HomeMy WebLinkAboutSUNSHINE HOUSE FC EARLY LEARNING ACADEMY - PDP/FDP - FDP130041 - SUBMITTAL DOCUMENTS - ROUND 2 - TRAFFIC STUDYTABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use ......................................................................................................................... 2
Roads .............................................................................................................................. 2
Existing Traffic ................................................................................................................. 5
Existing Operation ........................................................................................................... 5
Pedestrians Facilities ...................................................................................................... 8
Bicycle Facilities .............................................................................................................. 8
Transit Facilities .............................................................................................................. 8
III. PROPOSED DEVELOPMENT ................................................................................. 9
Trip Generation ............................................................................................................... 9
Trip Distribution ............................................................................................................... 9
Background Traffic Projections ....................................................................................... 9
Trip Assignment ............................................................................................................ 13
Signal Warrants ............................................................................................................. 13
Operation Analysis ........................................................................................................ 13
Geometry ...................................................................................................................... 13
Pedestrian Level of Service ........................................................................................... 19
Bicycle Level of Service ................................................................................................ 19
Transit Level of Service ................................................................................................. 19
IV. CONCLUSIONS/RECOMMENDATIONS .............................................................. 20
DELICH Sunshine House Daycare TIS, November 2013
ASSOCIATES
LIST OF TABLES
1. Current Peak Hour Operation .................................................................................... 7
2. Trip Generation ......................................................................................................... 9
3. Short Range (2018) Background Peak Hour Operation .......................................... 16
4. Short Range (2018) Total Peak Hour Operation ..................................................... 17
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Intersection Geometry.................................................................................. 4
3. Recent Peak Hour Traffic .......................................................................................... 6
4. Site Plan .................................................................................................................. 10
5. Trip Distribution ....................................................................................................... 11
6. Short Range (2018) Background Peak Hour Traffic ................................................ 12
7. Site Generated Peak Hour Traffic ........................................................................... 14
8. Short Range (2018) Total Peak Hour Traffic ........................................................... 15
9. Short Range (2018) Geometry ................................................................................ 18
APPENDICES
A. Base Assumptions Form
B. Recent Peak Hour Traffic
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS
Standards
D. Short Range (2018) Background Peak Hour Operation
E. Short Range (2018) Total Peak Hour Operation
F. Pedestrian/Bicycle Level of Service
DELICH Sunshine House Daycare TIS, November 2013
ASSOCIATES
I. INTRODUCTION
This intermediate transportation impact study (ITIS) addresses the capacity,
geometric, and control requirements at and near the proposed Sunshine House Daycare.
The proposed Sunshine House Daycare site is located in the southwest quadrant of the
Centre/Perennial intersection in Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made with the project
developer (CSU/CSURF), the project planning consultant (TB - Group), the Fort Collins
Traffic Engineering staff, and the Fort Collins Transportation Planning staff. This study
generally conforms to the format set forth in the Fort Collins transportation impact study
guidelines contained in the “Larimer County Urban Area Street Standards” (LCUASS). A
Base Assumptions Form and related information are provided in Appendix A. The study
involved the following steps:
• Collect physical, traffic, and development data;
• Perform trip generation, trip distribution, and trip assignment;
• Determine peak hour traffic volumes;
• Conduct capacity and operational level of service analyses on key intersections;
• Analyze signal warrants;
• Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation.
This TIS is a revision to the “Sunshine House Daycare Transportation Impact
Study” dated October 2013. The revision was requested by the City of Fort Collins
because some data collection occurred during the Federal Government shutdown in
early October 2013.
DELICH Sunshine House Daycare TIS, November 2013
ASSOCIATES Page 1
II. EXISTING CONDITIONS
The location of the Sunshine House Daycare site is shown in Figure 1. It is
important that a thorough understanding of the existing conditions be presented.
Land Use
Land uses in the area are primarily commercial, institutional (CSU/CSURF), or
residential. Land adjacent to the site is flat (<2% grade) from a traffic operations
perspective. This site is near the center of Fort Collins. Colorado State University and the
Fort Collins CBD are north of the proposed Sunshine House Daycare site.
Roads
The primary streets near the Sunshine House Daycare site are Prospect Road,
Centre Avenue, Rolland Moore Drive, and Perennial Lane. The existing geometry at
the key intersections is shown in Figure 2.
Prospect Road is to the north of the Sunshine House Daycare site. It is classified
as a four-lane arterial street on the Fort Collins Master Street Plan. Currently, Prospect
Road has a four-lane cross section near the Prospect/Centre intersection. At the
Prospect/Centre intersection, Prospect Road has eastbound and westbound left-turn
lanes and two travel lanes in each direction. According to LCUASS, eastbound and
westbound right-turn lanes are required with the existing traffic volumes. The
Prospect/Centre intersection has signal control. The existing speed limit in this are is 35
mph.
Centre Avenue is to the east of (adjacent to) the Sunshine House Daycare site.
In this area, it is generally a north-south street designated as a collector street on the
Fort Collins Master Street Plan. Currently, it has a two-lane cross section with a center
two-way continuous left-turn lane. At the Prospect/Centre intersection, Centre Avenue
has northbound and southbound left-turn lanes, one through lane in each direction, and
northbound and southbound right-turn lanes. At the Centre/Rolland Moore-NRRC
South and Centre/Perennial-NRRC North intersections, Centre Avenue has the center
two-way continuous left-turn lane and one through lane in each direction. The existing
posted speed in this area is 35 mph. During the morning peak hour, the northbound
right-turn volumes at both the Centre/Perennial-NRRC North and Centre/Rolland
Moore-NRRC South intersections exceed the threshold volume requiring a right-turn
lane. However, the NRRC land uses have been in existence for a number of years with
no accident history that would be mitigated by these right-turn lanes. Current traffic
volumes on Centre Avenue indicate that it should be classified as a two-lane arterial
street, since the current traffic volumes exceed 5,000 vehicles per day.
Rolland Moore Drive is an east-west street designated as a collector street on
the Fort Collins Master Street Plan. Currently, Rolland Moore Drive has a two-lane
cross section. The east leg of the Centre/Rolland Moore-NRRC South intersection
DELICH Sunshine House Daycare TIS, November 2013
ASSOCIATES Page 2
Shields
Centre
Prospect
Rolland
Moore
Drake
NRRC North
NRRC South
Perennial
SCALE: 1"=1000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
Sunshine House Daycare TIS, November 2013
Page 3
EXISTING INTERSECTION GEOMETRY Figure 2
DELICH
ASSOCIATES
Sunshine House Daycare TIS, November 2013
Page 4
Prospect
Rolland
Moore
NRRC North
NRRC South
Centre
- Denotes Lane
- Two-way Continuous Left-turn Lane
Perennial
serves the NRRC campus. At the Centre/Rolland Moore-NRRC South intersection,
Rolland Moore Drive has an eastbound left-turn lane and a combined eastbound right-
turn/through lane. The NRRC South Access has a westbound left-turn lane and a
combined westbound right-turn/through lane. The Centre/Rolland Moore-NRRC South
intersection has stop control on Rolland Moore Drive and the NRRC South Access.
Perennial Lane is an east-west street designated as a local street on the Fort
Collins Master Street Plan. Currently, Perennial Lane has a two-lane cross section.
The east leg of the Centre/Perennial-NRRC North intersection serves the NRRC
campus. At the Centre/Perennial-NRRC North intersection, Perennial Lane has an
eastbound left-turn lane and a combined eastbound through/right-turn lane. The NRRC
North Access has a westbound left-turn lane and a combined westbound through/right-
turn lane. The Centre/Perennial-NRRC North intersection has stop control on Perennial
Lane and the NRRC North Access.
Existing Traffic
Recent peak hour traffic volumes at the Prospect/Centre, Centre/Perennial-
NRRC North, and Centre/Rolland Moore-NRRC South intersections are shown in Figure
3. The traffic data at the Centre/Perennial-NRRC North and Centre/Rolland Moore-
NRRC South intersections was collected in November 2013. The peak hour traffic at
the Prospect/Centre intersection was obtained in September 2013. Raw traffic count
data is provided in Appendix B. Since the reason for this revised TIS was due to the
Federal Government shutdown and its impact on the two accesses to the NRRC
Campus, the peak hour traffic counts from the different days were compared. While
there are differences in the volumes using the respective accesses, the composite
differences were not significant. There were forty more vehicles using the NRRC
driveways during the Federal Government shutdown in the morning peak hour, and
thirteen less vehicles using the NRRC driveways during the Federal Government
shutdown in the afternoon peak hour.
Existing Operation
The Prospect/Centre, Centre/Perennial-NRRC North, and Centre/Rolland Moore-
NRRC South intersections were evaluated and the peak hour operation is displayed in
Table 1. Calculation forms are provided in Appendix C. The Prospect/Centre
intersection is currently operating acceptably with existing control, geometry, and signal
timing in the morning and afternoon peak hours. The Centre/Perennial-NRRC North
and Centre/Rolland Moore-NRRC South intersections do not meet acceptable levels of
service with the existing traffic. The intersections were evaluated using techniques
provided in the 2010 Highway Capacity Manual. A description of level of service for
signalized and unsignalized intersections from the 2010 Highway Capacity Manual and
a table showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are also
provided in Appendix C. The Prospect/Centre intersection is in an area termed “mixed-
use district.” In areas termed “mixed-use districts,” acceptable operation at signalized
DELICH Sunshine House Daycare TIS, November 2013
ASSOCIATES Page 5
AM/PM
RECENT PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
Sunshine House Daycare TIS, November 2013
Page 6
49/87
205/93
192/307
29/93
54/175
27/135
96/28
760/808
90/70
152/52
575/957
260/292
1/1
635/582
54/2
4/27
243/541
29/3
12/31
0/0
5/2
11/66
1/0
3/63
3/37
613/463
109/27
5/29
158/553
92/23
30/27
0/1
16/30
43/90
0/3
8/75
Prospect
Rolland
Moore
NRRC North
NRRC South
Centre
Perennial
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
Prospect/Centre
(signal)
EB LT A A
EB T B B
EB RT B B
EB APPROACH B B
WB LT A A
WB T A B
WB RT A B
WB APPROACH A B
NB LT D D
NB T D C
NB RT C C
NB APPROACH D D
SB LT D D
SB T C D
SB RT A C
SB APPROACH D D
OVERALL B B
Centre/Perennial-NRRC North
(stop sign)
EB LT D F
EB T/RT C E
EB APPROACH C E
WB LT D F
WB T/RT C D
WB APPROACH C D
NB LT A A
SB LT A A
Centre/Rolland Moore-NRRC
South
(stop sign)
EB LT E F
EB T/RT C D
EB APPROACH D E
WB LT C F
WB T/RT B D
WB APPROACH C E
NB LT B A
SB LT A A
DELICH Sunshine House Daycare TIS, November 2013
ASSOCIATES Page 7
intersections during the peak hours is defined as level of service E or better for the
overall intersection, and level of service E or better for any leg or movement. The
Sunshine House Daycare site is in an area termed “all other areas.” Acceptable
operation at unsignalized intersections during the peak hours is defined as level of
service E or better for any approach leg for an arterial/collector and level of service C or
better for any approach leg for a local and collector/local intersection.
