Loading...
HomeMy WebLinkAboutFORT COLLINS VETERINARY EMERGENCY & REHABILITATION HOSPITAL - FDP - FDP130038 - CORRESPONDENCE -Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview October 30, 2013 Bj Deforge Hauser Architechts, PC 3780 E. 15th St. Ste. 201 Loveland, CO 80538 Comment Summary: Department: Current Planning Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com Topic: Site Plan 10/07/2013: The site plan will need a signature block. I e-mailed you the signature block template on Monday, October 7th to include in the pre-mylar check set. Comment Number: 1 Comment Originated: 10/07/2013 Department: Engineering Development Review Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com Topic: General 10/18/2013: Please provide the legal exhibit and description for the 1' of right of way dedication. Please complete the standard deed of dedication to dedicate to the City. Comment Number: 1 Comment Originated: 10/18/2013 10/18/2013: Add the city of fort collins street cut note to the demolition and grading plan. Although no utility cuts are proposed there might be some curb and gutter work for the driveway and concrete chase that could require a little roadway patching. Comment Number: 2 Comment Originated: 10/18/2013 10/18/2013: Please show the proposed signs on the Civil Grading Drawing. It appears the swale to the concrete sidewalk chase may conflict with the proposed sign. Comment Number: 3 Comment Originated: 10/18/2013 Department: Light And Power Contact: Rob Irish, 970-224-6167, rirish@fcgov.com Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Courtney Levingston, at 970-416-2283 or clevingston@fcgov.com. RE: Fort Collins Veterinary Emergency & Rehabilitation Hospital, FDP130038, Round Number 1 Page 1 of 2 Topic: General 10/29/2013: Coordinate installation of new 3-phase service and removal of existing 1-phase service with Light & Power @ 970-221-6700. Comment Number: 1 Comment Originated: 10/29/2013 10/29/2013: When the project is approved please send an Autocad copy of the approved Site Plan to TCOX@fcgov.com. Comment Number: 2 Comment Originated: 10/29/2013 Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control 10/07/2013: After talking with Patricia about the plans, a sequence chart will be applied to these Erosion Control Plans and future plans to help facilitate contractors' understanding of the 'sequencing' and to meet the City's 'sequencing requirements' for future submittles. If you need clarification concerning this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Comment Number: 1 Comment Originated: 10/07/2013 Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General 10/29/2013: Please provide a design and cross-section for the water quality swale. Comment Number: 2 Comment Originated: 10/29/2013 10/29/2013: Please label the radius of the channel at Lemay Avenue as 1 foot. See redlines. Comment Number: 3 Comment Originated: 10/29/2013 10/29/2013: It looks like a conflict exists with the grass-lines swale and the landscape plan which shows a sign. Coordination needs to take place to ensure the function of the swale. Comment Number: 4 Comment Originated: 10/29/2013 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Construction Drawings 10/28/2013: There are still line over text issues on sheet 4. See redlines. Comment Number: 2 Comment Originated: 10/28/2013 Topic: General 10/28/2013: ROW DEDICATION: Please correct the symbols in the bearings shown in the legal description. See redlines. Comment Number: 3 Comment Originated: 10/28/2013 Page 2 of 2