HomeMy WebLinkAboutTHE LEARNING EXPERIENCE @ MIRAMONT OFFICE PARK - PDP - PDP130023 - PLANS - LANDSCAPE PLAN9+87
10+00
T
W
6 CS
2 PC
6 CI
3 GD
4 CS
7 CI
12 HES
2 CS
1 PC
11 CAB
5 VD
1 GT
14 HES
7" OHIO BUCKEY TO
BE REMOVED
7" BLUE SPRUCE TO
BE REMOVED
6.5" BLUE SPRUCE TO
BE REMOVED
MULCH
EXISTING TURF
TO REMAIN (TYP)
EXISTIING TREE
TO REMAIN (TYP)
STEEL EDGING
13 PB
3 AT 38 HES
28 CS
12 PA
23 CAB
2 AA
8 RA
2 PN
9 CI
12 CAB 1 AA
IRRIGATED NATIVE
GRASS
1 GT
9 HES
9 CS
12 CAO
8 CS
SHEET
DRAWN
CHECKED
APPROVED
PROJECT NO.
HORZ. SCALE
VERT. SCALE
DATE NO. NOTES
1" = 20'-0"
0 10 20 40
Scale: L1.0
LANDSCAPE PLAN, NOTES,LEGEND
THE LEARNING EXPERIENCE
MIRAMONT OFFICE PARK
SHEET
DRAWN
CHECKED
APPROVED
PROJECT NO.
HORZ. SCALE
VERT. SCALE
DATE NO. NOTES
DECIDUOUS TREE PLANTING & STAKING
SCALE: 1/4"=1'-0"
2 X ROOT BALL
WIDTH, MIN.
1'-0"
MIN.
STAKE TREES ON OPPOSITE SIDES AS SHOWN,
PROVIDE TWO STAKES @ 180 DEGREES FOR
ALL TREES
PRUNE ALL DAMAGED WOOD PRIOR TO DELIVERY
TO SITE, MULTIPLE OR "V"-SHAPED LEADERS
NEED APPROVAL PRIOR TO PURCHASE
DARK GREEN FABRIC STRAPS WITH BRASS
GROMMETS, MIN. 12" LONG
DOUBLE STRAND 12 GAUGE GALV. STEEL WIRE,
TWIST TAUT
WHITE 3/4" PVC PIPE ALL SIDES
PROVIDE 3" HIGH SAUCER IN TURF AND 6" HIGH
SAUCER IN PLANTING BED WITH MULCH, SEE
SPECS.
REMOVE ALL CORD, TOP 1/3RD BURLAP AND TOP
BASKET
STEEL "T"-POSTS, MIN. 6' LONG DRIVEN MIN. 18"
DEEP
PLANT 2-3" ABOVE EXISTING GRADE
SCARIFY SIDES OF HOLE PRIOR TO
BACK FILLING.
BACK FILL MIX.:
75% NATIVE SOIL EXCAVATED FROM PIT
25% ORGANIC COMPOST
NOTE: IF HOLE IS TOO DEEP, ANY SOIL ADDED
TO RAISE THE ROOT BALL SHOULD BE COMPACTED.
UNDISTURBED SOIL.
PROVIDE TREE WRAP TO SECOND BRANCH
(KRAFT OR EQUAL) WITH DUCT TAPE ANCHORS @
TOP, BOTTOM AND 2' INTERVALS AFTER SEPT.
15TH
TYPICAL SHRUB PLANTING
SCALE: 1/2"=1'-0"
2 X ROOT BALL
WIDTH, MIN.
REMOVE PLANT FROM CONTAINER OR W/ B&B
MATERIAL, REMOVE WIRE BASKET FROM ROOT BALL
AND PEEL BACK BURLAP AFTER 2/3 BURIED IN PIT.
PLANT CROWN AT 2" ABOVE FINISHED GRADE.
MULCH, SEE SPECS.