Pedestrian Facilities
There are sidewalks along Prospect Road, Centre Avenue, Rolland Moore Drive,
and Perennial Lane.
Bicycle Facilities
Bicycle lanes exist on Centre Avenue. Prospect Road has no bicycle lanes.
Bike lanes are not required on local or connector streets.
Transit Facilities
Currently, Transfort serves this area of Fort Collins with Route 7. Route 7 runs
from the Mall Transfer Point, along Drake Road, Centre Avenue, through the CSU
Campus, and to the CSU Transit Center. There are transit stops very close to this site.
DELICH Sunshine House Daycare TIS, November 2013
ASSOCIATES Page 8
III. PROPOSED DEVELOPMENT
Sunshine House Daycare is a proposed daycare with approximately 152
students. Figure 4 shows a site plan of the Sunshine House Daycare site. The site plan
shows access to/from Perennial Lane. The short range analysis (Year 2018) includes
development of the Sunshine House Daycare site and an appropriate increase in
background traffic, due to normal growth, and other approved developments in the area.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contained in Trip Generation, 9
th
Edition, ITE was used to estimate trips that would be
generated by the proposed/expected use at this site. Table 2 shows the expected trip
generation on a daily and peak hour basis.
TABLE 2
Trip Generation
Code Use Size
AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
565 Daycare 152
Students 4.48 680 0.42 64 0.38 58 0.39 59 0.43 65
Trip Distribution
Directional distribution of the generated trips was determined for the Sunshine
House Daycare site. Future year data was obtained from the NFRRTP and other traffic
studies. Figure 5 shows the trip distribution used for the Sunshine House Daycare site.
The trip distribution was discussed and agreed to in the scoping discussions.
Background Traffic Projections
Figure 6 shows the short range (2018) background traffic projections.
Background traffic projections for the short range future horizon were obtained by
reviewing the NFRRTP, reviewing traffic studies for other developments, and reviewing
historic count data for this area of Fort Collins. Traffic at the key intersections was
increased at a rate of one percent per year for the short range (2018) background traffic
forecasts.
DELICH Sunshine House Daycare TIS, November 2013
ASSOCIATES Page 9
SCALE: 1"=60'
SITE PLAN Figure 4
DELICH
ASSOCIATES
Sunshine House Daycare TIS, November 2013
Page 10
Centre Avenue
Perennial Lane
Perennial Lane
Site Access
Centre
Prospect
Rolland
Moore
NRRC North
NRRC South
30% 20%
10%
25%
15%
NOM
SCALE: 1"=600'
TRIP DISTRIBUTION Figure 5
DELICH
ASSOCIATES
Sunshine House Daycare TIS, November 2013
Page 11
AM/PM
SHORT RANGE (2018) BACKGROUND
PEAK HOUR TRAFFIC Figure 6
DELICH
ASSOCIATES
Sunshine House Daycare TIS, November 2013
Page 12
51/91
215/98
202/323
30/98
57/184
28/142
101/29
799/849
95/74
160/55
604/1006
273/307
1/1
667/612
57/2
4/28
255/569
30/3
13/33
0/0
5/1
12/69
1/0
3/66
3/39
644/487
115/28
5/30
166/581
97/24
32/28
0/1
17/32
45/95
0/3
8/79
Prospect
Rolland
Moore
NRRC North
NRRC South
Centre
Perennial
Trip Assignment
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. The site generated trip assignment for the Sunshine House Daycare site is
shown in Figure 7. The site generated traffic was combined with the background traffic
to determine the total forecasted traffic at the key intersections. Figure 8 shows the
short range (2018) total peak hour traffic at the key intersections.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices (MUTCD). None of
the stop sign controlled intersections are expected to meet peak hour signal warrants.
Operation Analysis
Operation analyses were performed at the key intersections. The operation
analyses were conducted for the short range analysis, reflecting a year 2018 condition.
Using the short range (2018) background peak hour traffic volumes, the key
intersections operate as indicated in Table 3. Calculation forms for these analyses are
provided in Appendix D. The Prospect/Centre intersection operates acceptably with
existing control, geometry, and signal timing in the morning and afternoon peak hours.
The Centre/Perennial-NRRC North and Centre/Rolland Moore-NRRC South
intersections do not meet acceptable levels of service, since Centre Avenue is classified
as a collector street.
Using the traffic volumes shown in Figure 8, the key intersections operate in the
short range (2018) total condition as indicated in Table 4. Calculation forms for these
analyses are provided in Appendix E. As with the background traffic, the
Prospect/Centre intersection operates acceptably with existing control, geometry, and
signal timing in the morning and afternoon peak hours. The Centre/Perennial-NRRC
North and Centre/Rolland Moore-NRRC South intersections do not meet acceptable
levels of service, since Centre Avenue is classified as a collector street. A variance with
regard to the operation at the Centre/Perennial-NRRC North and Centre/Rolland Moore-
NRRC South intersections will be submitted with this TIS.
Geometry
The short range (2018) geometry is shown in Figure 9. The geometry at the
analyzed intersections is the existing geometry. As mentioned earlier, according to
LCUASS, eastbound and westbound right-turn lanes are required with the existing
traffic volumes at the Prospect/Centre intersection.
DELICH Sunshine House Daycare TIS, November 2013
ASSOCIATES Page 13
AM/PM
SITE GENERATED
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
Sunshine House Daycare TIS, November 2013
Page 14
17/20
6/6
12/13
6/6
19/17
13/12
10/9
38/35
35/39
8/10
6/6
10/9
8/10
6/6
Prospect
Rolland
Moore
NRRC North
NRRC South
Centre
Perennial
AM/PM
SHORT RANGE (2018) TOTAL
PEAK HOUR TRAFFIC Figure 8
DELICH
ASSOCIATES
Sunshine House Daycare TIS, November 2013
Page 15
68/111
221/104
214/336
30/98
63/190
28/142
101/29
799/849
114/91
160/55
604/1006
286/319
11/10
667/612
57/2
42/63
255/569
30/3
48/72
0/0
13/11
12/69
1/0
3/66
9/45
654/496
115/28
5/30
174/591
97/24
32/28
0/1
23/38
45/95
0/3
8/79
Prospect
Rolland
Moore
NRRC North
NRRC South
Centre
Perennial
TABLE 3
Short Range (2018) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Prospect/Centre
(signal)
EB LT A A
EB T B B
EB RT B B
EB APPROACH B B
WB LT B B
WB T A B
WB RT B B
WB APPROACH B B
NB LT D D
NB T D C
NB RT C C
NB APPROACH D D
SB LT D D
SB T C D
SB RT A C
SB APPROACH D D
OVERALL B B
Centre/Perennial-NRRC North
(stop sign)
EB LT D F
EB T/RT C F
EB APPROACH D F
WB LT D F
WB T/RT C D
WB APPROACH C E
NB LT A A
SB LT A A
Centre/Rolland Moore-NRRC
South
(stop sign)
EB LT E F
EB T/RT C D
EB APPROACH D E
WB LT E F
WB T/RT C E
WB APPROACH C F
NB LT B A
SB LT A A
DELICH Sunshine House Daycare TIS, November 2013
ASSOCIATES Page 16
TABLE 4
Short Range (2018) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Prospect/Centre
(signal)
EB LT A A
EB T B B
EB RT B B
EB APPROACH B B
WB LT B B
WB T B B
EB RT B B
WB APPROACH B B
NB LT D D
NB T D C
NB RT D C
NB APPROACH D D
SB LT D D
SB T C C
SB RT A C
SB APPROACH D D
OVERALL B B
Centre/Perennial-NRRC North
(stop sign)
EB LT E F
EB T/RT D F
EB APPROACH D F
WB LT D F
WB T/RT C D
WB APPROACH C E
NB LT A A
SB LT A A
Centre/Rolland Moore-NRRC
South
(stop sign)
EB LT F F
EB T/RT C D
EB APPROACH D E
WB LT E F
WB T/RT C E
WB APPROACH C F
NB LT B A
SB LT A A
DELICH Sunshine House Daycare TIS, November 2013
ASSOCIATES Page 17
SHORT RANGE (2018) GEOMETRY Figure 9
DELICH
ASSOCIATES
Sunshine House Daycare TIS, November 2013
Page 18
Prospect
Rolland
Moore
NRRC North
NRRC South
Centre
- Denotes Lane
- Two-way Continuous Left-turn Lane
Perennial
Pedestrian Level of Service
Appendix F shows a map of the area that is within 1320 feet of the Sunshine
House Daycare. The Sunshine House Daycare site is located within an area termed as a
“other,” which sets the level of service threshold at LOS C for all measured factors.
There are six destination areas within 1320 feet of the proposed Sunshine House
Daycare: 1) NRRC Campus; 2) The Grove residential neighborhood; 3) the residential
neighborhood to the northwest of the site; 4) the residential neighborhood to the north of
the site; 5) Spring Creek Trail; and 6) The Gardens on Spring Creek. In most cases,
sidewalks exist within the pedestrian influence area. It is assumed that sidewalks will
be completed as properties develop. Appendix F contains a Pedestrian LOS
Worksheet. This site will have sidewalk access to the Spring Creek Trail. Level of
service B cannot be achieved for the Directness category to the neighborhood to the
north of the site (destination #4). There is a body of water between this neighborhood
and the Spring Creek Trail. Therefore, this neighborhood accesses the Spring Creek
Trail on the far west side of the neighborhood. This causes the Directness ratio to be
approximately 1.77.
