Loading...
HomeMy WebLinkAboutFOOTHILLS MALL REDEVELOPMENT, PHASE ONE - MAJOR AMENDMENT/FDP - FDP130040 - SUBMITTAL DOCUMENTS - ROUND 2 - ELEVATIONSFOOTHILLS REDEVELOPMENT LOCATED IN THE SOUTHWEST QUARTER OF SECTION 25, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO FINAL PLANS PLANNING AREA 1 NOVEMBER 6, 2013 Do not scale prints. Use figured dimensions. 2010 JPRA Architects Issued for: Subject: Project: Sheet No. Job No. FORT COLLINS, CO FOOTHILLS REDEVELOPMENT 3 A-300 2 A-300 1 A-300 4 A-300 GROUND MOUNTED SCISSOR LIFT ROOF DRAIN PIPE WITH ADJACENT OVERFLOW DRAIN PIPE ROOF DRAIN PIPE WITH ADJACENT OVERFLOW DRAIN PIPE METAL STUD WALL BEHIND SPANDREL GLAZED STOREFRONT GAS METER ELEC. PANEL SCREEN WALL PROPOSED TRANSFORMER LOACATION T BIKE RACKS METAL STUD WALL BEHIND SPANDREL GLAZED STOREFRONT GROSS AREA 10,501 SF 1 FLOOR 1/8" = 1'-0" PLAN A200 12048.01 ENLARGED SITE PLAN FOOTHILLS REDEVELOPMENT LOCATED IN THE SOUTHWEST QUARTER OF SECTION 25, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO FINAL PLANS PLANNING AREA 1 NOVEMBER 6, 2013 Do not scale prints. Use figured dimensions. 2010 JPRA Architects Issued for: Subject: Project: Sheet No. Job No. FORT COLLINS, CO FOOTHILLS REDEVELOPMENT FIRST LEVEL 100' - 0" UPPER PARAPET 123' - 0" 1 3 4 5 6 LOWER PARAPET 120' - 0" T.O. WINDOWS 110' - 0" E-14 E-14 E-8 M-1 E-8 ST-2 ST-2 ST-1 SF-2 SF-2 SF-1 SF-1 SF-1 SF-1 SF-1 AW-1 AW-2 M-2 AW-1 M-2 SIGNAGE 10' - 0" 4' - 0" 2 FIRST LEVEL 100' - 0" UPPER PARAPET 123' - 0" B C D F LOWER PARAPET 120' - 0" T.O. WINDOWS 110' - 0" E-14 M-1 E-8 ST-2 ST-2 E-14 E-8 E-1 B-1 M-2 M-2 3 FOOTHILLS REDEVELOPMENT LOCATED IN THE SOUTHWEST QUARTER OF SECTION 25, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO FINAL PLANS PLANNING AREA 1 NOVEMBER 6, 2013 Do not scale prints. Use figured dimensions. 2010 JPRA Architects Issued for: Subject: Project: Sheet No. Job No. FORT COLLINS, CO FOOTHILLS REDEVELOPMENT FIRST LEVEL 100' - 0" UPPER PARAPET 123' - 0" CONCRETE FOUNDATION WALL RE: STRUCTURAL 2" PERIMETER RIGID FOUNDATION INSULATION. EXTEND MIN. 2' BELOW FINISH GRADE. 1/2" CONT SEALANT INTERIOR CONCRETE SLAB OVER 4" GRANULAR FILL DAMP PROOFING. ST-2 PRECAST BASE EIFS OVER WEATHER BARRIER OVER SHEATHING OVER INSULATED METAL STUDS OVER GYP. BD. EIFS CORNICE MECHANICALLY FASTENED TPO INSULATION OVER METAL DECK METAL CAP FLASHING FIRST LEVEL 100' - 0" LOWER PARAPET 120' - 0" METAL CAP FLASHING CONCRETE FOUNDATION WALL RE: STRUCTURAL 2" PERIMETER RIGID FOUNDATION INSULATION. EXTEND MIN. 2' BELOW FINISH GRADE. 1/2" CONT SEALANT INTERIOR CONCRETE SLAB OVER 4" GRANULAR FILL DAMP PROOFING. ST-2 PRECAST BASE ST-1 STONE OVER WEATHER BARRIER OVER SHEATHING OVER INSULATED METAL STUDS OVER GYP. BD. EIFS CORNICE MECHANICALLY FASTENED TPO INSULATION OVER METAL DECK G THROUGH WALL B-1 BRICK ST-2 PRECAST COPING A400 1 WALL 3/4" = 1'-0" SECTION 2 WALL 3/4" = 1'-0" SECTION 5 SECTION 3/4" = 1'-0" 12048.01 WALL SECTIONS A400 ELEC. SERVICE AND GAS METER BEYOND. PAINT P-1. A E G FIRST LEVEL 100' - 0" UPPER PARAPET 123' - 0" 4 3 1 5 6 LOWER PARAPET 120' - 0" T.O. WINDOWS 110' - 0" E-14 E-14 E-8 E-8 M-1 ST-2 ST-2 ST-1 SF-1 SF-1 SF-1 SF-1 E-14 E-8 ST-2 P-1 B-1 AW-2 AW-1 M-2 M-2 M-2 SIGNAGE 10' - 0" 4' - 0" 2 A400 1 A400 ST-2 SF-1 SF-2 2 FIRST LEVEL 100' - 0" UPPER PARAPET 123' - 0" B C F D LOWER PARAPET 120' - 0" T.O. WINDOWS 110' - 0" E-14 E-8 E-14 M-1 E-8 ST-2 ST-2 ST-1 SF-1 SF-1 SF-1 SF-1 SF-1 SF-1 SF-1 AW-1 M-2 AW-2 M-2 SIGNAGE 4' - 0" 10' - 0" SF-2 G E A E-14 MATERIALS LEGEND E-1 ST-1 E-8 SF-1 P-1 EIFS TO MATCH B.M. GRAYSTONE 1475 EIFS TO MATCH B.M. ROCKPORT GRAY HC-105 ENVIRONMENTAL STONEWORKS - STRIPSTONE COLLECTION: BUFF EIFS CORNICE TO MATCH B.M. 1477 STOREFRONT - ALUMINUM WITH 1" CLEAR GLAZING MATTHEWS PAINT TO MATCH B.M. 1477 SF-2 STOREFRONT - ALUMINUM WITH 1" SPANDREL GLAZING M-1 PREFINISHED METAL CAP FLASHING TO MATCH B.M. ROCKPORT GRAY HC-105 B-1 INTERSTATE BRICK (THROUGH-WALL): PLATINUM AW-1 SUNBRELLA EXTERIOR FABRIC AWNING: SLATE M-2 PREFINISHED METAL CAP FLASHING TO MATCH B.M. 1477 ST-2 PRECAST STONE BASE TO MATCH ST-1 COLOR AW-2 SUNBRELLA EXTERIOR FABRIC AWNING: CHARCOAL GREY 7 A300 6 A300 3 A400 6' - 0" 0' - 4" 12' - 0" 3 A400 B-1 ST-2 P-1 B-1 ST-2 P-1 1 WEST 1/8" = 1'-0" ELEVATION 2 SOUTH 1/8" = 1'-0" ELEVATION 3 EAST 1/8" = 1'-0" ELEVATION 4 NORTH 1/8" = 1'-0" ELEVATION 5 TRASH 1/4" = 1'-0" ENCLOSURE 6 TRASH 1/4" = 1'-0" ENCLOSURE ELEV 7 TRASH 1/4" = 1'-0" DOOR ELEV A300 12048.01 ARCHITECTURAL ELEVATIONS