 Site Disturbance ......................................................................................................... 2 2.6 Existing Data .............................................................................................................. 3 2.7 Existing Vegetation ...................................................................................................... 3 2.8 Potential Pollution Sources ........................................................................................... 3 2.9 Non-Stormwater Discharges ......................................................................................... 4 2.10 Receiving Waters ........................................................................................................ 4 3.0 Stormwater Management Controls .............................................................................. 5 3.1 SWMP Administrator ................................................................................................... 5 3.2 Best Management Practices (BMPs) for Stormwater Pollution Prevention .......................... 5 3.3 Structural Practices for Erosion and Sediment Control ..................................................... 5 3.4 Non-Structural Practices for Erosion and Sediment Control .............................................. 8 3.5 Phased BMP Installation ............................................................................................ 10 3.6 Material Handling and Spill Prevention ........................................................................ 10 3.7 Vehicle Tracking Control ............................................................................................ 11 3.8 Waste Management and Disposal ............................................................................... 11 3.9 Groundwater and Stormwater Dewatering .................................................................... 11 4.0 Final Stabilization and Long-Term Stormwater Management ........................................ 13 4.1 Final Stabilization ..................................................................................................... 13 4.2 Long-Term Stormwater Management ........................................................................... 13 5.0 Inspection, Maintenance and Record Keeping ............................................................ 14 5.1 BMP Inspection ........................................................................................................ 14 5.2 BMP Maintenance .................................................................................................... 14 5.3 Record Keeping ........................................................................................................ 14 6.0 Additional SWMP and BMP Resources ...................................................................... 16 References 17 Lakeview Subdivision Stormwater Management Plan/Erosion Control Report APPENDICES: APPENDIX A – Site Maps APPENDIX B – Erosion Control Details APPENDIX C – Landscape Plan APPENDIX D – Copies of Permits/Applications APPENDIX E – Stormwater Management Plan Inspection Log APPENDIX F – Contractor Inserts (as needed) APPENDIX G – Erosion Control Cost Estimate Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 1 1.0 General Requirements 1.1 Objectives The objective of a Stormwater Management Plan (SWMP) is to identify all potential sources of pollution likely to occur as a result of construction activity associated with the site construction, and describe the practices that will be used to reduce the pollutants in stormwater discharges from the site. The SWMP must be completed and implemented at the time the project breaks ground, and revised as necessary as construction proceeds to accurately reflect the conditions and practices at the site. This report summarizes the Stormwater Management Plan for the construction activity that will occur with the Project Site. This plan has been prepared according to regulations of the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division. 1.2 SWMP Availability This report is intended to remain at the construction site to allow for maintenance and inspection updates and for review during inspection. 1.3 Definitions Best Management Practices (BMPs) – BMPs encompass a wide range of erosion and sediment control practices, both structural and non-structural in nature, which are intended to reduce or eliminate potential water quality impacts from construction site stormwater runoff. Erosion Control BMPs – These practices are intended to prevent the erosion of soil. A few common examples include: minimizing the amount of disturbed area through phasing, temporary stabilization and preserving existing vegetation. Sedimentation Control BMPs – These practices are designed to reduce sediment load from runoff. Examples of a few include: straw wattles, silt fence and inlet protection. Non-structural BMPs – These BMPs prevent or limit the entry of pollutants into stormwater at their source through operational or managerial techniques. Some examples include: the preservation of natural vegetation, construction phasing, preventive maintenance, construction traffic control and spill response procedures. Structural BMPs – Structural BMPs are designed to control sediment migration within the project site as well as off-site during construction. This type of BMP includes physical barriers such as diversion structures and inlet protection. Most sedimentation Control BMPs fall within this category. 1.4 Additional Permitting As mentioned above, this Stormwater Management Plan is associated with the Colorado Department of Public Health and Environment (CDPHE) Stormwater Permit that is issued by the Water Quality Control Division of the CDPHE. Additional environmental permitting not described in this report will likely be required as a part of this project. An example is the Construction Dewatering Permit for groundwater, which will be discussed later. Another example is the Air Pollution Emission Notice (APEN). The CDPHE website contains links to both of these permits, as well as many other potential permits. The contractor is responsible for ensuring the proper permits are acquired. Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 2 2.0 Narrative Site Description 2.1 Existing Site Description The project site is located in the Northwest quarter of Section 30, Township 7 North, Range 68 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. The Lakeview Subdivision is bordered to the north by Drake Road; to the south by the Eastborough Subdivision and a City of Fort Collins owned detention pond; to the east by Eldorado Springs Subdivision; and to the west by the First Christian Church and Lemay Avenue. 2.2 Wind and Rainfall Erodibility | Sediment Migration Patterns The site is located within a Moderate Risk Wind Erodibility Zone per the City of Fort Collins Wind Erodibility Map. According to the Natural Resources Conservation Service website (www.websoilsurvey.nrcs.usda.gov), the average applicable soil erodibility factor (K) is 0.28. This value is indicative of soils moderately susceptible to rainfall erosion. The long-term likelihood of erosion and sediment problems occurring on-site is minimal because the site will be paved, vegetated with lot development or covered by structures that will permanently stabilize the areas disturbed by proposed construction activity. During the interim period, in which the disturbed areas are open, the BMPs described herein were selected to prevent erosion and limit sediment migration. 2.3 Nature of Construction Activity The project will completely raze all of the existing structures currently occupying the property. The proposed development will consist of single family residential homes, associated streets and landscaped open areas. 2.4 Sequence of Major Activities To complete the project, many basic construction activities will take place. The project will first be stripped of topsoil and existing improvements will be removed. Secondly the site will be overlot graded and detention facilities will be installed. Installation of utilities will follow and includes: domestic water, sanitary sewer and storm sewer. Finally, streets will be paved, landscaping will be installed and open areas will be reseeded in anticipation of lot development. Installation of permanent water quality measures will follow initial stabilization of the site to prevent overwhelming loads during construction. 2.5 Site Disturbance The total area of the project site is 11.2 acres. The total area of the project to undergo disturbance is 10.8 acres. Site disturbance is expected to be uniform. At this time, a firm construction schedule of land disturbing activities is not available as a contractor has not been chosen. However, several general milestone dates follow. These will be updated as information becomes available:  Demo existing: TBD  Begin site work: TBD  Move-in: TBD Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 3 2.6 Existing Data In order to complete the associated construction plans, a series of topographical surveys of the site were completed. The survey consisted of field measurements made by Northern Engineering Services, Inc. in July, 2013. More site-specific exploration was performed by CTL Thompson Inc. Detailed results from the site investigation are contained in the Preliminary Geotechnical Investigation-Lakeview Single-Family Residential 2700 South Lemay Avenue Fort Collins, Colorado (Project No. FC05622.001-115) dated June 24, 2013. 2.7 Existing Vegetation The existing ground cover consists mostly of manicured grasses and ball fields as this is a re- development project. The existing on-site runoff generally drains south across flat grades (e.g., <2.00%) into the existing detention facility for the Christ Center Community Church. The historic cover is undetermined. Final stabilization will occur with an individual plant density of at least 70 percent ground cover which is the natural density aside from previous development or equivalent permanent, physical erosion reduction methods will be achieved. Roughly 40 percent of the total disturbed area will be permanently stabilized with asphalt, concrete or roof area. The remaining area will be stabilized with landscaping such as wetland seed, sod and planting beds. It is highly recommended that pre-construction photos be taken to clearly document vegetative conditions prior any disturbance activities. 2.8 Potential Pollution Sources As is typical with most construction sites, there are a number of potential pollution sources which could affect water quality. It is not possible for this report to identify all materials that will be used or stored on the construction site. It is the sole responsibility of the contractor to identify and properly handle all materials that are potential pollution sources. The following are some common examples of potential pollution sources:  All disturbed and stored soils  Vehicle tracking of sediments  Management of contaminated soils  Loading and unloading operations  Outdoor storage activities (e.g., building materials, fertilizers, chemicals, etc.)  Vehicle and equipment maintenance and fueling  Significant dust or particulate generating processes  Routine maintenance activities involving fertilizers, pesticides, detergents, fuels, solvents, oils, etc.  On-site waste disposal practices (e.g., waste piles, liquid wastes, dumpsters, etc.)  Concrete truck/equipment washing, including the concrete truck chute and associated fixtures and equipment  Dedicated asphalt and concrete batch plants  Non-industrial waste sources such as worker trash and portable toilets  Other areas or procedures where potential spills can occur Management of Contaminated Soils: We are not aware of on-site contaminated soils. However, the contractor should conduct a thorough, pre-construction environmental site assessment. If contaminated soils are discovered, the contractor will identify appropriate practices and procedures for the specific contaminants discovered on-site. Loading and Unloading Operations: During site demolition, material loading and unloading will Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 4 occur on-site. As site development and building construction progresses, space constraints will limit the number of on-site locations for loading and unloading activities. The contractor will be responsible for the proper handling and management of pollution sources during loading and unloading operations. Dedicated Asphalt and Concrete Batch Plants: neither dedicated asphalt nor concrete batch plant will be constructed on-site. 2.9 Non-Stormwater Discharges The Stormwater Construction Permit only covers discharges composed entirely of stormwater. Emergency firefighting water is the only authorized exception. Concrete Washout water can NOT be discharged to surface waters or to storm sewer systems without separate permit coverage. The discharge of Concrete Washout water to the ground, under specific conditions, may be allowed by the Stormwater Construction Permit when appropriate BMPs are implemented. Construction Dewatering water can NOT be discharged to surface waters or to storm sewer systems without separate permit coverage. The discharge of Construction Dewatering water to the ground, under specific conditions, may be allowed by the Stormwater Construction Permit when appropriate BMPs are implemented. The discharge of pumped stormwater, ONLY, from excavations, ponds, depressions, etc., to surface waters, or to a municipal separate storm-sewer system (MS4) is allowed by the Stormwater Construction Permit, as long as the dewatering activity and associated BMPs are identified in the SWMP (including location of the activity), and BMPs are implemented in accordance with the SWMP. 2.10 Receiving Waters Stormwater runoff from the project area will generally drain to a Extended Detention Basin designed for the project. The outfall from the EDB is the existing City of Fort Collins Detention Pond. The storm system connected to the detention pond is routed to Nelson Reservoir Ultimately, the developed runoff from the project drains to the Poudre River. The proposed drainage patterns are generally consistent with existing drainage patterns. Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 5 3.0 Stormwater Management Controls 3.1 SWMP Administrator A SWMP Administrator must be designated in conjunction with the Stormwater Permit. This person shall be responsible for developing, implementing, maintaining and revising the SWMP. The SWMP Administrator will also be the contact for all SWMP-related issues and will be the person responsible for the accuracy, completeness and implementation of the SWMP. The Administrator should be a person with authority to adequately manage and direct day-to-day stormwater quality management activities at the site. The SWMP Administrator for this site is: Name: Company: Phone: E-mail: 3.2 Best Management Practices (BMPs) for Stormwater Pollution Prevention Best Management Practices (BMPs) are loosely defined as a method, activity, maintenance procedure or other management practice for reducing the amount of pollution entering a water body. The term originated from rules and regulations in Section 208 of the Clean Water Act. Beginning with mobilization, and throughout the entire construction of the buildings, erosion control devices shall be installed and maintained to minimize pollutant migration. The BMPs may be installed or implemented in phases, or not at all, depending on actual conditions encountered at the site. It is the responsibility of the contractor to make the determination as to what practices should be employed and when. In the event that a review agency deems BMPs to be insufficient, it shall be the responsibility of the contractor to implement modifications as directed. The Drainage & Erosion Control Exhibit (Refer to sheet DR1 in Appendix A) illustrates the assumed location for each of the BMPs. Details for recommended BMPs are included in Appendix A. These details should be used for additional information on installation and maintenance of BMPs described herein. Details for Structural and Non-Structural BMPs have been included in Appendix B. These details should be used for additional information on installation and maintenance of BMPs specified in this report. It is also intended to serve as a resource for additional BMPs that may be appropriate for the site that have not specifically been mentioned in the report. 3.3 Structural Practices for Erosion and Sediment Control Structural BMPs are physical devices that prevent or minimize water quality impacts associated with construction site stormwater runoff. These devices can be temporary or permanent, and the installation of individual components will vary depending on the stage of construction. A table depicting the construction sequence and BMP application/removal will be placed on the “Dynamic Site Plan” (with future submittal) to help document the implementation of these BMPs. Refer to the Drainage & Erosion Control Exhibit in the Appendix A for the assumed location of all BMPs. Construction Details for Temporary BMPs are located in Appendix A for reference. Again, the final determination of which BMPs will be installed, where they will be located and when they will be installed shall be made by the contractor, along with all documentation throughout the construction process. Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 6 Silt Fencing (Phases I - IV) Perimeter silt fencing shall be provided to prevent migration of sediment off-site into the public right-of-way or onto adjacent properties whenever grading promotes sheet runoff from the site. All perimeter silt fencing applicable during preconstruction or anticipated during the sequence of grading shall be installed prior to any land disturbing activity (i.e., stockpiling, stripping, grading, excavation, earthwork activities, etc.). The silt fence inspections should identify tears or holes in the material as well as check for slumping fence, poorly installed jointing or undercut areas that allow flows to bypass the fencing. The damaged sections of fencing should be replaced and properly joined within previously installed fence. Sediment accumulations equal to or greater than 6 inches behind the silt fence should be removed to maintain BMP effectiveness. All spoils from installation shall be placed uphill of the fence. See the static erosion control plan for all suggested locations of silt fencing. Silt fencing is suggested on the east side of the site due to proposed detail grading sloping offsite. Silt fencing may be used as stockpile protection surrounding the toe of any stockpile. Silt Fence fence should not be used for interception of runoff from large disturbed areas. Diversions should be installed where heavy runoff is anticipated. Sediment Control Log – aka “Straw Wattles” (Phases I - IV) A Sediment Control Log (SW) is a linear roll made of natural materials, such as excelsior, coconut fiber or other fibrous material trenched into the ground and anchored with wooden stakes. Logs shall be entrenched slightly to minimize runoff bypass by undercutting. Sediment Control Logs can be used as perimeter control for stockpiles, as check dams in small drainage ways (e.g., swales) or on disturbed slopes to shorten flow lengths. Sediment Control Logs should be inspected for excess sediment accumulation. The sediment should be removed prior to reaching half the height of the log. Logs shall be replaced when sediment loading is obvious within the fibers integral to the log. At a minimum, Sediment Control Logs should be used around soil stockpiles and for sediment removal at the upstream end of the proposed metal sidewalk culverts. Wattles should be used as checks within swales to minimize erosion. For swale use 2% slope shall be maintained from bottom of upstream log to top of downstream log. Vehicle Tracking Control Pad (Phases I - II) A Vehicle Tracking Control (VTC) pad shall be provided to minimize tracking of mud and sediment onto paved surfaces and neighboring roadways. The vehicle tracking control pad shall be installed prior to any land disturbing activity (e.g., stockpiling, stripping, grading, etc.). The vehicle tracking control pad should be located at any and all existing and future vehicle accesses being used during any of the construction phases. These locations will primarily be dictated by gates or openings in the temporary construction fencing. Vehicle tracking pads should be inspected for degradation. The aggregate material should remain rough (unpacked) and be replaced if the area becomes clogged with water and/or excess sediment. The current plan shows a single vehicle tracking control pad at the north access to the site. Curb Inlet Protection (Phases I - IV) Curb inlet protection shall be provided around existing curb inlets (Oxborough Lane) and immediately after installation curb connected to any proposed inlet. The filter shall be Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 7 installed at existing inlets prior to adjacent earth disturbing activities. When pavement is constructed adjacent to the structure or if the area adjacent to the inlet is changed such that the wattle dike type filter is no longer effective, it shall be the responsibility of the contractor to ensure that an appropriate replacement is implemented. For example, rock sock inlet filter may be installed. All type-13 (grated) inlets shall be completely covered by inlet protection. Filter fabric style inlet grate protection bags with curb inlet dike or an approved equal are suggested in such cases. Area Inlet Protection (Phases I - IV) Area Inlet protection (IP) should be dike type surrounding the inlet. Silt fence is not an appropriate material for area inlet protection. Filter fabric may be used in conjunction with dikes to cover any grated inlet. Area inlet projection should not fully impede large stormflows from entering inlets unless alternate flowpath are determined prior to installation. Inlet protection should also be inspected for sediment accumulation upstream of the inlet and replaced when sediment loading is obvious within the fibers integral to the structure. Rock Socks (Phases I - IV) Rock sock check dams to be used within curb and gutter at a regular interval where runoff from disturbed area is are proposed to drain to curb and gutter. Rock sock heights should allow for pools to develop upstream, creating minor backwaters to both reduce velocities and to allow sediment deposition. The rock socks should be spaced so that the top of each dam is no more than 2% slope below the toe of the next upstream rock sock. Rock Socks may also be used in curb inlet protection where it is possible to completely block drainage pathways to inlets. Overtopping of rock socks used for curb inlet protection should be allowed in all cases unless alternative flow paths are determined prior to installation. Rock socks should be inspected regularly for gaps or holes which would allow untreated water to pass through, under or around the structures. The accumulated sediment should be removed, typically prior to the sediment depth reaching half the height of the check dam. Concrete Washout Area (Phases II - III) A concrete washout area shall be provided on the site prior to any concrete installation. The washout can be a lined or unlined excavated pit in the ground, a commercially manufactured prefabricated container or an aboveground holding area. The concrete washout area must be located a minimum of 400 feet from any natural drainage way or body of water and at least 1000 feet from any wells or drinking water sources. If not lined, the concrete washout area should not be located in an area where shallow groundwater may be present. The contractor shall clearly show the desired location and access to the Concrete Washout Area on the Stormwater Management Plan - Dynamic Site Plan. The contractor shall place a Vehicle Tracking Pad if the selected location for the Concrete Washout Area is detached from pavement. Clear signage identifying the concrete washout shall also be provided. The Concrete Washout Area shall be inspected regularly with particular attention being paid to signage to ensure that the area is clearly marked. Confirmation that the washout is being used should also be noted to ensure that other undesignated areas of the site are not being used incorrectly as a concrete washout. Washout areas shall be cleaned out when half of the retained capacity is consumed. Washout areas shall not be used for dumping materials Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 8 and shall be removed when concrete construction is no longer anticipated. Permanent/Established Vegetation (Phase IV) Permanent or established vegetation and landscaping is considered a permanent form of sediment and erosion control. Areas where the previous conditions apply will contain sufficient permanent BMPs such as sod or landscape material (e.g., smooth river rock/cobble and wood mulch). 