Bicycle Level of Service
Based upon Fort Collins bicycle LOS criteria, there is one destination area
(Spring Creek Trail) within 1320 feet of the Sunshine House Daycare. The bicycle level
of service is acceptable. The Mason Trail is greater than 1320 feet from the Sunshine
House Daycare. The bicycle LOS Worksheet is provided in Appendix F.
Transit Level of Service
Currently, Transfort serves this area of Fort Collins with Route 7. Route 7 runs
from the Mall Transfer Point, along Drake Road, Centre Avenue, through the CSU
Campus, and to the CSU Transit Center. There are transit stops very close to this site.
DELICH Sunshine House Daycare TIS, November 2013
ASSOCIATES Page 19
IV. CONCLUSIONS/RECOMMENDATIONS
This study assessed the impacts of the Sunshine House Daycare site development
on the short range (2018) street system in the vicinity of the proposed development. As a
result of this analysis, the following is concluded:
• The development of the Sunshine House Daycare site is feasible from a traffic
engineering standpoint. At full development, the Sunshine House Daycare site
will generate approximately 680 daily trip ends, 122 morning peak hour trip ends,
and 124 afternoon peak hour trip ends.
• Current operation at the key intersections is acceptable.
• In the short range (2018) future, given development of the Sunshine House
Daycare site and an increase in background traffic, the Prospect/Centre
intersection operates acceptably with existing control, geometry, and signal
timing in the morning and afternoon peak hours. The Centre/Perennial-NRRC
North and Centre/Rolland Moore-NRRC South intersections do not meet
acceptable levels of service, since Centre Avenue is classified as a collector
street. A variance with regard to the operation at the Centre/Perennial-NRRC
North and Centre/Rolland Moore-NRRC South intersections will be submitted
with this TIS.
• Acceptable level of service is achieved for bicycle and transit modes based upon
the measures in the multi-modal transportation guidelines. Acceptable level of
service is achieved for pedestrians, except for one category to one destination.
DELICH Sunshine House Daycare TIS, November 2013
ASSOCIATES Page 20
APPENDIX A
Shields
Centre
Prospect
Rolland
Moore
Drake
NRRC North
NRRC South
SCALE: 1"=1000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
Sunshine House Daycare TIS, October 2013
Page 3
SCALE: 1"=60'
SITE PLAN Figure 4
DELICH
ASSOCIATES
Sunshine House Daycare TIS, October 2013
Page 10
Centre Avenue
Perennial Lane
Perennial Lane
Site Access
DELICH Sunshine House Daycare TIS, October 2013
ASSOCIATES Page 9
TABLE 2
Trip Generation
Code Use Size AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
565 Daycare 152
Students 4.48 680 0.42 64 0.38 58 0.39 59 0.43 65
Centre
Prospect
Rolland
Moore
NRRC North
NRRC South
30% 20%
10%
25%
15%
NOM
SCALE: 1"=600'
TRIP DISTRIBUTION Figure 5
DELICH
ASSOCIATES
Sunshine House Daycare TIS, October 2013
Page 11
Centre
Prospect
Rolland
Moore
NRRC North
NRRC South
Spring Creek Trail
Mason Trail
SCALE: 1"=600'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
Sunshine House Daycare TIS, October 2013
The map is of the area that is within 1320 feet of the Sunshine House Daycare.
The Sunshine House Daycare site is located within an area termed as a “other,”
which sets the level of service threshold at LOS C for all measured factors.
There are six destinationareas within 1320 feet of the proposed Sunshine House
Daycare: 1) NRRC Campus; 2) The Grove residential neighborhood; 3) the
residential neighborhood to the northwest of the site; 4) the residential
neighborhood to the north of the site; 5) Spring Creek Trail; and 6) The Gardens
on Spring Creek.
Spring Creek Trail
Mason Trail
Centre
Prospect
Rolland
Moore
NRRC North
NRRC South
SCALE: 1"=600'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES
Sunshine House Daycare TIS, October 2013
APPENDIX B
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 9/18/2013 Observer: City of Fort Collins
Day: Wednesday Jurisdiction: Fort Collins
R = right turn Intersection: Prospect/Centre
S = straight
L = left turn
Time Northbound: Centre Southbound: Centre Total Eastbound: Prospect Westbound: Prospect Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 14 54 45 113 7 10 4 21 134 31 199 22 252 72 152 56 280 532 666
7:45 16 74 61 151 2 18 9 29 180 33 205 21 259 82 185 42 309 568 748
8:00 13 39 49 101 12 16 8 36 137 12 170 20 202 60 116 27 203 405 542
8:15 6 38 37 81 6 10 8 24 105 20 186 27 233 46 122 27 195 428 533
7:30-8:30 49 205 192 446 27 54 29 110 556 96 760 90 946 260 575 152 987 1933 2489
PHF 0.77 0.69 0.79 0.74 0.56 0.75 0.81 0.76 0.73 0.93 0.83 0.91 0.79 0.78 0.68 0.8 0.83
4:30 18 14 63 95 32 45 21 98 193 10 184 21 215 62 220 16 298 513 706
4:45 13 43 61 117 31 40 17 88 205 10 211 21 242 64 257 12 333 575 780
5:00 35 27 93 155 35 46 30 111 266 4 206 13 223 77 245 7 329 552 818
5:15 21 9 90 120 37 44 25 106 226 4 207 15 226 89 235 17 341 567 793
4:30-5:30 87 93 307 487 135 175 93 403 890 28 808 70 906 292 957 52 1301 2207 3097
PHF 0.62 0.54 0.83 0.79 0.91 0.95 0.78 0.91 0.7 0.96 0.83 0.94 0.82 0.93 0.76 0.95 0.95
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 11/6/2013 Observer: Sue
Day: Wednesday Jurisdiction: Fort Collins
R = right turn Intersection: Centre/Perennial-NRRC North Access
S = straight
L = left turn
Time Northbound: Centre Southbound: Centre Total Eastbound: Perennial Westbound: NRRC North Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 0 194 24 218 3 62 1 66 284 1 0 0 1 0 0 1 1 2 286
7:45 1 211 13 225 12 72 0 84 309 6 0 1 7 2 0 2 4 11 320
8:00 0 117 1 118 13 62 1 76 194 4 0 4 8 0 0 3 3 11 205
8:15 0 113 16 129 1 47 2 50 179 1 0 0 1 1 1 5 7 8 187
7:30-8:30 1 635 54 690 29 243 4 276 966 12 0 5 17 3 1 11 15 32 998
PHF 0.25 0.75 0.56 0.77 0.56 0.84 0.5 0.82 0.5 n/a 0.31 0.53 0.38 0.25 0.55 0.54 0.78
4:30 0 124 1 125 1 104 14 119 244 11 0 1 12 14 0 20 34 46 290
4:45 0 138 0 138 0 119 2 121 259 11 0 0 11 17 0 15 32 43 302
5:00 1 158 1 160 1 187 5 193 353 7 0 0 7 21 0 21 42 49 402
5:15 0 162 0 162 1 131 6 138 300 2 0 1 3 11 0 10 21 24 324
4:30-5:30 1 582 2 585 3 541 27 571 1156 31 0 2 33 63 0 66 129 162 1318
PHF 0.25 0.9 0.5 0.9 0.75 0.72 0.48 0.74 0.7 n/a 0.5 0.69 0.75 n/a 0.79 0.77 0.82
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 11/6/2013 Observer: Michael
Day: Wednesday Jurisdiction: Fort Collins
R = right turn Intersection: Centre/New Rolland Moore-NRRC South Access
S = straight
L = left turn
Time Northbound: Centre Southbound: Centre Total Eastbound: New Rol. M. Westbound: NRRC South Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 1 201 25 227 20 38 0 58 285 10 0 4 14 1 0 3 4 18 303
7:45 1 200 35 236 36 39 4 79 315 10 0 3 13 6 0 10 16 29 344
8:00 0 101 32 133 20 48 0 68 201 6 0 4 10 0 0 16 16 26 227
8:15 1 111 17 129 16 33 1 50 179 4 0 5 9 1 0 14 15 24 203
7:30-8:30 3 613 109 725 92 158 5 255 980 30 0 16 46 8 0 43 51 97 1077
PHF 0.75 0.76 0.78 0.77 0.64 0.82 0.31 0.81 0.75 n/a 0.8 0.82 0.33 n/a 0.67 0.8 0.78
4:30 11 100 7 118 4 111 5 120 238 9 0 7 16 24 0 18 42 58 296
4:45 8 111 9 128 13 115 9 137 265 9 0 4 13 18 1 16 35 48 313
5:00 4 128 8 140 1 183 10 194 334 4 0 9 13 20 1 30 51 64 398
5:15 14 124 3 141 5 144 5 154 295 5 1 10 16 13 1 26 40 56 351
4:30-5:30 37 463 27 527 23 553 29 605 1132 27 1 30 58 75 3 90 168 226 1358
PHF 0.66 0.9 0.75 0.93 0.44 0.76 0.73 0.78 0.75 0.25 0.75 0.91 0.78 0.75 0.75 0.82 0.85
APPENDIX C
HCM 2010 Signalized Intersection Summary Recent AM
3: Centre & Prospect HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates recent am 2010 analysis.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 96 760 90 260 575 152 49 205 192 27 54 29
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 0.93 0.75 0.97 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 193.7 186.3
Lanes 120120111111
Cap, veh/h 527 1957 217 482 1800 452 286 367 235 153 382 312
Arrive On Green 0.05 0.59 0.58 0.09 0.63 0.62 0.20 0.20 0.20 0.20 0.20 0.00
Sat Flow, veh/h 1774 3290 364 1774 2858 718 1244 1863 1192 1008 1937 1583
Grp Volume(v), veh/h 113 506 487 292 411 380 58 241 91 32 64 0
Grp Sat Flow(s),veh/h/ln 1774 1863 1792 1774 1863 1713 1244 1863 1192 1008 1937 1583
Q Serve(g_s), s 2.3 14.5 14.6 4.9 10.1 10.2 3.9 11.5 6.4 2.9 2.6 0.0
Cycle Q Clear(g_c), s 2.3 14.5 14.6 4.9 10.1 10.2 6.5 11.5 6.4 14.4 2.6 0.0
Prop In Lane 1.00 0.20 1.00 0.42 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 527 1108 1066 482 1173 1079 286 367 235 153 382 312
V/C Ratio(X) 0.21 0.46 0.46 0.61 0.35 0.35 0.20 0.66 0.39 0.21 0.17 0.00
Avail Cap(c_a), veh/h 579 1108 1066 602 1173 1079 429 582 372 269 605 494
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 6.6 10.8 10.9 8.2 8.5 8.6 34.7 35.6 33.5 42.2 32.0 0.0
Incr Delay (d2), s/veh 0.2 1.4 1.4 1.2 0.8 0.9 0.3 2.0 1.0 0.7 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 0.8 6.2 6.0 1.9 4.2 3.9 1.2 5.5 1.9 0.8 1.3 0.0
Lane Grp Delay (d), s/veh 6.8 12.2 12.3 9.4 9.3 9.5 35.1 37.6 34.6 42.9 32.2 0.0
