HomeMy WebLinkAboutMASON STREET SUSTAINABLE DEVELOPMENT - PDP - PDP130038 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT (3)1501 Academy Ct. Ste. 203 Fort Collins, Colorado 80524 (970) 530-4044
Preliminary Drainage Summary S
401 South Mason Street
FortCollins Fort Collins, , CO
Prepared for:
Coin Street Mason, LLC.
5425 Tradewind Drive
Windsor, CO 80528
October 9, 2013
Drainage Summary
401 South Mason Street
Fort Collins, CO
1 U13008-DrainageSummary-Preliminary.doc
October 9, 2013
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins, Colorado 80521
RE: 401 South Mason Street
Fort Collins, Colorado
Project Number: U13008
Dear Staff:
United Civil Design Group, LLC. is pleased to submit this Preliminary Drainage Summary for the
401 South Mason Street site in Fort Collins, Colorado. In general, this summary serves to
document the stormwater impacts associated with the proposed 401 South Mason Street
project.
Site Location and Project Description
The development site (referred herein as ”the site”) is located at 401 South Mason Street in
the City of Fort Collins, Colorado. The site consists of approximately 2,830 square-feet (sf) and
is bounded by Magnolia Street on the north, Mason Street on the East, an existing restaurant
on the south, and a residential property to the west. See the attached Drainage Exhibit for
additional information.
The planned development for the site will consist of the following:
• The removal of the existing one-story building and parking areas on the site.
• The construction of multi-story, mixed-use building with a proposed footprint of
approximately 2,830 sf.
• The construction of utilities to support the proposed building including sanitary, water
and storm drainage.
• The construction of right-of-way improvements including public sidewalk, drive
approach and landscaping.
Existing Conditions
Hydrology
The site (Basin A1), which is located within the Old Town Basin, currently consists of an
existing one-story building, parking area, and a small landscape area with an existing
percent-imperviousness of approximately 88%. Storm runoff from the site currently
drains towards Magnolia and Mason Streets where runoff is intercepted by existing
Drainage Summary
401 South Mason Street
Fort Collins, CO
2 U13008-DrainageSummary-Preliminary.doc
storm sewer inlets and piping located within Mason Street. Refer to Appendix A for
additional information.
Floodplain
The site is located within the City-regulatory Old Town Basin 100-year floodway, flood
fringe, and moderate risk flood fringe. Refer to the attached Drainage Exhibit for
additional information.
Developed Conditions
Hydrology
The developed site of 2,830 sf will be entirely covered by the proposed building
footprint. The rooftop is currently being proposed to provide approximately 970 sf of
green roof which results in a proposed percent-imperviousness for the site (Basin A1) of
approximately 60%. Existing drainage patterns are being preserved with the proposed
development and water from the site will be directed from the rooftop to the existing
storm sewer system located with Mason Street. Refer to Appendix A for additional
information.
Floodplain
The site is located within the City-regulatory Old Town Basin 100-year floodway, flood
fringe, and moderate risk flood fringe. The following requirements shall be met
regarding the construction of the proposed mixed-use building:
• The development team is currently proposing to flood proof the proposed
building in lieu of raising the finished floor 18-inches above the Base Flood
Elevation (BFE). Refer to the architectural plans for additional information
regarding the building flood proof design. All flood proofing measures shall
adhere to Section 10-38 of the City Code and the requirements set forth within
the City’s “Floodproofing Guidelines”. A Flood Proofing Certificate will be
required prior to the issuance of a certificate of occupancy.
• All development within the city regulatory floodway must be preceded by an
approved floodplain use permit and $25 fee.
• All development within the city regulatory floodway must be preceded by an
approved no-rise certification followed by re-certification of no-rise in the as-
built condition.
Detention Requirements
Per communication with City personnel, the site has historically paid fees for 100%
imperviousness. As the existing site currently has an approximate imperviousness of
approximately 88%, City personnel have indicated that the development may request a
variance to the detention requirement for the site. This variance request is being
Drainage Summary
401 South Mason Street
Fort Collins, CO
3 U13008-DrainageSummary-Preliminary.doc
requested with this PDP Submittal and the site currently does not provide onsite
detention.