3.4 Non-Structural Practices for Erosion and Sediment Control Non-Structural BMPs are practices or activities that are implemented to prevent erosion from happening or to limit erosion once it occurs. These BMPs can be a practice resulting in a physical change to the site, such as mulching or slope stabilization. They can also result in behavioral changes on the site, such as changes to construction phasing to minimize exposure to weather elements or increased employee awareness gained through training. Protection of Existing Vegetation (Phases I - IV) Protection of existing vegetation on a construction site can be accomplished through installation of a construction fence around the area requiring protection. In cases where upgradient areas are disturbed, it may also be necessary to install perimeter controls to minimize sediment loading to sensitive areas such as wetlands. Trees that are to remain after construction is complete must also be protected. Most tree roots grow within the top 12”-18” of soil, and soil compaction is a significant threat to tree health. As such, particular care should be taken to avoid activities within the drip-line of the tree. Direct equipment damage should also be prevented. The most effective way to ensure the health of trees is to establish a protection zone at the drip-line of the tree. Fencing should be inspected and repaired as needed. If damage occurs to a tree, an arborist should be consulted. If a tree is damage beyond repair, the City Forester should be consulted on remediation measures. Stockpile Management (Phases I - IV) Stockpile management should be utilized to minimize erosion and sediment transport from soil stockpiles. In general, soil stockpiles should be located a minimum of 100 feet from any drainage way and 50 feet from any storm sewer inlets. Where practical, choose a stockpile location that will remain undisturbed for the longest period of time as the phases of construction progress. Sediment control BMPs should be placed around the perimeter of the stockpile, and a designated access point on the upstream side of the stockpile should be identified. BMPs such as surface roughening, temporary seeding, mulching, erosion control blankets or soil binders should be used to stabilize the stockpile surface. As a part of stockpile management, regular inspections of the perimeter controls should be completed. If BMPs have been utilized to stabilize the surface of the stockpile, which is usually true for stockpiles that sit longer than 30 days, they should be inspected and repaired as needed. Mulching (Phases I - IV) Mulching helps reduce erosion by protecting bare soil from rainfall impact, reducing sheet flow velocities, increasing infiltration and initial abstraction and reducing runoff. Although often applied in conjunction with temporary or permanent seeding, it can also be used for temporary stabilization of areas that cannot be permanently reseeded due to seasonal Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 9 constraints. Temporary seeding should be implemented with mulching using sterile/annual cover crops, appropriate for the time of year when not within a permanent seeding window. The most common type of mulch used is straw that is crimped into the soil to keep it secure. The Contractor shall mulch all planted areas within twenty-four (24) hours after planting. Only weed-free and seed-free straw mulch may be used. Straw mulch should be applied at two (2) to four (4) tons per acre, and shall be adequately secured by crimping. Hydraulic mulching may also be used on steep slopes or where access is limited. In the case that hydraulic mulching is utilized, the contractor shall use wood cellulose fibers mixed with water at two thousand to two thousand five hundred (2,000-2,500) pounds per acre and organic tackifier at one hundred to four hundred (100-400) pounds per acre. Wind Erosion/Dust Control (Phases I - IV) Wind Erosion and Dust Control BMPs help to keep soil particles from entering the air as a result of land disturbing construction activities. Examples include the use of a water truck or irrigation/sprinkler system to wet the top layer of disturbed soil, seeding and mulching, soil binders or wind fences. If a water truck or irrigation/sprinkler system is utilized, then monitoring for sufficient water application is crucial to ensuring soil particles don’t become airborne. Equally important is monitoring for overwatering, as too much water can lead to increased erosion and sediment laden construction site runoff. Good Housekeeping Practices (Phases I - IV) Good housekeeping practices that will prevent pollution associated with solid, liquid and hazardous construction-related materials and wastes should be implemented throughout the project. Examples of good housekeeping include providing an appropriate location for waste management containers, establishing proper building material staging areas, designating paint and concrete washout areas and establishing proper equipment/vehicle fueling and maintenance practices. Development of a spill prevention and response plan is another example of Good Housekeeping practices that should be used on the project. Street Sweeping and Vacuuming – Street sweeping and vacuuming should be used to remove sediment that has been tracked onto adjacent roadways. Roadways should be inspected at least once a day, and sediment should be removed as needed. A check of inlet protection should be completed after sweeping to ensure nothing was displaced during sweeping operations. Waste Management – Designate trash and bulk waste collection areas on-site. When possible, materials should be recycled. Hazardous material waste should be segregated from other solid waste. Waste collection areas should be located away from streets, gutters, watercourses and storm drains. Dumpsters should be located near site entrances to minimize traffic on disturbed soils, and they should be placed on a level soil surface. Establish Proper Building Material Handling and Staging areas – Clearly designate site areas for staging and storage of building materials. Provide appropriate BMPs to ensure that spills or leaks are contained. Establish Proper Equipment/Vehicle Fueling and Maintenance Practices – If needed, create a clearly designated on-site fueling and maintenance area that is clean and dry. Provide appropriate BMPs to ensure that spills or leaks are contained. Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 10 Saw Cutting Pollution Prevention (Phase II) The following protocol is recommended to prevent dust and slurry from asphalt and concrete saw cutting activities from migrating into the existing storm drain system. - Slurry and cuttings shall be wet vacuumed during cutting and surfacing operations - Slurry and cuttings shall not remain on permanent concrete or asphalt pavement overnight - Slurry and cuttings shall not drain to any natural or constructed drainage conveyance - Collected slurry and cuttings shall be disposed of in a manner that does not violate groundwater or surface water standards - Where slurry will not stay in place due to pavement grade, plastic sheet materials may be used to trap slurry until wet vacuuming can be accomplished. Construction Traffic Control (Phases I - IV) Controlling traffic entering and leaving the construction site is crucial for implementation of appropriate vehicle tracking controls. Standard orange construction fence on tee posts is suggested for perimeter traffic controls. Barriers such as temporary type-3 barricades can be utilized approaching paved areas to deter tracking in unprotected areas. 3.5 Phased BMP Installation It is important to recognize the four (4) major Development Phases as defined by the State of Colorado’s Stormwater Discharge Permit (SDP). These four development phases, which are referred to as Sequencing by the City of Fort Collins, have been distinguished to aid in the appropriate timing of installation/implementation of BMPs at different stages of the construction process. These phases are described as follows: Phase I – Grading Stage; BMPs for initial installation of perimeter controls with clear and grub phasing to minimize ground disturbance to only when necessary for construction. Phase II – Infrastructure Stage; BMPs for utility, paving and curb installation Phase III – Vertical Construction Stage; BMPs for individual building construction. Phase IV – Permanent BMPs and final site stabilization. 3.6 Material Handling and Spill Prevention Potential pollution sources, as discussed in earlier sections, are to be to be identified by the contractor. Spill prevention procedures are to be determined and put in place prior to construction by the contractor. A spill and flooding response procedure must also be determined and put in place prior to construction by the contractor. Additionally, steps should be taken to reduce the potential for leaks and spills coming into contact with stormwater runoff. A notification procedure must be put in place by the contractor, by which workers would first notify the site construction superintendent, who would then notify the SWMP Administrator. Depending on the severity of the spill, the site construction superintendent and SWMP Administrator would possibly notify the Colorado Department of Public Health and Environment - Water Quality Control Division, downstream water users or other appropriate agencies. The release of any chemical, oil, petroleum product, sewage, etc., which enter waters of the State of Colorado (which include Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 11 surface water, ground water, and dry gullies or storm sewers leading to surface water) must be reported immediately to the Division’s emergency spill reporting line at (877) 518-5608. All spills that will require cleanup, even if the spill is minor and does not need to be reported to the state, should still be reported to the City Utilities office at 970-221-6700. It will be the responsibility of the contractor to designate a fueling area and take the necessary precautions to ensure that no stormwater pollution occurs in the event that a fueling area is needed. Fueling areas shall be located a minimum 100 feet from all drainage courses. A 12-inch high compacted earthen berm capable of retaining potential spills shall enclose fueling areas. Other secondary containment devices can be used instead of the earthen berm. The area shall be covered with a non-porous lining to prevent soil contamination. Printed instructions for cleanup procedures shall be posted in the fueling area and appropriate fuel absorbents shall be available along with containers for used absorbents. 3.7 Vehicle Tracking Control In addition to the vehicle tracking pads discussed previously, additional measures can be taken to minimize and control sediment discharges from the site due to vehicle tracking. These measures can include fencing around the site to control access points. Regular street sweeping can also be used to minimize the transmission of sediment from the site due to vehicles leaving the site. The use of gravel parking areas and wash racks can also be implemented to ensure minimal vehicle tracking from the site. Minimizing or limiting the number of vehicles accessing the site by providing designated delivery areas, or by restricting deliveries when the site is muddy is also encouraged. 3.8 Waste Management and Disposal It will be the responsibility of the contractor to designate a concrete truck chute washout area and to clearly identify that area. Detailed information about the design and maintenance of the Concrete Washout can be found under the Structural Practices section of this report. At no time should untreated wash water be allowed to discharge from the site or to enter a storm drain system or stream. Upon completion of construction activities the concrete washout material shall be removed and properly disposed of prior to the area being restored. Any waste material that currently exists on the site or that is generated by construction will be disposed of in such a manner as to not cause pollutants in stormwater discharges. If waste is to be stored on-site, it shall be in an area located a minimum of 100 feet from all drainage courses. Whenever waste is not stored in a non-porous container, it shall be in an area enclosed by a 12- inch high compacted earthen berm or some other approved secondary containment device. The area shall be covered with a non-porous lining to prevent soil contamination. Whenever precipitation is predicted, the waste shall be covered with a non-porous cover and anchored on all sides to prevent its removal by wind. On-site waste disposal practices, such as dumpsters, should be covered or otherwise contained as to prevent dispersion of waste materials by wind. It shall also be the responsibility of the contractor to maintain a clean jobsite and to prevent the dispersion of waste material and potential pollutants into adjacent properties or waterways. The location of, and protective measures for, temporary restroom facilities shall be the responsibility of the SWMP Administrator. 3.9 Groundwater and Stormwater Dewatering The BMPs selected for construction dewatering vary depending on the site-specific features, such as soils, topography, discharge quantities and discharge location. Typically, dewatering involves pumping water from an inundated area to a BMP, prior to the water being released downstream Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 12 into a receiving waterway, sediment basin, or well-vegetated area. Acceptable BMPs included discharging water into a sediment trap or basin, using a dewatering filter bag or using a series of sediment logs. A settlement tank or an active treatment system can also be utilized as long as it is not a chemically induced treatment system. Another commonly used method to handle the pumped water is the “sprinkler method,” which involves applying the water to vegetated areas through a perforated discharge hose. Dispersal from a water truck for dust control can also be used to disperse the pumped water. Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 13 4.0 Final Stabilization and Long-Term Stormwater Management 4.1 Final Stabilization All disturbed areas will be seeded, crimped and mulched. Soil amendments such as compost, peat, aged manure, or other similar materials, shall also be utilized. Soil amendments shall be tilled into the soil to a minimum depth of 6”, and should comply with the requirements found in City Code Section 12-132 (refer also to Land Use Code 3.8.21). As defined by the Colorado Department of Public Health and Environment (CDPHE) in the General Permit Application for Stormwater Discharges, “Final stabilization is reached when all soil disturbing activities at the site have been completed, and uniform vegetative cover has been established with a density of at least 70 percent of pre-disturbance levels or equivalent permanent, physical erosion reduction methods have been employed.” Qualifying vegetative cover is perennial and does not include annual cover crops or volunteer species. Table 1 – Native Grass Seed Mix Preferred Varieties Seeded Rate (lbs. per acre, drilled) PLS Seeded/acre Leymus Cinereus Great Basin Wilrye Mangar 3 285,000 Nassella Viridula Green Needlegrass Lodorm 2 362,000 Chnatherum Hymenoides Indian Ricegrass Paloma, Nezpar 1 188,000 Elymus Trachycaulus Slender Wheatgrass Primar, Revenue 2 320,000 Elymus Lanceolatus Thickspike Wheatgrass Critana 3 580,500 Pascopyrum Smithii Western Wheatgrass Arriba, Barton 4 504,000 Totals 15 2,239,500 Species 4.2 Long-Term Stormwater Management The primary method of long-term stormwater management will be an ultra urban developed site mostly comprised of rooftop area and concrete. Small pockets of fully landscaped areas will also exist. Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 14 5.0 Inspection, Maintenance and Record Keeping 5.1 BMP Inspection All temporary erosion control facilities shall be inspected at a minimum of once every two (2) weeks and after each significant storm event or snowmelt. Repairs or reconstruction of BMPs, as necessary, shall occur as soon as possible in order to ensure the continued performance of their intended function. It is the responsibility of the SWMP Administrator to conduct bi-weekly inspections, maintain BMPs if needed, keep records of site conditions and inspections and to update the SWMP as necessary. The construction site perimeter, disturbed areas, all applicable/installed erosion and sediment control measures and areas used for material storage that are exposed to precipitation shall be inspected for evidence of, or the potential for, pollutants entering the drainage system. Erosion and sediment control measures shall be identified in the SWMP and shall be observed to ensure that they are operating correctly. Particular attention shall be paid to areas that have a significant potential for stormwater pollution, such as demolition areas, concrete washout locations and vehicle entries to the site. The inspection must be documented to ensure compliance with the permit requirements. 5.2 BMP Maintenance Any BMPs not operating in accordance with the SWMP must be addressed as soon as possible to prevent the discharge of pollutants. If modifications are necessary, such modifications shall be documented so that the SWMP accurately reflects on-site conditions. The SWMP needs to accurately represent field conditions at all times. Uncontrolled releases of mud, muddy water or measurable amounts of sediment found off-site will be recorded with a brief explanation of the measures taken to clean-up the sediment that has left the site, as well as the measures taken to prevent future releases. This record shall be made available to the appropriate public agencies (Colorado Department of Public Health and Environment, Water Quality Control Division; Environmental Protection Agency; City of Fort Collins; etc.) upon request. Preventative maintenance of all temporary and permanent erosion control BMPs shall be provided in order to ensure the continued performance of their intended function. Temporary erosion control measures are to be removed after the site has been sufficiently stabilized as determined by the City of Fort Collins. Maintenance activities and actions to correct problems shall be noted and recorded during inspections. Inspection and maintenance procedures specific to each BMP identified with this SWMP are discussed in Section 3. Details have also been included with Appendix B. 5.3 Record Keeping Documentation of site inspections must be maintained. The following items are to be recorded and kept with the SWMP:  Date of Inspection  Name(s) and title(s) of personnel making the inspection  Location(s) of sediment discharges or other pollutants from the site  Location(s) of BMP’s that need to be maintained  Location(s) of BMP’s that failed to operate as designed or proved inadequate  Locations(s) where additional BMP’s are needed that were not in place at the time of inspection  Deviations from the minimum inspection schedule Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 15  Descriptions of corrective action taken to remedy deficiencies that have been identified  The report shall contain a signed statement indicating the site is in compliance with the permit to the best of the signer’s knowledge and belief after corrective actions have been taken. Provided in a future submittal within Appendix E of this SWMP will be an Example Inspection Log to aid in the record keeping of BMP inspections and maintenance. Photographs, field notebooks, drawings and maps should be included when appropriate. In addition to the Inspection Log, records should be kept documenting:  BMP maintenance and operation  Stormwater contamination  Contacts with suppliers  Notes on the need for and performance of preventive maintenance and other repairs  Implementation of specific items in the SWMP  Training events (given or attended)  Events involving materials handling and storage  Contacts with regulatory agencies and personnel  Notes of employee activities, contact, notifications, etc. Records of spills, leaks or overflows that result in the discharge of pollutants must be documented and maintained. A record of other spills that are responded to, even if they do not result in a discharge of pollutants, should be made. Information that should be recorded for all occurrences includes the time and date, weather conditions, reasons for the spill, etc. Some spills may need to be reported to authorities immediately. Specifically, a release of any chemical, oil, petroleum product, sewage, etc., which may enter waters of the State of Colorado (which include surface water, ground water and dry gullies or storm sewers leading to surface water) must be reported to the CDPHE. Additionally, the “Dynamic Site Plan” is intended to be a “living document” where the SWMP Administrator can hand write the location and dates of BMPs installations to accurately reflect the current site conditions. Also on the “Dynamic Site Plan” should be a “Table of Construction Sequence and BMP Application/Removal” that the SWMP Administrator can use to document when BMPs were installed or removed in conjunction with construction activities. These items will be included as an aid to the SWMP Administrator, and other methods of record keeping are at his or her discretion. This Stormwater Management Plan (both the text and map) is not a static document, it is a dynamic device intended to be kept current and logged as construction takes place. It shall be the responsibility of the SWMP Administrator and/or the permit holder (or applicant thereof) to ensure the plan is properly maintained and followed. Diligent administration is critical, including processing the Notice to Proceed and noting on the Stormwater Management Plan the dates that various construction activities occur and respective BMPs are installed and/or removed. Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 16 6.0 Additional SWMP and BMP Resources Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual - Volume 3 “Best Management Practices” Colorado Department of Transportation Erosion Control and Stormwater Quality Guide BMP Field Academy EPA Menu of BMP’s Construction Site Storm Water Runoff Control International Stormwater Best Management (BMP) Database Rocky Mountain Education Center Rocky Mountain Education Center Red Rocks Community College, Lakewood Keep It Clean Partnership Boulder Lakeview Subdivision Stormwater Management Plan/Erosion Control Report 17 References 1. Final Drainage Report for The Carriage House Apartments, Northern Engineering Services, May 29, 2013 (NES Project No. 620-002) 2. Geotechnical Engineering Study and Pavement Thickness Design Proposed Student Apartment Development 1305 and 1319 South Shields Avenue Fort Collins, Colorado, December 13, 2012, Kumar and Associates, Inc. (Project No. 12-1-517). 3. Soil Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 4. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Water Resources Publications, LLC., Denver, Colorado, Updated November 2010. APPENDIX A SITE MAPS ELEC WV H Y D H Y D CABLE VAULT CONTROL IRR T C C CT C T C LOT 10 LOT 9 LOT 8 LOT 7 LOT 6 ���������� ������� ������ ������ �������� ������� ������ ������ LOT 104 LOT 105 LOT 106 LOT 108 LOT 109 LOT 110 LOT 111 ����������� TRACT A EASTBOROUGH OWNER: CITY OF FORT COLLINS LOT 133 LOT 131 LOT 132 S T T T T F E S ��� 1, ����� 1 ����� ������ ������ ��� ������ #8730212901 LOT 134 LOT 112 �������� ������� ������ ������ SF SF SF SF SF CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner N/A No. Revisions: By: Date: REVIEWED BY: R. Banning DESIGNED BY: DRAWN BY: SCALE: DATE: NOVEMBER 2013 PROJECT: 665-002 Sheet Of26Sheets LAKEVIEW SUBDIVISION T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 08/21/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� SPACE POSTS PER MANUFACTURES RECOMMENDATIONS C��� E������� D��� D��� D��� D��� D��� S��������� U������ P���� & R��������� T������ E������� D��� APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: W���� & W��������� U������ C��� �� F��� C������, C������� UTILITY PLAN APPROVAL E������������ P������ N/A N�. R��������: B�: D���: REVIEWED BY: R. B������ DESIGNED BY: DRAWN BY: SCALE: DATE: NOVEMBER 2013 PROJECT: 665-002 S���� O�26S����� LAKEVIEW SUBDIVISION T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 08/21/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� EC3 EROSION CONTROL DETAILS A. B���� A. B���� 1"=50' APPENDIX B EROSION CONTROL DETAILS Chapter 7 Construction BMPs November 2010 Urban Drainage and Flood Control District 7-13 Urban Storm Drainage Criteria Manual Volume 3 Final Stabilization ▪ Revegetate Site ▪ Activate Post Construction BMPs (e.g., convert sediment basin to extended detention basin) ▪ Remove Temporary BMPs ▪ Closeout State and Local Stormwater Permits Construction Phase Representative Phases: ▪ Clearing and Grubbing ▪ Rough Grading ▪ Road Construction ▪ Utility and Infrastructure Installation ▪ Vertical Construction (Buildings) ▪ Final Grading Management Practices: ▪ Phase Construction Activities to Minimize Disturbed Area at a Given Time ▪ Sequence Contruction within Phases to Avoid Idle Disturbed Areas ▪ Install, Inspect and Proactively Maintain BMPs Appropriate for Each Phase of Construction ▪ Maintain and Update SWMP as Construction Progresses Pre-Construction ▪ Develop Site Plan ▪ Obtain Site Survey, Hydrology and Soils Information ▪ Prepare SWMP ▪ Obtain Stormwater Construction Permits (State and Local) ▪ Obtain Other Relevant Permits (e.g., 404 , Floodplain, Dewatering) Figure 7-2. Construction Stormwater Management Construction BMPs Construction BMPs 7-14 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Functions Erosion Control Sediment Control Site/Material Management Surface Roughening Yes No No Temporary/Permanent Seeding Yes No No Soil Binders Yes No Moderate Mulching Yes Moderate No Compost Blankets and Filter Berms Yes Moderate No Rolled Erosion Control Products Yes No No Temporary Slope Drains Yes No No Temporary Outlet Protection Yes Moderate No Rough Cut Street Control Yes Moderate No Earth Dikes / Drainage Swales Yes Moderate No Terracing Yes Moderate No Check Dams Yes Moderate No Streambank Stabilization Yes No No Wind Erosion / Dust Control Yes No Moderate Silt Fence No Yes No Sediment Control Log Moderate Yes No Straw Bale Barrier No Moderate No Brush Barrier Moderate Moderate No Rock Sock (perimeter control) No Yes No Inlet Protection (various forms) No Yes No Sediment Basins No Yes No Sediment Traps No Yes No Vegetative Buffers Moderate Yes Yes Chemical Treatment Moderate Yes No Concrete Washout Area No No Yes Stockpile Management Yes Yes Yes Good Houskeeping (multiple practices) No No Yes Construction Phasing Moderate Moderate Yes Protection of Existing Vegetation Yes Moderate Yes Construction Fence No No Yes Vehicle Tracking Control Moderate Yes Yes Stabilized Construction Roadway Yes Moderate Yes Stabilized Staging Area Yes Moderate Yes Street Sweeping / Vacuuming No Yes Yes Temporary Diversion Channel Yes No No Dewatering Operations Moderate Yes Yes Temporary Stream Crossing Yes Yes No Temporary Batch Plants No No Yes Paving and Grinding Operations No No Yes Site Management and Other Specific Practices Sediment Control BMPs Erosion Control BMPs Materials Management Table 7-2. Overview of Construction BMPs Surface Roughening (SR) EC-1 November 2010 Urban Drainage and Flood Control District SR-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph SR-1. Surface roughening via imprinting for temporary stabilization. Description Surface roughening is an erosion control practice that involves tracking, scarifying, imprinting, or tilling a disturbed area to provide temporary stabilization of disturbed areas. Surface roughening creates variations in the soil surface that help to minimize wind and water erosion. Depending on the technique used, surface roughening may also help establish conditions favorable to establishment of vegetation. Appropriate Uses Surface roughening can be used to provide temporary stabilization of disturbed areas, such as when revegetation cannot be immediately established due to seasonal planting limitations. Surface roughening is not a stand-alone BMP, and should be used in conjunction with other erosion and sediment controls. Surface roughening is often implemented in conjunction with grading and is typically performed using heavy construction equipment to track the surface. Be aware that tracking with heavy equipment will also compact soils, which is not desirable in areas that will be revegetated. Scarifying, tilling, or ripping are better surface roughening techniques in locations where revegetation is planned. Roughening is not effective in very sandy soils and cannot be effectively performed in rocky soil. Design and Installation Typical design details for surfacing roughening on steep and mild slopes are provided in Details SR-1 and SR-2, respectively. Surface roughening should be performed either after final grading or to temporarily stabilize an area during active construction that may be inactive for a short time period. Surface roughening should create depressions 2 to 6 inches deep and approximately 6 inches apart. The surface of exposed soil can be roughened by a number of techniques and equipment. Horizontal grooves (running parallel to the contours of the land) can be made using tracks from equipment treads, stair-step grading, ripping, or tilling. Fill slopes can be constructed with a roughened surface. Cut slopes that have been smooth graded can be roughened as a subsequent operation. Roughening should follow along the contours of the slope. The tracks left by truck mounted equipment working perpendicular to the contour can leave acceptable horizontal depressions; however, the equipment will also compact the soil. Surface Roughening Functions Erosion Control Yes Sediment Control No Site/Material Management No EC-1 Surface Roughening (SR) SR-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Maintenance and Removal Care should be taken not to drive vehicles or equipment over areas that have been surface roughened. Tire tracks will smooth the roughened surface and may cause runoff to collect into rills and gullies. Because surface roughening is only a temporary control, additional treatments may be necessary to maintain the soil surface in a roughened condition. Areas should be inspected for signs of erosion. Surface roughening is a temporary measure, and will not provide long-term erosion control. Surface Roughening (SR) EC-1 November 2010 Urban Drainage and Flood Control District SR-3 Urban Storm Drainage Criteria Manual Volume 3 EC-1 Surface Roughening (SR) SR-4 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Temporary and Permanent Seeding (TS/PS) EC-2 November 2010 Urban Drainage and Flood Control District TS/PS-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph TS/PS -1. Equipment used to drill seed. Photo courtesy of Douglas County. Description Temporary seeding can be used to stabilize disturbed areas that will be inactive for an extended period. Permanent seeding should be used to stabilize areas at final grade that will not be otherwise stabilized. Effective seeding includes preparation of a seedbed, selection of an appropriate seed mixture, proper planting techniques, and protection of the seeded area with mulch, geotextiles, or other appropriate measures. Appropriate Uses When the soil surface is disturbed and will remain inactive for an extended period (typically 30 days or longer), proactive stabilization measures should be implemented. If the inactive period is short-lived (on the order of two weeks), techniques such as surface roughening may be appropriate. For longer periods of inactivity, temporary seeding and mulching can provide effective erosion control. Permanent seeding should be used on finished areas that have not been otherwise stabilized. Typically, local governments have their own seed mixes and timelines for seeding. Check jurisdictional requirements for seeding and temporary stabilization. Design and Installation Effective seeding requires proper seedbed preparation, selection of an appropriate seed mixture, use of appropriate seeding equipment to ensure proper coverage and density, and protection with mulch or fabric until plants are established. The USDCM Volume 2 Revegetation Chapter contains detailed seed mix, soil preparations, and seeding and mulching recommendations that may be referenced to supplement this Fact Sheet. Drill seeding is the preferred seeding method. Hydroseeding is not recommended except in areas where steep slopes prevent use of drill seeding equipment, and even in these instances it is preferable to hand seed and mulch. Some jurisdictions do not allow hydroseeding or hydromulching. Seedbed Preparation Prior to seeding, ensure that areas to be revegetated have soil conditions capable of supporting vegetation. Overlot grading can result in loss of topsoil, resulting in poor quality subsoils at the ground surface that have low nutrient value, little organic matter content, few soil microorganisms, rooting restrictions, and conditions less conducive to infiltration of precipitation. As a result, it is typically necessary to provide stockpiled topsoil, compost, or other Temporary and Permanent Seeding Functions Erosion Control Yes Sediment Control No Site/Material Management No EC-2 Temporary and Permanent Seeding (TS/PS) TS/PS-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 soil amendments and rototill them into the soil to a depth of 6 inches or more. Topsoil should be salvaged during grading operations for use and spread on areas to be revegetated later. Topsoil should be viewed as an important resource to be utilized for vegetation establishment, due to its water-holding capacity, structure, texture, organic matter content, biological activity, and nutrient content. The rooting depth of most native grasses in the semi-arid Denver metropolitan area is 6 to 18 inches. At a minimum, the upper 6 inches of topsoil should be stripped, stockpiled, and ultimately respread across areas that will be revegetated. Where topsoil is not available, subsoils should be amended to provide an appropriate plant-growth medium. Organic matter, such as well digested compost, can be added to improve soil characteristics conducive to plant growth. Other treatments can be used to adjust soil pH conditions when needed. Soil testing, which is typically inexpensive, should be completed to determine and optimize the types and amounts of amendments that are required. If the disturbed ground surface is compacted, rip or rototill the surface prior to placing topsoil. If adding compost to the existing soil surface, rototilling is necessary. Surface roughening will assist in placement of a stable topsoil layer on steeper slopes, and allow infiltration and root penetration to greater depth. Prior to seeding, the soil surface should be rough and the seedbed should be firm, but neither too loose nor compacted. The upper layer of soil should be in a condition suitable for seeding at the proper depth and conducive to plant growth. Seed-to-soil contact is the key to good germination. Seed Mix for Temporary Vegetation To provide temporary vegetative cover on disturbed areas which will not be paved, built upon, or fully landscaped or worked for an extended period (typically 30 days or more), plant an annual grass appropriate for the time of planting and mulch the planted areas. Annual grasses suitable for the Denver metropolitan area are listed in Table TS/PS-1. These are to be considered only as general recommendations when specific design guidance for a particular site is not available. Local governments typically specify seed mixes appropriate for their jurisdiction. Seed Mix for Permanent Revegetation To provide vegetative cover on disturbed areas that have reached final grade, a perennial grass mix should be established. Permanent seeding should be performed promptly (typically within 14 days) after reaching final grade. Each site will have different characteristics and a landscape professional or the local jurisdiction should be contacted to determine the most suitable seed mix for a specific site. In lieu of a specific recommendation, one of the perennial grass mixes appropriate for site conditions and growth season listed in Table TS/PS-2 can be used. The pure live seed (PLS) rates of application recommended in these tables are considered to be absolute minimum rates for seed applied using proper drill-seeding equipment. If desired for wildlife habitat or landscape diversity, shrubs such as rubber rabbitbrush (Chrysothamnus nauseosus), fourwing saltbush (Atriplex canescens) and skunkbrush sumac (Rhus trilobata) could be added to the upland seedmixes at 0.25, 0.5 and 1 pound PLS/acre, respectively. In riparian zones, planting root stock of such species as American plum (Prunus americana), woods rose (Rosa woodsii), plains cottonwood (Populus sargentii), and willow (Populus spp.) may be considered. On non-topsoiled upland sites, a legume such as Ladak alfalfa at 1 pound PLS/acre can be included as a source of nitrogen for perennial grasses. Temporary and Permanent Seeding (TS/PS) EC-2 November 2010 Urban Drainage and Flood Control District TS/PS-3 Urban Storm Drainage Criteria Manual Volume 3 Seeding dates for the highest success probability of perennial species along the Front Range are generally in the spring from April through early May and in the fall after the first of September until the ground freezes. If the area is irrigated, seeding may occur in summer months, as well. See Table TS/PS-3 for appropriate seeding dates. Table TS/PS-1. Minimum Drill Seeding Rates for Various Temporary Annual Grasses Speciesa (Common name) Growth Seasonb Pounds of Pure Live Seed (PLS)/acrec Planting Depth (inches) 1. Oats Cool 35 - 50 1 - 2 2. Spring wheat Cool 25 - 35 1 - 2 3. Spring barley Cool 25 - 35 1 - 2 4. Annual ryegrass Cool 10 - 15 ½ 5. Millet Warm 3 - 15 ½ - ¾ 6. Sudangrass Warm 5–10 ½ - ¾ 7. Sorghum Warm 5–10 ½ - ¾ 8. Winter wheat Cool 20–35 1 - 2 9. Winter barley Cool 20–35 1 - 2 10. Winter rye Cool 20–35 1 - 2 11. Triticale Cool 25–40 1 - 2 a Successful seeding of annual grass resulting in adequate plant growth will usually produce enough dead-plant residue to provide protection from wind and water erosion for an additional year. This assumes that the cover is not disturbed or mowed closer than 8 inches. Hydraulic seeding may be substituted for drilling only where slopes are steeper than 3:1 or where access limitations exist. When hydraulic seeding is used, hydraulic mulching should be applied as a separate operation, when practical, to prevent the seeds from being encapsulated in the mulch. b See Table TS/PS-3 for seeding dates. Irrigation, if consistently applied, may extend the use of cool season species during the summer months. c Seeding rates should be doubled if seed is broadcast, or increased by 50 percent if done using a Brillion Drill or by hydraulic seeding. EC-2 Temporary and Permanent Seeding (TS/PS) TS/PS-4 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Table TS/PS-2. Minimum Drill Seeding Rates for Perennial Grasses Common a Name Botanical Name Growth Seasonb Growth Form Seeds/ Pound Pounds of PLS/acre Alakali Soil Seed Mix Alkali sacaton Sporobolus airoides Cool Bunch 1,750,000 0.25 Basin wildrye Elymus cinereus Cool Bunch 165,000 2.5 Sodar streambank wheatgrass Agropyron riparium 'Sodar' Cool Sod 170,000 2.5 Jose tall wheatgrass Agropyron elongatum 'Jose' Cool Bunch 79,000 7.0 Arriba western wheatgrass Agropyron smithii 'Arriba' Cool Sod 110,000 5.5 Total 17.75 Fertile Loamy Soil Seed Mix Ephriam crested wheatgrass Agropyron cristatum 'Ephriam' Cool Sod 175,000 2.0 Dural hard fescue Festuca ovina 'duriuscula' Cool Bunch 565,000 1.0 Lincoln smooth brome Bromus inermis leyss 'Lincoln' Cool Sod 130,000 3.0 Sodar streambank wheatgrass Agropyron riparium 'Sodar' Cool Sod 170,000 2.5 Arriba western wheatgrass Agropyron smithii 'Arriba' Cool Sod 110,000 7.0 Total 15.5 High Water Table Soil Seed Mix Meadow foxtail Alopecurus pratensis Cool Sod 900,000 0.5 Redtop Agrostis alba Warm Open sod 5,000,000 0.25 Reed canarygrass Phalaris arundinacea Cool Sod 68,000 0.5 Lincoln smooth brome Bromus inermis leyss 'Lincoln' Cool Sod 130,000 3.0 Pathfinder switchgrass Panicum virgatum 'Pathfinder' Warm Sod 389,000 1.0 Alkar tall wheatgrass Agropyron elongatum 'Alkar' Cool Bunch 79,000 5.5 Total 10.75 Transition Turf Seed Mixc Ruebens Canadian bluegrass Poa compressa 'Ruebens' Cool Sod 2,500,000 0.5 Dural hard fescue Festuca ovina 'duriuscula' Cool Bunch 565,000 1.0 Citation perennial ryegrass Lolium perenne 'Citation' Cool Sod 247,000 3.0 Lincoln smooth brome Bromus inermis leyss 'Lincoln' Cool Sod 130,000 3.0 Total 7.5 Temporary and Permanent Seeding (TS/PS) EC-2 November 2010 Urban Drainage and Flood Control District TS/PS-5 Urban Storm Drainage Criteria Manual Volume 3 Table TS/PS-2. Minimum Drill Seeding Rates for Perennial Grasses (cont.) Common Name Botanical Name Growth Seasonb Growth Form Seeds/ Pound Pounds of PLS/acre Sandy Soil Seed Mix Blue grama Bouteloua gracilis Warm Sod-forming bunchgrass 825,000 0.5 Camper little bluestem Schizachyrium scoparium 'Camper' Warm Bunch 240,000 1.0 Prairie sandreed Calamovilfa longifolia Warm Open sod 274,000 1.0 Sand dropseed Sporobolus cryptandrus Cool Bunch 5,298,000 0.25 Vaughn sideoats grama Bouteloua curtipendula 'Vaughn' Warm Sod 191,000 2.0 Arriba western wheatgrass Agropyron smithii 'Arriba' Cool Sod 110,000 5.5 Total 10.25 Heavy Clay, Rocky Foothill Seed Mix Ephriam crested wheatgrass d Agropyron cristatum 'Ephriam' Cool Sod 175,000 1.5 Oahe Intermediate wheatgrass Agropyron intermedium 'Oahe' Cool Sod 115,000 5.5 Vaughn sideoats grama e Bouteloua curtipendula 'Vaughn' Warm Sod 191,000 2.0 Lincoln smooth brome Bromus inermis leyss 'Lincoln' Cool Sod 130,000 3.0 Arriba western wheatgrass Agropyron smithii 'Arriba' Cool Sod 110,000 5.5 Total 17.5 a All of the above seeding mixes and rates are based on drill seeding followed by crimped hay or straw mulch. These rates should be doubled if seed is broadcast and should be increased by 50 percent if the seeding is done using a Brillion Drill or is applied through hydraulic seeding. Hydraulic seeding may be substituted for drilling only where slopes are steeper than 3:1. If hydraulic seeding is used, hydraulic mulching should be done as a separate operation. b See Table TS/PS-3 for seeding dates. c If site is to be irrigated, the transition turf seed rates should be doubled. d Crested wheatgrass should not be used on slopes steeper than 6H to 1V. e Can substitute 0.5 lbs PLS of blue grama for the 2.0 lbs PLS of Vaughn sideoats grama. EC-2 Temporary and Permanent Seeding (TS/PS) TS/PS-6 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Table TS/PS-3. Seeding Dates for Annual and Perennial Grasses Annual Grasses (Numbers in table reference species in Table TS/PS-1) Perennial Grasses Seeding Dates Warm Cool Warm Cool January 1–March 15   March 16–April 30 4 1,2,3   May 1–May 15 4  May 16–June 30 4,5,6,7 July 1–July 15 5,6,7 July 16–August 31 September 1–September 30 8,9,10,11 October 1–December 31   Mulch Cover seeded areas with mulch or an appropriate rolled erosion control product to promote establishment of vegetation. Anchor mulch by crimping, netting or use of a non-toxic tackifier. See the Mulching BMP Fact Sheet for additional guidance. Maintenance and Removal Monitor and observe seeded areas to identify areas of poor growth or areas that fail to germinate. Reseed and mulch these areas, as needed. An area that has been permanently seeded should have a good stand of vegetation within one growing season if irrigated and within three growing seasons without irrigation in Colorado. Reseed portions of the site that fail to germinate or remain bare after the first growing season. Seeded areas may require irrigation, particularly during extended dry periods. Targeted weed control may also be necessary. Protect seeded areas from construction equipment and vehicle access. Mulching (MU) EC-4 November 2010 Urban Drainage and Flood Control District MU-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph MU-1. An area that was recently seeded, mulched, and crimped. Description Mulching consists of evenly applying straw, hay, shredded wood mulch, bark or compost to disturbed soils and securing the mulch by crimping, tackifiers, netting or other measures. Mulching helps reduce erosion by protecting bare soil from rainfall impact, increasing infiltration, and reducing runoff. Although often applied in conjunction with temporary or permanent seeding, it can also be used for temporary stabilization of areas that cannot be reseeded due to seasonal constraints. Mulch can be applied either using standard mechanical dry application methods or using hydromulching equipment that hydraulically applies a slurry of water, wood fiber mulch, and often a tackifier. Appropriate Uses Use mulch in conjunction with seeding to help protect the seedbed and stabilize the soil. Mulch can also be used as a temporary cover on low to mild slopes to help temporarily stabilize disturbed areas where growing season constraints prevent effective reseeding. Disturbed areas should be properly mulched and tacked, or seeded, mulched and tacked promptly after final grade is reached (typically within no longer than 14 days) on portions of the site not otherwise permanently stabilized. Standard dry mulching is encouraged in most jurisdictions; however, hydromulching may not be allowed in certain jurisdictions or may not be allowed near waterways. Do not apply mulch during windy conditions. Design and Installation Prior to mulching, surface-roughen areas by rolling with a crimping or punching type roller or by track walking. Track walking should only be used where other methods are impractical because track walking with heavy equipment typically compacts the soil. A variety of mulches can be used effectively at construction sites, including the following types: Mulch Functions Erosion Control Yes Sediment Control Moderate Site/Material Management No EC-4 Mulching (MU) MU-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3  Clean, weed- and seed-free, long-stemmed grass hay (preferred) or cereal grain straw. Hay is preferred because it is less susceptible to removal by wind. Mulch should be applied evenly at a rate of 2 tons per acre and must be tacked or fastened by an approved method suitable for the type of mulch used. At least 50 percent of the grass hay mulch, by weight, should be 10 inches or more in length.  Grass hay mulch must be anchored and not merely placed on the surface. This can be accomplished mechanically by crimping or with the aid of tackifiers or nets. Anchoring with a crimping implement is preferred, and is the recommended method for areas flatter than 3:1. Mechanical crimpers must be capable of tucking the long mulch fibers into the soil to a depth of 3 inches without cutting them. An agricultural disk, while not an ideal substitute, may work if the disk blades are dull or blunted and set vertically; however, the frame may have to be weighted to afford proper soil penetration.  On small areas sheltered from the wind and heavy runoff, spraying a tackifier on the mulch is satisfactory for holding it in place. For steep slopes and special situations where greater control is needed, erosion control blankets anchored with stakes should be used instead of mulch.  Hydraulic mulching consists of wood cellulose fibers mixed with water and a tackifying agent and should be applied at a rate of no less than 1,500 pounds per acre (1,425 lbs of fibers mixed with at least 75 lbs of tackifier) with a hydraulic mulcher. For steeper slopes, up to 2000 pounds per acre may be required for effective hydroseeding. Hydromulch typically requires up to 24 hours to dry; therefore, it should not be applied immediately prior to inclement weather. Application to roads, waterways and existing vegetation should be avoided.  Erosion control mats, blankets, or nets are recommended to help stabilize steep slopes (generally 3:1 and steeper) and waterways. Depending on the product, these may be used alone or in conjunction with grass or straw mulch. Normally, use of these products will be restricted to relatively small areas. Biodegradable mats made of straw and jute, straw-coconut, coconut fiber, or excelsior can be used instead of mulch. (See the ECM/TRM BMP for more information.)  Some tackifiers or binders may be used to anchor mulch. Check with the local jurisdiction for allowed tackifiers. Manufacturer's recommendations should be followed at all times. (See the Soil Binder BMP for more information on general types of tackifiers.)  Rock can also be used as mulch. It provides protection of exposed soils to wind and water erosion and allows infiltration of precipitation. An aggregate base course can be spread on disturbed areas for temporary or permanent stabilization. The rock mulch layer should be thick enough to provide full coverage of exposed soil on the area it is applied. Maintenance and Removal After mulching, the bare ground surface should not be more than 10 percent exposed. Reapply mulch, as needed, to cover bare areas. Wind Erosion/Dust Control (DC) EC-14 November 2010 Urban Drainage and Flood Control District DC-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph DC-1. Water truck used for dust suppression. Photo courtesy of Douglas County. Description Wind erosion and dust control BMPs help to keep soil particles from entering the air as a result of land disturbing construction activities. These BMPs include a variety of practices generally focused on either graded disturbed areas or construction roadways. For graded areas, practices such as seeding and mulching, use of soil binders, site watering, or other practices that provide prompt surface cover should be used. For construction roadways, road watering and stabilized surfaces should be considered. Appropriate Uses Dust control measures should be used on any site where dust poses a problem to air quality. Dust control is important to control for the health of construction workers and surrounding waterbodies. Design and Installation The following construction BMPs can be used for dust control:  An irrigation/sprinkler system can be used to wet the top layer of disturbed soil to help keep dry soil particles from becoming airborne.  Seeding and mulching can be used to stabilize disturbed surfaces and reduce dust emissions.  Protecting existing vegetation can help to slow wind velocities across the ground surface, thereby limiting the likelihood of soil particles to become airborne.  Spray-on soil binders form a bond between soil particles keeping them grounded. Chemical treatments may require additional permitting requirements. Potential impacts to surrounding waterways and habitat must be considered prior to use.  Placing rock on construction roadways and entrances will help keep dust to a minimum across the construction site.  