Lane Grp LOS ABBAAADDCDC
Approach Vol, veh/h 1106 1083 390 96
Approach Delay, s/veh 11.7 9.4 36.5 35.8
Approach LOS B A D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 8.1 61.7 11.5 65.0 22.9 22.9
Change Period (Y+Rc), s 4.0 5.5 4.0 5.5 5.0 5.0
Max Green Setting (Gmax), s 7.0 52.5 14.0 59.5 29.0 29.0
Max Q Clear Time (g_c+I1), s 4.3 16.6 6.9 12.2 13.5 16.4
Green Ext Time (p_c), s 0.1 7.8 0.5 7.9 1.5 1.4
Intersection Summary
HCM 2010 Ctrl Delay 15.2
HCM 2010 LOS B
Notes
Timing Report, Sorted By Phase Recent AM
3: Centre & Prospect HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates recent am 2010 analysis.syn
Phase Number 234678
Movement NBTL WBL EBTL SBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None None C-Max None None C-Max
Maximum Split (s) 34 18 58 34 11 65
Maximum Split (%) 30.9% 16.4% 52.7% 30.9% 10.0% 59.1%
Minimum Split (s) 23 11 23.5 23 11 24.5
Yellow Time (s) 334334
All-Red Time (s) 2 1 1.5 2 1 1.5
Minimum Initial (s) 7 4 10 7 4 10
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 11 11 11 12
Dual Entry Yes No Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 79 3 21 79 3 14
End Time (s) 3 21 79 3 14 79
Yield/Force Off (s) 108 17 73.5 108 10 73.5
Yield/Force Off 170(s) 97 17 62.5 97 10 61.5
Local Start Time (s) 0 34 52 0 34 45
Local Yield (s) 29 48 104.5 29 41 104.5
Local Yield 170(s) 18 48 93.5 18 41 92.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 79 (72%), Referenced to phase 4:EBTL and 8:WBTL, Start of Red
Splits and Phases: 3: Centre & Prospect
HCM 2010 Signalized Intersection Summary Recent PM
3: Centre & Prospect HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates recent pm 2010 analysis.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 28 808 70 292 957 52 87 93 307 135 175 93
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 0.94 0.85 0.93 0.76
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 193.7 186.3
Lanes 120120111111
Cap, veh/h 392 1980 163 501 2250 118 214 393 284 262 409 254
Arrive On Green 0.03 0.58 0.57 0.09 0.64 0.63 0.21 0.21 0.21 0.21 0.21 0.21
Sat Flow, veh/h 1774 3391 279 1774 3503 184 1107 1863 1345 1139 1937 1202
Grp Volume(v), veh/h 29 467 454 307 536 524 92 98 61 142 184 19
Grp Sat Flow(s),veh/h/ln 1774 1863 1807 1774 1863 1824 1107 1863 1345 1139 1937 1202
Q Serve(g_s), s 0.6 14.0 14.0 5.2 14.5 14.5 7.9 4.4 3.8 11.9 8.3 1.3
Cycle Q Clear(g_c), s 0.6 14.0 14.0 5.2 14.5 14.5 16.3 4.4 3.8 16.3 8.3 1.3
Prop In Lane 1.00 0.15 1.00 0.10 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 392 1087 1055 501 1196 1172 214 393 284 262 409 254
V/C Ratio(X) 0.07 0.43 0.43 0.61 0.45 0.45 0.43 0.25 0.21 0.54 0.45 0.07
Avail Cap(c_a), veh/h 477 1087 1055 782 1196 1172 377 668 482 430 694 431
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 7.9 11.6 11.7 8.6 9.0 9.0 41.6 33.0 32.7 39.8 34.5 31.7
Incr Delay (d2), s/veh 0.1 1.2 1.3 1.2 1.2 1.2 1.4 0.3 0.4 1.7 0.8 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 0.3 6.1 5.9 2.4 5.9 5.8 2.3 2.1 0.0 3.6 4.2 0.4
Lane Grp Delay (d), s/veh 8.0 12.9 12.9 9.8 10.2 10.3 43.0 33.3 33.1 41.5 35.3 31.9
Lane Grp LOS ABBABBDCCDDC
Approach Vol, veh/h 950 1367 251 345
Approach Delay, s/veh 12.7 10.2 36.8 37.7
Approach LOS B B D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 6.2 63.1 12.1 69.0 25.2 25.2
Change Period (Y+Rc), s 4.0 5.5 4.0 5.5 5.0 5.0
Max Green Setting (Gmax), s 7.0 46.5 24.0 63.5 35.0 35.0
Max Q Clear Time (g_c+I1), s 2.6 16.0 7.2 16.5 18.3 18.3
Green Ext Time (p_c), s 0.0 8.7 0.9 9.3 1.9 1.9
Intersection Summary
HCM 2010 Ctrl Delay 16.6
HCM 2010 LOS B
Notes
Timing Report, Sorted By Phase Recent PM
3: Centre & Prospect HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates recent pm 2010 analysis.syn
Phase Number 234678
Movement NBTL WBL EBTL SBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None None C-Max None None C-Max
Maximum Split (s) 40 28 52 40 11 69
Maximum Split (%) 33.3% 23.3% 43.3% 33.3% 9.2% 57.5%
Minimum Split (s) 23 11 23.5 23 11 24.5
Yellow Time (s) 334334
All-Red Time (s) 2 1 1.5 2 1 1.5
Minimum Initial (s) 7 4 10 7 4 10
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 11 11 11 12
Dual Entry Yes No Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 16 56 84 16 56 67
End Time (s) 56 84 16 56 67 16
Yield/Force Off (s) 51 80 10.5 51 63 10.5
Yield/Force Off 170(s) 40 80 119.5 40 63 118.5
Local Start Time (s) 0 40 68 0 40 51
Local Yield (s) 35 64 114.5 35 47 114.5
Local Yield 170(s) 24 64 103.5 24 47 102.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 16 (13%), Referenced to phase 4:EBTL and 8:WBTL, Start of Red
Splits and Phases: 3: Centre & Prospect
HCM 2010 TWSC Recent AM
6: Centre & NRRC North/Perennial HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates recent am 2010 analysis.syn
Intersection
Intersection Delay, s/veh 0.9
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 12 0531111 6355429 2434
Conflicting Peds, #/hr 800000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 75 - - 75 - - 0 - - 0 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 222222222222
Mvmt Flow 14 0641131 7476434 2865
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1152 1177 296 1148 1148 779 299 0 0 811 0 0
Stage 1 364 364 - 781 781 -------
Stage 2 788 813 - 367 367 -------
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 175 191 743 176 199 396 1262 - - 815 - -
Stage 1 655 624 - 388 405 -------
Stage 2 384 392 - 653 622 -------
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 162 182 739 169 189 396 1262 - - 815 - -
Mov Capacity-2 Maneuver 162 182 - 169 189 -------
Stage 1 651 595 - 388 405 -------
Stage 2 370 392 - 621 593 -------
Approach SE NW NE SW
HCM Control Delay, s 23 17.7 0 1
HCM LOS C C
Minor Lane / Major Mvmt NEL NET NER NWLn1 NWLn2 SELn1 SELn2 SWL SWT SWR
Capacity (veh/h) 1262 - - 169 333 162 286 815 - -
HCM Lane V/C Ratio 0.001 - - 0.014 0.046 0.058 0.037 0.042 - -
HCM Control Delay (s) 7.855 - - 26.6 16.3 28.6 18.1 9.61 - -
HCM Lane LOS A DCDCA
HCM 95th %tile Q(veh) 0.003 - - 0.042 0.144 0.183 0.115 0.131 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics Recent AM
6: Centre & NRRC North/Perennial HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates recent am 2010 analysis.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 10 10 10 16 12 12 16 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 75 0 75 0 0 0 0 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.861 0.988 0.997
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1652 1478 0 1652 1497 0 2006 1840 0 2006 1857 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1652 1478 0 1652 1497 0 2006 1840 0 2006 1857 0
Link Speed (mph) 25 25 35 35
Link Distance (ft) 315 317 771 2032
Travel Time (s) 8.6 8.6 15.0 39.6
Intersection Summary
Area Type: Other
HCM 2010 TWSC Recent PM
6: Centre & NRRC North/Perennial HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates recent pm 2010 analysis.syn
Intersection
Intersection Delay, s/veh 4.5
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 31 0 2 63 0 66 1 582 2 3 541 27
Conflicting Peds, #/hr 001100000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 75 - - 75 - - 0 - - 0 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 92
Heavy Vehicles, % 222222222222
Mvmt Flow 36 0 2 74 0 78 1 685 2 4 636 29
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1387 1349 652 1349 1363 687 667 0 0 688 0 0
Stage 1 659 659 - 689 689 -------
Stage 2 728 690 - 660 674 -------
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 120 151 468 128 148 447 923 - - 906 - -
Stage 1 453 461 - 436 446 -------
Stage 2 415 446 - 452 454 -------
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 99 150 468 127 147 447 923 - - 906 - -
Mov Capacity-2 Maneuver 99 150 - 127 147 -------
Stage 1 452 459 - 435 445 -------
Stage 2 343 445 - 448 452 -------
Approach SE NW NE SW
HCM Control Delay, s 48.4 33.4 0 0
HCM LOS E D
Minor Lane / Major Mvmt NEL NET NER NWLn1 NWLn2 SELn1 SELn2 SWL SWT SWR
Capacity (veh/h) 923 - - 127 278 99 114 906 - -
HCM Lane V/C Ratio 0.001 - - 0.389 0.368 0.246 0.127 0.004 - -
HCM Control Delay (s) 8.905 - - 50.3 25.3 52.8 41.1 8.989 - -
HCM Lane LOS A F D F E A
HCM 95th %tile Q(veh) 0.004 - - 1.635 1.628 0.892 0.423 0.012 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics Recent PM
6: Centre & NRRC North/Perennial HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates recent pm 2010 analysis.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 10 10 10 16 12 12 16 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 75 0 75 0 0 0 0 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.850 0.993
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1652 1478 0 1652 1478 0 2006 1863 0 2006 1850 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1652 1478 0 1652 1478 0 2006 1863 0 2006 1850 0
Link Speed (mph) 25 25 35 35
Link Distance (ft) 315 317 771 2032
Travel Time (s) 8.6 8.6 15.0 39.6
Intersection Summary
Area Type: Other
HCM 2010 TWSC Recent AM