Water Quality Requirements
The site is located within the Udall Natural Area which provides water quality for the
site; and therefore, additional water quality is not required. However, the development
is currently proposing to provide approximately 970 sf of green roof which will provide
additional water quality for the site.
Low Impact Development (LID) Requirements
The developed site (Basin A1) of 2,830 sf will be entirely covered by the proposed
building footprint. Therefore, with no paving being provided, the site is not providing
pervious paved areas. In order to meet LID requirements, the rooftop of the building is
being proposed with approximately 970 sf of green roof resulting in a lower percent-
imperviousness and less overall runoff from the site compared to existing conditions.
Details of the green roof will be provided with subsequent submittals; however, for this
submittal calculations have been provided for the green roof assuming characteristics
of a rain garden with an underdrain system. Refer to Appendix B for rain garden
calculations.
Conclusions
In conclusion, the drainage system proposed within this drainage summary provides adequate
conveyance of the developed stormwater runoff from the proposed development to existing
discharge locations and drainage systems. It should also be noted that with this summary and
the corresponding design, every attempt has been made to minimize any negative impacts on
the downstream receiving waters. With the incorporation of the green roof, the site will
discharge a lower sediment load and less runoff than existing conditions.
We understand that review by the City of Fort Collins is to assure general compliance with
standardized criteria contained in the Fort Collins Stormwater Criteria Manual (FCSCM). This
letter was prepared in compliance with technical criteria set forth in both the Urban Drainage
and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual and the FCSCM.
If you should have any questions or comments as you review this drainage summary, please
feel free to contact us at your convenience.
Sincerely,
United Civil Design Group, LLC
Kevin Brazelton, PE
Engineering Manager
APPENDIX A
Hydrology Calculations
401 South Mason Street
Loveland, CO Runoff Summary
Area Q2
Q100
(acre) (cfs) (cfs)
A1 A1 0.06 60% 0.36 0.56 0.07 0.36
OS1 OS1 0.08 85% 0.63 0.75 0.15 0.61
OS2 OS2 0.10 93% 0.75 0.85 0.21 0.82
Onsite Total 0.24 81% 0.58 0.71 0.42 1.80
A1 A1 0.06 0.88 0.68 0.79 0.13 0.51
OS1 OS1 0.08 77% 0.53 0.67 0.12 0.55
OS2 OS2 0.10 83% 0.61 0.73 0.17 0.71
Onsite Total 0.24 82% 0.60 0.72 0.42 1.77
Proposed Onsite Basins
Existing Onsite Basins
C100
C2
Basin %I
Design
Point
Calculations by: KRB
Date: 10/9/2013 D:\Dropbox\U13008-401 Mason\Drainage\Hydrology\U13008-Runoff.xlsx
401 South Mason Street
Fort Collins, CO Runoff Coefficients and % Impervious
Roof (1) Walks(1) Streets(1) Landscape(1&3)
%I = 90% %I = 90% %I =100% %I=2%
acres sf sf sf sf sf C2 C100
Proposed Onsite Basins
A1 A1 0.065 2829 1859 0 0 970 60% 0.36 0.56
OS1 OS1 0.083 3596 0 760 2346 490 85% 0.63 0.75
OS2 OS2 0.097 4244 0 1042 2993 209 93% 0.75 0.85
Onsite Total 0.245 10669 1859 1802 5339 1669 81% 0.58 0.71
Existing Onsite Basins
A1 A1 0.065 2829 1847 0 832 150 88% 0.68 0.79
OS1 OS1 0.083 3596 0 442 2346 808 77% 0.53 0.67
OS2 OS2 0.097 4244 0 584 2993 667 83% 0.61 0.73
Onsite Total 0.245 10669 1847 1026 6171 1625 82% 0.60 0.72
Notes:
(1) Recommended % Imperviousness Values from USDCM Vol 1 - Ch 5 - Table RO-3. Increased Lawns from 0% to 2% Impervious.
(2) Runoff C is based on %I, UDFCD Eq RO-7 and correction factors in Table RO-4.
(3) The landscaped area of Basin A1 denotes the approximate area of green roof being proposed with this project.
Composite Runoff
Basin Coefficients (2)
Areas
Composite
Imperviousness
(%I)
Total Total
Design
Pt.