Wind fences can be installed on site to reduce wind speeds. Install fences perpendicular to the prevailing wind direction for maximum effectiveness. Maintenance and Removal When using an irrigation/sprinkler control system to aid in dust control, be careful not to overwater. Overwatering will cause construction vehicles to track mud off-site. Wind Erosion Control/ Dust Control Functions Erosion Control Yes Sediment Control No Site/Material Management Moderate Concrete Washout Area (CWA) MM-1 November 2010 Urban Drainage and Flood Control District CWA-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph CWA-1. Example of concrete washout area. Note gravel tracking pad for access and sign. Description Concrete waste management involves designating and properly managing a specific area of the construction site as a concrete washout area. A concrete washout area can be created using one of several approaches designed to receive wash water from washing of tools and concrete mixer chutes, liquid concrete waste from dump trucks, mobile batch mixers, or pump trucks. Three basic approaches are available: excavation of a pit in the ground, use of an above ground storage area, or use of prefabricated haul- away concrete washout containers. Surface discharges of concrete washout water from construction sites are prohibited. Appropriate Uses Concrete washout areas must be designated on all sites that will generate concrete wash water or liquid concrete waste from onsite concrete mixing or concrete delivery. Because pH is a pollutant of concern for washout activities, when unlined pits are used for concrete washout, the soil must have adequate buffering capacity to result in protection of state groundwater standards; otherwise, a liner/containment must be used. The following management practices are recommended to prevent an impact from unlined pits to groundwater:  The use of the washout site should be temporary (less than 1 year), and  The washout site should be not be located in an area where shallow groundwater may be present, such as near natural drainages, springs, or wetlands. Design and Installation Concrete washout activities must be conducted in a manner that does not contribute pollutants to surface waters or stormwater runoff. Concrete washout areas may be lined or unlined excavated pits in the ground, commercially manufactured prefabricated washout containers, or aboveground holding areas constructed of berms, sandbags or straw bales with a plastic liner. Although unlined washout areas may be used, lined pits may be required to protect groundwater under certain conditions. Do not locate an unlined washout area within 400 feet of any natural drainage pathway or waterbody or within 1,000 feet of any wells or drinking water sources. Even for lined concrete washouts, it is advisable to locate the facility away from waterbodies and drainage paths. If site constraints make these Concrete Washout Area Functions Erosion Control No Sediment Control No Site/Material Management Yes MM-1 Concrete Washout Area (CWA) CWA-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 setbacks infeasible or if highly permeable soils exist in the area, then the pit must be installed with an impermeable liner (16 mil minimum thickness) or surface storage alternatives using prefabricated concrete washout devices or a lined aboveground storage area should be used. Design details with notes are provided in Detail CWA-1 for pits and CWA-2 for aboveground storage areas. Pre-fabricated concrete washout container information can be obtained from vendors. Maintenance and Removal A key consideration for concrete washout areas is to ensure that adequate signage is in place identifying the location of the washout area. Part of inspecting and maintaining washout areas is ensuring that adequate signage is provided and in good repair and that the washout area is being used, as opposed to washout in non-designated areas of the site. Remove concrete waste in the washout area, as needed to maintain BMP function (typically when filled to about two-thirds of its capacity). Collect concrete waste and deliver offsite to a designated disposal location. Upon termination of use of the washout site, accumulated solid waste, including concrete waste and any contaminated soils, must be removed from the site to prevent on-site disposal of solid waste. If the wash water is allowed to evaporate and the concrete hardens, it may be recycled. Photograph CWA-3. Earthen concrete washout. Photo courtesy of CDOT. Photograph CWA-2. Prefabricated concrete washout. Photo courtesy of CDOT. Concrete Washout Area (CWA) MM-1 November 2010 Urban Drainage and Flood Control District CWA-3 Urban Storm Drainage Criteria Manual Volume 3 MM-1 Concrete Washout Area (CWA) CWA-4 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Stockpile Management (SP) MM-2 November 2010 Urban Drainage and Flood Control District SP-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph SP-1. A topsoil stockpile that has been partially revegetated and is protected by silt fence perimeter control. Description Stockpile management includes measures to minimize erosion and sediment transport from soil stockpiles. Appropriate Uses Stockpile management should be used when soils or other erodible materials are stored at the construction site. Special attention should be given to stockpiles in close proximity to natural or manmade storm systems. Design and Installation Locate stockpiles away from all drainage system components including storm sewer inlets. Where practical, choose stockpile locations that that will remain undisturbed for the longest period of time as the phases of construction progress. Place sediment control BMPs around the perimeter of the stockpile, such as sediment control logs, rock socks, silt fence, straw bales and sand bags. See Detail SP-1 for guidance on proper establishment of perimeter controls around a stockpile. For stockpiles in active use, provide a stabilized designated access point on the upgradient side of the stockpile. Stabilize the stockpile surface with surface roughening, temporary seeding and mulching, erosion control blankets, or soil binders. Soils stockpiled for an extended period (typically for more than 60 days) should be seeded and mulched with a temporary grass cover once the stockpile is placed (typically within 14 days). Use of mulch only or a soil binder is acceptable if the stockpile will be in place for a more limited time period (typically 30-60 days). Timeframes for stabilization of stockpiles noted in this fact sheet are "typical" guidelines. Check permit requirements for specific federal, state, and/or local requirements that may be more prescriptive. Stockpiles should not be placed in streets or paved areas unless no other practical alternative exists. See the Stabilized Staging Area Fact Sheet for guidance when staging in roadways is unavoidable due to space or right-of-way constraints. For paved areas, rock socks must be used for perimeter control and all inlets with the potential to receive sediment from the stockpile (even from vehicle tracking) must be protected. Maintenance and Removal Inspect perimeter controls and inlet protection in accordance with their respective BMP Fact Sheets. Where seeding, mulch and/or soil binders are used, reseeding or reapplication of soil binder may be necessary. When temporary removal of a perimeter BMP is necessary to access a stockpile, ensure BMPs are reinstalled in accordance with their respective design detail section. Stockpile Management Functions Erosion Control Yes Sediment Control Yes Site/Material Management Yes MM-2 Stockpile Management (SM) SP-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 When the stockpile is no longer needed, properly dispose of excess materials and revegetate or otherwise stabilize the ground surface where the stockpile was located. Stockpile Management (SP) MM-2 November 2010 Urban Drainage and Flood Control District SP-3 Urban Storm Drainage Criteria Manual Volume 3 MM-2 Stockpile Management (SM) SP-4 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Stockpile Management (SP) MM-2 November 2010 Urban Drainage and Flood Control District SP-5 Urban Storm Drainage Criteria Manual Volume 3 MM-2 Stockpile Management (SM) SP-6 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Good Housekeeping Practices (GH) MM-3 November 2010 Urban Drainage and Flood Control District GH-1 Urban Storm Drainage Criteria Manual Volume 3 Photographs GH-1 and GH-2. Proper materials storage and secondary containment for fuel tanks are important good housekeeping practices. Photos courtesy of CDOT and City of Aurora. Description Implement construction site good housekeeping practices to prevent pollution associated with solid, liquid and hazardous construction-related materials and wastes. Stormwater Management Plans (SWMPs) should clearly specify BMPs including these good housekeeping practices:  Provide for waste management.  Establish proper building material staging areas.  Designate paint and concrete washout areas.  Establish proper equipment/vehicle fueling and maintenance practices.  Control equipment/vehicle washing and allowable non- stormwater discharges.  Develop a spill prevention and response plan. Acknowledgement: This Fact Sheet is based directly on EPA guidance provided in Developing Your Stormwater Pollution Prevent Plan (EPA 2007). Appropriate Uses Good housekeeping practices are necessary at all construction sites. Design and Installation The following principles and actions should be addressed in SWMPs:  Provide for Waste Management. Implement management procedures and practices to prevent or reduce the exposure and transport of pollutants in stormwater from solid, liquid and sanitary wastes that will be generated at the site. Practices such as trash disposal, recycling, proper material handling, and cleanup measures can reduce the potential for stormwater runoff to pick up construction site wastes and discharge them to surface waters. Implement a comprehensive set of waste-management practices for hazardous or toxic materials, such as paints, solvents, petroleum products, pesticides, wood preservatives, acids, roofing tar, and other materials. Practices should include storage, handling, inventory, and cleanup procedures, in case of spills. Specific practices that should be considered include: Solid or Construction Waste o Designate trash and bulk waste-collection areas on- site. Good Housekeeping Functions Erosion Control No Sediment Control No Site/Material Management Yes MM-3 Good Housekeeping Practices (GH) GH-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Photograph GH-3. Locate portable toilet facilities on level surfaces away from waterways and storm drains. Photo courtesy of WWE. o Recycle materials whenever possible (e.g., paper, wood, concrete, oil). o Segregate and provide proper disposal options for hazardous material wastes. o Clean up litter and debris from the construction site daily. o Locate waste-collection areas away from streets, gutters, watercourses, and storm drains. Waste- collection areas (dumpsters, and such) are often best located near construction site entrances to minimize traffic on disturbed soils. Consider secondary containment around waste collection areas to minimize the likelihood of contaminated discharges. o Empty waste containers before they are full and overflowing. Sanitary and Septic Waste o Provide convenient, well-maintained, and properly located toilet facilities on-site. o Locate toilet facilities away from storm drain inlets and waterways to prevent accidental spills and contamination of stormwater. o Maintain clean restroom facilities and empty portable toilets regularly. o Where possible, provide secondary containment pans under portable toilets. o Provide tie-downs or stake-downs for portable toilets. o Educate employees, subcontractors, and suppliers on locations of facilities. o Treat or dispose of sanitary and septic waste in accordance with state or local regulations. Do not discharge or bury wastewater at the construction site. o Inspect facilities for leaks. If found, repair or replace immediately. o Special care is necessary during maintenance (pump out) to ensure that waste and/or biocide are not spilled on the ground. Hazardous Materials and Wastes o Develop and implement employee and subcontractor education, as needed, on hazardous and toxic waste handling, storage, disposal, and cleanup. o Designate hazardous waste-collection areas on-site. o Place all hazardous and toxic material wastes in secondary containment. Good Housekeeping Practices (GH) MM-3 November 2010 Urban Drainage and Flood Control District GH-3 Urban Storm Drainage Criteria Manual Volume 3 o Hazardous waste containers should be inspected to ensure that all containers are labeled properly and that no leaks are present.  Establish Proper Building Material Handling and Staging Areas. The SWMP should include comprehensive handling and management procedures for building materials, especially those that are hazardous or toxic. Paints, solvents, pesticides, fuels and oils, other hazardous materials or building materials that have the potential to contaminate stormwater should be stored indoors or under cover whenever possible or in areas with secondary containment. Secondary containment measures prevent a spill from spreading across the site and may include dikes, berms, curbing, or other containment methods. Secondary containment techniques should also ensure the protection of groundwater. Designate staging areas for activities such as fueling vehicles, mixing paints, plaster, mortar, and other potential pollutants. Designated staging areas enable easier monitoring of the use of materials and clean up of spills. Training employees and subcontractors is essential to the success of this pollution prevention principle. Consider the following specific materials handling and staging practices: o Train employees and subcontractors in proper handling and storage practices. o Clearly designate site areas for staging and storage with signs and on construction drawings. Staging areas should be located in areas central to the construction site. Segment the staging area into sub-areas designated for vehicles, equipment, or stockpiles. Construction entrances and exits should be clearly marked so that delivery vehicles enter/exit through stabilized areas with vehicle tracking controls (See Vehicle Tracking Control Fact Sheet). o Provide storage in accordance with Spill Protection, Control and Countermeasures (SPCC) requirements and plans and provide cover and impermeable perimeter control, as necessary, for hazardous materials and contaminated soils that must be stored on site. o Ensure that storage containers are regularly inspected for leaks, corrosion, support or foundation failure, or other signs of deterioration and tested for soundness. o Reuse and recycle construction materials when possible.  Designate Concrete Washout Areas. Concrete contractors should be encouraged to use the washout facilities at their own plants or dispatch facilities when feasible; however, concrete washout commonly occurs on construction sites. If it is necessary to provide for concrete washout areas on- site, designate specific washout areas and design facilities to handle anticipated washout water. Washout areas should also be provided for paint and stucco operations. Because washout areas can be a source of pollutants from leaks or spills, care must be taken with regard to their placement and proper use. See the Concrete Washout Area Fact Sheet for detailed guidance. Both self-constructed and prefabricated washout containers can fill up quickly when concrete, paint, and stucco work are occurring on large portions of the site. Be sure to check for evidence that contractors are using the washout areas and not dumping materials onto the ground or into drainage facilities. If the washout areas are not being used regularly, consider posting additional signage, relocating the facilities to more convenient locations, or providing training to workers and contractors. When concrete, paint, or stucco is part of the construction process, consider these practices which will help prevent contamination of stormwater. Include the locations of these areas and the maintenance and inspection procedures in the SWMP. MM-3 Good Housekeeping Practices (GH) GH-4 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 o Do not washout concrete trucks or equipment into storm drains, streets, gutters, uncontained areas, or streams. Only use designated washout areas. o Establish washout areas and advertise their locations with signs. Ensure that signage remains in good repair. o Provide adequate containment for the amount of wash water that will be used. o Inspect washout structures daily to detect leaks or tears and to identify when materials need to be removed. o Dispose of materials properly. The preferred method is to allow the water to evaporate and to recycle the hardened concrete. Full service companies may provide dewatering services and should dispose of wastewater properly. Concrete wash water can be highly polluted. It should not be discharged to any surface water, storm sewer system, or allowed to infiltrate into the ground in the vicinity of waterbodies. Washwater should not be discharged to a sanitary sewer system without first receiving written permission from the system operator.  Establish Proper Equipment/Vehicle Fueling and Maintenance Practices. Create a clearly designated on-site fueling and maintenance area that is clean and dry. The on-site fueling area should have a spill kit, and staff should know how to use it. If possible, conduct vehicle fueling and maintenance activities in a covered area. Consider the following practices to help prevent the discharge of pollutants to stormwater from equipment/vehicle fueling and maintenance. Include the locations of designated fueling and maintenance areas and inspection and maintenance procedures in the SWMP. o Train employees and subcontractors in proper fueling procedures (stay with vehicles during fueling, proper use of pumps, emergency shutoff valves, etc.). o Inspect on-site vehicles and equipment regularly for leaks, equipment damage, and other service problems. o Clearly designate vehicle/equipment service areas away from drainage facilities and watercourses to prevent stormwater run-on and runoff. o Use drip pans, drip cloths, or absorbent pads when replacing spent fluids. o Collect all spent fluids, store in appropriate labeled containers in the proper storage areas, and recycle fluids whenever possible.  Control Equipment/Vehicle Washing and Allowable Non-Stormwater Discharges. Implement practices to prevent contamination of surface and groundwater from equipment and vehicle wash water. Representative practices include: o Educate employees and subcontractors on proper washing procedures. o Use off-site washing facilities, when available. o Clearly mark the washing areas and inform workers that all washing must occur in this area. o Contain wash water and treat it using BMPs. Infiltrate washwater when possible, but maintain separation from drainage paths and waterbodies. Good Housekeeping Practices (GH) MM-3 November 2010 Urban Drainage and Flood Control District GH-5 Urban Storm Drainage Criteria Manual Volume 3 o Use high-pressure water spray at vehicle washing facilities without detergents. Water alone can remove most dirt adequately. o Do not conduct other activities, such as vehicle repairs, in the wash area. o Include the location of the washing facilities and the inspection and maintenance procedures in the SWMP.  Develop a Spill Prevention and Response Plan. Spill prevention and response procedures must be identified in the SWMP. Representative procedures include identifying ways to reduce the chance of spills, stop the source of spills, contain and clean up spills, dispose of materials contaminated by spills, and train personnel responsible for spill prevention and response. The plan should also specify material handling procedures and storage requirements and ensure that clear and concise spill cleanup procedures are provided and posted for areas in which spills may potentially occur. When developing a spill prevention plan, include the following: o Note the locations of chemical storage areas, storm drains, tributary drainage areas, surface waterbodies on or near the site, and measures to stop spills from leaving the site. o Provide proper handling and safety procedures for each type of waste. Keep Material Safety Data Sheets (MSDSs) for chemical used on site with the SWMP. o Establish an education program for employees and subcontractors on the potential hazards to humans and the environment from spills and leaks. o Specify how to notify appropriate authorities, such as police and fire departments, hospitals, or municipal sewage treatment facilities to request assistance. Emergency procedures and contact numbers should be provided in the SWMP and posted at storage locations. o Describe the procedures, equipment and materials for immediate cleanup of spills and proper disposal. o Identify personnel responsible for implementing the plan in the event of a spill. Update the spill prevention plan and clean up materials as changes occur to the types of chemicals stored and used at the facility. MM-3 Good Housekeeping Practices (GH) GH-6 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Spill Prevention, Control, and Countermeasure (SPCC) Plan Construction sites may be subject to 40 CFR Part 112 regulations that require the preparation and implementation of a SPCC Plan to prevent oil spills from aboveground and underground storage tanks. The facility is subject to this rule if it is a non-transportation-related facility that:  Has a total storage capacity greater than 1,320 gallons or a completely buried storage capacity greater than 42,000 gallons.  Could reasonably be expected to discharge oil in quantities that may be harmful to navigable waters of the United States and adjoining shorelines. Furthermore, if the facility is subject to 40 CFR Part 112, the SWMP should reference the SPCC Plan. To find out more about SPCC Plans, see EPA's website on SPPC at www.epa.gov/oilspill/spcc.htm. Reporting Oil Spills In the event of an oil spill, contact the National Response Center toll free at 1-800-424- 8802 for assistance, or for more details, visit their website: www.nrc.uscg.mil. Maintenance and Removal Effective implementation of good housekeeping practices is dependent on clear designation of personnel responsible for supervising and implementing good housekeeping programs, such as site cleanup and disposal of trash and debris, hazardous material management and disposal, vehicle and equipment maintenance, and other practices. Emergency response "drills" may aid in emergency preparedness. Checklists may be helpful in good housekeeping efforts. Staging and storage areas require permanent stabilization when the areas are no longer being used for construction-related activities. Construction-related materials, debris and waste must be removed from the construction site once construction is complete. Design Details See the following Fact Sheets for related Design Details: MM-1 Concrete Washout Area MM-2 Stockpile Management SM-4 Vehicle Tracking Control Design details are not necessary for other good housekeeping practices; however, be sure to designate where specific practices will occur on the appropriate construction drawings. Silt Fence (SF) SC-1 November 2010 Urban Drainage and Flood Control District SF-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph SF-1. Silt fence creates a sediment barrier, forcing sheet flow runoff to evaporate or infiltrate. Description A silt fence is a woven geotextile fabric attached to wooden posts and trenched into the ground. It is designed as a sediment barrier to intercept sheet flow runoff from disturbed areas. Appropriate Uses A silt fence can be used where runoff is conveyed from a disturbed area as sheet flow. Silt fence is not designed to receive concentrated flow or to be used as a filter fabric. Typical uses include:  Down slope of a disturbed area to accept sheet flow.  Along the perimeter of a receiving water such as a stream, pond or wetland.  At the perimeter of a construction site. Design and Installation Silt fence should be installed along the contour of slopes so that it intercepts sheet flow. The maximum recommended tributary drainage area per 100 lineal feet of silt fence, installed along the contour, is approximately 0.25 acres with a disturbed slope length of up to 150 feet and a tributary slope gradient no steeper than 3:1. Longer and steeper slopes require additional measures. This recommendation only applies to silt fence installed along the contour. Silt fence installed for other uses, such as perimeter control, should be installed in a way that will not produce concentrated flows. For example, a "J-hook" installation may be appropriate to force runoff to pond and evaporate or infiltrate in multiple areas rather than concentrate and cause erosive conditions parallel to the silt fence. See Detail SF-1 for proper silt fence installation, which involves proper trenching, staking, securing the fabric to the stakes, and backfilling the silt fence. Properly installed silt fence should not be easily pulled out by hand and there should be no gaps between the ground and the fabric. Silt fence must meet the minimum allowable strength requirements, depth of installation requirement, and other specifications in the design details. Improper installation of silt fence is a common reason for silt fence failure; however, when properly installed and used for the appropriate purposes, it can be highly effective. Silt Fence Functions Erosion Control No Sediment Control Yes Site/Material Management No SC-1 Silt Fence (SF) SF-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Photograph SF-2. When silt fence is not installed along the contour, a "J-hook" installation may be appropriate to ensure that the BMP does not create concentrated flow parallel to the silt fence. Photo courtesy of Tom Gore. Maintenance and Removal Inspection of silt fence includes observing the material for tears or holes and checking for slumping fence and undercut areas bypassing flows. Repair of silt fence typically involves replacing the damaged section with a new section. Sediment accumulated behind silt fence should be removed, as needed to maintain BMP effectiveness, typically before it reaches a depth of 6 inches. Silt fence may be removed when the upstream area has reached final stabilization. Silt Fence (SF) SC-1 November 2010 Urban Drainage and Flood Control District SF-3 Urban Storm Drainage Criteria Manual Volume 3 SC-1 Silt Fence (SF) SF-4 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Sediment Control Log (SCL) SC-2 November 2010 Urban Drainage and Flood Control District SCL-1 Urban Storm Drainage Criteria Manual Volume 3 Photographs SCL-1 and SCL-2. Sediment control logs used as 1) a perimeter control around a soil stockpile; and, 2) as a "J-hook" perimeter control at the corner of a construction site. Description A sediment control log is a linear roll made of natural materials such as straw, coconut fiber, or other fibrous material trenched into the ground and held with a wooden stake. Sediment control logs are also often referred to as "straw wattles." They are used as a sediment barrier to intercept sheet flow runoff from disturbed areas. Appropriate Uses Sediment control logs can be used in the following applications to trap sediment:  As perimeter control for stockpiles and the site.  