8: Centre & NRRC South/Rolland Moore HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates recent am 2010 analysis.syn
Intersection
Intersection Delay, s/veh 3
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 30 0 16 8 0 43 3 613 109 92 158 5
Conflicting Peds, #/hr 402000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 0 - - 0 - - 0 - - 0 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 222222222222
Mvmt Flow 35 0 19 9 0 51 4 721 128 108 186 6
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1227 1265 193 1211 1204 785 196 0 0 849 0 0
Stage 1 409 409 - 792 792 -------
Stage 2 818 856 - 419 412 -------
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 155 169 849 159 184 393 1377 - - 789 - -
Stage 1 619 596 - 382 401 -------
Stage 2 370 374 - 612 594 -------
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 120 145 847 139 158 393 1377 - - 789 - -
Mov Capacity-2 Maneuver 120 145 - 139 158 -------
Stage 1 615 513 - 381 400 -------
Stage 2 321 373 - 516 511 -------
Approach SE NW NE SW
HCM Control Delay, s 30.3 18.5 0 3.7
HCM LOS D C
Minor Lane / Major Mvmt NEL NET NER NWLn1 NWLn2 SELn1 SELn2 SWL SWT SWR
Capacity (veh/h) 1377 - - 139 355 120 254 789 - -
HCM Lane V/C Ratio 0.003 - - 0.045 0.151 0.196 0.12 0.137 - -
HCM Control Delay (s) 7.621 - - 32.1 16.9 42.2 21.1 10.287 - -
HCM Lane LOS A D C E C B
HCM 95th %tile Q(veh) 0.008 - - 0.141 0.528 0.692 0.405 0.474 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics Recent AM
8: Centre & NRRC South/Rolland Moore HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates recent am 2010 analysis.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 10 10 10 16 12 12 16 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 75 0 75 0 0 0 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.850 0.977 0.995
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1652 1478 0 1652 1478 0 2006 1820 0 2006 1853 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1652 1478 0 1652 1478 0 2006 1820 0 2006 1853 0
Link Speed (mph) 25 25 35 35
Link Distance (ft) 302 263 348 771
Travel Time (s) 8.2 7.2 6.8 15.0
Intersection Summary
Area Type: Other
HCM 2010 TWSC Recent PM
8: Centre & NRRC South/Rolland Moore HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates recent pm 2010 analysis.syn
Intersection
Intersection Delay, s/veh 7.5
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 27 1 30 75 3 90 37 463 27 23 553 29
Conflicting Peds, #/hr 000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 0 - - 0 - - 0 - - 0 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 222222222222
Mvmt Flow 32 1 35 88 4 106 44 545 32 27 651 34
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1424 1386 668 1388 1387 561 685 0 0 576 0 0
Stage 1 722 722 - 648 648 -------
Stage 2 702 664 - 740 739 -------
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 113 143 458 120 143 527 908 - - 997 - -
Stage 1 418 431 - 459 466 -------
Stage 2 429 458 - 409 424 -------
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 83 132 458 104 132 527 908 - - 997 - -
Mov Capacity-2 Maneuver 83 132 - 104 132 -------
Stage 1 398 419 - 437 443 -------
Stage 2 324 436 - 366 413 -------
Approach SE NW NE SW
HCM Control Delay, s 37.2 45 0.6 0.3
HCM LOS E E
Minor Lane / Major Mvmt NEL NET NER NWLn1 NWLn2 SELn1 SELn2 SWL SWT SWR
Capacity (veh/h) 908 - - 104 272 83 220 997 - -
HCM Lane V/C Ratio 0.048 - - 0.566 0.51 0.255 0.214 0.027 - -
HCM Control Delay (s) 9.164 - - 77.4 31.3 62.6 25.8 8.712 - -
HCM Lane LOS A F D F D A
HCM 95th %tile Q(veh) 0.151 - - 2.657 2.692 0.918 0.788 0.084 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics Recent PM
8: Centre & NRRC South/Rolland Moore HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates recent pm 2010 analysis.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 10 10 10 16 12 12 16 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 75 0 30 0 0 0 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.854 0.855 0.992 0.993
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1652 1485 0 1652 1486 0 2006 1848 0 2006 1850 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1652 1485 0 1652 1486 0 2006 1848 0 2006 1850 0
Link Speed (mph) 25 25 35 35
Link Distance (ft) 302 263 348 771
Travel Time (s) 8.2 7.2 6.8 15.0
Intersection Summary
Area Type: Other
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
Table 4-3
Fort Collins (City Limits)
Motor Vehicle LOS Standards (Intersections)
Land Use (from structure plan)
Other corridors within:
Intersection type Commercial
corridors
Mixed use
districts
Low density
mixed use
residential
All other
areas
Signalized intersections
(overall)
DE*DD
Any Leg EEDE
Any Movement EEDE
Stop sign control
(arterial/collector or local—
any approach leg)
N/A F** F** E
Stop sign control
(collector/local—any
approach leg)
N/A C C C
* mitigating measures required
** considered normal in an urban environment
APPENDIX D
HCM 2010 Signalized Intersection Summary Short Bkgrd AM
3: Centre & Prospect HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates sb am 2010 analysis.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 101 799 95 273 604 160 51 215 202 28 57 30
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 0.94 0.76 0.97 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 193.7 186.3
Lanes 120120111111
Cap, veh/h 506 1928 215 463 1778 449 291 378 244 151 394 322
Arrive On Green 0.06 0.59 0.58 0.09 0.62 0.61 0.20 0.20 0.20 0.20 0.20 0.00
Sat Flow, veh/h 1774 3287 367 1774 2854 721 1244 1863 1202 989 1937 1583
Grp Volume(v), veh/h 119 533 512 307 433 399 60 253 103 33 67 0
Grp Sat Flow(s),veh/h/ln 1774 1863 1791 1774 1863 1713 1244 1863 1202 989 1937 1583
Q Serve(g_s), s 2.5 16.1 16.1 5.4 11.1 11.2 4.1 12.2 7.3 3.1 2.8 0.0
Cycle Q Clear(g_c), s 2.5 16.1 16.1 5.4 11.1 11.2 6.8 12.2 7.3 15.3 2.8 0.0
Prop In Lane 1.00 0.20 1.00 0.42 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 506 1092 1050 463 1161 1067 291 378 244 151 394 322
V/C Ratio(X) 0.24 0.49 0.49 0.66 0.37 0.37 0.21 0.67 0.42 0.22 0.17 0.00
Avail Cap(c_a), veh/h 553 1092 1050 574 1161 1067 423 575 371 256 598 489
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 7.0 11.6 11.7 9.8 9.0 9.1 34.8 35.7 33.7 42.7 31.9 0.0
Incr Delay (d2), s/veh 0.2 1.6 1.6 2.0 0.9 1.0 0.3 2.0 1.2 0.7 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 0.9 7.0 6.8 2.8 4.6 4.3 1.3 5.8 2.2 0.8 1.4 0.0
Lane Grp Delay (d), s/veh 7.3 13.2 13.3 11.8 9.9 10.1 35.1 37.7 34.9 43.4 32.1 0.0
Lane Grp LOS ABBBABDDCDC
Approach Vol, veh/h 1164 1139 416 100
Approach Delay, s/veh 12.6 10.5 36.6 35.9
Approach LOS B B D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 8.4 61.4 11.9 65.0 23.7 23.7
Change Period (Y+Rc), s 4.0 5.5 4.0 5.5 5.0 5.0
Max Green Setting (Gmax), s 7.0 52.5 14.0 59.5 29.0 29.0
Max Q Clear Time (g_c+I1), s 4.5 18.1 7.4 13.2 14.2 17.3
Green Ext Time (p_c), s 0.1 8.4 0.6 8.6 1.6 1.5
Intersection Summary
HCM 2010 Ctrl Delay 16.1
HCM 2010 LOS B
Notes
Timing Report, Sorted By Phase Short Bkgrd AM
3: Centre & Prospect HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates sb am 2010 analysis.syn
Phase Number 234678
Movement NBTL WBL EBTL SBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None None C-Max None None C-Max
Maximum Split (s) 34 18 58 34 11 65
Maximum Split (%) 30.9% 16.4% 52.7% 30.9% 10.0% 59.1%
Minimum Split (s) 23 11 23.5 23 11 24.5
Yellow Time (s) 334334
All-Red Time (s) 2 1 1.5 2 1 1.5
Minimum Initial (s) 7 4 10 7 4 10
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 11 11 11 12
Dual Entry Yes No Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 79 3 21 79 3 14
End Time (s) 3 21 79 3 14 79
Yield/Force Off (s) 108 17 73.5 108 10 73.5
Yield/Force Off 170(s) 97 17 62.5 97 10 61.5
Local Start Time (s) 0 34 52 0 34 45
Local Yield (s) 29 48 104.5 29 41 104.5
Local Yield 170(s) 18 48 93.5 18 41 92.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 79 (72%), Referenced to phase 4:EBTL and 8:WBTL, Start of Red
Splits and Phases: 3: Centre & Prospect
HCM 2010 Signalized Intersection Summary Short Bkgrd PM
3: Centre & Prospect HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates sb pm 2010 analysis.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 29 849 74 307 1006 55 91 98 323 142 184 98
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 0.95 0.85 0.94 0.77
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 193.7 186.3
Lanes 120120111111
Cap, veh/h 368 1941 161 481 2222 117 217 409 297 268 425 267
Arrive On Green 0.03 0.57 0.56 0.09 0.63 0.62 0.22 0.22 0.22 0.22 0.22 0.22
Sat Flow, veh/h 1774 3389 281 1774 3502 185 1099 1863 1353 1134 1937 1214
Grp Volume(v), veh/h 31 491 477 323 563 552 96 103 65 149 194 20
Grp Sat Flow(s),veh/h/ln 1774 1863 1807 1774 1863 1824 1099 1863 1353 1134 1937 1214
Q Serve(g_s), s 0.7 15.6 15.6 5.7 16.1 16.1 8.4 4.6 4.0 12.7 8.8 1.3
Cycle Q Clear(g_c), s 0.7 15.6 15.6 5.7 16.1 16.1 17.3 4.6 4.0 17.4 8.8 1.3
Prop In Lane 1.00 0.16 1.00 0.10 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 368 1067 1035 481 1182 1157 217 409 297 268 425 267