EASE BACK SLOPE ON UPHILL SIDE, WHERE
APPLICABLE.
3" HIGH WATER RETENTION BERM EXCEPT IN
DRIP IRRIGATED AREAS, REMOVE AT END OF
MAINTENANCE PERIOD.
SCARIFY SIDES OF HOLE PRIOR TO PLANTING.
BACK FILL MIX:
75% NATIVE SOIL EXCAVATED FROM PIT
25% ORGANIC COMPOST
FOOT-TAMPED COMPACTED BACK FILL UNDER
ROOT BALL TO ELIMINATE SETTLING.
UNDISTURBED SUBSOIL.
TYPICAL PERENNIAL PLANTING DETAIL
SCALE: 1/2"=1'-0"
PLANT LAYOUT EITHER GRID OR
TRIANGLE WITH PRIOR APPROVAL
BY OWNER'S REPRESENTATIVE
PLANT 1" ABOVE EXISTING GRADES
BY MOUNDING SOIL UNDER MULCH
MULCH, SEE SPECS.
DO NOT COVER PLANT BASES,
LEAVE PLANT TISSUES EXPOSED
PREPARE BACKFILL FOR TOP 6"
MINIMUM, SEE SPECS.
UNDISTURBED SOIL
EQ. EQ.
STEEL EDGING
SCALE: 1"=1'-0"
MULCH TYPE AND
DEPTH VARIES
SEE PLANS AND SPECS.
FINISHED GRADE FOR SOD TO BE 1/2" BELOW
TOP OF EDGING.
TAMPER MULCH AT EDGING SO THAT IT DOES
NOT SPILL INTO TURF.
NOTES:
1.
2.
1/8" X 6" STEEL EDGING
COLOR: BLACK
EDGING STAKES
INSTALL PER MANUFACTURER'S
RECOMMENDATIONS
SOIL SEPARATING FABRIC
SEE SPECS.
SEE LANDSCAPE PLAN
NOTES:
Fencing Height must be at least 48" high.
Attach "Tree Protection Area" Signs to
Fencing every 50 feet.
The Tree Protection Area shall NOT be
modified or removed prior to consent of the
City Forester.
Materials, debris, equipment, and site
amenities shall NOT be stored within the Tree
Protection Area.
Entrance to the Tree Protection Area is NOT
permitted without consent of the owner's
representative.
ZONE 2
LOWER CANOPY PROTECTION.
TREE PROTECTION AREA
The area inside a perimeter established at the Critical
Root Zone (CRZ). The (CRZ) is equal to the dripline
(furthest extent of the tree canopy) or is equal to one
foot radially from the tree for every one inch of trunk
diameter at breast height (DBH), which is ever greater.
48"
min.
VARIES PER TREE SIZE
EXTENDS FROM DRIPLINE TO DRIPLINE
ZONE 3
TREE PROTECTION DETAIL
SCALE: NTS
Contact the City Forester if any pruning is needed
prior to work if potential for damage exist.
TRUNK PROTECTION
Required if construction equipment involved within ten
feet or less (permitted inside the CRZ only if
equipment is operated exclusively on existing
hardscape and no soil compaction takes place).
ZONE 1
ROOT PROTECTION
Any digging, excavating, trenching, changing of grade,
or other actions that may potentially impact the rooting
environment must be authorized by the City Forester
prior to work commencement. Work within the CRZ
must take place in accordance with the conditions
established by the City Forester.
1.
2.
3.
4.
5.
L1.1
LANDSCAPE DETAILS
THE LEARNING EXPERIENCE
MIRAMONT OFFICE PARK
CPC
RMC
MDC
12026
07.12.2013 1 FIRST SUBMITTAL
10.04.2013 2 SECOND SUBMITTAL
CPC
RMC
MDC
12026
07.12.2013 1 1ST SUBMITTAL
10.04.2013 2 2ND SUBMITTAL