Calculations by: KRB
Date: 10/9/2013 D:\Dropbox\U13008-401 Mason\Drainage\Hydrology\U13008-Runoff.xlsx
401 South Mason Street
Fort Collins, CO Time of Concentration
Area Length Slope ti
(2)
Length Slope
Velocity
(3) t
t
(4) Check
tc?
Total
Length
tc
(5)
acres ft % min ft % fps min min
u =
urban
ft min min
Proposed Onsite Basins
A1 A1 2,829 Roof 0.73 55 2 3.9 10 2 20 2.8 0.1 4.0 u 65 10 5
OS1 OS1 3,596 Street 0.90 30 4 1.2 35 0.2 20 0.9 0.7 1.9 u 65 10 5
OS2 OS2 4,244 Street 0.90 27 5 1.1 43 0.2 20 0.9 0.8 1.9 u 70 10 5
Existing Onsite Basins
A1 A1 2,829 Roof 0.73 60 2 4.1 21 0.6 20 1.5 0.2 4.3 u 81 10 5
OS1 OS1 3,596 Street 0.90 30 4 1.2 35 0.2 20 0.9 0.7 1.9 u 65 10 5
OS2 OS2 4,244 Street 0.90 27 5 1.1 43 0.2 20 0.9 0.8 1.9 u 70 10 5
Notes:
(1)
C5
based initial ground type and Table RO-5
(4)
tt
=L/(V*60 sec/min)
(2)
ti
= [1.8(1.1-C5
)L
1/2
]/S
1/3
, S= slope in %, L=length of overland flow (400' max)
(5)
tc
check (for urban or developed areas only) = total length/180 + 10
(3)
V=Cv
S
0.5
, S=watercourse slope in ft/ft, UDFCD Equation RO-4
(6)
min tc
= 5 min
Final
tc
(6)
tc Check for Urbanized
Basin
Initial Overland Flow Time (ti) Travel/Channelized Time of Flow (tt)
Design
Pt.
401 South Mason Street
Fort Collins, CO Rational Method Peak Runoff
Final
tc
(6) I2 I100 Q2 Q100
sf min in/hr in/hr cfs cfs
Proposed Onsite Basins
A1 2,829 5 0.36 0.56 2.85 9.95 0.068 0.364
OS1 3,596 5 0.63 0.75 2.85 9.95 0.147 0.613
OS2 4,244 5 0.75 0.85 2.85 9.95 0.209 0.820
Onsite Total 10,669 0.424 1.796
Existing Onsite Basins
A1 A1 2,829 5 0.68 0.79 2.85 9.95 0.126 0.510
OS1 OS1 3,596 5 0.53 0.67 2.85 9.95 0.124 0.552
OS2 OS2 4,244 5 0.61 0.73 2.85 9.95 0.169 0.710
Onsite Total 10,669 0.419 1.771
Design
Pt.
Peak Discharge
Area
Basin Runoff Coefficients Rainfall Intensity
C2 C100
Calculations by: KRB
Date: 10/9/2013 D:\Dropbox\U13008-401 Mason\Drainage\Hydrology\U13008-Runoff.xlsx
APPENDIX B
LID Water Quality Calculations
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia = 60.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.600
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.19 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 2,829 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.60 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 62 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum) DWQCV = 0.25 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 0.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin = 41 sq ft
D) Actual Flat Surface Area AActual = 970 sq ft
E) Area at Design Depth (Top Surface Area) ATop = 970 sq ft
F) Rain Garden Total Volume VT= 20 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y = 2.50 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 = 62 cu ft
iii) Orifice Diameter, 3/8" Minimum DO = 0.17 in MINIMUM DIAMETER = 3/8"
Design Procedure Form: Rain Garden (RG)
KRB
United Civil Design Group, LLC.
October 9, 2013
401 South Mason Street
Basin A1
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
UD-BMP_v3.02_RG-Basin 1.xls, RG 10/9/2013, 9:16 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
NO SPRINKLER HEADS ON THE FLAT SURFACE
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
KRB
United Civil Design Group, LLC.