V/C Ratio(X) 0.08 0.46 0.46 0.67 0.48 0.48 0.44 0.25 0.22 0.56 0.46 0.08
Avail Cap(c_a), veh/h 450 1067 1035 749 1182 1157 365 660 479 421 686 430
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 8.6 12.6 12.7 10.3 9.7 9.8 41.9 32.8 32.5 39.9 34.4 31.5
Incr Delay (d2), s/veh 0.1 1.4 1.5 1.6 1.4 1.4 1.4 0.3 0.4 1.8 0.8 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 0.3 6.8 6.7 3.3 6.9 6.8 2.4 2.2 0.0 3.8 4.5 0.4
Lane Grp Delay (d), s/veh 8.7 14.0 14.1 11.9 11.1 11.2 43.3 33.1 32.9 41.7 35.2 31.6
Lane Grp LOS ABBBBBDCCDDC
Approach Vol, veh/h 999 1438 264 363
Approach Delay, s/veh 13.9 11.3 36.8 37.7
Approach LOS B B D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 6.3 62.7 12.6 69.0 26.3 26.3
Change Period (Y+Rc), s 4.0 5.5 4.0 5.5 5.0 5.0
Max Green Setting (Gmax), s 7.0 46.5 24.0 63.5 35.0 35.0
Max Q Clear Time (g_c+I1), s 2.7 17.6 7.7 18.1 19.3 19.4
Green Ext Time (p_c), s 0.0 9.3 1.0 10.1 2.0 2.0
Intersection Summary
HCM 2010 Ctrl Delay 17.5
HCM 2010 LOS B
Notes
Timing Report, Sorted By Phase Short Bkgrd PM
3: Centre & Prospect HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates sb pm 2010 analysis.syn
Phase Number 234678
Movement NBTL WBL EBTL SBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None None C-Max None None C-Max
Maximum Split (s) 40 28 52 40 11 69
Maximum Split (%) 33.3% 23.3% 43.3% 33.3% 9.2% 57.5%
Minimum Split (s) 23 11 23.5 23 11 24.5
Yellow Time (s) 334334
All-Red Time (s) 2 1 1.5 2 1 1.5
Minimum Initial (s) 7 4 10 7 4 10
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 11 11 11 12
Dual Entry Yes No Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 16 56 84 16 56 67
End Time (s) 56 84 16 56 67 16
Yield/Force Off (s) 51 80 10.5 51 63 10.5
Yield/Force Off 170(s) 40 80 119.5 40 63 118.5
Local Start Time (s) 0 40 68 0 40 51
Local Yield (s) 35 64 114.5 35 47 114.5
Local Yield 170(s) 24 64 103.5 24 47 102.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 16 (13%), Referenced to phase 4:EBTL and 8:WBTL, Start of Red
Splits and Phases: 3: Centre & Prospect
HCM 2010 TWSC Short Bkgrd AM
6: Centre & NRRC North/Perennial HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates sb am 2010 analysis.syn
Intersection
Intersection Delay, s/veh 1
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 13 0531121 6675730 2554
Conflicting Peds, #/hr 800000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 75 - - 75 - - 0 - - 0 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 222222222222
Mvmt Flow 15 0641141 7856735 3005
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1209 1235 310 1205 1204 818 313 0 0 852 0 0
Stage 1 381 381 - 821 821 -------
Stage 2 828 854 - 384 383 -------
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 160 176 730 161 184 376 1247 - - 787 - -
Stage 1 641 613 - 369 389 -------
Stage 2 365 375 - 639 612 -------
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 147 167 726 154 175 376 1247 - - 787 - -
Mov Capacity-2 Maneuver 147 167 - 154 175 -------
Stage 1 637 582 - 369 389 -------
Stage 2 350 375 - 606 582 -------
Approach SE NW NE SW
HCM Control Delay, s 25.2 18.5 0 1
HCM LOS D C
Minor Lane / Major Mvmt NEL NET NER NWLn1 NWLn2 SELn1 SELn2 SWL SWT SWR
Capacity (veh/h) 1247 - - 154 317 147 257 787 - -
HCM Lane V/C Ratio 0.001 - - 0.015 0.052 0.069 0.043 0.045 - -
HCM Control Delay (s) 7.89 - - 28.7 17 31.3 19.6 9.789 - -
HCM Lane LOS A DCDCA
HCM 95th %tile Q(veh) 0.003 - - 0.046 0.164 0.221 0.133 0.141 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics Short Bkgrd AM
6: Centre & NRRC North/Perennial HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates sb am 2010 analysis.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 10 10 10 16 12 12 16 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 75 0 75 0 0 0 0 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.860 0.988 0.998
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1652 1478 0 1652 1495 0 2006 1840 0 2006 1859 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1652 1478 0 1652 1495 0 2006 1840 0 2006 1859 0
Link Speed (mph) 25 25 35 35
Link Distance (ft) 315 317 771 2032
Travel Time (s) 8.6 8.6 15.0 39.6
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Bkgrd PM
6: Centre & NRRC North/Perennial HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates sb pm 2010 analysis.syn
Intersection
Intersection Delay, s/veh 5.3
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 33 0 1 66 0 69 1 612 2 3 569 28
Conflicting Peds, #/hr 001100000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 75 - - 75 - - 0 - - 0 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 92
Heavy Vehicles, % 222222222222
Mvmt Flow 39 0 1 78 0 81 1 720 2 4 669 30
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1458 1419 686 1418 1433 722 701 0 0 723 0 0
Stage 1 693 693 - 725 725 -------
Stage 2 765 726 - 693 708 -------
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 107 137 447 114 134 427 896 - - 879 - -
Stage 1 434 445 - 416 430 -------
Stage 2 396 430 - 434 438 -------
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 86 136 447 113 133 427 896 - - 879 - -
Mov Capacity-2 Maneuver 86 136 - 113 133 -------
Stage 1 433 443 - 415 429 -------
Stage 2 320 429 - 431 436 -------
Approach SE NW NE SW
HCM Control Delay, s 59.4 39.5 0 0
HCM LOS F E
Minor Lane / Major Mvmt NEL NET NER NWLn1 NWLn2 SELn1 SELn2 SWL SWT SWR
Capacity (veh/h) 896 - - 113 255 86 92 879 - -
HCM Lane V/C Ratio 0.001 - - 0.458 0.42 0.301 0.153 0.004 - -
HCM Control Delay (s) 9.023 - - 61.3 29 64 51.1 9.112 - -
HCM Lane LOS A F D F F A
HCM 95th %tile Q(veh) 0.004 - - 2.009 1.963 1.124 0.516 0.012 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics Short Bkgrd PM
6: Centre & NRRC North/Perennial HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates sb pm 2010 analysis.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 10 10 10 16 12 12 16 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 75 0 75 0 0 0 0 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.850 0.994
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1652 1478 0 1652 1478 0 2006 1863 0 2006 1852 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1652 1478 0 1652 1478 0 2006 1863 0 2006 1852 0
Link Speed (mph) 25 25 35 35
Link Distance (ft) 315 317 771 2032
Travel Time (s) 8.6 8.6 15.0 39.6
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Bkgrd AM
8: Centre & NRRC South/Rolland Moore HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates sb am 2010 analysis.syn
Intersection
Intersection Delay, s/veh 3.3
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 32 0 17 8 0 45 3 644 115 97 166 5
Conflicting Peds, #/hr 402000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 0 - - 0 - - 0 - - 0 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 222222222222
Mvmt Flow 38 0 20 9 0 53 4 758 135 114 195 6
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1289 1330 202 1272 1265 825 205 0 0 893 0 0
Stage 1 430 430 - 832 832 -------
Stage 2 859 900 - 440 433 -------
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 141 155 839 144 169 372 1366 - - 759 - -
Stage 1 603 583 - 363 384 -------
Stage 2 351 357 - 596 582 -------
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 106 131 837 124 143 372 1366 - - 759 - -
Mov Capacity-2 Maneuver 106 131 - 124 143 -------
Stage 1 600 494 - 362 383 -------
Stage 2 300 356 - 494 493 -------
Approach SE NW NE SW
HCM Control Delay, s 34.6 19.7 0 3.8
HCM LOS D C
Minor Lane / Major Mvmt NEL NET NER NWLn1 NWLn2 SELn1 SELn2 SWL SWT SWR
Capacity (veh/h) 1366 - - 124 335 106 229 759 - -
HCM Lane V/C Ratio 0.003 - - 0.051 0.167 0.237 0.142 0.15 - -
HCM Control Delay (s) 7.642 - - 35.6 17.9 49.2 23.3 10.581 - -
HCM Lane LOS A E C E C B
HCM 95th %tile Q(veh) 0.008 - - 0.158 0.593 0.858 0.487 0.527 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics Short Bkgrd AM
8: Centre & NRRC South/Rolland Moore HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates sb am 2010 analysis.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 10 10 10 16 12 12 16 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 75 0 75 0 0 0 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.850 0.977 0.996
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1652 1478 0 1652 1478 0 2006 1820 0 2006 1855 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1652 1478 0 1652 1478 0 2006 1820 0 2006 1855 0
Link Speed (mph) 25 25 35 35
Link Distance (ft) 302 263 348 771
Travel Time (s) 8.2 7.2 6.8 15.0
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Bkgrd PM
8: Centre & NRRC South/Rolland Moore HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates sb pm 2010 analysis.syn
Intersection
Intersection Delay, s/veh 9.4
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 28 1 32 79 3 95 39 487 28 24 581 30
Conflicting Peds, #/hr 000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 0 - - 0 - - 0 - - 0 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 222222222222