As part of inlet protection designs.  As check dams in small drainage ditches. (Sediment control logs are not intended for use in channels with high flow velocities.)  On disturbed slopes to shorten flow lengths (as an erosion control).  As part of multi-layered perimeter control along a receiving water such as a stream, pond or wetland. Sediment control logs work well in combination with other layers of erosion and sediment controls. Design and Installation Sediment control logs should be installed along the contour to avoid concentrating flows. The maximum allowable tributary drainage area per 100 lineal feet of sediment control log, installed along the contour, is approximately 0.25 acres with a disturbed slope length of up to 150 feet and a tributary slope gradient no steeper than 3:1. Longer and steeper slopes require additional measures. This recommendation only applies to sediment control logs installed along the contour. When installed for other uses, such as perimeter control, it should be installed in a way that will not produce concentrated flows. For example, a "J-hook" installation may be appropriate to force runoff to pond and evaporate or infiltrate in multiple areas rather than concentrate and cause erosive conditions parallel to the BMP. Sediment Control Log Functions Erosion Control Moderate Sediment Control Yes Site/Material Management No SC-2 Sediment Control Log (SCL) SCL-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Although sediment control logs initially allow runoff to flow through the BMP, they can quickly become a barrier and should be installed is if they are impermeable. Design details and notes for sediment control logs are provided in Detail SCL-1. Sediment logs must be properly trenched and staked into the ground to prevent undercutting, bypassing and displacement. When installed on slopes, sediment control logs should be installed along the contours (i.e., perpendicular to flow). Improper installation can lead to poor performance. Be sure that sediment control logs are properly trenched, anchored and tightly jointed. Maintenance and Removal Be aware that sediment control logs will eventually degrade. Remove accumulated sediment before the depth is one-half the height of the sediment log and repair damage to the sediment log, typically by replacing the damaged section. Once the upstream area is stabilized, remove and properly dispose of the logs. Areas disturbed beneath the logs may need to be seeded and mulched. Sediment control logs that are biodegradable may occasionally be left in place (e.g., when logs are used in conjunction with erosion control blankets as permanent slope breaks). However, removal of sediment control logs after final stabilization is typically recommended when used in perimeter control, inlet protection and check dam applications. Sediment Control Log (SCL) SC-2 November 2010 Urban Drainage and Flood Control District SCL-3 Urban Storm Drainage Criteria Manual Volume 3 SC-2 Sediment Control Log (SCL) SCL-4 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Sediment Control Log (SCL) SC-2 November 2010 Urban Drainage and Flood Control District SCL-5 Urban Storm Drainage Criteria Manual Volume 3 Rock Sock (RS) SC-5 November 2010 Urban Drainage and Flood Control District RS-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph RS-1. Rock socks placed at regular intervals in a curb line can help reduce sediment loading to storm sewer inlets. Rock socks can also be used as perimeter controls. Description A rock sock is constructed of gravel that has been wrapped by wire mesh or a geotextile to form an elongated cylindrical filter. Rock socks are typically used either as a perimeter control or as part of inlet protection. When placed at angles in the curb line, rock socks are typically referred to as curb socks. Rock socks are intended to trap sediment from stormwater runoff that flows onto roadways as a result of construction activities. Appropriate Uses Rock socks can be used at the perimeter of a disturbed area to control localized sediment loading. A benefit of rock socks as opposed to other perimeter controls is that they do not have to be trenched or staked into the ground; therefore, they are often used on roadway construction projects where paved surfaces are present. Use rock socks in inlet protection applications when the construction of a roadway is substantially complete and the roadway has been directly connected to a receiving storm system. Design and Installation When rock socks are used as perimeter controls, the maximum recommended tributary drainage area per 100 lineal feet of rock socks is approximately 0.25 acres with disturbed slope length of up to 150 feet and a tributary slope gradient no steeper than 3:1. A rock sock design detail and notes are provided in Detail RS-1. Also see the Inlet Protection Fact Sheet for design and installation guidance when rock socks are used for inlet protection and in the curb line. When placed in the gutter adjacent to a curb, rock socks should protrude no more than two feet from the curb in order for traffic to pass safely. If located in a high traffic area, place construction markers to alert drivers and street maintenance workers of their presence. Maintenance and Removal Rock socks are susceptible to displacement and breaking due to vehicle traffic. Inspect rock socks for damage and repair or replace as necessary. Remove sediment by sweeping or vacuuming as needed to maintain the functionality of the BMP, typically when sediment has accumulated behind the rock sock to one-half of the sock's height. Once upstream stabilization is complete, rock socks and accumulated sediment should be removed and properly disposed. Rock Sock Functions Erosion Control No Sediment Control Yes Site/Material Management No SC-5 Rock Sock (RS) RS-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Rock Sock (RS) SC-5 November 2010 Urban Drainage and Flood Control District RS-3 Urban Storm Drainage Criteria Manual Volume 3 Inlet Protection (IP) SC-6 November 2010 Urban Drainage and Flood Control District IP-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph IP-1. Inlet protection for a curb opening inlet. Description Inlet protection consists of permeable barriers installed around an inlet to filter runoff and remove sediment prior to entering a storm drain inlet. Inlet protection can be constructed from rock socks, sediment control logs, silt fence, block and rock socks, or other materials approved by the local jurisdiction. Area inlets can also be protected by over-excavating around the inlet to form a sediment trap. Appropriate Uses Install protection at storm sewer inlets that are operable during construction. Consider the potential for tracked-out sediment or temporary stockpile areas to contribute sediment to inlets when determining which inlets must be protected. This may include inlets in the general proximity of the construction area, not limited to downgradient inlets. Inlet protection is not Design and Installation a stand-alone BMP and should be used in conjunction with other upgradient BMPs. To function effectively, inlet protection measures must be installed to ensure that flows do not bypass the inlet protection and enter the storm drain without treatment. However, designs must also enable the inlet to function without completely blocking flows into the inlet in a manner that causes localized flooding. When selecting the type of inlet protection, consider factors such as type of inlet (e.g., curb or area, sump or on-grade conditions), traffic, anticipated flows, ability to secure the BMP properly, safety and other site-specific conditions. For example, block and rock socks will be better suited to a curb and gutter along a roadway, as opposed to silt fence or sediment control logs, which cannot be properly secured in a curb and gutter setting, but are effective area inlet protection measures. Several inlet protection designs are provided in the Design Details. Additionally, a variety of proprietary products are available for inlet protection that may be approved for use by local governments. If proprietary products are used, design details and installation procedures from the manufacturer must be followed. Regardless of the type of inlet protection selected, inlet protection is most effective when combined with other BMPs such as curb socks and check dams. Inlet protection is often the last barrier before runoff enters the storm sewer or receiving water. Design details with notes are provided for these forms of inlet protection: IP-1. Block and Rock Sock Inlet Protection for Sump or On-grade Inlets IP-2. Curb (Rock) Socks Upstream of Inlet Protection, On-grade Inlets Inlet Protection (various forms) Functions Erosion Control No Sediment Control Yes Site/Material Management No SC-6 Inlet Protection (IP) IP-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 IP-3. Rock Sock Inlet Protection for Sump/Area Inlet IP-4. Silt Fence Inlet Protection for Sump/Area Inlet IP-5. Over-excavation Inlet Protection IP-6. Straw Bale Inlet Protection for Sump/Area Inlet CIP-1. Culvert Inlet Protection Propriety inlet protection devices should be installed in accordance with manufacturer specifications. More information is provided below on selecting inlet protection for sump and on-grade locations. Inlets Located in a Sump When applying inlet protection in sump conditions, it is important that the inlet continue to function during larger runoff events. For curb inlets, the maximum height of the protective barrier should be lower than the top of the curb opening to allow overflow into the inlet during larger storms without excessive localized flooding. If the inlet protection height is greater than the curb elevation, particularly if the filter becomes clogged with sediment, runoff will not enter the inlet and may bypass it, possibly causing localized flooding, public safety issues, and downstream erosion and damage from bypassed flows. Area inlets located in a sump setting can be protected through the use of silt fence, concrete block and rock socks (on paved surfaces), sediment control logs/straw wattles embedded in the adjacent soil and stacked around the area inlet (on pervious surfaces), over-excavation around the inlet, and proprietary products providing equivalent functions. Inlets Located on a Slope For curb and gutter inlets on paved sloping streets, block and rock sock inlet protection is recommended in conjunction with curb socks in the gutter leading to the inlet. For inlets located along unpaved roads, also see the Check Dam Fact Sheet. Maintenance and Removal Inspect inlet protection frequently. Inspection and maintenance guidance includes:  Inspect for tears that can result in sediment directly entering the inlet, as well as result in the contents of the BMP (e.g., gravel) washing into the inlet.  Check for improper installation resulting in untreated flows bypassing the BMP and directly entering the inlet or bypassing to an unprotected downstream inlet. For example, silt fence that has not been properly trenched around the inlet can result in flows under the silt fence and directly into the inlet.  Look for displaced BMPs that are no longer protecting the inlet. Displacement may occur following larger storm events that wash away or reposition the inlet protection. Traffic or equipment may also crush or displace the BMP.  Monitor sediment accumulation upgradient of the inlet protection. Inlet Protection (IP) SC-6 November 2010 Urban Drainage and Flood Control District IP-3 Urban Storm Drainage Criteria Manual Volume 3  Remove sediment accumulation from the area upstream of the inlet protection, as needed to maintain BMP effectiveness, typically when it reaches no more than half the storage capacity of the inlet protection. For silt fence, remove sediment when it accumulates to a depth of no more than 6 inches. Remove sediment accumulation from the area upstream of the inlet protection as needed to maintain the functionality of the BMP.  Propriety inlet protection devices should be inspected and maintained in accordance with manufacturer specifications. If proprietary inlet insert devices are used, sediment should be removed in a timely manner to prevent devices from breaking and spilling sediment into the storm drain. Inlet protection must be removed and properly disposed of when the drainage area for the inlet has reached final stabilization. SC-6 Inlet Protection (IP) IP-4 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Inlet Protection (IP) SC-6 November 2010 Urban Drainage and Flood Control District IP-5 Urban Storm Drainage Criteria Manual Volume 3 SC-6 Inlet Protection (IP) IP-6 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Inlet Protection (IP) SC-6 November 2010 Urban Drainage and Flood Control District IP-7 Urban Storm Drainage Criteria Manual Volume 3 Vegetated Buffers (VB) SC-9 November 2010 Urban Drainage and Flood Control District VB-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph VB-1. A vegetated buffer is maintained between the area of active construction and the drainage swale. Photo courtesy of WWE. Description Buffer strips of preserved natural vegetation or grass help protect waterways and wetlands from land disturbing activities. Vegetated buffers improve stormwater runoff quality by straining sediment, promoting infiltration, and slowing runoff velocities. Appropriate Uses Vegetated buffers can be used to separate land disturbing activities and natural surface waters or conveyances. In many jurisdictions, local governments require some type of setback from natural waterways. Concentrated flow should not be directed through a buffer; instead, runoff should be in the form of sheet flow. Vegetated buffers are typically used in combination with other perimeter control BMPs such as sediment control logs or silt fence for multi- layered protection. Design and Installation Minimum buffer widths may vary based on local regulations. Clearly delineate the boundary of the natural buffer area using construction fencing, silt fence, or a comparable technique. In areas that have been cleared and graded, vegetated buffers such as sod can also be installed to create or restore a vegetated buffer around the perimeter of the site. Maintenance and Removal Inspect buffer areas for signs of erosion such as gullies or rills. Stabilize eroding areas, as needed. If erosion is due to concentrated flow conditions, it may be necessary to install a level spreader or other technique to restore sheet flow conditions. Inspect perimeter controls delineating the vegetative buffer and repair or replace as needed. Vegetated Buffers Functions Erosion Control Moderate Sediment Control Yes Site/Material Management Yes Protection of Existing Vegetation (PV) SM-2 November 2010 Urban Drainage and Flood Control District PV-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph PV-1. Protection of existing vegetation and a sensitive area. Photo courtesy of CDOT. Description Protection of existing vegetation on a construction site can be accomplished through installation of a construction fence around the area requiring protection. In cases where upgradient areas are disturbed, it may also be necessary to install perimeter controls to minimize sediment loading to sensitive areas such as wetlands. Existing vegetation may be designated for protection to maintain a stable surface cover as part of construction phasing, or vegetation may be protected in areas designated to remain in natural condition under post-development conditions (e.g., wetlands, mature trees, riparian areas, open space). Appropriate Uses Existing vegetation should be preserved for the maximum practical duration on a construction site through the use of effective construction phasing. Preserving vegetation helps to minimize erosion and can reduce revegetation costs following construction. Protection of wetland areas is required under the Clean Water Act, unless a permit has been obtained from the U.S. Army Corps of Engineers (USACE) allowing impacts in limited areas. If trees are to be protected as part of post-development landscaping, care must be taken to avoid several types of damage, some of which may not be apparent at the time of injury. Potential sources of injury include soil compaction during grading or due to construction traffic, direct equipment-related injury such as bark removal, branch breakage, surface grading and trenching, and soil cut and fill. In order to minimize injuries that may lead to immediate or later death of the tree, tree protection zones should be developed during site design, implemented at the beginning of a construction project, as well as continued during active construction. Design and Installation General Once an area has been designated as a preservation area, there should be no construction activity allowed within a set distance of the area. Clearly mark the area with construction fencing. Do not allow stockpiles, equipment, trailers or parking within the protected area. Guidelines to protect various types of existing vegetation follow. Protection of Existing Vegetation Functions Erosion Control Yes Sediment Control Moderate Site/Material Management Yes SM-2 Protection of Existing Vegetation (PV) PV-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Surface Cover During Phased Construction Install construction fencing or other perimeter controls around areas to be protected from clearing and grading as part of construction phasing. Maintaining surface cover on steep slopes for the maximum practical duration during construction is recommended. Open Space Preservation Where natural open space areas will be preserved as part of a development, it is important to install construction fencing around these areas to protect them from compaction. This is particularly important when areas with soils with high infiltration rates are preserved as part of LID designs. Preserved open space areas should not be used for staging and equipment storage. Wetlands and Riparian Areas Install a construction fence around the perimeter of the wetland or riparian (streamside vegetation) area to prevent access by equipment. In areas downgradient of disturbed areas, install a perimeter control such as silt fence, sediment control logs, or similar measure to minimize sediment loading to the wetland. Tree Protection 1  Before beginning construction operations, establish a tree protection zone around trees to be preserved by installing construction fences. Allow enough space from the trunk to protect the root zone from soil compaction and mechanical damage, and the branches from mechanical damage (see Table PV-1). If low branches will be kept, place the fence outside of the drip line. Where this is not possible, place fencing as far away from the trunk as possible. In order to maintain a healthy tree, be aware that about 60 percent of the tree's root zone extends beyond the drip line. Table PV-1 Guidelines for Determining the Tree Protection Zone (Source: Matheny and Clark, 1998; as cited in GreenCO and WWE 2008) Distance from Trunk (ft) per inch of DBH Species Tolerance to Damage Young Mature Over mature Good 0.5' 0.75' 1.0' Moderate 0.75' 1.0' 1.25' Poor 1.0' 1.25' 1.5' Notes: DBH = diameter at breast height (4.5 ft above grade); Young = <20% of life expectancy; Mature = 20%-80% of life expectancy; Over mature =>80% of life expectancy  Most tree roots grow within the top 12 to 18 inches of soil. Grade changes within the tree protection zone should be avoided where possible because seemingly minor grade changes can either smother 1 Tree Protection guidelines adapted from GreenCO and WWE (2008). Green Industry Best Management Practices (BMPs) for the Conservation and Protection of Water Resources in Colorado: Moving Toward Sustainability, Third Release. See www.greenco.org for more detailed guidance on tree preservation. Protection of Existing Vegetation (PV) SM-2 November 2010 Urban Drainage and Flood Control District PV-3 Urban Storm Drainage Criteria Manual Volume 3 roots (in fill situations) or damage roots (in cut situations). Consider small walls where needed to avoid grade changes in the tree protection zone.  Place and maintain a layer of mulch 4 to 6-inch thick from the tree trunk to the fencing, keeping a 6-inch space between the mulch and the trunk. Mulch helps to preserve moisture and decrease soil compaction if construction traffic is unavoidable. When planting operations are completed, the mulch may be reused throughout planting areas.  Limit access, if needed at all, and appoint one route as the main entrance and exit to the tree protection zone. Within the tree protection zone, do not allow any equipment to be stored, chemicals to be dumped, or construction activities to take place except fine grading, irrigation system installation, and planting operations. These activities should be conducted in consultation with a landscaping professional, following Green Industry BMPs.  Be aware that soil compaction can cause extreme damage to tree health that may appear gradually over a period of years. Soil compaction is easier to prevent than repair. Maintenance and Removal Repair or replace damaged or displaced fencing or other protective barriers around the vegetated area. If damage occurs to a tree, consult an arborist for guidance on how to care for the tree. If a tree in a designated preservation area is damaged beyond repair, remove and replace with a 2-inch diameter tree of the same or similar species. Construction equipment must not enter a wetland area, except as permitted by the U.S. Army Corps of Engineers (USACE). Inadvertent placement of fill in a wetland is a 404 permit violation and will require notification of the USACE. If damage to vegetation occurs in a protected area, reseed the area with the same or similar species, following the recommendations in the USDCM Revegetation chapter. Construction Fence (CF) SM-3 November 2010 Urban Drainage and Flood Control District CF-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph CF-1. A construction fence helps delineate areas where existing vegetation is being protected. Photo courtesy of Douglas County. Description A construction fence restricts site access to designated entrances and exits, delineates construction site boundaries, and keeps construction out of sensitive areas such as natural areas to be preserved as open space, wetlands and riparian areas. Appropriate Uses A construction fence can be used to delineate the site perimeter and locations within the site where access is restricted to protect natural resources such as wetlands, waterbodies, trees, and other natural areas of the site that should not be disturbed. If natural resource protection is an objective, then the construction fencing should be used in combination with other perimeter control BMPs such as silt fence, sediment control logs or similar measures. Design and Installation Construction fencing may be chain link or plastic mesh and should be installed following manufacturer’s recommendations. See Detail CF-1 for typical installations. Do not place construction fencing in areas within work limits of machinery. Maintenance and Removal  Inspect fences for damage; repair or replace as necessary.  Fencing should be tight and any areas with slumping or fallen posts should be reinstalled.  Fencing should be removed once construction is complete. Construction Fence Functions Erosion Control No Sediment Control No Site/Material Management Yes SM-3 Construction Fence (CF) CF-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Construction Fence (CF) SM-3 November 2010 Urban Drainage and Flood Control District CF-3 Urban Storm Drainage Criteria Manual Volume 3 Vehicle Tracking Control (VTC) SM-4 November 2010 Urban Drainage and Flood Control District VTC-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph VTC-1. A vehicle tracking control pad constructed with properly sized rock reduces off-site sediment tracking. Description Vehicle tracking controls provide stabilized construction site access where vehicles exit the site onto paved public roads. An effective vehicle tracking control helps remove sediment (mud or dirt) from vehicles, reducing tracking onto the paved surface. Appropriate Uses Implement a stabilized construction entrance or vehicle tracking control where frequent heavy vehicle traffic exits the construction site onto a paved roadway. An effective vehicle tracking control is particularly important during the following conditions:  Wet weather periods when mud is easily tracked off site.  During dry weather periods where dust is a concern.  