October 9, 2013
401 South Mason Street
Basin A1
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
UD-BMP_v3.02_RG-Basin 1.xls, RG 10/9/2013, 9:16 AM
APPENDIX C
Drainage Exhibits
X X
X
X X
LOT 7
LOT 8
CITY HIGH RISK FLOODWAY
CITY HIGH RISK FLOODWAY
CITY HIGH RISK 100-YEAR
FLOODPLAIN
EXISTING LOT LINE
EXISTING INLET
EXISTING INLET
100-YEAR FLOOD ELEVATION-4994 (FTC NVDG-29)
FLOODPLAIN CROSS SECTION #2446
FLOODPLAIN CROSS SECTION #2510
100-YEAR FLOOD ELEVATION-4993 (FTC NVDG-29)
A1
OS1
OS2
PREPARED FOR: DATE SUBMITTED:
The engineer preparing these plans will not be responsible for, or
liable for, unauthorized changes to or uses of these plans. All
changes to the plans must be in writing and must be approved by
the preparer of these plans.
CAUTION
COIN STREET MASON, LLC. 10/9/2013
401 SOUTH MASON STREET
7
U13008
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
Civil Engineering & Consulting
1501 Academy Court, Suite 203
Fort Collins, CO 80524
(970) 300-2508
www.unitedcivil.com
NONE KEVIN
D:\DROPBOX\U13008-401 MASON\CADD\ET
HISTORIC DRAINAGE EXHIBIT.DWG
10/9/2013 8:45:01 AM
SME
HISTORIC DRAINAGE EXHIBIT
DR-1
N/A
10'
1
LEGEND
NOTES
1. PORTIONS OF THIS PROJECT ARE LOCATED WITHIN A CITY-REGULATED FLOODWAY AND FLOOD FRINGE OF THE OLD
TOWN BASIN AND IS SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE CITY CODE.
EXISTING CURB & GUTTER
EXISTING CONCRETE
EXISTING BUILDING
EXISTING PROPERTY LINE
EXISTING LOT LINE
EXISTING FENCE
EXISTING GRAVEL
EXISTING PAVEMENT STRIPING
EXISTING WATER
X X
X
X X
LOT 7
LOT 8
CITY HIGH RISK FLOODWAY
CITY HIGH RISK FLOODWAY
CITY HIGH RISK 100-YEAR
FLOODPLAIN
EXISTING LOT LINE
EXISTING INLET
EXISTING INLET
100-YEAR FLOOD ELEVATION-4994 (FTC NVDG-29)
FLOODPLAIN CROSS SECTION #2446
FLOODPLAIN CROSS SECTION #2510
100-YEAR FLOOD ELEVATION-4993 (FTC NVDG-29)
FFE=92.60
A1
OS1
OS2
PREPARED FOR: DATE SUBMITTED:
The engineer preparing these plans will not be responsible for, or
liable for, unauthorized changes to or uses of these plans. All
changes to the plans must be in writing and must be approved by
the preparer of these plans.
CAUTION
COIN STREET MASON, LLC. 10/9/2013
401 SOUTH MASON STREET
7
U13008
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
Civil Engineering & Consulting
1501 Academy Court, Suite 203
Fort Collins, CO 80524
(970) 300-2508
www.unitedcivil.com
NONE KEVIN
D:\DROPBOX\U13008-401 MASON\CADD\CP
C5.00_DRAINAGE.DWG
10/8/2013 4:39:34 PM
SME
DRAINAGE EXHIBIT
C5.00
N/A
10'
0 10' 20'
SCALE: 1" = 10'
5'
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
LEGEND
NOTES
1. PORTIONS OF THIS PROJECT ARE LOCATED WITHIN A CITY-REGULATED FLOODWAY AND FLOOD FRINGE OF THE OLD
TOWN BASIN AND IS SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE CITY CODE.
2. THE FIRST FLOOR OF THE PROPOSED MIXED-USE BUILDING IS BEING FLOOD PROOFED. REFER TO ARCHITECTURAL
PLANS FOR FLOOD PROOFING DETAILS AND SPECIFICATIONS. ALL FLOOD PROOFING MEASURES SHALL ADHERE TO
SECTION 10-38 OF CITY CODE AND THE REQUIREMENTS SET FORTH WITHIN THE CITY'S "FLOODPROOFING GUIDELINES". A
FLOOD PROOFING CERTIFICATE WILL BE REQUIRED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
3. ALL DEVELOPMENT WITHIN THE CITY REGULATORY FLOODWAY MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE
PERMIT AND $25 FEE.