Mvmt Flow 33 1 38 93 4 112 46 573 33 28 684 35
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1497 1456 701 1458 1456 589 719 0 0 606 0 0
Stage 1 758 758 - 681 681 -------
Stage 2 739 698 - 777 775 -------
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 101 130 439 107 130 508 882 - - 972 - -
Stage 1 399 415 - 440 450 -------
Stage 2 409 442 - 390 408 -------
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 72 120 439 # 91 120 508 882 - - 972 - -
Mov Capacity-2 Maneuver 72 120 - # 91 120 -------
Stage 1 378 403 - 417 427 -------
Stage 2 300 419 - 345 396 -------
Approach SE NW NE SW
HCM Control Delay, s 43.1 58 0.7 0.3
HCM LOS E F
Minor Lane / Major Mvmt NEL NET NER NWLn1 NWLn2 SELn1 SELn2 SWL SWT SWR
Capacity (veh/h) 882 - - 91 248 72 201 972 - -
HCM Lane V/C Ratio 0.052 - - 0.681 0.59 0.305 0.248 0.029 - -
HCM Control Delay (s) 9.305 - - 104.2 38.4 75.6 28.7 8.814 - -
HCM Lane LOS A F E F D A
HCM 95th %tile Q(veh) 0.164 - - 3.336 3.403 1.117 0.941 0.09 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics Short Bkgrd PM
8: Centre & NRRC South/Rolland Moore HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates sb pm 2010 analysis.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 10 10 10 16 12 12 16 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 75 0 30 0 0 0 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.854 0.855 0.992 0.993
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1652 1485 0 1652 1486 0 2006 1848 0 2006 1850 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1652 1485 0 1652 1486 0 2006 1848 0 2006 1850 0
Link Speed (mph) 25 25 35 35
Link Distance (ft) 302 263 348 771
Travel Time (s) 8.2 7.2 6.8 15.0
Intersection Summary
Area Type: Other
APPENDIX E
HCM 2010 Signalized Intersection Summary Short Total AM
3: Centre & Prospect HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates st am 2010 analysis.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 101 799 114 286 604 160 68 221 214 28 63 30
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 0.94 0.76 0.97 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 193.7 186.3
Lanes 120120111111
Cap, veh/h 502 1863 248 456 1769 444 292 387 251 151 403 329
Arrive On Green 0.06 0.58 0.57 0.10 0.62 0.61 0.21 0.21 0.21 0.21 0.21 0.00
Sat Flow, veh/h 1774 3215 427 1774 2858 718 1239 1863 1209 973 1937 1583
Grp Volume(v), veh/h 119 545 520 321 433 398 80 260 115 33 74 0
Grp Sat Flow(s),veh/h/ln 1774 1863 1780 1774 1863 1713 1239 1863 1209 973 1937 1583
Q Serve(g_s), s 2.6 17.0 17.1 5.7 11.3 11.4 5.6 12.6 8.1 3.2 3.1 0.0
Cycle Q Clear(g_c), s 2.6 17.0 17.1 5.7 11.3 11.4 8.6 12.6 8.1 15.7 3.1 0.0
Prop In Lane 1.00 0.24 1.00 0.42 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 502 1079 1031 456 1153 1060 292 387 251 151 403 329
V/C Ratio(X) 0.24 0.50 0.50 0.70 0.38 0.38 0.27 0.67 0.46 0.22 0.18 0.00
Avail Cap(c_a), veh/h 549 1079 1031 559 1153 1060 415 572 371 247 594 486
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 7.3 12.2 12.3 11.1 9.2 9.4 35.4 35.7 33.9 42.9 31.9 0.0
Incr Delay (d2), s/veh 0.2 1.7 1.8 3.0 0.9 1.0 0.5 2.0 1.3 0.7 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 1.0 7.5 7.2 3.5 4.7 4.4 1.7 6.0 2.5 0.8 1.5 0.0
Lane Grp Delay (d), s/veh 7.6 13.9 14.1 14.1 10.2 10.4 35.9 37.7 35.2 43.6 32.1 0.0
Lane Grp LOS ABBBBBDDDDC
Approach Vol, veh/h 1184 1152 455 107
Approach Delay, s/veh 13.3 11.4 36.7 35.7
Approach LOS B B D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 8.4 61.1 12.3 65.0 24.3 24.3
Change Period (Y+Rc), s 4.0 5.5 4.0 5.5 5.0 5.0
Max Green Setting (Gmax), s 7.0 52.5 14.0 59.5 29.0 29.0
Max Q Clear Time (g_c+I1), s 4.6 19.1 7.7 13.4 14.6 17.7
Green Ext Time (p_c), s 0.1 8.5 0.6 8.8 1.8 1.6
Intersection Summary
HCM 2010 Ctrl Delay 17.1
HCM 2010 LOS B
Notes
Timing Report, Sorted By Phase Short Total AM
3: Centre & Prospect HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates st am 2010 analysis.syn
Phase Number 234678
Movement NBTL WBL EBTL SBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None None C-Max None None C-Max
Maximum Split (s) 34 18 58 34 11 65
Maximum Split (%) 30.9% 16.4% 52.7% 30.9% 10.0% 59.1%
Minimum Split (s) 23 11 23.5 23 11 24.5
Yellow Time (s) 334334
All-Red Time (s) 2 1 1.5 2 1 1.5
Minimum Initial (s) 7 4 10 7 4 10
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 11 11 11 12
Dual Entry Yes No Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 79 3 21 79 3 14
End Time (s) 3 21 79 3 14 79
Yield/Force Off (s) 108 17 73.5 108 10 73.5
Yield/Force Off 170(s) 97 17 62.5 97 10 61.5
Local Start Time (s) 0 34 52 0 34 45
Local Yield (s) 29 48 104.5 29 41 104.5
Local Yield 170(s) 18 48 93.5 18 41 92.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 79 (72%), Referenced to phase 4:EBTL and 8:WBTL, Start of Red
Splits and Phases: 3: Centre & Prospect
HCM 2010 Signalized Intersection Summary Short Total PM
3: Centre & Prospect HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates st pm 2010 analysis.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 29 849 91 319 1006 55 111 104 336 142 190 98
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 0.95 0.86 0.94 0.78
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 193.7 186.3
Lanes 120120111111
Cap, veh/h 355 1835 187 466 2170 115 233 442 325 283 460 294
Arrive On Green 0.03 0.55 0.54 0.10 0.62 0.61 0.24 0.24 0.24 0.24 0.24 0.24
Sat Flow, veh/h 1774 3320 338 1774 3502 185 1097 1863 1368 1128 1937 1238
Grp Volume(v), veh/h 31 502 483 336 563 552 117 109 71 149 200 21
Grp Sat Flow(s),veh/h/ln 1774 1863 1796 1774 1863 1824 1097 1863 1368 1128 1937 1238
Q Serve(g_s), s 0.8 17.1 17.2 6.4 17.1 17.2 10.6 4.9 4.3 12.8 9.1 1.4
Cycle Q Clear(g_c), s 0.8 17.1 17.2 6.4 17.1 17.2 19.7 4.9 4.3 17.8 9.1 1.4
Prop In Lane 1.00 0.19 1.00 0.10 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 355 1030 993 466 1155 1130 233 442 325 283 460 294
V/C Ratio(X) 0.09 0.49 0.49 0.72 0.49 0.49 0.50 0.25 0.22 0.53 0.44 0.07
Avail Cap(c_a), veh/h 434 1030 993 716 1155 1130 352 644 473 406 670 428
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 9.6 14.2 14.3 12.4 10.8 10.8 42.1 32.1 31.9 39.3 33.8 30.8
Incr Delay (d2), s/veh 0.1 1.6 1.7 2.1 1.5 1.5 1.7 0.3 0.3 1.5 0.6 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 0.3 7.7 7.5 4.3 7.4 7.2 3.0 2.3 1.5 3.8 4.6 0.4
Lane Grp Delay (d), s/veh 9.8 15.9 16.0 14.6 12.3 12.3 43.8 32.4 32.3 40.9 34.4 30.9
Lane Grp LOS ABBBBBDCCDCC
Approach Vol, veh/h 1016 1451 297 370
Approach Delay, s/veh 15.8 12.8 36.9 36.8
Approach LOS B B D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 6.4 62.0 13.3 69.0 28.7 28.7
Change Period (Y+Rc), s 4.0 5.5 4.0 5.5 5.0 5.0
Max Green Setting (Gmax), s 7.0 46.5 24.0 63.5 35.0 35.0
Max Q Clear Time (g_c+I1), s 2.8 19.2 8.4 19.2 21.7 19.8
Green Ext Time (p_c), s 0.0 9.3 1.0 10.2 2.0 2.1
Intersection Summary
HCM 2010 Ctrl Delay 18.9
HCM 2010 LOS B
Notes
Timing Report, Sorted By Phase Short Total PM
3: Centre & Prospect HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates st pm 2010 analysis.syn
Phase Number 234678
Movement NBTL WBL EBTL SBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None None C-Max None None C-Max
Maximum Split (s) 40 28 52 40 11 69
Maximum Split (%) 33.3% 23.3% 43.3% 33.3% 9.2% 57.5%
Minimum Split (s) 23 11 23.5 23 11 24.5
Yellow Time (s) 334334
All-Red Time (s) 2 1 1.5 2 1 1.5
Minimum Initial (s) 7 4 10 7 4 10
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 11 11 11 12
Dual Entry Yes No Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 16 56 84 16 56 67
End Time (s) 56 84 16 56 67 16
Yield/Force Off (s) 51 80 10.5 51 63 10.5
Yield/Force Off 170(s) 40 80 119.5 40 63 118.5
Local Start Time (s) 0 40 68 0 40 51
Local Yield (s) 35 64 114.5 35 47 114.5
Local Yield 170(s) 24 64 103.5 24 47 102.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 16 (13%), Referenced to phase 4:EBTL and 8:WBTL, Start of Red
Splits and Phases: 3: Centre & Prospect
HCM 2010 TWSC Short Total AM
6: Centre & NRRC North/Perennial HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates st am 2010 analysis.syn
Intersection
Intersection Delay, s/veh 2.4
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 48 0 13 3 1 12 11 667 57 30 255 42
Conflicting Peds, #/hr 800000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 75 - - 75 - - 0 - - 0 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 222222222222
Mvmt Flow 56 0 15 4 1 14 13 785 67 35 300 49
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1255 1281 333 1255 1272 818 357 0 0 852 0 0
Stage 1 403 403 - 844 844 -------
Stage 2 852 878 - 411 428 -------
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 148 166 709 148 168 376 1202 - - 787 - -
Stage 1 624 600 - 358 379 -------
Stage 2 354 366 - 618 585 -------
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 135 156 705 139 158 376 1202 - - 787 - -
Mov Capacity-2 Maneuver 135 156 - 139 158 -------
Stage 1 614 570 - 354 375 -------
Stage 2 336 362 - 578 556 -------
Approach SE NW NE SW