When poorly drained, clayey soils are present on site. Although wheel washes are not required in designs of vehicle tracking controls, they may be needed at particularly muddy sites. Design and Installation Construct the vehicle tracking control on a level surface. Where feasible, grade the tracking control towards the construction site to reduce off-site runoff. Place signage, as needed, to direct construction vehicles to the designated exit through the vehicle tracking control. There are several different types of stabilized construction entrances including: VTC-1. Aggregate Vehicle Tracking Control. This is a coarse-aggregate surfaced pad underlain by a geotextile. This is the most common vehicle tracking control, and when properly maintained can be effective at removing sediment from vehicle tires. VTC-2. Vehicle Tracking Control with Construction Mat or Turf Reinforcement Mat. This type of control may be appropriate for site access at very small construction sites with low traffic volume over vegetated areas. Although this application does not typically remove sediment from vehicles, it helps protect existing vegetation and provides a stabilized entrance. Vehicle Tracking Control Functions Erosion Control Moderate Sediment Control Yes Site/Material Management Yes SM-4 Vehicle Tracking Control (VTC) VTC-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Photograph VTC-2. A vehicle tracking control pad with wheel wash facility. Photo courtesy of Tom Gore. VTC-3. Stabilized Construction Entrance/Exit with Wheel Wash. This is an aggregate pad, similar to VTC-1, but includes equipment for tire washing. The wheel wash equipment may be as simple as hand-held power washing equipment to more advance proprietary systems. When a wheel wash is provided, it is important to direct wash water to a sediment trap prior to discharge from the site. Vehicle tracking controls are sometimes installed in combination with a sediment trap to treat runoff. Maintenance and Removal Inspect the area for degradation and replace aggregate or material used for a stabilized entrance/exit as needed. If the area becomes clogged and ponds water, remove and dispose of excess sediment or replace material with a fresh layer of aggregate as necessary. With aggregate vehicle tracking controls, ensure rock and debris from this area do not enter the public right-of-way. Remove sediment that is tracked onto the public right of way daily or more frequently as needed. Excess sediment in the roadway indicates that the stabilized construction entrance needs maintenance. Ensure that drainage ditches at the entrance/exit area remain clear. A stabilized entrance should be removed only when there is no longer the potential for vehicle tracking to occur. This is typically after the site has been stabilized. When wheel wash equipment is used, be sure that the wash water is discharged to a sediment trap prior to discharge. Also inspect channels conveying the water from the wash area to the sediment trap and stabilize areas that may be eroding. When a construction entrance/exit is removed, excess sediment from the aggregate should be removed and disposed of appropriately. The entrance should be promptly stabilized with a permanent surface following removal, typically by paving. Vehicle Tracking Control (VTC) SM-4 November 2010 Urban Drainage and Flood Control District VTC-3 Urban Storm Drainage Criteria Manual Volume 3 SM-4 Vehicle Tracking Control (VTC) VTC-4 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Vehicle Tracking Control (VTC) SM-4 November 2010 Urban Drainage and Flood Control District VTC-5 Urban Storm Drainage Criteria Manual Volume 3 SM-4 Vehicle Tracking Control (VTC) VTC-6 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Stabilized Staging Area (SSA) SM-6 November 2010 Urban Drainage and Flood Control District SSA-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph SSA-1. Example of a staging area with a gravel surface to prevent mud tracking and reduce runoff. Photo courtesy of Douglas County. Description A stabilized staging area is a clearly designated area where construction equipment and vehicles, stockpiles, waste bins, and other construction-related materials are stored. The contractor office trailer may also be located in this area. Depending on the size of the construction site, more than one staging area may be necessary. Appropriate Uses Most construction sites will require a staging area, which should be clearly designated in SWMP drawings. The layout of the staging area may vary depending on the type of construction activity. Staging areas located in roadways due to space constraints require special measures to avoid materials being washed into storm inlets. Design and Installation Stabilized staging areas should be completed prior to other construction activities beginning on the site. Major components of a stabilized staging area include:  Appropriate space to contain storage and provide for loading/unloading operations, as well as parking if necessary.  A stabilized surface, either paved or covered, with 3-inch diameter aggregate or larger.  Perimeter controls such as silt fence, sediment control logs, or other measures.  Construction fencing to prevent unauthorized access to construction materials.  Provisions for Good Housekeeping practices related to materials storage and disposal, as described in the Good Housekeeping BMP Fact Sheet.  A stabilized construction entrance/exit, as described in the Vehicle Tracking Control BMP Fact Sheet, to accommodate traffic associated with material delivery and waste disposal vehicles. Over-sizing the stabilized staging area may result in disturbance of existing vegetation in excess of that required for the project. This increases costs, as well as requirements for long-term stabilization following the construction period. When designing the stabilized staging area, minimize the area of disturbance to the extent practical. Stabilized Staging Area Functions Erosion Control Yes Sediment Control Moderate Site/Material Yes SM-6 Stabilized Staging Area (SSA) SSA-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 See Detail SSA-1 for a typical stabilized staging area and SSA-2 for a stabilized staging area when materials staging in roadways is required. Maintenance and Removal Maintenance of stabilized staging areas includes maintaining a stable surface cover of gravel, repairing perimeter controls, and following good housekeeping practices. When construction is complete, debris, unused stockpiles and materials should be recycled or properly disposed. In some cases, this will require disposal of contaminated soil from equipment leaks in an appropriate landfill. Staging areas should then be permanently stabilized with vegetation or other surface cover planned for the development. Minimizing Long-Term Stabilization Requirements  Utilize off-site parking and restrict vehicle access to the site.  Use construction mats in lieu of rock when staging is provided in an area that will not be disturbed otherwise.  Consider use of a bermed contained area for materials and equipment that do not require a stabilized surface.  Consider phasing of staging areas to avoid disturbance in an area that will not be otherwise disturbed. Stabilized Staging Area (SSA) SM-6 November 2010 Urban Drainage and Flood Control District SSA-3 Urban Storm Drainage Criteria Manual Volume 3 SM-6 Stabilized Staging Area (SSA) SSA-4 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Street Sweeping and Vacuuming (SS) SM-7 November 2010 Urban Drainage and Flood Control District SS-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph SS-1. A street sweeper removes sediment and potential pollutants along the curb line at a construction site. Photo courtesy of Tom Gore. Description Street sweeping and vacuuming remove sediment that has been tracked onto roadways to reduce sediment transport into storm drain systems or a surface waterway. Appropriate Uses Use this practice at construction sites where vehicles may track sediment offsite onto paved roadways. Design and Installation Street sweeping or vacuuming should be conducted when there is noticeable sediment accumulation on roadways adjacent to the construction site. Typically, this will be concentrated at the entrance/exit to the construction site. Well-maintained stabilized construction entrances, vehicle tracking controls and tire wash facilities can help reduce the necessary frequency of street sweeping and vacuuming. On smaller construction sites, street sweeping can be conducted manually using a shovel and broom. Never wash accumulated sediment on roadways into storm drains. Maintenance and Removal  Inspect paved roads around the perimeter of the construction site on a daily basis and more frequently, as needed. Remove accumulated sediment, as needed.  Following street sweeping, check inlet protection that may have been displaced during street sweeping.  Inspect area to be swept for materials that may be hazardous prior to beginning sweeping operations. Street Sweeping/ Vacuuming Functions Erosion Control No Sediment Control Yes Site/Material Management Yes Paving and Grinding Operations (PGO) SM-12 November 2010 Urban Drainage and Flood Control District PGO-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph PGO-1. Paving operations on a Colorado highway. Photo courtesy of CDOT. Description Manage runoff from paving and grinding operations to reduce pollutants entering storm drainage systems and natural drainageways. Appropriate Uses Use runoff management practices during all paving and grinding operations such as surfacing, resurfacing, and saw cutting. Design and Installation There are a variety of management strategies that can be used to manage runoff from paving and grinding operations:  Establish inlet protection for all inlets that could potentially receive runoff.  Schedule paving operations when dry weather is forecasted.  Keep spill kits onsite for equipment spills and keep drip pans onsite for stored equipment.  Install perimeter controls when asphalt material is used on embankments or shoulders near waterways, drainages, or inlets.  Do not wash any paved surface into receiving storm drain inlets or natural drainageways. Instead, loose material should be swept or vacuumed following paving and grinding operations.  Store materials away from drainages or waterways.  Recycle asphalt and pavement material when feasible. Material that cannot be recycled must be disposed of in accordance with applicable regulations. See BMP Fact Sheets for Inlet Protection, Silt Fence and other perimeter controls selected for use during paving and grinding operations. Maintenance and Removal Perform maintenance and removal of inlet protection and perimeter controls in accordance with their respective fact sheets. Promptly respond to spills in accordance with the spill prevention and control plan. Paving and Grinding Operations Functions Erosion Control No Sediment Control No Site/Material Management Yes APPENDIX C LANDSCAPE PLAN APPENDIX D COPIES OF PERMITS/APPLICATIONS For Agency Use Only Permit Number Assigned COR03- Date Received /_ /_ Month Day Year COLORADO DISCHARGE PERMIT SYSTEM (CDPS) STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES APPLICATION PHOTO COPIES, FAXED COPIES, PDF COPIES OR EMAILS WILL NOT BE ACCEPTED. Please print or type. Original signatures are required. All items must be completed accurately and in their entirety for the application to be deemed complete. Incomplete applications will not be processed until all information is received which will ultimately delay the issuance of a permit. If more space is required to answer any question, please attach additional sheets to the application form. Applications must be submitted by mail or hand delivered to: Colorado Department of Public Health and Environment Water Quality Control Division 4300 Cherry Creek Drive South WQCD-P-B2 Denver, Colorado 80246-1530 Any additional information that you would like the Division to consider in developing the permit should be provided with the application. Examples include effluent data and/or modeling and planned pollutant removal strategies. PERMIT INFORMATION Reason for Application: NEW CERT RENEW CERT EXISTING CERT # Applicant is: Property Owner Contractor/Operator A. CONTACT INFORMATION - NOT ALL CONTACT TYPES MAY APPLY * indicates required *PERMITTEE (If more than one please add additional pages) *ORGANIZATION FORMAL NAME: 1) *PERMITTEE the person authorized to sign and certify the permit application. This person receives all permit correspondences and is legally responsible for compliance with the permit. Responsible Position (Title): Currently Held By (Person): Telephone No:_ email address Organization: Mailing Address: City:_ State: Zip: This form must be signed by the Permittee (listed in item 1) to be considered complete. Per Regulation 61 In all cases, it shall be signed as follows: a) In the case of corporations, by a responsible corporate officer. For the purposes of this section, the responsible corporate officer is responsible for the overall operation of the facility from which the discharge described in the application originates. b) In the case of a partnership, by a general partner. c) In the case of a sole proprietorship, by the proprietor. d) In the case of a municipal, state, or other public facility, by either a principal executive officer or ranking elected official page 1 of 5 revised April 2011 2) DMR COGNIZANT OFFICIAL (i.e. authorized agent) the person or position authorized to sign and certify reports required by the Division including Discharge Monitoring Reports *DMR’s, Annual Reports, Compliance Schedule submittals, and other information requested by the Division. The Division will transmit pre-printed reports (ie. DMR’s) to this person. If more than one, please add additional pages. Same As 1) Permittee Responsible Position (Title): Currently Held By (Person): Telephone No:_ email address Organization: Mailing Address: City:_ State: Zip: Per Regulation 61 : All reports required by permits, and other information requested by the Division shall be signed by the permittee or by a duly authorized representative of that person. A person is a duly authorized representative only if: (i) The authorization is made in writing by the permittee (ii) The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and (iii) The written authorization is submitted to the Division 3) *SITE CONTACT local contact for questions relating to the facility & discharge authorized by this permit for the facility. Same As 1) Permittee Responsible Position (Title): Currently Held By (Person): Telephone No:_ email address Organization: Mailing Address: City:_ State: Zip: 4) * BILLING CONTACT if different than the permittee Responsible Position (Title): Currently Held By (Person): Telephone No:_ email address Organization: Mailing Address: City:_ State: Zip: Page 2 of 5 revised April 2011 5) OTHER CONTACT TYPES (check below) Add pages if necessary: ResponsiblePosition (Title): Currently Held By (Person): Telephone No:_ email address Organization: Mailing Address: City:_ State: Zip: o Pretreatment Coordinator o Environmental Contact o Biosolids Responsible Party o Property Owner Inspection Facility Contact Consultant Compliance Contact Stormwater MS4 Responsible Person Stormwater Authorized Representative Other B. Permitted Project/Facility Information Project/Facility Name Street Address or cross streets (e.g., “S. of Park St. between 5th Ave. and 10th Ave.”, or “W. side of C.R. 21, 3.25 miles N. of Hwy 10”; A street name without an address, intersection, mile marker, or other identifying information describing the location of the project is not adequate. For linear projects, the route of the project should be described as best as possible with the location more accurately indicated by a map.) City, Zip Code County Facility Latitude/Longitude— (approximate center of site to nearest 15 seconds using one of following formats 001A Latitude . Longitude . (e.g., 39.703°, 104.933°’) degrees (to 3 decimal places) degrees (to 3 decimal places) or 001A Latitude º ’ " Longitude º ’ " (e.g., 39°46'11"N, 104°53'11"W) degrees minutes seconds degrees minutes seconds For the approximate center point of the property, to the nearest 15 seconds. The latitude and longitude must be provided as either degrees, minutes, and seconds, or in decimal degrees with three decimal places. This information may be obtained from a variety of sources, including: o Surveyors or engineers for the project should have, or be able to calculate, this information. o EPA maintains a web-based siting tool as part of their Toxic Release Inventory program that uses interactive maps and aerial photography to help users get latitude and longitude. The siting tool can be accessed at www.epa.gov/tri/report/siting_tool/index.htm o U.S. Geological Survey topographical map(s), available at area map stores. o Using a Global Positioning System (GPS) unit to obtain a direct reading. Note: the latitude/longitude required above is not the directional degrees, minutes, and seconds provided on a site legal description to define property boundaries. C. MAP (Attachment) If no map is submitted, the permit will not be issued. Map: Attach a map that indicates the site location and that CLEARLY shows the boundaries of the area that will be disturbed. Maps must be no larger than 11x17 inches. D. LEGAL DESCRIPTION Legal description: If subdivided, provide the legal description below, or indicate that it is not applicable (do not supply Township/Range/Section or metes and bounds description of site) Subdivision(s): Lot(s): Block(s): OR Not applicable (site has not been subdivided) page 3 of 5 revised April 2011 E. AREA OF CONSTRUCTION SITE Total area of project site (acres): Area of project site to undergo disturbance (acres): Note: aside from clearing, grading and excavation activities, disturbed areas also include areas receiving overburden (e.g., stockpiles), demolition areas, and areas with heavy equipment/vehicle traffic and storage that disturb existing vegetative cover Total disturbed area of Larger Common Plan of Development or Sale, if applicable: (i.e., total, including all phases, filings, lots, and infrastructure not covered by this application) Provide both the total area of the construction site, and the area that will undergo disturbance, in acres. Note: aside from clearing, grading and excavation activities, disturbed areas also include areas receiving overburden (e.g., stockpiles), demolition areas, and areas with heavy equipment/vehicle traffic and storage that disturb existing vegetative cover (see construction activity description under the APPLICABILITY section on page 1). If the project is part of a larger common plan of development or sale (see the definition under the APPLICABILITY section on page 1), the disturbed area of the total plan must also be included. F. NATURE OF CONSTRUCTION ACTIVITY Check the appropriate box(s) or provide a brief description that indicates the general nature of the construction activities. (The full description of activities must be included in the Stormwater Management Plan.) Single Family Residential Development Multi-Family Residential Development Commercial Development Oil and Gas Production and/or Exploration (including pad sites and associated infrastructure) Highway/Road Development (not including roadways associated with commercial or residential development) Other – Description: G. ANTICIPATED CONSTRUCTION SCHEDULE Construction Start Date: ___________________________ Final Stabilization Date: _____________________________ Construction Start Date - This is the day you expect to begin ground disturbing activities, including grubbing, stockpiling, excavating, demolition, and grading activities. Final Stabilization Date - in terms of permit coverage, this is when the site is finally stabilized. This means that all ground surface disturbing activities at the site have been completed, and all disturbed areas have been either built on, paved, or a uniform vegetative cover has been established with an individual plant density of at least 70 percent of pre-disturbance levels. Permit coverage must be maintained until the site is finally stabilized. Even if you are only doing one part of the project, the estimated final stabilization date must be for the overall project. If permit coverage is still required once your part is completed, the permit certification may be transferred or reassigned to a new responsible entity(s). H. RECEIVING WATERS (If discharge is to a ditch or storm sewer, include the name of the ultimate receiving waters) Immediate Receiving Water(s): Ultimate Receiving Water(s): Identify the receiving water of the stormwater from your site. Receiving waters are any waters of the State of Colorado. This includes all water courses, even if they are usually dry. If stormwater from the construction site enters a ditch or storm sewer system, identify that system and indicate the ultimate receiving water for the ditch or storm sewer. Note: a stormwater discharge permit does not allow a discharge into a ditch or storm sewer system without the approval of the owner/operator of that system. page 4 of 5 revised April 2011 I. REQUIRED SIGNATURES (Both parts i. and ii. must be signed) Signature of Applicant: The applicant must be either the owner and/or operator of the construction site. Refer to Part B of the instructions for additional information. The application must be signed by the applicant to be considered complete. In all cases, it shall be signed as follows: (Regulation 61.4 (1ei) a) In the case of corporations, by the responsible corporate officer is responsible for the overall operation of the facility from which the discharge described in the form originates b) In the case of a partnership, by a general partner. c) In the case of a sole proprietorship, by the proprietor. d) In the case of a municipal, state, or other public facility, by either a principal executive officer, ranking elected official, (a principal executive officer has responsibility for the overall operation of the facility from which the discharge originates). STOP!: A Stormwater Management Plan must be completed prior to signing the following certifications! i. STORMWATER MANAGEMENT PLAN CERTIFICATION “I certify under penalty of law that a complete Stormwater Management Plan, has been prepared for my activity. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the Stormwater Management Plan is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for falsely certifying the completion of said SWMP, including the possibility of fine and imprisonment for knowing violations.” XX Signature of Legally Responsible Person or Authorized Agent (submission must include original signature) Date Signed Name (printed) Title ii. SIGNATURE OF PERMIT LEGAL CONTACT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." “I understand that submittal of this application is for coverage under the State of Colorado General Permit for Stormwater Discharges Associated with Construction Activity for the entirety of the construction site/project described and applied for, until such time as the application is amended or the certification is transferred, inactivated, or expired.” XX Signature of Legally Responsible Person (submission must include original signature) Date Signed Name (printed Title DO NOT INCLUDE A COPY OF THE STORMWATER MANAGEMENT PLAN DO NOT INCLUDE PAYMENT – AN INVOICE WILL BE SENT AFTER THE CERTIFICATION IS ISSUED. page 5 of 5 revised April 2011 COLORADO DISCHARGE PERMIT SYSTEM (CDPS) For Agency Use Only Permit Number Assigned COG07-______________ Date Received ____/____/____ Month Day Year CONSTRUCTION DEWATERING INDUSTRIAL WASTEWATER DISCHARGE APPLICATION PHOTO COPIES, FAXED COPIES, PDF COPIES OR EMAILS WILL NOT BE ACCEPTED. Please print or type. Original signatures are required. All items must be completed accurately and in their entirety for the application to be deemed complete. Incomplete applications will not be processed until all information is received which will ultimately delay the issuance of a permit. If more space is required to answer any question, please attach additional sheets to the application form. Applications must be submitted by mail or hand delivered to: Colorado Department of Public Health and Environment Water Quality Control Division 4300 Cherry Creek Drive South WQCD-P-B2 Denver, Colorado 80246-1530 Any additional information that you would like the Division to consider in developing the permit should be provided with the application. Examples include effluent data and/or modeling and planned pollutant removal strategies. PERMIT INFORMATION Reason for Application: NEW CERT RENEW CERT EXISTING CERT #____________________ Applicant is: Property Owner Contractor/Operator A. Contact Information Permittee (If more than one please add additional pages) Organization Formal Name: ___________________________________________________________ 1. Permittee the person authorized to sign and certify the permit application. This person receives all permit correspondences and is legally responsible for compliance with the permit. Responsible Position (Title): ______________________________________________________________ Currently Held By (Person): _______________________________________________________________ Telephone No:__________________________________________________________________________ email address__________________________________________________________________________ Organization: ___________________________________________________________________________ Mailing Address: ________________________________________________________________________ City:_______________________________ State: ______________________ Zip: ____________________ This form must be signed by the Permittee to be considered complete. Per Regulation 61: In all cases the permit application shall be signed as follows: a) In the case of corporations, by a responsible corporate officer. For the purposes of this section, the responsible corporate officer is responsible for the overall operation of the facility from which the discharge described in the application originates. b) In the case of a partnership, by a general partner. c) In the case of a sole proprietorship, by the proprietor. d) In the case of a municipal, state, or other public facility, by either a principal executive officer or ranking elected official Page 1 of 6 Revised April 2011 Industrial Wastewater Discharge Permit – Construction Dewatering www.coloradowaterpermits.com 2. DMR Cognizant Official (i.e. authorized agent)—the person or position authorized to sign and certify reports required by permits including Discharge Monitoring Reports [DMR’s], Annual Reports, Compliance Schedule submittals, and other information requested by the Division. The Division will send pre-printed reports (e.g. DMR’s) to this person. If more than one, please add additional pages. Same as 1) Permittee Responsible Position (Title): _______________________________________________________ Currently Held By (Person): ________________________________________________________ Telephone No:___________________________________________________________________ Email address____________________________________________________________________ Organization: ____________________________________________________________________ Mailing Address: _________________________________________________________________ City:______________________________ State: ______________ Zip: ______________________ Per Regulation 61: All reports required by permits, and other information requested by the Division shall be signed by the permittee or by a duly authorized representative of that person. A person is a duly authorized representative only if: (i) The authorization is made in writing by the permittee; (ii) The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and (iii) The written authorization is submitted to the Division. 