October 30, 2013
Bj Deforge
Hauser Architechts, PC
3780 E. 15th St. Ste. 201
Loveland, CO 80538
Comment Summary:
Department: Current Planning
Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com
Topic: Site Plan
10/07/2013: The site plan will need a signature block. I e-mailed you the signature block template on
Monday, October 7th to include in the pre-mylar check set.
Comment Number: 1 Comment Originated: 10/07/2013
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com
Topic: General
10/18/2013: Please provide the legal exhibit and description for the 1' of right of way dedication.
Please complete the standard deed of dedication to dedicate to the City.
Comment Number: 1 Comment Originated: 10/18/2013
10/18/2013: Add the city of fort collins street cut note to the demolition and grading plan. Although no
utility cuts are proposed there might be some curb and gutter work for the driveway and concrete
chase that could require a little roadway patching.
Comment Number: 2 Comment Originated: 10/18/2013
10/18/2013: Please show the proposed signs on the Civil Grading Drawing. It appears the swale to
the concrete sidewalk chase may conflict with the proposed sign.
Comment Number: 3 Comment Originated: 10/18/2013
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of
the above referenced project. If you have questions about any comments, you may contact the individual
commenter or direct your questions through the Project Planner, Courtney Levingston, at 970-416-2283 or
clevingston@fcgov.com.
RE: Fort Collins Veterinary Emergency & Rehabilitation Hospital, FDP130038, Round Number 1
Page 1 of 2
Topic: General
10/29/2013: Coordinate installation of new 3-phase service and removal of existing 1-phase service
with Light & Power @ 970-221-6700.
Comment Number: 1 Comment Originated: 10/29/2013
10/29/2013: When the project is approved please send an Autocad copy of the approved Site Plan to
TCOX@fcgov.com.
Comment Number: 2 Comment Originated: 10/29/2013
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
10/07/2013: After talking with Patricia about the plans, a sequence chart will be applied to these
Erosion Control Plans and future plans to help facilitate contractors' understanding of the 'sequencing'
and to meet the City's 'sequencing requirements' for future submittles. If you need clarification
concerning this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @
jschlam@fcgov.com
Comment Number: 1 Comment Originated: 10/07/2013
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
10/29/2013: Please provide a design and cross-section for the water quality swale.
Comment Number: 2 Comment Originated: 10/29/2013
10/29/2013: Please label the radius of the channel at Lemay Avenue as 1 foot. See redlines.
Comment Number: 3 Comment Originated: 10/29/2013
10/29/2013: It looks like a conflict exists with the grass-lines swale and the landscape plan which
shows a sign. Coordination needs to take place to ensure the function of the swale.
Comment Number: 4 Comment Originated: 10/29/2013
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
10/28/2013: There are still line over text issues on sheet 4. See redlines.
Comment Number: 2 Comment Originated: 10/28/2013
Topic: General
10/28/2013: ROW DEDICATION: Please correct the symbols in the bearings shown in the legal
description. See redlines.
Comment Number: 3 Comment Originated: 10/28/2013