HCM Control Delay, s 33.9 19.1 0.1 0.9
HCM LOS D C
Minor Lane / Major Mvmt NEL NET NER NWLn1 NWLn2 SELn1 SELn2 SWL SWT SWR
Capacity (veh/h) 1202 - - 139 308 135 212 787 - -
HCM Lane V/C Ratio 0.011 - - 0.017 0.053 0.279 0.161 0.045 - -
HCM Control Delay (s) 8.028 - - 31.3 17.3 41.7 25.2 9.789 - -
HCM Lane LOS A D C E D A
HCM 95th %tile Q(veh) 0.033 - - 0.052 0.169 1.067 0.561 0.141 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics Short Total AM
6: Centre & NRRC North/Perennial HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates st am 2010 analysis.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 10 10 10 16 12 12 16 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 75 0 75 0 0 0 0 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.860 0.988 0.979
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1652 1478 0 1652 1495 0 2006 1840 0 2006 1824 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1652 1478 0 1652 1495 0 2006 1840 0 2006 1824 0
Link Speed (mph) 25 25 35 35
Link Distance (ft) 315 317 771 2032
Travel Time (s) 8.6 8.6 15.0 39.6
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total PM
6: Centre & NRRC North/Perennial HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates st pm 2010 analysis.syn
Intersection
Intersection Delay, s/veh 9.4
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 72 0 11 66 0 69 10 612 2 3 569 63
Conflicting Peds, #/hr 001100000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 75 - - 75 - - 0 - - 0 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 92
Heavy Vehicles, % 222222222222
Mvmt Flow 85 0 13 78 0 81 12 720 2 4 669 68
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1498 1459 705 1464 1492 722 739 0 0 723 0 0
Stage 1 712 712 - 746 746 -------
Stage 2 786 747 - 718 746 -------
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 101 129 436 106 123 427 867 - - 879 - -
Stage 1 423 436 - 405 421 -------
Stage 2 385 420 - 420 421 -------
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver # 81 126 436 101 121 427 867 - - 879 - -
Mov Capacity-2 Maneuver # 81 126 - 101 121 -------
Stage 1 417 434 - 399 415 -------
Stage 2 307 414 - 406 419 -------
Approach SE NW NE SW
HCM Control Delay, s 92 45.1 0.1 0
HCM LOS F E
Minor Lane / Major Mvmt NEL NET NER NWLn1 NWLn2 SELn1 SELn2 SWL SWT SWR
Capacity (veh/h) 867 - - 101 240 81 109 879 - -
HCM Lane V/C Ratio 0.014 - - 0.513 0.446 0.697 0.378 0.004 - -
HCM Control Delay (s) 9.209 - - 73.3 31.5 117.6 56.8 9.112 - -
HCM Lane LOS A F D F F A
HCM 95th %tile Q(veh) 0.041 - - 2.297 2.14 3.317 1.541 0.012 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics Short Total PM
6: Centre & NRRC North/Perennial HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates st pm 2010 analysis.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 10 10 10 16 12 12 16 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 75 0 75 0 0 0 0 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.850 0.986
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1652 1478 0 1652 1478 0 2006 1863 0 2006 1837 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1652 1478 0 1652 1478 0 2006 1863 0 2006 1837 0
Link Speed (mph) 25 25 35 35
Link Distance (ft) 315 317 771 2032
Travel Time (s) 8.6 8.6 15.0 39.6
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total AM
8: Centre & NRRC South/Rolland Moore HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates st am 2010 analysis.syn
Intersection
Intersection Delay, s/veh 3.5
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 32 0 23 8 0 45 9 654 115 97 174 5
Conflicting Peds, #/hr 402000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 0 - - 0 - - 0 - - 0 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 222222222222
Mvmt Flow 38 0 27 9 0 53 11 769 135 114 205 6
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1325 1366 212 1311 1301 837 215 0 0 905 0 0
Stage 1 440 440 - 858 858 -------
Stage 2 885 926 - 453 443 -------
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 133 147 828 136 161 367 1355 - - 752 - -
Stage 1 596 578 - 352 374 -------
Stage 2 340 347 - 586 576 -------
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 100 123 826 116 135 367 1355 - - 752 - -
Mov Capacity-2 Maneuver 100 123 - 116 135 -------
Stage 1 590 489 - 349 371 -------
Stage 2 289 344 - 481 487 -------
Approach SE NW NE SW
HCM Control Delay, s 34 20.3 0.1 3.7
HCM LOS D C
Minor Lane / Major Mvmt NEL NET NER NWLn1 NWLn2 SELn1 SELn2 SWL SWT SWR
Capacity (veh/h) 1355 - - 116 327 100 250 752 - -
HCM Lane V/C Ratio 0.008 - - 0.054 0.171 0.251 0.158 0.152 - -
HCM Control Delay (s) 7.678 - - 37.8 18.3 52.7 22.1 10.642 - -
HCM Lane LOS A E C F C B
HCM 95th %tile Q(veh) 0.024 - - 0.169 0.61 0.916 0.553 0.533 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics Short Total AM
8: Centre & NRRC South/Rolland Moore HCM2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates st am 2010 analysis.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 10 10 10 16 12 12 16 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 75 0 75 0 0 0 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.850 0.978 0.996
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1652 1478 0 1652 1478 0 2006 1822 0 2006 1855 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1652 1478 0 1652 1478 0 2006 1822 0 2006 1855 0
Link Speed (mph) 25 25 35 35
Link Distance (ft) 302 263 348 771
Travel Time (s) 8.2 7.2 6.8 15.0
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total PM
8: Centre & NRRC South/Rolland Moore HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates st pm 2010 analysis.syn
Intersection
Intersection Delay, s/veh 10.5
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 28 1 38 79 3 95 45 496 28 24 591 30
Conflicting Peds, #/hr 000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 0 - - 0 - - 0 - - 0 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 222222222222
Mvmt Flow 33 1 45 93 4 112 53 584 33 28 695 35
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1533 1491 713 1498 1493 600 731 0 0 616 0 0
Stage 1 769 769 - 706 706 -------
Stage 2 764 722 - 792 787 -------
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 95 124 432 101 123 501 873 - - 964 - -
Stage 1 394 411 - 427 439 -------
Stage 2 396 431 - 382 403 -------
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 67 113 432 # 84 112 501 873 - - 964 - -
Mov Capacity-2 Maneuver 67 113 - # 84 112 -------
Stage 1 370 399 - 401 412 -------
Stage 2 287 405 - 332 391 -------
Approach SE NW NE SW
HCM Control Delay, s 44.2 66.2 0.7 0.3
HCM LOS E F
Minor Lane / Major Mvmt NEL NET NER NWLn1 NWLn2 SELn1 SELn2 SWL SWT SWR
Capacity (veh/h) 873 - - 84 235 67 205 964 - -
HCM Lane V/C Ratio 0.061 - - 0.738 0.622 0.328 0.277 0.029 - -
HCM Control Delay (s) 9.39 - - 121.9 42.6 83 29.2 8.847 - -
HCM Lane LOS A F E F D A
HCM 95th %tile Q(veh) 0.193 - - 3.636 3.707 1.205 1.088 0.09 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
Lanes and Geometrics Short Total PM
8: Centre & NRRC South/Rolland Moore HCM 2010 analysis
Sunshine House Daycare 11/11/2013 Synchro 8 Light Report
Delich Associates st pm 2010 analysis.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 10 10 10 16 12 12 16 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 75 0 30 0 0 0 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.853 0.855 0.992 0.993
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1652 1483 0 1652 1486 0 2006 1848 0 2006 1850 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1652 1483 0 1652 1486 0 2006 1848 0 2006 1850 0
Link Speed (mph) 25 25 35 35
Link Distance (ft) 302 263 348 771
Travel Time (s) 8.2 7.2 6.8 15.0
Intersection Summary
Area Type: Other
APPENDIX F
Centre
Prospect
Rolland
Moore
NRRC North
NRRC South
Spring Creek Trail
Mason Trail
SCALE: 1"=600'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
Sunshine House Daycare TIS, October 2013
Pedestrian LOS Worksheet
Project Location Classification: Other
Level of Service (minimum based on project location classification)
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Minimum C C C C C
1 Actual A A A B A
NRRC Campus Commercial
Proposed A A A B A
Minimum C C C C C
2 Actual A A A B A
The Grove Residential
Proposed A A A B A
Minimum C C C C C
3 Actual B B A B B
Neighborhood to the
northwest Residential
Proposed B B A B B
Minimum C C C C C
4 Actual D C A C B
Neighborhood to the
north Residential
Proposed D C A C B
Minimum C C C C C
5 Actual A A A A A
The Gardens at Spring
Creek Commercial
Proposed A A A A A
Minimum
6 Actual
Proposed
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed
Spring Creek Trail
Mason Trail
Centre
Prospect
Rolland
Moore
NRRC North
NRRC South
SCALE: 1"=600'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES
Sunshine House Daycare TIS, October 2013
Bicycle LOS Worksheet
Level of Service – Connectivity
Minimum Actual Proposed
Base Connectivity: C B B
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
1
Spring Creek Trail Recreation C A A
2
3
4