3. Site/Local Contact—contact for questions regarding the facility & discharges authorized by this permit Same as Permittee—Item 1 Responsible Position (Title): ________________________________________________________ Currently Held By (Person): _________________________________________________________ Telephone No:____________________________________________________________________ Email address_____________________________________________________________________ Organization: _____________________________________________________________________ Mailing Address: __________________________________________________________________ City:______________________________ State: ______________ Zip: _______________________ 4. Operator in Responsible Charge Same as Permittee—Item 1 Responsible Position (Title): __________________________________________________________ Currently Held By (Person): ___________________________________________________________ Telephone No:______________________________________________________________________ Email address______________________________________________________________________ Organization: _______________________________________________________________________ Mailing Address: ____________________________________________________________________ City:_______________________________ State: ______________ Zip: ________________________ Certification Type____________________Certification Number________________________________ Page 2 of 6 Revised April 2011 Industrial Wastewater Discharge Permit – Construction Dewatering www.coloradowaterpermits.com 5. Billing Contact (if different than the permittee) Responsible Position (Title): _____________________________________________________________ Currently Held By (Person): ______________________________________________________________ Telephone No:_________________________________________________________________________ Email address_________________________________________________________________________ Organization: __________________________________________________________________________ Mailing Address: _______________________________________________________________________ City:______________________________ State: ______________ Zip: ____________________________ 6. Other Contact Types (check below) Add pages if necessary: Responsible Position (Title): ______________________________________________________________ Currently Held By (Person): _______________________________________________________________ Telephone No:__________________________________________________________________________ Email address__________________________________________________________________________ Organization: ___________________________________________________________________________ Mailing Address: ________________________________________________________________________ City:______________________________________ State: ______________ Zip: _____________________ Pretreatment Coordinator Environmental Contact Biosolids Responsible Party Property Owner Inspection Facility Contact Consultant Compliance Contact Stormwater MS4 Responsible Person Stormwater Authorized Representative Other ____________________ B. Permitted Project/Facility Information 1. Project/Facility Name ____________________________________________________________________________ Street Address or cross streets_____________________________________________________________________ City, State and Zip Code _____________________________________________County _____________________ Type of Facility Ownership City Government Corporation Private Municipal or Water District State Government Mixed Ownership _________________________________ 2. Facility Latitude/Longitude—List the latitude and longitude of the excavation(s) resulting in the discharge(s). If the exact excavation location(s) are not known, list the latitude and longitude of the center point of the construction project. If using the center point, be sure to specify that it is the center point of construction activity. 001A Latitude __________ . _________ Longitude ___________ . _____________ (e.g., 39.703°, 104.933°’) degrees (to 3 decimal places) degrees (to 3 decimal places) or 001A Latitude _____ º _____’ _____" Longitude _____ º _____’ _____" (e.g., 39°46'11"N, 104°53'11"W) degrees minutes seconds degrees minutes seconds Horizontal Collection Method: GPS Unspecified Interpolation Map – Map Scale Number__________ Reference Point: Project/Facility Entrance Project/Facility Center/Centroid Horizontal Accuracy Measure (WQCD Requires use of NAD83 Datum for all references)___________________ (add additional pages if necessary) Page 3 of 6 Revised April 2011 Industrial Wastewater Discharge Permit – Construction Dewatering www.coloradowaterpermits.com B. Permitted Project/Facility Information Continued… 3. Facility Activity and Anticipated Schedule Dewatering will begin (date) _______________ Estimate how long dewatering will last: Years____________Months_______________Days_________________ Describe Activity e.g., highway bridge and tunnel construction, storm drain expansion, etc. and a description of activities being performed, including construction schedule and months of operation. Specify source(s) of wastewater to be discharged (i.e.well, foundation excavation, trenching, etc). 4. Will the discharge go to a ditch or storm sewer? YES NO If YES, in the appropriate table below include the name of the ultimate receiving waters where the ditch or storm sewer discharges. If YES, applicant must contact the owner of the ditch or storm sewer system (prior to discharging) to verify local ordinances and to determine whether or not additional requirements are going to be imposed by the owner. 5. What type of discharge will this be? Defined Discharge Undefined Discharge A Defined Discharge is a discharge where the dewatering discharge locations and number of outfalls are known at the time of permit application. If discharge is Defined – enter information in table C for Defined Discharges An Undefined Discharge is a discharge where the exact dewatering discharge locations are unknown at the time of permit application. The permit applicant must request the maximum number of potential outfalls (discharges) for the permitted facility. If discharge is Undefined – enter information in table D for Undefined Discharges Note: For undefined discharges, the site specific sampling and monitoring parameters will be selected based on the potential pollutant sources found within the entire permitted project area and will be applied to all outfall(s). The most stringent of the surface water limitations for each identified site specific parameter will be applied to each permitted outfall. C. Information for Defined Discharge Location(s): 1. In the following table, include the following information for the discharge: Include the number of discharge points (outfalls); Include the name of the receiving stream for each Outfall Number. If the discharge is to groundwater fill out discharge information located next to G001A, G002A, etc.—Please review the Division’s Low Risk Discharge Guidance for Discharges of Uncontaminated Groundwater to Land to determine if discharges to groundwater can be allowed under the Guidance in lieu of obtaining a Construction Dewatering Permit.; Include the approximate location of the discharge (e.g. ―discharge will occur between 5th Avenue and 20th Avenue‖, or ―the discharge will enter the storm sewer located at the corner of Speer Blvd and 8th Ave., which eventually flows to Cherry Creek‖ ; Include the maximum anticipated flow rate of the discharge; this can be based on pump capacity or other applicable measure. OUTFALL NUMBER RECEIVING STREAM(S) APPROXIMATE LOCATION OF DISCHARGE MAXIMUM FLOW RATE LATITUDE/LONGITUDE OF EACH DISCHARGE OUTFALL 001A 002A OUTFALL NUMBER GROUNDWATER APPROXIMATE LOCATION OF DISCHARGE MAXIMUM FLOW RATE LATITUDE/LONGITUDE OF EACH DISCHARGE OUTFALL G001A G002A Add more pages if necessary Page 4 of 6 Revised April 2011 Industrial Wastewater Discharge Permit – Construction Dewatering www.coloradowaterpermits.com D. Information for Undefined Discharge Location(s): 1. In the following table include the following information for the discharge: Include the maximum number of potential outfalls (discharges) for the permitted facility/project; Include the maximum anticipated flow rate of the discharge; this can be based on pump capacity or other applicable measure; Include the name of all potential receiving streams for the entire project. If the discharge is to groundwater fill out discharge information located next to G001A, G002A, etc.—Please review the Division’s Low Risk Discharge Guidance for Discharges of Uncontaminated Groundwater to Land to determine if discharges to groundwater can be allowed under the Guidance in lieu of obtaining a Construction Dewatering Permit. Note: For undefined discharges, the site specific sampling and monitoring parameters will be selected based on the potential pollutant sources found within the entire permitted project area and will be applied to all outfall(s). The most stringent of the surface water limitations for each identified site specific parameter will be applied to each permitted outfall. OUTFALL NUMBER MAXIMUM FLOW RATE (GPM) POTENTIAL RECEIVING STREAM(S) 001A 002A OUTFALL NUMBER MAXIMUM FLOW RATE (GPM) GROUNDWATER G001A GROUNDWATER G002A Add more pages if necessary Sampling and Reporting Requirements for Defined and Undefined Discharges: Sampling must occur at every end-of- pipe dewatering location (after going through your choice of BMP, if necessary). The permittee will be issued Discharge Monitoring Report (DMR) forms for all requested outfall numbers. The permittee will be required to submit the DMR forms for each requested outfall number monthly. For the outfall numbers(s) where no discharge occurred for a given month, the permittee shall mark ―No Discharge‖ on the DMR forms. The sampling results must be maintained by the permittee. E. A Location Map for Defined and Undefined Discharges—designating the location of the project/facility, the location of the discharge point(s)/outfalls—applicable only to defined discharges, and the receiving water(s) listed in Items C & D. A north arrow shall be shown. This map must be on paper that can be folded to 8 ½ x 11 inches. F. A Legible Sketch of the Site 1. For Defined Discharges—A legible site sketch shall be submitted and must include: the location of the end of pipe dewatering discharges at the site (e.g. where the flow will be discharged from the pump or BMP), the BMP(s) that will be used to treat the discharge(s), and the sampling location(s). Refer to the instructions for additional guidance specific to sites with multiple potential dewatering locations. This map must be on paper that can be folded to 8 ½ x 11 inches. OR 2. For Undefined Discharges—A legible site sketch shall be submitted and must include: the limits of the construction site boundary to include street names (if applicable) or landmarks; description of the BMPs to be implemented; and location of all potential receiving waters. This map must be on paper that can be folded to 8 ½ x 11 inches. G. Potential Groundwater Contamination 1. Is this operation located within one mile of a landfill, abandoned landfill or any mine or mill tailings? YES NO 2. Has the dewatering discharge been analyzed for any parameters (pH, Oil and Grease, Metals, Organics, etc.)? YES NO If YES, please attach a copy of the sampling results. Page 5 of 6 Revised April 2011 Industrial Wastewater Discharge Permit – Construction Dewatering www.coloradowaterpermits.com Note to the applicant: Upon review of the application, the Division may request characterization of the water to be discharged or analysis of certain parameters once the application has been reviewed. If the Division requests a representative analysis of the water to be discharged, the application processing time may be lengthened. 3. Has the dewatering area been checked for possible groundwater contamination, such as plumes from leaking underground storage tanks, mine tailings,etc –or- has a Phase I or Phase II been conducted on the site? YES NO If YES, show location of the landfill, tailings, or possible groundwater contamination on the location map or general sketch map. (Explain the location, extent of contamination, and possible effect on the groundwater pumping from this facility). Or include a copy of the phase I or Phase II report. If the reports are not available, submit a summary of the results of the report. If any sampling results are available, please attach a copy of all data. Note: Contact Water Quality Control Division for the proper water chemistry parameters to report. H. Additional Information 1. Does the applicant have a Stormwater Permit for Construction Activities? YES NO PENDING If Yes, Stormwater Construction Permit Number _________________________________ WATER RIGHTS The State Engineers Office (SEO) has indicated that any discharge that does not return water directly to surface waters (i.e.land application, rapid infiltration basins, etc.) has the potential for material injury to a water right. As a result, the SEO needs to determine that material injury to a water right will not occur from such activities. To make this judgment, the SEO requests that a copy of all documentation demonstrating that the requirements of Colorado water law have been met, be submitted to their office for review. The submittal should be made as soon as possible to the following address: Colorado Division of Water Resources 1313 Sherman Street, Room 818 Denver, Colorado 80203 Should there be any questions on the issue of water rights, the SEO can be contacted at (303) 866-3581. It is important to understand that any CDPS permit issued by the Division does not constitute a water right. The issuance of a CDPS permit does not negate the need to also have the necessary water rights in place. Additionally, if the activity has an existing CDPS permit, there is no guarantee that the proper water rights are in place. I. Required Certification Signature [Reg 61.4(1)(h)] "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." ―I understand that submittal of this application is for coverage under the State of Colorado General Permit for Discharges Associated with Construction Dewatering for the entirety of the construction site/project described and applied for, until such time as the application is amended or the certification is transferred, inactivated, or expired.‖ Signature (Legally Responsible Party)_________________________________________Date ________________ Name (printed) _____________________________________________Title______________________________ Page 6 of 6 Revised April 2011 Industrial Wastewater Discharge Permit – Construction Dewatering www.coloradowaterpermits.com Construction Dewatering Application Instructions Item A- Contact Information Permit Applicant: Provide the company, corporation, or organization name 1. Permittee—Identify the title and name of the individual who is the legally responsible for the permit. The requirement of who can be listed as the legally responsible party is included in the permit application. Include all requested information such as the legal party‘s phone number, email address and mailing address. The individual identified here must sign the permit application—Part I. 2. DMR Cognizant Official—Identify the title and individual‘s name 3. Site Contact—Identify the title and name of individual who is familiar with the day to day operations of the site. This person will have first-hand information regarding the construction site, discharges occurring on site, and implementation of BMPs. 4. Operator in Responsible Charge— Identify the title and individual‘s name if there is an Operator in Charge (Not required) 5. Billing Contact— Identify the title and individual‘s name 6. Other Contacts – Identify the title and individual‘s name for any of the listed descriptions (Not required) Item B – Permitted Project/Facility Information 1. Name of the project/facility and location; include the name of the project/facility and include a description of the location of the project/facility. The location may be a physical address or if the exact address is not available you may use an approximate address such as: the nearest intersection or boundary streets including directional identifiers (e.g., ―South of 14th Avenue between Sherman St. and Logan St.‖, or ―West side of C.R. 21, 3.25 miles North of Hwy 10‖) or other identifying information. A street name without an address, intersection, mile marker or other identifying information is not adequate. 2. Latitude/Longitude: For each excavation resulting in a discharge/outfall provide the Latitude/Longitude of the excavation. If the exact location of the disturbance resulting in discharge is not known, provide the lat/long of the center point of the construction activity. If identifying the center point of construction activity, make sure to write in ―center point‘ next to lat/long. The lat/long may be provided as decimal degrees or degrees, minutes, seconds format. This information can be obtained from a variety of sources, including:  Various Websites: http://terraserver.microsoft.com, http://geocoder.us/, or www.epa.gov/tri/reports/siting_tool/index.htm  U.S Geological Survey topographical map, available at area map stores  Surveyors or engineers for the construction project should have, or be able to calculate this information using a Global Positioning System (GPS) unit Specify whether the Latitude/Longitude information was collected either by using a GPS unit or through Map interpolation. 3. Facility Activity and Schedule: Include the anticipated start date of construction dewatering and provide the length of time dewatering is anticipated to last. Provide a description of the general nature of the construction activities that are requiring the dewatering. Also describe if the dewatering discharge is from an open excavation, such as a trench or foundation, or from groundwater lowering wells. Examples of activity descriptions may include: ‗open trench excavation for installation of 4,000 linear feet of new water lines‘, or ‗a series of shallow groundwater wells will be installed around the perimeter of the construction site in order to lower the water table for construction of a new 5,000 square foot music shop—all wells will be piped to one manifold resulting in one discharge location as indicated on our site sketch. 4. Discharges to ditches and storm sewers: Indicate by checking yes or no whether or not the immediate effluent will be discharged to a ditch or storm sewer. If yes is marked, the applicant must contact the owner of the ditch or storm sewer system prior to discharge to verify if the owner will allow a discharge to their system. The owner of the ditch/storm sewer system may impose additional requirements. Storm drainage systems are typically owned by the city or county they are located within, and therefore contacting the local city/county is the appropriate place to start. If yes is marked, in Table C or Table D be sure to include the location of the system and the ultimate receiving waters. 5. Defined or Undefined Discharge: Identify whether the applicant is applying for a Defined or Undefined discharge. A Defined Discharge is a discharge where the dewatering discharge locations are known at the time of permit application. If discharge is Defined – enter discharge information in Table C Page 1 of 3—Revised April 2011 Industrial Wastewater Discharge Permit – Construction Dewatering www.coloradowaterpermits.com An Undefined Discharge is a discharge where the exact dewatering discharge locations are unknown at the time of permit application. The permit applicant must request the maximum number of potential outfalls (discharges) for the permitted facility/project. If discharge is Undefined – enter discharge information in Table D. The applicant must identify all potential receiving streams for the entire project. If the applicant is requesting undefined discharges, the site specific sampling and monitoring parameters will be selected based on the potential pollutant sources found within the entire permitted project area and will be applied to all outfall(s). The most stringent of the surface water limitations for each identified site specific parameter will be applied to each permitted outfall. For example, if the undefined project includes installation of 8 miles of linear pipeline and leaking underground storage tanks are expected to present in one section of the project, sampling and monitoring for Benzene, Toluene, Ethyl benzene, and Xylenes will be required for all requested outfall(s). Item C- Information for Defined Discharge Location(s). 1. If Defined Discharge was marked in Section B.5 fill out Table C. Table C requires the following information:  Number of discharge(s) (outfalls)—Identify the number of outfalls requested in Table C, this includes discharges to surface water and groundwater. If there are more than two requested discharges to surface water, attach a separate piece of paper including all requested information.  Name of the receiving water(s)—If the discharge is to a ditch, identify the ditch and the ultimate receiving water(s). Receiving waters are any waters of the state of Colorado, even if the natural drainage is usually dry. If discharge is to groundwater, then fill out the appropriate information within Table C next to G001A, G001A. If there are more than two discharges to groundwater, attach a separate piece of paper including all requested information. If the applicant is requesting a discharge to groundwater, please review the Division‘s Low Risk Discharge Guidance for Discharges of Uncontaminated Groundwater to Land. http://www.cdphe.state.co.us/wq/PermitsUnit/policyguidancefactsheets/policyandguidance/lowriskgwdischargeto land.pdf Discharges performed in accordance with the Guidance for Discharges of Uncontaminated Groundwater to Land do not require a separate construction dewatering permit.  Narrative description of the approximate location of the discharge—Include a narrative description of the discharge path. For example, ―the dewatering discharge will enter the storm sewer located at 6th Avenue and Sheridan which flows to Bear Creek‖ or ―the dewatering will discharge to a field located at 66 th and Farmers Road with potential to runoff to Sanders Creek‖. If there is more than one known discharge, include this descriptive information for all known discharges.  Maximum anticipated flow rate of the discharge (in gallons per minute)—Do not leave this section blank. Include the maximum flow rate. You may estimate the flow contribution based on pump capacity if data is not available.  Latitude/Longitude of each discharge location—Include the latitude/longitude of each discharge location. See the instructions B.2 for information on how to obtain latitude/longitude information. Item D- Information for Undefined Discharge Location(s). 1. If Undefined Discharge was marked in Section B.5 fill out Table D. Table D requires the flowing information:  Maximum number of potential outfalls (discharges) for the permitted facility—The applicant must identify the maximum number of discharge locations (outfalls) for the entire construction project. If more than 5 outfalls are requested, attach a separate piece of paper. DMRs will be sent to the permittee for each requested outfall.  Maximum anticipated flow rate of the discharge (in gallons per minute)—Do not leave this section blank. The flow rate may be estimated based on pump capacity if data is not available.  Name(s) of the all potential receiving stream(s)—Identify all potential receiving streams for the entire project. If the discharge is to groundwater then fill out the information in Table D next to G001A, G002A, etc. Page 2 of 3 Revised April 2011 Industrial Wastewater Discharge Permit – Construction Dewatering www.coloradowaterpermits.com Item E – Location Map—A location map is required to be submitted with all applications for both defined and undefined discharges. The location map must include the location of the project/facility, the approximate location of each defined discharge points, and the identified receiving water(s) listed in Items C or D. The map must have a minimum scale of 1:24000 (the scale of a USGS 7.5 minute map). A legible submittal is required on paper that can be folded to8 ½ by 11 inches. Item F- Detailed Sketch of the Site—If a defined discharge is requested please submit a detailed site sketch which includes the information requested in F.1. If an undefined discharge is requested please submit a detailed site sketch which includes the information requested in F.2. 