Loading...
HomeMy WebLinkAboutFOOTHILLS MALL REDEVELOPMENT, PHASE ONE - MAJOR AMENDMENT/FDP - FDP130040 - SUBMITTAL DOCUMENTS - ROUND 4 - UTILITY PLANS (5)PROJECT NOTES 1730 Appleton, WI Orange County, CA Pittsburgh, PA 16745 W. Bluemound Road, Brookfield, WI 53005-5938 262-781-1000 Fax 262-781-8466, www.rasmithnational.com R.A. Smith National Beyond Surveying and Engineering FOOTHILLS REDEVELOPMENT LOCATED IN THE SOUTHWEST QUARTER OF SECTION 25, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO FINAL PLANS PLANNING AREA 1 C003 ¶ ³ ´ ± ¶ ¶ ¶ : ¶ CITY OF FORT COLLINS GENERAL PROJECT NOTES CITY OF FORT COLLINS GENERAL PROJECT NOTES (CONT.) ³ ´ CITY OF FORT COLLINS GENERAL PROJECT NOTES (CONT.) CITY OF FORT COLLINS GENERAL UTILITY NOTES (CONT.) City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED: City Engineer Date CHECKED BY: Water & Wastewater Utility Date CHECKED BY: Stormwater Utility Date CHECKED BY: Parks & Recreation Date Traffic Engineer Date CHECKED BY: Environmental Planner Date CHECKED BY: Date CHECKED BY: P:\3120115\Dwg\PA-1\TS001D01.dwg, Cover Sheet-3, 11/25/2013 8:19:01 AM, ncp