4. ALL DEVELOPMENT WITHIN THE CITY REGULATORY FLOODWAY MUST BE PRECEDED BY AN APPROVED NO-RISE
CERTIFICATION FOLLOWED BY RE-CERTIFICATIONOF NO-RISE IN THE AS-BUILT CONDITION.
5. ALL SPOT ELEVATIONS AND BASE FLOOD ELEVATIONS AS SHOWN ON THIS DRAWING ARE PER CITY OF FORT COLLINS
VERTICAL CONTROL DATUM (NVDG 29 - UNADJUSTED).
6. NO STORAGE OF MATERIAL OR EQUIPMENT MAY OCCUR AT ANY TIME IN THE FLOODWAY BEFORE, DURING OR AFTER
CONSTRUCTION.
LIMITS OF DISTURBANCE
EXISTING CURB & GUTTER
EXISTING CONCRETE
EXISTING BUILDING
EXISTING PROPERTY LINE
EXISTING LOT LINE
EXISTING FENCE
EXISTING GRAVEL
EXISTING PAVEMENT STRIPING
EXISTING WATER
EXISTING SANITARY
EXISTING OVERHEAD ELECTRIC
EXISTING CABLE TV
EXISTING ELECTRIC
EXISTING STORM SEWER
EXISTING GAS
BASIN DESIGNATION
BASIN AREA (ACRE)
2 - YR RUNOFF COEFF.
100 - YR RUNOFF COEFF.
BASIN BOUNDARY
DESIGN POINT
FLOW DIRECTION
EXISTING CONTOUR
PROPOSED CONTOUR
CITY HIGH RISK FLOODWAY
CITY HIGH RISK 100-YEAR
FLOODPLAIN
RUNOFF SUMMARY
Basin
Design
Point
Area
%I C2 C100
Q2 Q100
(acre) (cfs) (cfs)
A1 A1 0.06 60% 0.36 0.56 0.07 0.36
OS1 OS1 0.08 85% 0.63 0.75 0.15 0.61
OS2 OS2 0.10 93% 0.75 0.85 0.21 0.82
Onsite
Total
0.24 81% 0.58 0.71 0.42 1.80
A1 A1 0.06 0.88 0.68 0.79 0.13 0.51
OS1 OS1 0.08 77% 0.53 0.67 0.12 0.55
OS2 OS2 0.10 83% 0.61 0.73 0.17 0.71
Onsite
Total
0.24 82% 0.60 0.72 0.42 1.77
EXISTING SANITARY
EXISTING OVERHEAD ELECTRIC
EXISTING CABLE TV
EXISTING ELECTRIC
EXISTING STORM SEWER
EXISTING GAS
BASIN DESIGNATION
BASIN AREA (ACRE)
2 - YR RUNOFF COEFF.
100 - YR RUNOFF COEFF.
BASIN BOUNDARY
DESIGN POINT
FLOW DIRECTION
EXISTING CONTOUR
CITY HIGH RISK FLOODWAY
CITY HIGH RISK 100-YEAR
FLOODPLAIN
0 10' 20'
SCALE: 1" = 10'
5'
RUNOFF SUMMARY
Basin
Design
Point
Area
%I C2 C100
Q2 Q100
(acre) (cfs) (cfs)
A1 A1 0.06 60% 0.36 0.56 0.07 0.36
OS1 OS1 0.08 85% 0.63 0.75 0.15 0.61
OS2 OS2 0.10 93% 0.75 0.85 0.21 0.82
Onsite
Total
0.24 81% 0.58 0.71 0.42 1.80
A1 A1 0.06 0.88 0.68 0.79 0.13 0.51
OS1 OS1 0.08 77% 0.53 0.67 0.12 0.55
OS2 OS2 0.10 83% 0.61 0.73 0.17 0.71
Onsite
Total
0.24 82% 0.60 0.72 0.42 1.77
Initial
Ground
Type
C5
(1)
Cv
ti+tt
Calculations by: KRB
Date: 10/9/2013 D:\Dropbox\U13008-401 Mason\Drainage\Hydrology\U13008-Runoff.xlsx