1. Detailed Sketch of the Site for Defined Discharges—Must included a detailed sketch of the site showing the location of end of pipe dewatering discharge(s) at the site—to include the flow line of each requested dewatering discharge. The location and identification of the structural Best Management Practices (BMPs) used to treat the effluent prior to discharge. The map shall also include the sampling locations for each requested outfall. A legible submittal is required on paper that can be folded to 8 ½ by 11 inches. 2. Detailed Sketch of the Site for Undefined Discharges—This map must include the boundary of the construction site where all potential dewatering could occur. The boundaries should include a northern boundary, an eastern boundary, a southern boundary and a western boundary. The map must highlight or call out street names that border the project boundary. If streets are not available, landmarks or mile-markers must be identified. The map must highlight all potential receiving streams. The map must also include the identification of the structural BMPs used to treat the effluent prior to discharge. A legible submittal is required on paper that can be folded to 8 ½ by 11 inches. Item G—Potential Groundwater Contamination 1. Dewatering on/near Landfills, Mines, or Mill Tailings: If the dewatering project is located within one mile of a landfill, abandoned landfill, mine or mill tailings check yes. In addition, provide as much detail as possible regarding the extent of contamination and attach all sampling data. Indicate the location of the landfill, mine, etc. on the Location and Detail Maps.  Contamination plume information can be obtained from the following source: http://www.cdphe.state.co.us/hm/HMSiteCover.htm 2. Sampling Data: If any sampling data is available that is representative of the proposed discharge mark yes. Attach a copy of all sampling results to the application. If the data was collected for another agency or private company include a brief description as to why the data was collected. 3. Additional Sources of Contamination: Mark yes if the proposed construction site resulting in a dewatering discharge has been evaluated for any additional sources of contamination. Additional sources include underground storage tanks, dry cleaners, voluntary clean-up sites, etc. Also mark yes, if a Phase I or Phase II has been conducted on the property or adjacent properties. Attach a copy of all records (phase I, phase II, sampling efforts) that could help characterized the water to be discharged.  Contamination plume information can be obtained from the following source: http://www.cdphe.state.co.us/hm/HMSiteCover.htm Item H—Additional Information 1. Stormwater Permit for Construction Activities: If the applicant holds a stormwater permit for construction related activities (parcels > 1 acre) include the stormwater permit number. If you have applied, or intend to apply but have not yet obtained coverage and your certification number, indicate ―Pending‖ for this item. Item I—Signature Requirements—The permit applicant listed in Part A.1 must sign the permit application. Signatures must meet the requirements established in Regulation 61.4(1)(h). Page 3 of 3—Revised April 2011 APPENDIX E INSPECTION LOGS '3036%(3()4%681)283*86%274368%8-32 (%-0=78361;%8)603+ -REGGSVHERGI[MXLWYFWIGXMSR 7XSVQ[EXIV1EREKIQIRX*MIPH(EMP]-RWTIGXMSR6ITSVX-RWXVYGXMSRW -RWTIGXEPPIVSWMSRERHWIHMQIRXGSRXVSP&14WXLVSYKLSYXXLIIRXMVIGSRWXVYGXMSRWMXIzSFWIVZIVIGSVHERHHIXIVQMRIXLIMV IJJIGXMZIRIWW-JEHHMXMSREP&14WEVIRIIHIHSVER]&14MWRSXSTIVEXMRKIJJIGXMZIP]MXWLEPPFIVIGSVHIHSRXLMWJSVQERH EHHVIWWIHMQQIHMEXIP] 6IGSVHXLIWMXIPSGEXMSR '3036%(3()4%681)283*86%274368%8-32 (%-0=78361;%8)603+%((-8-32%04%+) (EXI 4VSNIGXRYQFIV 7YFEGGSYRXRYQFIV 8LIIRXMVIWMXIWLEPPFIMRWTIGXIHXSHIXIVQMRI[LIXLIV&14WEVIFIMRKMQTPIQIRXIHERHQEMRXEMRIHMREGGSVHERGI[MXLXLI TVSNIGXvWWMXIWTIGMJMG7;14ERHXLI'(477'48LI)VSWMSR'SRXVSP7YTIVZMWSV APPENDIX F CONTRACTOR INSERTS APPENDIX G EROSION CONTROL COST ESTIMATE Lakeview Subdivision Project Number: 665-002 Location: Fort Collins, CO Date: November 21, 2013 Total Acres: 10.80 EROSION CONTROL MEASURE Units Estimated Quantity Unit Price Total Price L.F. 2190 $1.85 $4,051.50 Construction Fence L.F. 700 $2.00 $1,400.00 each 10 $20.00 $200.00 Curb Inlet Protection each 1 $220.00 $220.00 Concrete Chase Setup each 1 $220.00 $220.00 Concrete Washout Area each 1 $100.00 $100.00 Bale Outlet Protection each 2 $180.00 $360.00 Rock Sock each 12 $25.00 $300.00 Seeding and Mulching - Mobilization each 1 $1,000.00 $1,000.00 Seeding and Mulching - Installation acre 6.4 $750.00 $4,800.00 Vehicle Tracking Contol Pad each 1 $700.00 $700.00 L.F. 400 $0.50 $200.00 per hour 10 $70.00 $700.00 acre 1.60 $1,325.00 $2,120.00 Sub-Total: $16,371.50 1.5 x Sub-Total: $24,557.25 Amount of security: $24,557.25 Total Acres x $842.5/acre: $14,310.00 Sub-Total: $14,310.00 1.5 x Sub-Total: $21,465.00 Cost to Re-seed: $21,465.00 Minimum escrow amount: $16,200.00 @ $1,500/acre Erosion Control Escrow: $16,200.00 This is an engineers estimate based upon historic costs. NES is not responsible for fluctuation in costs NOTE: 'Total Acres' represents total disturbed area. Option 3 | Miniumum Escrow Amount Final Escrow Amount Lakeview Subdivision Erosion Control Cost Estimate Vegetate Landscaped Areas Option 1 | BMP Costs Silt Fence Sawcutting Pollution Prevention Street Sweeping and Cleaning Option 2 | Cost to Re-seed Disturbed acreage Straw Wattles (9" x 10' dimension) 11/19/2013 1:32 PM D:\Projects\665-002\Drainage\Erosion\665-002_Erosion-Escrow-Estimate.xlsx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w&14WXLEXEVIRSXSTIVEXMRKIJJIGXMZIP]LEZITVSZIRXSFIMREHIUYEXISVLEZIJEMPIHQYWXFI EHHVIWWIHEWWSSREWTSWWMFPIMQQIHMEXIP]MRQSWXGEWIWx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z7XSVQ[EXIV'SRWXVYGXMSR4IVQMX '(477'4  8LMWJSVQMWXSFIYWIHEWXLIHEMP]HMEV]XSIZEPYEXI&14WYWIHHYVMRKGSRWXVYGXMSREGXMZMXMIW 7IIXLIMRWXVYGXMSRWJSVQSVIMRJSVQEXMSR (EXI 4VSNIGXRYQFIV 7YFEGGSYRXRYQFIV 8LIIRXMVIWMXIWLEPPFIMRWTIGXIHXSHIXIVQMRI[LIXLIV&14WEVIFIMRKMQTPIQIRXIHERHQEMRXEMRIHMREGGSVHERGI[MXLXLI TVSNIGXv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w&14WXLEXEVIRSXSTIVEXMRKIJJIGXMZIP]LEZITVSZIRXSFIMREHIUYEXISVLEZIJEMPIHQYWXFI EHHVIWWIHEWWSSREWTSWWMFPIMQQIHMEXIP]MRQSWXGEWIWx 0SGEXMSR &148]TI 'SRHMXMSR 2SXIW'SQQIRXW (EXI 'SQTPIXIH -RMXMEPW %00&147%6)-234)6%8-2+'32(-8-32%2(231%-28)2%2')-72))()(  MRMXMEPXLIFS\XSXLIVMKLX[LIRXLMWETTPMIW 'SQQIRXW+IRIVEPRSXIW EXXEGLTLSXSWMJRIGIWWEV] -RWTIGXMSRWMKREXYVI 7YTIVMRXIRHIRXSV)'72EQI 4VMRX 7MKREXYVIEXIWMKRIH ( 4%SVQ+)3* '(38* VEHICLE CONTROL TRACKING PAD NOT TO SCALE MANHOLE ROCK BERM SHALL CURB INLET 2"� 4" WOOD STUD EXTENDED INTO CONCRETE BLOCKS WIRE ENCLOSED 1 1/2" WASHED ROCK CONCRETE BLOCKS CURB INLET GRAVEL FILTER WIRE SHALL ENCLOSED BE 2"�4" WOOD STUD OVERFLOW FILTERED RUNOFF %SECTION A-A A A %PLAN VIEW �CURB INLET GRAVEL FILTER (CONTINUOUS GRADE)� %SECTION B-B %PLAN VIEW B B ROCK BERM SHALL BE PLACED TIGHTLY AGAINST CURB FACE WIRE ENCLOSED 1 1/2" WASHED ROCK CURB AND GUTTER CURB AND GUTTER BE PLACED TIGHTLY AGAINST CURB FACE GRAVEL FILTER 1/2" TO 1" BELOW TOP OF CURB TUBULAR MARKER IF AREA ADJACENT TO CURB INLET BOX IS NOT STABILIZED, INSTALL A TEMPORARY SEDIMENT/EROSION CONTROL BMP UNTIL THE SURROUNDING AREA IS SUFFICIENTLY STABILIZED. TUBULAR MARKER TUBULAR MARKER 2' 3' 4' CURB INLET WIRE ENCLOSED SETTLED RUNOFF GRAVEL FILTER CURB INLET MANHOLE �CURB INLET BLOCK AND GRAVEL FILTER (INLET IN SUMP)� INTERIM CONFIGURATION INLET PROTECTION IN STREETS SHALL BE INSTALLED WITHIN 48 HOURS OF POURING INLET. INLET PROTECTION (AFTER PAVING) SHALL BE INSTALLED WITHIN 48 HOURS AFTER PAVING IS PLACED. WASHED ROCK SHALL COMPLY WITH A 1-1/2" MINUS GRADATION. WIRE MESH SHALL BE FABRICATED OF 10 GAUGE WIRE TWISTED INTO A MESH WITH A MAXIMUM OPENING OF 1" (COMMONLY TERMED "CHICKEN WIRE"). ROLL WIDTH SHALL BE 48". TUBULAR MARKERS SHALL MEET REQUIREMENTS OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). OTHER CURB INLET PROTECTION METHODS WILL BE ALLOWED IF ACCEPTED BY THE CITY. �GENERAL NOTES: �1. 2. 3. 4. 5. THE CONTRACTOR SHALL INSPECT INLET PROTECTION EVERY TWO WEEKS AND AFTER SIGNIFICANT STORM EVENTS AND MAKE REPAIRS OR CLEAN OUT AS NECESSARY. SEDIMENT ACCUMULATED UPSTREAM OF INLET PROTECTION SHALL BE REMOVED WHEN THE SEDIMENT DEPTH UPSTREAM OF ROCK BERM IS 2 1/2" OF THE CREST. INLET PROTECTION IS TO REMAIN IN PLACE UNTIL THE UPSTREAM DISTURBED AREA IS STABILIZED AND GRASS COVER IS ACCEPTED. UNLESS THE CITY ACCEPTS EARLIER REMOVAL OF INLET PROTECTION IN STREETS. �MAINTENANCE NOTES: �1. 2. 3. 4" MIN 5" MAX BMP WIDTH VARIES BMP WIDTH VARIES BMP WIDTH VARIES BMP WIDTH VARIES TUBULAR MARKER CURB INLET PROTECTION NOT TO SCALE IP VEHICLE TRACKING CONTROL PAD SHALL BE LOCATED AT EVERY ACCESS POINT TO THE CONSTRUCTION SITE. A SIGN SHALL BE PLACED NEXT TO THE VEHICLE TRACKING CONTROL PAD TO DESIGNATE THE LOCATION AS THE CONSTRUCTION ENTRANCE/EXIT. VEHICLE TRACKING CONTROL PADS SHALL CONSIST OF HARD, DENSE, DURABLE STONE, ANGULAR IN SHAPE AND RESISTANT TO WEATHERING. ROUNDED STONE (�.�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�4'S, PIPES, DIRT, GRAVEL OR ASPHALT, SHALL BE PLACED IN GUTTER TO FACILITATE MOUNTING CURB; HOWEVER, CURB MAY BE CUT DOWN TO A HEIGHT OF 2" OR HIGHER FOR EASIER ACCESS AND REPLACED AT PROJECT COMPLETION. OTHER ACCESS DEVICES MAY BE USED AS ACCEPTED BY THE CITY. 3" - 6" ROCK %PLAN% CURB CUT 50' MIN. 2" MIN. 6" MIN. 6" MIN. ALTHOUGH NOT NORMALLY USED, THE CITY RESERVES THE RIGHT TO REQUIRE VEHICLE TRACKING CONTROL WITH A TEMPORARY CATTLE GUARD AND/OR WHEEL WASH FACILITIES AT SITES WHERE TRACKING ONTO PAVED AREAS BECOMES A SIGNIFICANT PROBLEM AS DETERMINED BY THE CITY INSPECTOR. IF VEHICLE TRACKING CONTROL WITH WHEEL WASH FACILITIES ARE REQUIRED, ALL WHEELS ON EVERY VEHICLE LEAVING THE SITE SHALL BE CLEANED OF MUD USING A PRESSURE-WASHER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A WATER SOURCE AND CONSTRUCTING A WASHWATER SEDIMENT TRAP. 5. 6. IF VEHICLE WHEEL WASH FACILITIES ARE REQUIRED, CONTRACTOR SHALL INSPECT VEHICLE TRACKING CONTROL AND WHEEL WASH FACILITIES DAILY. ACCUMULATED SEDIMENTS SHALL BE REMOVED FROM THE PAD SURFACE. ACCUMULATED SEDIMENT IN THE WASHWATER/SEDIMENT TRAP SHALL BE REMOVED WHEN THE SEDIMENT REACHES AN AVERAGE DEPTH OF 12-INCHES. 4. 5. VTC 003 EC3 004 EC3 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO K��� ����'������. C��� ������ ��� ���. R CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON SITE. VEHICLE TRACKING CONTROL IS REQUIRED IF ACCESS TO CONCRETE WASHOUT AREA IS OFF PAVEMENT. SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA, AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE. AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN ACCEPTED WASTE SITE. WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY. LOCATION OF CONCRETE WASHOUT AREA ON SHEET EC1 IS CONCEPTUAL ONLY. FINAL LOCATION TO BE DETERMINED IN THE FIELD AT CONTRACTOR'S DISCRETION. �NOTES: �1. 2. 3. 4. 5. 6. 7. 3H:1V OR FLATTER SIDE SLOPES 12" MIN 8'� 8' MIN OR AS REQUIRED TO CONTAIN WASTE CONCRETE 12" 2'-0" MIN. COMPACTED EMBANKMENT MATERIAL, TYP. BERM AROUND PERIMETER GROUND SURFACE SIGN TO INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA CONCRETE WASHOUT AREA NOT TO SCALE CWA 005 EC3 SWALE WATTLE DIKE NOT TO SCALE ENTRENCH 3" POINT A SECTION A-A POINTS A MUST BE HIGHER THAN POINT B PLAN VIEW POINT B POINT A WATTLE POINT A FLOW POINT B POINT A WATTLE DIKE �DITCH INSTALLATION� A A THE CONTRACTOR SHALL INSPECT DIKES EVERY TWO WEEKS AND AFTER SIGNIFICANT STORM EVENTS AND MAKE REPAIRS OR CLEAN OUT UPSTREAM SEDIMENT AS NECESSARY. SEDIMENT ACCUMULATED UPSTREAM OF DIKES SHALL BE REMOVED WHEN THE UPSTREAM SEDIMENT REACHES 1/2 OF THE DESIGN DEPTH. DIKES ARE TO REMAIN IN PLACE UNTIL THE UPSTREAM DISTURBED AREA IS STABILIZED AND GRASS COVER IS ACCEPTED BY THE CITY. WHEN REINFORCED ROCK BERMS ARE REMOVED, ANY DISTURBED AREA SHALL BE SEEDED, CRIMPED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY. �MAINTENANCE NOTES: �1. 2. 3. 4. WD STAKES SHOULD BE DRIVEN ACROSS FROM EACH OTHER AND ON EACH SIDE OF THE WATTLE. LEAVING 4"-6" OF STAKE PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR NYLON ROPE SHOULD BE TIED TO THE STAKES ACROSS THE WATTLE. STAKES SHOULD THEN BE DRIVEN UNTIL THE BAILING WIRE OR NYLON ROPE IS SUFFICIENTLY SNUG TO THE WATTLE. STA %OR% OR (10" MIN. DIA.) 007 EC3 PORTABLE TYPE-3 BARRICADE NOT TO SCALE 006 EC3 ORANGE CONSTRUCTION FENCE DETAIL NOT TO SCALE 006 EC3 EC2 EROSION CONTROL DETAILS A. Boese A. Boese 1"=50' SILT FENCE WATTLE INSTALLATION NOT TO SCALE 000 EC2 001 EC2 NOT TO SCALE 002 EC2 EROSION CONTROL FOR CONSTRUCTION ON INDIVIDUAL RESIDENTIAL LOTS COMPACTED BACKFILL FLOW SILT TRENCH FENCE AND FABRIC ATTACHED (ASTM TO D6461) POST. ANCHORED IN 24" MIN 6' MAX FLOW TRENCH AND ATTACHED TO POST. 4"x4" TRENCH SILT FENCE FABRIC (ASTM D6461) ANCHORED IN 18" MIN 24" MIN 42" MIN POSTS {PREASSEMBLED SILT FENCE} JOIN FIRST ROTATE SECOND POSTS SHALL OVERLAP AT JOINTS SO THAT NO GAPS EXIST IN SILT FENCE. NOTE: THICKNESS OF GEOTEXTILE HAS BEEN EXAGGERATED. POST SHALL BE JOINED AS SHOWN, THEN ROTATED 180� IN DIRECTION SHOWN AND DRIVEN INTO THE GROUND. {SILT FENCE JOINTS} DRIVE POSTS VERTICALLY INTO THE GROUND TO A MINIMUM DEPTH OF 18". EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 4" DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER. ANCHOR TRENCH SHALL BE EXCAVATED BY HAND, WITH TRENCHER, OR WITH SILT FENCE INSTALLATION MACHINE. NO ROAD GRADERS, BACKHOES, ETC. SHALL BE USED. NOT LESS THAN THE BOTTOM 1' OF THE SILT FENCE FABRIC SHALL BE BURIED IN THE TRENCH. THE TRENCH SHALL BE COMPACTED BY HAND, WITH "JUMPING JACK" OR BY WHEEL ROLLING. COMPACTION SHALL BE SUCH THAT THE SILT FENCE RESISTS BEING PULLED OUT OF ANCHOR TRENCH BY HAND. SILT FENCE INDICATED IN THE PLANS SHALL BE INSTALLED PRIOR TO ANY LAND-DISTURBING ACTIVITIES. USE WOOD POSTS OR OTHER MATERIAL AS ACCEPTED BY THE CITY. {INSTALLATION NOTES: }1. 2. 3. 4. 5. 6. 7. THE CONTRACTOR SHALL INSPECT SILT FENCE EVERY TWO WEEKS AND AFTER SIGNIFICANT STORM EVENTS AND MAKE REPAIRS OR CLEAN OUT UPSTREAM SEDIMENT AS NECESSARY. SEDIMENT ACCUMULATED UPSTREAM OF SILT FENCE SHALL BE REMOVED WHEN THE UPSTREAM SEDIMENT REACHES A DEPTH OF 6". SILT FENCE SHALL BE REMOVED WHEN THE UPSTREAM DISTURBED AREA IS STABILIZED AND GRASS COVER IS ACCEPTED BY THE CITY. IF ANY DISTURBED AREA EXISTS AFTER REMOVAL, IT SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY. {MAINTENANCE NOTES: }1. 2. 3. 4" MIN. 4" MIN. {1 " x 1 " WOODEN FENCE POSTS} COMPACTED BACKFILL SF TOP BACK CURB STORM WATER LINE WEIGHTED WATTLE AT 45 DEG. TO CURB WATTLES - DETAIL A FLOW 3'-4' ADJACENT ROLLS SHALL TIGHTLY ABUT W1 NOTES: INSTALLATION: WHEN INSTALLING RUNNING LENGTHS OF WATTLES, BUTT THE SECOND WATTLE TIGHTLY AGAINST THE FIRST, DO NOT OVERLAP THE ENDS. STAKE THE WATTLES AT EACH END AND FOUR FOOT ON CENTER. FOR EXAMPLE: A 25 FOOT WATTLE USES 6 STAKES A 20 FOOT WATTLE USES 5 STAKES A 12 FOOT WATTLE USES 4 STAKES STAKES SHOULD BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE. LEAVING 2 - 3 INCHES OF THE STAKE PROTRUDING ABOVE THE WATTLE. A HEAVY SEDIMENT LOAD WILL TEND TO PICK THE WATTLE UP AND COULD PULL IT OFF THE STAKES IF THEY ARE DRIVEN DOWN TOO LOW. IT MAY BE NECESSARY TO MAKE A HOLE IN THE WATTLE WITH A PICK END OF YOUR MADDOX IN ORDER TO GET THE STAKE THROUGH THE STRAW. WHEN STRAW WATTLES ARE USED FOR FLAT GROUND APPLICATIONS, DRIVE THE STAKES STRAIGHT DOWN; WHEN INSTALLING WATTLES ON SLOPES, DRIVE THE STAKES PERPENDICULAR TO THE SLOPE. DRIVE THE FIRST END STAKE OF THE SECOND WATTLE AT AN ANGLE TOWARD THE FIRST WATTLE IN ORDER TO HELP ABUT THEM TIGHTLY TOGETHER. IF YOU HAVE DIFFICULTY DRIVING THE STAKE INTO EXTREMELY HARD OR ROCKY SLOPES, A PILOT BAR MAY BE NEEDED TO BEGIN THE STAKE HOLE. 1"x 1" WOOD STAKES 18"-24" BAILING WIRE OR NYLON ROPE WATTLE "A" WATTLE "B" 1' 2' TYP. 1' 1' WATTLES - DETAIL B W2 NOTES: INSTALLATION: STAKES SHOULD BE DRIVEN ACROSS FROM EACH OTHER AND ON EACH SIDE OF THE WATTLE. LEAVING 4"-6" OF STAKE PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR NYLON ROPE SHOULD BE TIED TO THE STAKES ACROSS THE WATTLE. STAKES SHOULD THEN BE DRIVEN UNTIL THE BAILING WIRE OR NYLON ROPE IS SUFFICIENTLY SNUG TO THE WATTLE. WHEN INSTALLING RUNNING LENGTHS OF WATTLES, TO PREVENT SHIFTING, BUTT THE SECOND WATTLE TIGHTLY AGAINST THE FIRST. DO NOT OVERLAP THE ENDS. STAKES SHOULD BE DRIVEN 1 FT. FROM END, ACROSS FROM AND ON EACH SIDE OF WATTLE LEAVING 4"-6" OF STAKE PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR NYLON ROPE SHOULD BE TIED TO STAKES IN AN HOUR GLASS FORMATION (FRONT TO BACK OF WATTLE "A", ACROSS TO FRONT OF WATTLE "B", ACROSS TO BACK AND BACK TO FRONT OF WATTLE "A"). STAKES SHOULD THEN BE DRIVEN IN UNTIL BAILING WIRE OR NYLON ROPE IS SUFFICIENTLY SNUG TO THE WATTLE. SEDIMENT DEPOSITION ZONE STORM WATER LINE WEIGHTED WATTLE LIP OF GUTTER SIDEWALK EXISTING OR PROPOSED INLET FLOW LINE %CURB INLET WATTLE PROTECTION SETUP% SEDIMENT DEPOSITION ZONE LIP OF GUTTER SIDEWALK TOP BACK CURB FLOW LINE SIDEWALK TOP BACK CURB FLOW LINE W4 NOTES: 1. NUMBER OF WATTLES AND SPACING SHOULD BE DETERMINED BY THE SLOPE AND SITE CONDITIONS. 2. TUBULAR MARKERS SHALL MEET THE REQUIREMENTS OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) 3. CITY RECOMMENDS INSTALLING AT LEAST 3 CHECKDAMS WHEN USING THIS SETUP. LIP OF GUTTER WEIGHTED WATTLE W1 & W2 INSTALLATION NOTES: 1. THE LOCATION AND LENGTH OF WATTLE IS DEPENDENT ON THE CONDITIONS OF EACH SITE. 2. WATTLES SHALL BE INSTALLED PRIOR TO ANY LAND-DISTURBING ACTIVITIES. 3. WATTLES SHALL CONSIST OF STRAW, COMPOST, EXCELSIOR, OR COCONUT FIBER. 4. NOT FOR USE IN CONCENTRATED FLOW AREAS. 5. THE WATTLES SHALL BE TRENCHED INTO THE GROUND A MINIMUM OF TWO (2) INCHES. 6. WATTLES SHALL BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. 7. ON SLOPES, WATTLES SHOULD BE INSTALLED ON CONTOUR WITH A SLIGHT DOWNWARD ANGLE AT THE END OF THE ROW IN ORDER TO PREVENT PONDING AT THE MID SECTION. 8. RUNNING LENGTHS OF WATTLES SHOULD BE ABUTTED FIRMLY TO ENSURE NO LEAKAGE AT THE ABUTMENTS. 9. SPACING - DOWNSLOPE: 10. VERTICAL SPACING FOR SLOPE INSTALLATIONS SHOULD BE DETERMINED BY SITE CONDITIONS. SLOPE GRADIENT AND SOIL TYPE ARE THE MAIN FACTORS. A GOOD RULE OF THUMB IS: 1:1 SLOPES = 10 FEET APART 2:1 SLOPES = 20 FEET APART 3:1 SLOPES = 30 FEET APART 4:1 SLOPES = 40 FEET APART, ETC. 11. HOWEVER, ADJUSTMENTS MAY HAVE TO BE MADE FOR THE SOIL TYPE: FOR SOFT, LOAMY SOILS - ADJUST THE ROWS CLOSER TOGETHER; FOR HARD, ROCKY SOILS - ADJUST THE ROWS FURTHER APART. A SECONDARY WATTLE PLACED BEHIND THE ABUTMENT OF TWO WATTLES IS ENCOURAGED ON STEEP SLOPES OR WHERE JOINTS HAVE FAILED IN THE PAST. 12. STAKING: THE CITY RECOMMENDS USING WOOD STAKES TO SECURE THE WATTLES. 1/2" TO 5/8" REBAR IS ALSO ACCEPTABLE. BE SURE TO USE A STAKE THAT IS LONG ENOUGH TO PROTRUDE SEVERAL INCHES ABOVE THE WATTLE: 18" IS A GOOD LENGTH FOR HARD, ROCKY SOIL. FOR SOFT LOAMY SOIL USE A 24" STAKE. 4"-6" ABOVE WATTLE AFTER BAILING WIRE OR NYLON ROPE IS ATTACHED. STAKES NEED TO BE TAMPED UNTIL WIRE/ROPE IS SNUG WITH WATTLE. W3 NOTE: IF THE AREA BEHIND THE INLET IS NOT STABILIZED, A BMP SHOULD BE USED TO PREVENT SEDIMENT FROM ENTERING THE INLET 1"x 1" WOOD STAKES 18"-24" W1 THE CONTRACTOR SHALL INSPECT WATTLES EVERY TWO WEEKS AND AFTER ANY SIGNIFICANT STORM EVENT AND MAKE REPAIRS OR REMOVE SEDIMENT ACCUMULATED BEHIND WATTLE AS NECESSARY. SEDIMENT ACCUMULATED BEHIND WATTLE SHALL BE REMOVED WHEN THE SEDIMENT HAS ACCUMULATED TO ONE HALF THE DIAMETER OF THE WATTLE. WATTLES SHALL REMAIN IN PLACE UNTIL THE UPSTREAM DISTURBED AREA IS STABILIZED AND IS ACCEPTED BY THE CITY. WATTLE MAINTENANCE NOTES: 1. 2. 3. ENDS SHALL ABUT TIGHTLY TO BACK OF CURB END SHALL ABUT TIGHTLY TO BACK OF CURB ENDS OF ADJACENT WATTLES SHALL BE TIGHTLY ABUTTED TO PREVENT SEDIMENT BYPASS 4' MAX. {PERVIOUS INSTALLATION} {IMPERVIOUS INSTALLATION} SEDIMENT DEPOSITION ZONE W3 W2 NOTE: ONLY WATTLES MADE WITH COCONUT FIBERS SHALL BE USED WHEN INSTALLATION COMES IN CONTACT WITH A WATER BODY. SIDEWALK CULVERT/CHASE/PAN W4 W3, W4 & W5 NOTES: 1. WHEN USING STRAW WATTLE, THE STRAW WATTLE MUST HAVE A WEIGHTED CORE. 2. ALL PRODUCTS SHALL BE INSTALLED PER THE MANUFACTURER'S SPECIFICATIONS. 3. OTHER PRODUCTS MAY BE USED IN PLACE OF WEIGHTED WATTLES UPON WRITTEN APPROVAL FROM THE CITY. NOTE: A COPY OF DETAILS AND SPECIFICATIONS WILL NEED TO BE INCORPORATED INTO THE SWMP. END SHALL TIGHTLY ABUT TO BACK OF CURB SEDIMENT DEPOSITION ZONE W5 TUBULAR MARKER EXISTING OR PROPOSED INLET CONCRETE CHASE/TRICKLE CHANNEL SETUP END SHALL TIGHTLY ABUT TO BACK OF CURB CURBSIDE CHECKDAMS SETUP NOT TO SCALE 003 EC2 FOREBAY DETAIL PROFILE SLOPE PER PLAN 2 x D 4" MIN. CONCRETE SLAB 3X1.5' DIA. WIDTH = 2 x D VOLUME (V) TRICKLE CHANNEL 0.2 - 0.5% SLOPE NOT TO SCALE PLAN NOT TO SCALE FOREBAY OUTLET NOTCH LIMITS OF 4" THICK CONCRETE SLAB "D" WALL HEIGHT (H) 2 x D 1-#3 REBAR TIE @ 3" CLEAR EACH WAY FROM TOP (CURB > 12") VERTICAL CURB (FOREBAY WALL) STANDARD W/ INCREASED BOULDER EXPOSED 6"-8" 1.5' BOULDERS 2 x D VERTICAL CURB /FOREBAY CONCRETE WALL & 1' INFALL GUTTER, 1" DROP 10/10 WIRE REMESH THROUGHOUT FOREBAY SCHEDULE FOREBAY NAME WALL HEIGHT (IN) MIN REQUIRED VOLUME (CU-FT) V-NOTCH RELEASE (CFS) V-NOTCH TOP WIDTH (IN) A (NORTH) 18 181 1.12 3.00 B (WEST) 12 113 0.88 4.40 SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF FOREBAY MU MU MU MU MU MU TRACT C LOT 24 LOT 25 LOT 26 LOT 27 LOT 28 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 13 LOT 14 LOT 15 LOT 16 LOT 17 LOT 18 LOT 19 LOT 20 LOT 23 LOT 22 LOT 21 LOT 42 LOT 41 LOT 40 LOT 37 LOT 36 LOT 35 LOT 34 LOT 33 LOT 32 LOT 31 LOT 30 LOT 29 TRACT A TRACT B LOT 39 LOT 38 ZINNIA WAY GERANIUM LANE BLUEBONNET LANE OUGH COURT FEATHERGRASS DRIVE FEATHERGRASS DRIVE DRAKE ROAD MU CF CF CF CF CF CF CF CF CF CF CF CF LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD FOREBAY VTC IP IP RR WD WD SF SF RS SF RS RS RS RS RS CWA SF SF SF SF SF TCB TCB TCB TCB TCB TCB TCB CF CF CF WD WD BOP BOP SB SF RS RS NORTH ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 1.IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2.THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4.CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS FULLY STABILIZED. 6.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7.INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 8.CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND ENTERING THE PERMEABLE PAVER SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED. 10.ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 11.CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 12.FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 13.CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 14.THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. {15.WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. EROSION CONTROL NOTES: NOTE: ALL BMPS SHOWN ON THIS PLAN ARE GRAPHIC REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR AND DOCUMENTED ON THE DYNAMIC SITE PLAN. No. Revisions: By: Date: REVIEWED BY: R. Banning DESIGNED BY: DRAWN BY: SCALE: DATE: NOVEMBER 2013 PROJECT: 665-002 Sheet Of26Sheets LAKEVIEW SUBDIVISION T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 08/21/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� EC1 EROSION CONTROL PLAN A. Boese A. Boese 1"=50' TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION Project: PATEROS CREEK CONSTRUCTION PHASE MOBILI�ATION DEMOLITION GRADING BEST MANAGEMENT PRACTICES (BMPS) STRUCTURAL "INSTALLATION" Construction & Silt Fence Barriers * Flow Barriers (Wattles) * Inlet Filter Bags * Rip Rap V��������� Temporary Seeding Planting Mulching / Sealant Permanent Seeding Planting Sod Installation Rolled Products : Netting / Blankets / Mats Contour Furrows (Ripping / Disking) Sediment Basin Rock Bags * UTILITIES INSTALLATION FLAT WORK INSTALLATION VERTICAL INSTALLATION LANDSCAPE DEMOBILI�ATION Vehicle Tracking Pad * * All Temporary BMPs to be Removed once Construction is Complete Other: Any prior inlets that could use protecting Any prior inlets that could use protecting Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days LEGEND: 4953 PROPOSED CONTOUR 93 PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED PROPERTY BOUNDARY CURB & GUTTER PROPOSED INLET PROPOSED UNDERDRAIN UD BENCHMARK/BASIS OF BEARING BENCHMARK #1: City of Fort Collins Benchmark 18-92 Elevation= 4966.96 BENCHMARK #2: City of Fort Collins Benchmark 19-92 Elevation= 4975.21 Basis of Bearing The Basis of Bearings is the West line of the Northwest Quarter, Section 30, Township 7 North, Range 68 West of the 6th P.M. as bearing South 00�13'48" East (assumed bearing). WATTLE DIKE INLET PROTECTION IP VEHICLE TRACKING CONTROL PAD VTC SILT FENCE SF SF ROCK SOCK RS RIP RAP RR {1.CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. CONTRACTOR TO USE CDOT STRAW MULCH SPECS UNLESS OTHERWISE DIRECTED. 2.SWMP ADMINISTRATOR: Contact________________________________ Company________________________________ Address________________________________ Phone________________________________ 3.CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4.DRYWELLS AND BIORETENTION MEDIA TO BE INSTALLED AFTER STABILIZATION OF OVERLOT GRADING. 5.ALL DISTURBED SOILS SHALL BE RESEEDED WITH A COVER CROP UPON COMPLETION OF THE INFRASTRUCTURE IMPROVEMENTS. THE RECOMMENDED SPECIES AND APPLICATION RATES OF SEED FOR COVER CROPS ARE AS FOLLOWS: GREAT BASIN WILRYE3LBS/ACRE GREEN NEEDLEGRASS2LBS/ACRE INDIAN RICEGRASS1LBS/ACRE SLENDER WHEATGRASS2LBS/ACRE THICKSPIKE WHEATGRASS3LBS/ACRE WESTERN WHEATGRASS4LBS/ACRE TRITICALE10LBS/ACRE WINTER WHEAT5LBS/ACRE 6. }7.REFER TO THE "PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR LAKEVIEW SUBDIVISION" BY NORTHERN ENGINEERING, DATED AUGUST 21{, 2013} FOR ADDITIONAL INFORMATION. GENERAL NOTES: WD MULCH TRAFFIC CONTROL BARRICADE TCB CONCRETE WASH AREA CWA MU BALE OUTLET PROTECTION BOP CONSTRUCTION FENCE CF CF CF LIMITS OF DISTURBANCE LOD CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner N/A Under slope stabilization rolled products. Reseeding may be required.